You are on page 1of 1

Comment by:

Katahira & Engineers International Package Chainage: CH 37+710 ~ CH 37+800 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: P1 & P2 KEI Geotech 1
Consortium

Engineer’s original comment KEI's reply to the original comment Contractor's follow-up Comment KEI's follow-up reply
No
Date: July 11th 2018 Date: July 12th2018 Date: : Date:

1 Attached herewith

2 Checked- Revision is not required

P1-LHS Borehole (BH 37740L) shows completely different results compared


to the RHS Borehole and hence it is not advisable to optimize the pile design.
Optimize the pile design of P1L
But, the pile optimization could be considered according to the actual site
conditions. Therefore, it is recommended to start the pile construction at RHS
3
initially. Based on the boring records and samples of both RHS and LHS
piles, pile optimization can be considered.

It is also important to preserve the samples taken from RHS and LHS for
comparison.

End of Comment