Professional Documents
Culture Documents
● Material Master
● BOM
● WORK CENTER
● ROUTING
● PRUDCTION VERSION
● Standard SOP
● Concept of MRP
● Scheduling
● Capacity planning
○ Master data
○ Planning(Line Loading)
○ Material Staging
7. PP-PI (2 Hrs)
● Batch Determination
9. Configuration (3 hrs)
● MRP Configure
● Production Execution
SAP QM Overview
1. Master Data
● SAMPLING Procedure
● Catalogs
● Inspection Method
2. Inspection Planning_Exectuion
● Inspection Plan
● Inspection Execution
3. Qm in Procurement
4. QM in Production
6. Calibration Inspection
7. QM in Batch Management
8. Quality Certificates
9. Quality Control
12. Configuration