Katahira & Engineers International Package Chainage: CH 43+770 – 46+053 Comments By: Reply by KEI Sheet 1

Comments Management Sheet A Structures: Piers Foundation Layout & details Pier MG Through PK-A Consortium
P43 – P47

The Engineer’s original comments KEI’s reply to the original comment The Engineer’s follow-up comment KEI’s follow-up reply
No
Date: 14th August 2018 (4199) Date: 04th October 2018 Date: Date:

Endorsement in the drawings


Drawing NO-CEP 2/PK-A/43+770/VD/P (48)-P (53)/
GN/001/R00
1 Corrected
Foundation Notes

2 Main water way to be clearly shown.


Main waterway is clearly shown in GA drawing

End of comments
Katahira & Engineers International Package Chainage: CH 43+770 – 46+053 Comments By: Reply by KEI Sheet 2
Comments Management Sheet A Structures: Piers Foundation Layout & details Pier MG Through PK-A Consortium
P43 – P47

End of Comments