Katahira & Engineers International Package Chainage: CH 43+770 – 46+053 Comments By: Reply by KEI Sheet 1

Comments Management Sheet A Structures: Substructure P66 – P71 MG Through PK-A Consortium

The Engineer’s original comment KEI’s reply to the original comment The Engineer’s follow-up comment KEI’s follow-up reply
No
Date: 09th August 2018 (4173) Date: 17th September 2018 Date: Date:

Agreed.
1
Revised accordingly.

Details are given in GA drawings.


2
No revision is required.

Checked and there correct.


3
No revision is required.

Level change due to camber is adjusted by plinth height. No


4
revision is required.

Camber is considered for finding levels.


5
No revision is required.

Level change due to camber is adjusted by plinth height. No


6
revision is required.

Camber is considered for finding levels.


7
No revision is required.

Camber is considered for finding levels.


8
No revision is required.

End of Comments