You are on page 1of 1

Areas 

for Improvement needed  for RB Projects

APNGO PEBL

S. No. DescriptionAs Per SOPAs on Site Remarks As on Site Remarks


Floor
Openings
1 100% 100%
/Cutout
Openings
Lift Shaft
2 100% 92%
TOWER-10,13,20,21
Openings
Staircase
3 100% 100% 50% Tower L
Openings
Floor
Edge
4 100% 100%
Protectio
n

Internal
5 Catchmen 100% 100%
t
External
6 Catchmen 100% 100%
t
Shaft
7 Openings 100% NA 0% Tower LFloor 18,19

Electrical
8 Shat 100% NA
Openings

Active
Mechanic
9 100% NA
al
Platform

Active
10 Civil 100% 100%
Platform

Ground
Level
Edge
Protectio
11 100% NA
n around
the
Excavated
Pit

Status of
Loose
12 Materials Nil
on floor
Edges