Appendix 11:

Acoustic report
8 Parker Street
8 Parker St, South Perth
Technical Specification for Acoustic Services

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A
PROJECT MANAGER
Limnios Projects

ARCHITECTS IN ASSOCIATION
Collière Architecture

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 2
Amendment Register

Section & Project


Rev. No Issue/Amendment Author Checked Date
Page No. Engineer

A - Tender Issue GC GC JC 24 April 2020

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 3
Contents

Section 01 – General 1
1. GENERAL 2
1.1 Preamble and Limitations 2
1.2 Project Description 2
1.3 Scope of this Specification 2
1.4 Purpose of this Specification 3
1.5 Excluded from this Specification 3
1.6 Information Provided to the Consultant 3
2. SUBJECT SITE AND SURROUNDING AREA 5
2.1 Noise Sensitive Receivers 6
3. EXISTING NOISE LEVELS 7
3.1 Ambient Noise 7
3.2 Noise Model Validation 8

Section 02 – Acoustic Criteria 9


4. NOISE CRITERIA 10
4.1 Road Traffic Noise Intrusion 10
4.2 Continuous (Non-Time Varying) Noise Levels 11
4.3 Transient Noise Levels 12
4.4 Sound Insulation Requirements 12
4.5 Noise Emission from the Proposed Development 13
4.6 Environmental Noise Emission Limits 17
4.7 Waste Collection 17
4.8 Construction Noise 18

Section 03 – Technical Requirements 19


5. GENERAL REQUIREMENTS 20
5.1 Building Envelope 20
5.2 National Construction Code 20
5.3 Manufacturer’s Specifications 20
5.4 External Noise Levels 20
6. BUILDING ENVELOPE 21
6.1 North Building (L01 – L14) Envelope Requirements 21
6.2 South Building (L04 – L06) Envelope Requirements 23
6.3 Example Glazing Systems 24
6.4 External Doors 25
6.5 External Walls 26
6.6 Roof Construction 27

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A
Contents (continued)

6.7 Mechanical Ventilation Requirements 27


7. SOUND INSULATION REQUIREMENTS OF INTERNAL PARTITIONS 28
7.1 Internal Walls / Partitions 28
7.2 Floors Between Apartments 30
7.3 Swimming Pool Isolation 30
8. ACOUSTIC DESIGN REQUIREMENTS FOR SERVICES 31
8.1 Hydraulic Services 31
8.2 Mechanical Services 32
8.3 Electrical Services 36
8.4 Vertical Transportation Services 36
8.5 Fire Protection Services 37
8.6 Garbage Chute Design 37

Appendix A – Referenced Drawings


Appendix B – Noise Contour Maps
Appendix C – Acoustic Mark-Ups
Appendix D – Acoustic Treatment to Garbage Chute

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 5
Section 01 – General

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 1
1. GENERAL
1.1 Preamble and Limitations
This Acoustic Technical Specification is to be read in conjunction with all other project documentation. The specific
acoustic performance criteria, as well as recommendations to achieve the criteria are contained within this
document. However, this Specification is not intended to be all encompassing and the reader must make reference
to other requirements stipulated in the architectural and trade documentation and specifications.
This Acoustic Technical Specification shall be read in conjunction with the applicable sections of the National
Construction Code (NCC) 2019, relevant Australian and International Standards, Conditions of Consent and acoustic
guidelines. Where any discrepancies between the Acoustic Technical Specification and other documentation exist
(including Manufacturer specifications), the reader shall make queries or submit requests for technical clarifications
to the Acoustic Consultant and await written instruction prior to pricing the affected works.
The information contained herein relates to acoustics only. Professional advice should be sought for design and
construction issues falling outside of the specialist field of acoustical engineering, including but not limited to,
structural integrity, fire rating, combustibility, thermal performance, architectural buildability and fit-for-purpose,
and waterproofing.
If there are further design changes (i.e. Architectural or Mechanical layouts) from the time this specification was
written which affects the information and advice provided in this report, then the Acoustic design intent, advice and
criteria provided in this report must be met and applied through the changes.
1.2 Project Description
Floth Pty Ltd (Floth) has been commissioned to provide Acoustic Engineering Services for the proposed residential
apartment development at 8 Parker Street, South Perth. The site being developed will consist of 29 Sole Occupancy
Units (SOUs) across two buildings on the site (North building with 15-storeys and South building with 3-storeys).
1.3 Scope of this Specification
The acoustic design considers:
• The acoustic design of the external façade to achieve compliance with AS/NZS 2107 and WA State Planning
Policies;
• Acoustic separation of functional areas and between Sole Occupancy Units (SOUs) in accordance with the
NCC 2019;
• Impact sound insulation of floors / ceilings separating SOUs in accordance with the NCC 2019;
• Vibration limits for occupied floors;
• Noise limits for building services such as hydraulic pipework and risers, mechanical plant and equipment
and lifts; and
• Environmental noise emission limits from mechanical plant and equipment to nearby buildings and noise-
sensitive uses.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 2
1.4 Purpose of this Specification
The objectives of this document are to:
a. Broadly outline the extent of the acoustic services;
b. Define the minimum acoustic criteria for the project that must be achieved;
c. Provide a basis for the Project Team to incorporate the acoustic requirements into documentation;
d. Inform the Cost Plan;
e. To act as a platform for the Detailed Design phases;
f. Provide a basis for the Client to confirm acceptance of the acoustic criteria and design advice.
1.5 Excluded from this Specification
The acoustic design aspects not covered by this Specification include:
• Green Star or other Ecologically Sustainable Design (ESD) assessment tools.
• Amendments to the design by the Purchaser;
• Assessment or comment on the potential for aerodynamic noise generated by façade elements. This should
be conducted by a suitably qualified wind or façade engineer.
• Assessment or consideration of any aspects other than the acoustics requirements of the project including
but not limited to:

– Fire rating; – Seismic loading and/or restraint;


– Combustibility; – Structural integrity;
– Audio / Visual design; – Architectural buildability;
– Façade engineering; – Waterproofing etc.
– Wind engineering;

1.6 Information Provided to the Consultant


The acoustic design requirements have been based on the following information:
1.6.1 Drawing Package
• As per the drawings listed in Appendix A
1.6.2 National Construction Code (NCC) 2019
• Part F5 Sound Transmission and Insulation
1.6.3 Other Applicable Design Guidelines
• Western Australian Environmental Protection (Noise) Regulations 1997 (EPNR);
• City of South Perth Town Planning Scheme No. 6 (TPS 6);
• State Planning Policy 5.4 Road and Rail Transport Noise and Freight Considerations in Land Use Planning
(SPP 5.4);

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 3
1.6.4 Applicable Standards

STANDARD TITLE

Acoustics – Recommended Design Sound Levels and Reverberation Times for


AS/NZS 2107:2016
Building Interiors

Acoustics – Field measurement of sound insulation in buildings and building


ISO 16283.1:2014
elements – Part 1: Airborne sound insulation.

Acoustics – Measurement of sound insulation in buildings and of building elements –


AS/NZS ISO 140.7:2006
Part 7: Field measurements of impact sound insulation of floors.

Acoustics – Rating of sound insulation in buildings and of building elements – Part 1:


AS/NZS ISO 717.1:2004
Airborne sound insulation

Acoustics – Rating of sound insulation in buildings and of building elements – Part 2:


AS ISO 717.2: 2013
Impact sound insulation

Acoustics – Rating of sound insulation in buildings and of building elements –


AS/NZS 1276.1:1999
Airborne sound insulation.

AS 1055:2018 Acoustics – Description and measurement of environmental noise

Guide to noise and vibration control on construction, maintenance and demolition


AS 2436:2010
sites

Guide to evaluation of human exposure to vibration in buildings, Part 1: Vibration


BS 6472-1:2008
sources other than blasting

AS 3671:1989 Acoustics – Road traffic noise intrusion – Building siting and construction

AS 1670.4:2018 Fire detection, warning, control and intercom systems – System design, installation
and commissioning – Part 4: Emergency warning and intercom systems

AS/NZS 1668.1:2015 The use of ventilation and air conditioning in buildings – Part 1: Fire and smoke
control in buildings

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 4
2. SUBJECT SITE AND SURROUNDING AREA
The subject site and surrounding area are presented in Figure 1. The City of Perth Interactive Mapping Tool
indicates that the site and surrounding area are located within a Residential (R80/R100) zone, with property details
as presented in Table 1.

Table 1: Property Details of the Subject Site

PROPERTY ADDRESS 8 Parker Street

LOT NUMBER Lot 500

TITLE AREA 2453 m2

PLANNING SCHEME City of South Perth Town Planning Scheme No. 6

ZONE NAME Residential

NSR 1: 9 Parker St
Project Site Location

Noise Monitoring Location


NSR 2: 144 Mill Point Rd

NSR 3: 6 Parker St
75 metres

Figure 1: Subject Site and Surrounding Area (Ref: Nearmap)

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 5
It can be seen from Figure 1 that the site is located approximately 75 metres (at the closest point) from Mill Point
Road. Mill Point Road carries more than 20,000 vehicles per day according to the WA Main Roads Interactive Traffic
Map. As such, further consideration of the potential road traffic noise impacts is warranted in accordance with the
State Planning Policy 5.4 – Road and Rail Transport Noise and Freight Considerations in Land Use Planning (SPP
5.4).
SPP 5.4 applies to new noise-sensitive developments in the vicinity of existing or future major transport corridors or
freight handling facilities. By definition, a development is considered to be ‘in the vicinity of’ a transport route when
it meets the following criteria:
i. Abutting; or
ii. Separated by only a road, access way or other land that is likely to remain substantially open and
undeveloped in terms of buildings, up to a maximum distance of 300 metres.
It can be seen from Figure 1 that although the proposed development is located within 300 metres of Mill Point
Road, there are already intervening buildings, albeit of lower height than the proposed development. As such, the
potential road traffic noise impacts must be considered in the design of the external façade.
2.1 Noise Sensitive Receivers
The nearest potentially affected NSR is the residential apartment building located immediately adjacent to the
proposed development on the northwest boundary as shown in Figure 1. Any potential noise impacts from the
development will be assessed at these NSRs, and other potentially affected NSRs surrounding the site.

Table 2: Nearest Noise Sensitive Receivers Surrounding Proposed Development Site

NSR DESCRIPTION ADDRESS DISTANCE SEPARATION

NSR 1 21 Storey Residential Tower 9 Parker Street ≈ 9 metres

NSR 2 10 Storey Residential Tower 144 Mill Point Road ≈ 15 metres

NSR 3 3 Storey Residential Tower 6 Parker Street ≈ 6 metres

The main sources of noise emission from the proposed development that will be controlled to satisfy the noise
limits at the surrounding NSRs are from the mechanical plant and equipment, loading bay, and car park. The onsite
car parking and loading bay are contained within the basement levels, and as such are not expected to cause any
negative noise impacts at the surrounding NSRs.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 6
3. EXISTING NOISE LEVELS
3.1 Ambient Noise
The existing ambient noise levels in the local area were measured at the subject site between the 1st and 8th May
2019 as shown in Figure 1. The noise logger was positioned between 8 and 9 Parker Street at a point close to the
edge of the road. The top of the microphone was 1.5 metres above Finished Floor Level (FFL) in ‘free-field’
conditions.
The test instrumentation consisted of:
• Logger: Norsonic Nor139 Class 1 sound level meter, serial number: 1392739
• Calibrator: Pulsar Model 105 sound level calibrator, serial number: 77507
The instrumentation had current NATA laboratory calibrations during the monitoring period. Field calibration
conducted prior to and at the completion of logging did not find any significant drift in the calibration of the logger
(< ±0.5 dB).
During the logging period weather data was obtained from the Bureau of Meteorology (BOM) website for Perth
(Station ID 009225). These weather observations were reviewed to ensure that the weather conditions did not
adversely impact upon the noise logging results. No significant rainfall was recorded during the monitoring period
apart from Monday the 6th of May, which was recorded to have 7.2mm of rainfall. As such, the noise data was
adjusted to exclude the results from Monday the 6th to remove the impact of rainfall noise.
Site observations identified the dominant noise sources at the site to consist of the typical urban ‘hum’, with some
noise contribution from the nearby construction/maintenance occurring adjacent to the 9 Parker Street building.
The applicable noise descriptors derived from the noise logging results are summarised in
Table 3.
Table 3: Existing (Free-Field) Ambient Noise Descriptors

TIME OF DAY NOISE DESCRIPTOR IN DB(A)

LAMAX,T1 LAEQ,T2 LA01,T3 LA10,T4 LA90,T5

Day (7 am – 6 pm) 72 52 62 57 49

Evening (6 pm – 10 pm) 67 47 56 51 45

Night (10 pm – 6 am) 59 44 51 47 41

1
LAmax is the average of the maximum A-weighted sound pressure levels occurring within consecutive 15-minute samples
2
LAeq is the A-weighted equivalent or energetic-averaged sound pressure level over a specified time-period
3
LA01 is the A-weighted sound pressure level exceeded for 1% of the specified time-period
4
LA10 is the A-weighted sound pressure level exceeded for 10% of the specified time-period
5
LA90 is the A-weighted sound pressure level exceeded for 90% of the specified time-period

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 7
3.2 Noise Model Validation
The noise model used for calculation of the external façade acoustic requirements was validated against the
ambient noise measurements. This was done by comparing the road traffic noise predicted in the model to the
ambient noise measured at the test site.
The model predicted noise within ±2 dB of the existing ambient noise in accordance with the Calculation of Road
Traffic Noise (CoRTN) methodology. Therefore, the model was considered to be a valid and suitable to determine
façade noise reduction requirements.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 8
Section 02 – Acoustic Criteria

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 9
4. NOISE CRITERIA
The noise criteria for the project is defined by Local Council requirements, WA state polices / legislation and
guidelines, National Construction Code 2019 and applicable Australian Standards. The relevant noise criteria for the
proposed development are presented in Table 4.

Table 4: Applicable Noise Policies and Guidelines

ASSESSMENT APPLICABLE REFERENCE NOISE SOURCES

Road traffic noise from the surrounding


Noise Impact on the Proposed SPP 5.4 transport network;
Development AS/NZS 2107:2016 Noise from mechanical plant associated
with surrounding residential buildings.

Sound Insulation of Building


NCC 2019 Airborne and impact sound
Elements Separating SOUs

Mechanical plant noise;


Noise Emissions from the WA Environmental Protection
Noise from refuse, car park and loading
Proposed Development (Noise) Regulations 1997
activities.

WA Environmental Protection
Noise associated with construction
Construction Noise (Noise) Regulations 1997
activities
AS 2436:2010

4.1 Road Traffic Noise Intrusion


SPP 5.4 (December 2014) outlines a procedure for assessing road traffic noise intrusion onto a new residential
development. SPP 5.4 defines an outdoor noise target and noise limit as shown in Table 5. The noise limit is
described as the 5dB difference between the noise target and the noise limit as ‘an acceptable margin for
compliance’. If the ambient noise in the area exceeds the noise limit, mitigation measures are required to be
implemented.

Table 5: Outdoor Noise Criteria (Ref. Table 1 of SPP 5.4)

TIME OF DAY NOISE TARGET NOISE LIMIT

Day (6 am – 10 pm) LAeq (Day) = 55 dB(A) LAeq (Day) = 60 dB(A)

Night (10 pm – 6 am) LAeq (Night) = 50 dB(A) LAeq (Night) = 55 dB(A)

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 10
Section 5.3.1 of SPP 5.4 states:
In the application of these outdoor noise criteria to new noise-sensitive developments, the objective of this
policy is to achieve –
• Acceptable indoor noise levels in noise-sensitive areas (for example, bedrooms and living rooms of houses,
and school classrooms); and
• A reasonable degree of acoustic amenity in at least one outdoor living area on each residential lot.
• If a noise-sensitive development takes place in an area where outdoor noise levels will meet the noise target,
no further measures are required under this policy
4.2 Continuous (Non-Time Varying) Noise Levels
The NCC does not presently contain any criteria for internal design sound limits within habitable and non-habitable
spaces. Instead, intruding noise from external sources such as road traffic and mechanical plant as well as the
mechanical services within the proposed development must achieve compliance with the recommended levels
specified in Table 1 of Australian Standard AS/NZS 2107:2016 Acoustics – Recommended Design Sound Levels and
Reverberation Times for Building Interiors.
The appropriate design sound limits for apartment buildings are presented in Table 6. It is noted that the NR curves
for mechanical services apply to the whole-of-system, including but not limited to duct-borne noise, breakout
noise, supply / return air grille noise, structure-borne and regenerated noise etc.

Table 6: Design Sound Levels for Continuous (Non-Time Varying) Noise Sources

TYPE OF OCCUPANCY/ACTIVITY DESIGN SOUND LEVEL RANGE (DBA) NOISE RATING (NR) FOR MECHANICAL
SERVICES

Apartment Common areas


45 to 50 45
(e.g. foyers, lift lobby)

Living areas 35 to 45 40

Sleeping areas (night-time) 35 to 40 35

Work areas 35 to 45 40

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 11
4.3 Transient Noise Levels
The internal noise levels from transient noise sources such as hydraulic services, vertical transportation etc. shall
not exceed the noise limits presented in Table 7 to minimise noise nuisance to occupants.

Table 7: Design Sound Levels for Transient Internal Noise Sources

TYPE OF OCCUPANCY/ACTIVITY MAXIMUM DESIGN SOUND LEVEL, LMAX (DBA)

Apartment Common areas (e.g. foyers, lift lobby) 48

Living areas 40

Sleeping areas (night-time) 35

Work areas 40

4.4 Sound Insulation Requirements


The walls and floor/ceilings of the units must be constructed to control airborne and impact sound transmission
between adjoining apartments, and apartments and adjoining common spaces or plant rooms, lift shafts and the
like. The construction must satisfy the minimum requirements of the National Construction Code (NCC) for a Class 2
building. Refer to the NCC for further detail.
4.4.1 Walls / Partitions
The airborne sound separation requirements for walls / partitions between apartments and adjoining spaces are
summarised in Table 8.

Table 8: Minimum NCC Sound Insulation Requirements for Walls / Partitions

WALLS SEPARATING MINIMUM NCC


REQUIREMENT

Walls separating a habitable space in one SOU from a habitable space in another SOU RW + Ctr ≥ 50

Walls separating a non-habitable space in one SOU from a non-habitable space in


RW + Ctr ≥ 50
another SOU

Walls separating a habitable space in one SOU from a non-habitable space in another
RW + Ctr ≥ 50 & DC
SOU

Walls separating a SOU from a common area including stairways / corridors RW ≥ 50

Walls separating a SOU from parts of a different classification RW ≥ 50

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 12
WALLS SEPARATING MINIMUM NCC
REQUIREMENT

Walls separating a SOU from a lift shaft or plant room RW ≥ 50 & DC

Walls separating a habitable space in a SOU from a service riser RW + Ctr ≥ 40

Walls separating a non-habitable space in a SOU from a service riser RW + Ctr ≥ 25

Doors separating a SOU from a common area including stairways RW ≥ 30

Note: DC = Discontinuous construction – Minimum 20mm air gap between separate leaves

Additionally, Part F5.5 of the NCC states:


e) Where a wall required to have sound insulation has a floor above, the wall must continue to –
i. the underside of the floor above; or
ii. a ceiling that provides the sound insulation required for the wall.
f) Where a wall required to have sound insulation has a roof above, the wall must continue to –
i. the underside of the floor above; or
ii. a ceiling that provides the sound insulation required for the wall.
4.4.2 Floor / Ceiling
The airborne and impact sound isolation requirements for floor / ceiling constructions are summarised in Table 9.

Table 9: Minimum NCC Sound Insulation Requirements for Floor / Ceiling

FLOOR / CEILING SEPARATING: MINIMUM NCC REQUIREMENT

Floor / Ceiling separating a SOU from another SOU, plant room, lift shafts, stairway, Rw + Ctr ≥ 50

common area or part of a different classification Ln,W (impact) ≤ 62

4.5 Noise Emission from the Proposed Development


Noise emissions associated with the proposed development are addressed via the Environmental Protection Act
1986, with the prescribed standards detailed in the Environmental Protection (Noise) Regulations 1997 (EPNR).
The EPNR sets out the maximum allowable noise levels based on the time of day and type of premise receiving the
noise. The maximum allowable noise levels are determined based on the assigned noise levels (L A10, LA1 and LAmax)
adjusted with the Influencing Factor (IF) if applicable. The IF is calculated with consideration to the land use zoning
in the vicinity of the NSRs. Table 10 presents the maximum assigned noise levels at premises surrounding the
project site.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 13
Table 10: Assigned Noise Level at Surrounding Uses (Ref. Table 1 of EPNR)

TYPE OF PREMISES RECEIVING NOISE TIME OF DAY ASSIGNED LEVEL (DB)

LA10 LA1 LAMAX

0700 to 1900 hours (Monday to Saturday) 45 + IF 55 + IF 65 + IF

0900 to 1900 hours (Sunday and Public


40 + IF 50 + IF 65 + IF
Holidays)
Noise sensitive premises: highly
sensitive area 1900 to 2200 hours (All days) 40 + IF 50 + IF 55 + IF

2200 hours on any day to 0700 hours


Monday to Saturday and 0900 hours on 35 + IF 45 + IF 55 + IF
Sunday and Public Holidays

Noise sensitive premises: any area


All hours 60 75 80
other than highly sensitive area

Commercial premises All hours 60 75 80

Industrial and utility premises other


than those in the Kwinana Industrial All hours 65 80 90
Area

Industrial and utility premises in the


All hours 75 85 90
Kwinana Industrial Area

A highly sensitive area means that area (if any) of noise sensitive premises comprising:
• A building, or part of a building, on the premises that is used for a noise sensitive purpose (i.e. residential or
accommodation use);
• Any other part of the premises within 15m of that building or that part of the building.
The influencing factor described in Table 10 accounts for higher noise levels in a locality due to nearby industrial
and commercial areas and major roads and is derived in accordance with Schedule 3 of the EPNR.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 14
The EPNR states the following:
7. Prescribed standard for noise emissions
(1) Noise emitted from any premises or public place when received at other premises –
(a) Must not cause, or significantly contribute to, a level of noise which exceeds the assigned level in
respect of noise received at premises of that kind; and
(b) Must be free of –
(i) tonality; and
(ii) impulsiveness; and
(iii) modulation,
When assessed under regulation 9.
(2) For the purposes of sub regulation (1)(a), a noise emission is taken to significantly contribute to a level of
noise if the noise emission as determined under sub regulation (3) exceeds a value which is 5 dB below the
assigned level at the point of reception.
(3) A level of noise emission may be determined by –
(a) Measurement at its point of reception when, to the extent practicable, other noises that would
contribute to the measured noise level are not present; or
(b) Calculation of the level at its point of reception based on measurement of the noise emission at a
reference point determined by the inspector or authorised person to be a point where the relationship
between the noise emission as measured at the reference point and at the point of reception can be
established.
4.5.1 Derivation of the Assigned Levels
To determine the influencing factors that are applied to the assigned levels presented in Table 10, the following has
been taken into consideration:
• The City of South Perth’s land-use zoning maps indicate that generally the area surrounding the site is zoned
Residential and parkland, with a scattering of commercial and civic uses.
• Within 100m of the nearest noise-sensitive receptor, there are no main or secondary roads6.
• Within 450m of the nearest noise-sensitive receptor is Mill Point Rd (major road), and Labouchere Rd (major
road).
Based upon the zoning plan, land usage and traffic data the influencing factor can be determined in accordance
with the EPNR as shown in Table 11.

6
A major road has an average daily traffic count in excess of 15,000 vehicles per day, while a secondary road has an average daily traffic count of
6,000 to 15,000 vehicles per day. The classifications of the roads have been determined via reference to traffic data contained in the
Metropolitan Traffic Digest 2009/10-2014/15 and WA Main Roads’ Traffic Maps

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 15
Table 11: Determination of the influencing factor

% INDUSTRIAL AND UTILITY USE % COMMERCIAL USE TRANSPORT FACTOR INFLUENCING FACTOR
(DB) (DB)
100M 450M 100M 450M

0 0.32 0 7.18 4 4.4

Using the influencing factor determined in Table 11, the appropriate assigned levels can be determined as
presented in Table 12. For mechanical plant and music noise emissions where the noise is generally continuous the
LA10 metric would be appropriate. For short-duration intermittent noise such as patron noise and vehicle
movements the LA1 metric is appropriate.

Table 12: Derived Assigned Levels at Surrounding Uses

TYPE OF PREMISES RECEIVING NOISE TIME OF DAY ASSIGNED LEVEL (DB)

LA10 LA1 LAMAX

Noise sensitive premises: highly 0700 to 1900 hours (Monday to Saturday) 49 59 69


sensitive area
0900 to 1900 hours (Sunday and Public 44 54 69
Holidays)

1900 to 2200 hours (All days) 44 54 59

2200 hours on any day to 0700 hours 39 44 59


Monday to Saturday and 0900 hours on
Sunday and Public Holidays

Noise sensitive premises: any area All hours 60 75 80


other than highly sensitive area

Commercial premises All hours 60 75 80

Industrial and utility premises other All hours 65 80 90


than those in the Kwinana Industrial
Area

Industrial and utility premises in the All hours 75 85 90


Kwinana Industrial Area

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 16
4.6 Environmental Noise Emission Limits
Noise emissions from the proposed development are not considered to significantly contribute to the noise level at
the receiving premise if the component noise emission level is 5dB or below the assigned levels presented in Table
12. As such, the noise emission limits that must be satisfied at premises surrounding the proposed development are
presented in Table 13.

Table 13: Project Noise Emission Limits

TYPE OF PREMISES RECEIVING NOISE TIME OF DAY ASSIGNED LEVEL (DB)

LA10 LA1 LAMAX

Noise sensitive premises: highly 07:00 to 19:00 (Monday to Saturday) 44 54 64


sensitive area
09:00 to 19:00 (Sunday and Public 39 49 64
Holidays)

19:00 to 22:00 (All days) 39 49 54

22:00 to 07:00 (Monday to Saturday) 34 39 54


22:00 to 09:00 (Sunday and Public
Holidays)

Noise sensitive premises: any area All hours 55 70 75


other than highly sensitive area

Commercial premises All hours 55 70 75

4.7 Waste Collection


Regulation 14 of the EPNR states that noise emission from waste collection is not required to comply with the noise
criteria in Table 13 if it is conducted in accordance with the following:
a. Is conducted between 0700 hours and 1900 hours on any day that is not a Sunday or a public holiday; and /
or
b. Is conducted between 0900 hours and 1900 hours on a Sunday or public holiday;
c. The works are carried out in the quietest reasonable and practicable manner; and
d. The equipment used to carry out the works is the quietest reasonably available.
Waste collection outside of these hours must be conducted in accordance with an approved Noise Management
Plan (NMP).

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 17
4.8 Construction Noise
The EPNR does not impose noise emission limits for construction work carried out between 0700 and 1900 on
Monday to Saturday (excluding public holidays), provided that:
a. The construction work is carried out in accordance with the control of environmental noise practices defined
in Section 4 of AS 2436-2010 Guide to noise and vibration control on construction, maintenance and
demolition sites;
b. The equipment used on the construction site is the quietest reasonably available; and
c. The construction work is carried out in accordance with an approved noise management plan (if required
under Sub-regulation (4) or (5A)).

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 18
Section 03 – Technical Requirements

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 19
5. GENERAL REQUIREMENTS
5.1 Building Envelope
The builder and its façade contractor must install systems that comply with the acoustic requirements of this
specification. Evidence that the system complies with the acoustic requirements must be submitted for approval.
5.2 National Construction Code
The builder must install all systems to comply with the acoustic requirements of Part F5 of the NCC 2019, unless this
specification, or other project documentation, nominates a higher requirement.
Where a building element is required to comply with the NCC (e.g. intertenancy walls / floors etc.), the builder must
provide certification (to the satisfaction of the building certifier), that the element complies with the relevant
acoustic requirement of the NCC. This certification shall be provided prior to or at Practical Completion of the
project.
5.3 Manufacturer’s Specifications
The builder must install all systems in accordance with the Manufacturer’s Specifications or recommendations
unless a more stringent requirement is nominated in the Project Documentation.
5.4 External Noise Levels
The noise emissions from mechanical plant and equipment (other than that used solely for emergency purposes)
must comply with the noise limits at the property boundaries and surrounding noise sensitive receivers. The
selection of plant and equipment must consider and comply with these noise limits.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 20
6. BUILDING ENVELOPE
A three-dimensional computer noise model of the site and surrounds was created in SoundPLAN v7.4 using
architectural plans provided by Colliere Architecture. The local topography was obtained from Google Earth and
verified with available survey data. Aerial photography and site observations were used to determine the existing
building heights. Façade and grid noise contour maps are presented in Appendix B for the predicted road traffic
noise levels during the day and night periods.
It can be seen from Appendix B that the noise levels are predicted to exceed the outdoor noise target of 55 dB
LAeq(day) and 50 dB LAeq(night) on some façade orientations.
6.1 North Building (L01 – L14) Envelope Requirements
The noise contour maps in Appendix B show that for the North Building, the noise levels are predicted to be less
than 63 dB LAeq(day) and 57 dB LAeq(night) for all facades and all levels.
As such, Acoustic Treatment Package B is appropriate for the external façade on the North Building. The
requirements for Acoustic Package B are presented in Table 14.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 21
Table 14: North Building External Façade (refer to SPP 5.4) Acoustic Performance Requirements (Package B)

AREA ORIENTATION PACKAGE B: LA,EQ(DAY) UP TO 63 dB


TO THE ROAD LA,EQ(NIGHT) UP TO 58 dB

Bedrooms Facing Walls: RW + Ctr ≥ 50


Windows / external door systems: RW + Ctr ≥ 31*; RW + Ctr ≥ 34**
Roof / ceiling: RW + Ctr ≥ 35
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Side-on As above, except glazing RW + Ctr rating may be 3dB less, or Max. % Area
increased by 20%

Opposite Walls: RW + Ctr ≥ 42


Windows / external door systems: RW + Ctr ≥ 25*; RW + Ctr ≥ 28**, RW + Ctr ≥ 31**
Roof / ceiling: RW + Ctr ≥ 32
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Indoor living and Facing Walls: RW + Ctr ≥ 50


work areas Windows / external door systems: RW + Ctr ≥ 28*; RW + Ctr ≥ 31**; RW + Ctr ≥ 34***
External doors other than glass doors: RW + Ctr ≥ 26
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Side-on As above, except glazing RW + Ctr rating may be 3dB less, or Max. % Area
increased by 20%

Opposite Walls: RW + Ctr ≥ 42


Windows / external door systems: RW + Ctr ≥ 22*; RW + Ctr ≥ 25**; RW + Ctr ≥ 28***
External doors other than glass doors: RW + Ctr ≥ 23
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Other indoor areas Any No requirements

Outdoor living areas Any At least one outdoor living area located on the opposite side of the building
from the transport corridor; and / or
At least one ground level outdoor living area screened using a solid
continuous fence or other structure of minimum 2.4 metres height above
ground level

For total glazing area, *up to 40% of room floor area; ** up to 60% of room floor area; and *** up to 80% of room floor area.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 22
6.2 South Building (L04 – L06) Envelope Requirements
The noise contour maps in Appendix B show that for the South Building, the noise levels are predicted to be less
than 60 dB LAeq(day) and 54 dB LAeq(night) for all facades and all levels.
As such, Acoustic Treatment Package A (refer to Table 6.3 of SPP 5.4) is appropriate for the external façade on the
South Building. The requirements for Acoustic Package B are presented in Table 15.

Table 15: South Building External Façade (refer to SPP 5.4) Acoustic Performance Requirements

AREA ORIENTATION PACKAGE A: LA,EQ(DAY) UP TO 60 dB


TO THE ROAD LA,EQ(NIGHT) UP TO 55 dB

Bedrooms Facing Walls: RW + Ctr ≥ 45


Windows / external door systems: RW + Ctr ≥ 28*; RW + Ctr ≥ 31**; RW + Ctr ≥ 34***
Roof / ceiling: RW + Ctr ≥ 35
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Side-on As above, except glazing RW + Ctr rating may be 3dB less, or Max. % Area
increased by 20%

Opposite No requirements

Indoor living and Facing Walls: RW + Ctr ≥ 45


work areas Windows / external door systems: RW + Ctr ≥ 25*; RW + Ctr ≥ 28**; RW + Ctr ≥ 31***
External doors other than glass doors: RW + Ctr ≥ 26
Mechanical ventilation: as per Section 6.3.1 of SPP 5.4

Side-on As above, except glazing RW + Ctr rating may be 3dB less, or Max. % Area
increased by 20%

Opposite No requirements

Other indoor areas Any No requirements

Outdoor living Any At least one outdoor living area located on the opposite side of the building
areas from the transport corridor; and / or
At least one ground level outdoor living area screened using a solid
continuous fence or other structure of minimum 2.0 metres height above
ground level

For total glazing area, *up to 40% of room floor area; ** up to 60% of room floor area; and *** up to 80% of room floor area.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 23
6.3 Example Glazing Systems
Example glazing systems that achieve the nominated acoustic ratings in Table 14 and Table 15 are presented in
Table 16.

Table 16: Example Glazing Systems (Ref. Table 6.4 SPP 5.4)

ACOUSTIC PERFORMANCE WINDOW TYPE


REQUIREMENT (RW + CTR)
SLIDING OR DOUBLE HUNG OPENING FIXED SASH, AWNING OR CASEMENT TYPE OPENING

22 4mm monolithic glass -

25 6mm monolithic; 4mm monolithic glass

6mm laminated or toughened safety


glass;
6 – 12 – 6 insulated glass unit (IGU).

28 10mm monolithic; -

10mm laminated or toughened safety


glass;
6 – 12 – 10 insulated glass unit (IGU).

31 - 6mm monolithic;
6mm laminated or toughened safety glass;
6 – 12 – 6 insulated glass unit (IGU).

34 - 10mm monolithic;
10mm laminated or toughened safety glass;
6 – 12 – 10 insulated glass unit (IGU).

Note: Acoustic seals (e.g. Schlegel Q-Lon) are required to achieve the acoustic performance rating

6.3.1 Samples and Test Data


Samples of glazing systems shall be submitted to the builder and developer’s representative for approval prior to
installation. The glazing supplier shall submit for approval by the Acoustic Consultant, Laboratory Test Reports
performed in a NATA certified laboratory as evidence that the system complies with the requirements of the
Acoustic Specification. The laboratory testing shall be conducted in accordance with AS 1191:2002, ISO 140-2:2010
or an approved equal.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 24
6.3.2 Acoustic Treatment to Window Frame Perimeter
Where external glazing is required to meet an acoustic performance rating (e.g. Weighted Sound Reduction Index,
RW), the perimeter of the window frame shall be acoustically sealed to ensure that there is no noise leakage
between the window frame and building envelope that would compromise the acoustic performance rating.
The method of acoustically sealing the window frame to the building envelope shall consider and allow for any
movement of the window frame relative to the building envelope.
It is recommended that:
• The window frame is installed with a 10-15mm gap (maximum) separating the window frame and the
building envelope.
• The gap between the window frame and the building envelope shall be caulked with a non-hardening, non-
shrinking sealant with a cured density of not less than 1000 kg/m3 (e.g. SikaSeal 300). A minimum 10mm deep
caulking shall be applied to both the inner and outer faces of the window frame using closed cell backing
rods or bond breaker (polyethylene) tapes as specified by the sealant manufacturer.
If the gap between the window frame and the building envelope exceeds 15mm, the gap shall be hard-packed with
glasswool or polyester insulation with density not less than 11kg/m3.
6.4 External Doors
To achieve the requirements in Table 14 and Table 15, External doors (other than glazed doors) shall be a minimum;
• 35mm solid core with acoustic seals in order to achieve the RW + Ctr 28.
• 40mm solid core with acoustic seals in order to achieve the RW + Ctr 31.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 25
6.5 External Walls
External walls must achieve an acoustic rating of not less than RW + Ctr 50. Example constructions are provided in
Table 17.

Table 17: Acceptable Constructions for External Walls (Refer to Architectural Documentation for Wall Types)

ACOUSTIC
PERFORMANCE EXTERNAL ARCHITECTURAL WALL TYPE CONSTRUCTION
REQUIREMENT

−162mm AFS
A162E −15mm Air Gaps

(Typical SOU External Wall with −15mm Foilboard Insulation Panel − SUPA15
LW162 AFS System) −28mm Furring Channel on LG Betafix Clip or Similar
−13mm Sheetrock HD

−200mm Insitu Concrete or with recess at 162mm insitu


concrete
C200RE
−15mm Air Gaps
(Typical SOU External Wall with 200 −15mm Foilboard Insulation Panel − SUPA15
RW + CTR ≥ 45 / 162 insitu concrete system)
−28mm Furring Channel on LG Betafix Clip or Similar
(South
−13mm Sheetrock HD
Building
External Wall −200mm Precast Concrete (Structural Thickness)
Requirement)
PC200E −15mm Air Gaps

(Typical SOU External Wall with −15mm Foilboard Insulation Panel − SUPA15
200mm Precast Concrete System −28mm Furring Channel on LG Betafix Clip or SImilar
−13mm Sheetrock HD

−250mm Precast Concrete (Structural Thickness)


PC250E −15mm Air Gaps

(Typical SOU External Wall with −15mm Foilboard Insulation Panel − SUPA15
250mm Precast Concrete System) −28mm Furring Channel on LG Betafix Clip or SImilar
−13mm Sheetrock HD

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 26
ACOUSTIC
PERFORMANCE EXTERNAL ARCHITECTURAL WALL TYPE CONSTRUCTION
REQUIREMENT

−15mm Compressed Fibre Cement Sheet;


−64mm steel stud (no Insulation);
−23mm Air gap;
A162P-02
−162mm AFS core;
(Typical External Party Wall System)
−11mm Air Gap;
−64mm Steel stud (no Insulation);
−15mm Compressed Fibre Cement Sheet
RW + CTR ≥ 50
−LW200D AFS Wall System
(North
Building A200E −15mm Air Gaps
External Wall (Typical SOU External Wall with −15mm Foilboard Insulation Panel − SUPA15
Requirement) LW200D AFS System) −28mm Furring Channel on LG Betafix Clip or Similar
−13mm Sheetrock HD

−150mm Precast Concrete (Structural Thickness)


PC150E −15mm Air Gaps

(Typical SOU External Wall with −15mm Foilboard Insulation Panel − SUPA15
150mm Precast Concrete System) −28mm Furring Channel on LG Betafix Clip or Similar
−13mm Sheetrock HD

6.6 Roof Construction


The roof must achieve an acoustic rating of not less than RW + Ctr 35 and attenuate rain noise such that the noise
criteria in Table 6 are not exceeded by more than 5 dB(A) for rainfall intensity of 10mm/hr. Acceptable
constructions include:
• Masonry: 150mm concrete slab
• Lightweight: sheet metal roof / Bradford Anticon 60 MD insulation over steel purlins / Rondo suspended
ceiling system with compatible furring channel / 1 layer of 13mm Gyprock Soundchek / 140 Gold Batts 2.5 in
the ceiling cavity
6.7 Mechanical Ventilation Requirements
Fresh air intakes and relief air paths must be fully ducted where connected to external louvres in order to meet
acceptable internal noise levels. The design of the mechanical ventilation should consider orientating the intakes /
discharges away from significant road traffic noise sources where possible. All mechanical ventilation systems must
comply with AS 1668.2 ‘The use of mechanical ventilation and air-conditioning in buildings’ on the basis that
external windows and doors on facades that exceed the noise criteria remain closed.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 27
7. SOUND INSULATION REQUIREMENTS OF INTERNAL PARTITIONS
7.1 Internal Walls / Partitions
The sound insulation requirements and wall types (refer to architectural documentation) are presented in Table 18.
The higher of the minimum NCC acoustic requirements and the acoustic performance of the wall type nominated in
the architectural documentation must be installed by the builder.

Table 18: Wall / Partition Construction to Achieve Nominated Acoustic Ratings

TYPE MINIMUM ACOUSTIC RATING WALL TYPES (REFER TO ARCHITECTURAL DOCUMENTATION)

• A150 • C200
Walls separating SOUs • A162 • C200T1
Habitable space to • A162-02 • C200T2
Habitable space; and • A162TC • C200TC
Rw + Ctr ≥ 50
• A200 • C200TP1
Walls separating SOUs • A200TC • C200TP2
Non-Habitable space to • B190 • C250
• B190-LSC • PC150
Non-Habitable space
• BR190 • PC200
• C150

• A162-01 • A162P-01
Walls separating SOUs Rw + Ctr ≥ 50 & DC
• A162-01a • A200-01
Habitable space to Non-
• A162C-01 • A200C-01
Habitable space
• A162C-02 • C200-01

Walls separating SOUs • A120 • BR140


from Common Apartment Rw 50 • B140 • BR150
Areas (including
Stairways, or parts of a
different classification)

• A162-01 • A162P-01
Rw ≥ 50 & DC
Walls separating SOUs • A162-01a • A200-01
from Lift Shafts • A162C-01 • A200C-01
• A162C-02 • C200-01

• A162-01 • A162P-01
Rw ≥ 50 & DC
Walls separating SOUs • A162-01a • A200-01
from Plant Rooms • A162C-01 • A200C-01
• A162C-02 • C200-01

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 28
TYPE MINIMUM ACOUSTIC RATING WALL TYPES (REFER TO ARCHITECTURAL DOCUMENTATION)

Walls separating Habitable • SW-04H


space in a SOU from Rw + Ctr ≥ 40
Service Risers*

Walls separating Non- • SW-03A • SW-04N


Habitable space in a SOU Rw + Ctr ≥ 25 • SW-03B
from Service Risers*

Doors separating SOUs • 38mm solid core door with acoustic seals to the
from Common Apartment Rw ≥ 30 perimeter (e.g. RP 10) and door bottom (e.g. RP 38)
Areas including Stairways

• A120 • C100
• A150 • C150
• A162 • C200
• A162-02 • C200T1
• A162TC • C200T2
• A200 • C200TC
Walls separating Base Rw ≥ 45
• A200TC • C200TP1
Building services from
• B90 • C200TP2
common areas
• B140 • C250
• B190 • PC150
• B190-LSC • PC200
• BR140 • SW-02W
• BR150 • SW-04H
• BR190 • SW-0FN
* Service riser partition ratings have not been shown on the Partition Mark-up and must comply with the table
above in all instances where required.
An acoustic mark-up of the walls / partitions is provided in Appendix C with the wall schedule available in the
architectural documentation. The construction detailing shall be in accordance with the applicable manufacturer’s
guidelines and recommendations.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 29
7.2 Floors Between Apartments
The floor / ceiling construction of each apartment shall achieve an airborne sound insulation rating of R W + Ctr ≥ 50
and an impact sound isolation of LnT,w ≤ 62.
The impact sound performance will be readily achieved where carpet is installed on a foam underlay. For tiled or
timber flooring proposed for the apartments, the recommended construction is as follows:
• Proposed hard flooring on suitable substrate;
• 5mm AcoustaMat 850RG underlay (or equivalent);
• 150mm concrete slab or greater;
• 1 layer of 13mm acoustic plasterboard suspended below the concrete slab with minimum cavity of 120mm;
• 75mm glasswool or polyester (14 kg/m3) laid over ceiling or bonded to soffit;
All ceiling penetrations including downlights shall be treated with acoustic / fire covers to minimise noise
transmission. In addition, all access panels shall be acoustically rated to ensure that the overall acoustic
performance rating is not degraded.
7.3 Swimming Pool Isolation
The swimming pool and spa must be isolated from the remaining structure such that structure borne noise is
inaudible in the apartments above and that perceptible vibration is minimised in the pool deck and lounge. The
isolation requirement could be reduced / eliminated if the pool was constructed on a separate structure to the
apartments (i.e. no rigid connections). Where a structural connection exists, an example product for a pool over
less critical areas is Embelton Triple Super Shearflex pads with 9mm static deflection. Early engagement with the
mount supplier is recommended to ensure the design requirements are accommodated.
Further to the isolation requirements, the following management / administrative controls may further reduce the
risk of acoustic issues:
• All pumps and mechanical equipment to be isolated from the structure in accordance with Sections 8.1 and
8.2.
• The pumps and mechanical equipment shall comply with the noise limits in 4.6.
• Access to the pool area and use of the pool shall be limited to 7am to 10pm.
• A ‘No Diving’ policy should be introduced to minimise the vibration levels transferred into the structure.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 30
8. ACOUSTIC DESIGN REQUIREMENTS FOR SERVICES
8.1 Hydraulic Services
8.1.1 Structural Isolation
• All pipes within services risers or adjacent to apartments shall be set into slabs with appropriately rated fire
collars.
• All hot and cold-water pipes located in services risers shall be isolated from the structure with oversized pipe
supports such as clamps, straps and hangers. A strip of resilient material (neoprene or rubber) is to be used
at each support to ensure that the pipe does not make direct contact with the support. Example restraints
include:
– Flexistrut ‘S Series’ Acoustic Pipe Clip
• Stormwater, soil and waste pipes located in services risers shall be isolated from the structure using a
resilient material and pipe clamp. Example restraints include:
– Flexistrut FM15 Medium Duty Saddle with a FM2600W Flexicushion (or approved alternative)
• Restrain pipes at heavy structural elements such as the edges of suspended slabs, rather than at lightweight
elements.
• Rotating pumps shall be isolated from the structure using 25mm static deflection springs and concrete
inertia bases with mass equal to 1.5 times the mass of the equipment (and piping) where they exceed 6 kW.
Where the pump capacity is less than 6 kW, rubber mounts are acceptable generally.
• Flexible connections and couplings (e.g. Victaulic) shall be installed between rotating equipment and
pipework in accordance with Manufacturer specifications.
8.1.2 System Design
• Pipes shall be lagged along their length. The pipe lagging should consist of minimum 4kg/m 2 mass-loaded
vinyl with 25mm convoluted insulation backing such as AcoustiLag 45 or Pyrotek 4525C.
• Select low noise fittings.
• Minimise the number of bends or changes in direction in pipework to limit reaction forces imparting
vibration into the structure.
• Provide water hammer arrestors in reticulation piping to dishwashers and washing machines.
• Size the plumbing so that the flow velocities are less than 2m/s and the system is not under high pressure
(<240kPa for branch lines serving individual units).
• Use flexible connectors to connect the plumbing system to vibrating equipment such as pumps, washing
machines, dishwashers, garbage disposals, air-handling units and chillers.
• Locate waste and drainage pipes in walls adjacent to rooms that are less noise sensitive such as bathrooms
or utility rooms.
• Ensure pipework located in ceiling voids is spaced at least 100mm away from the ceiling below to allow
sufficient space for the installation of lagging and insulation blankets where required.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 31
8.2 Mechanical Services
8.2.1 System Design
• Select the quietest possible equipment with respect to duct-borne noise, noise breakout and radiated noise
for external plant. A fan with more blades and motor with more poles will usually result in a noise spectrum
that is easier to attenuate (compared with a fan of the same capacity) using duct linings and attenuators due
to higher blade pass frequency which is more readily absorbed / attenuated.
• Locate mechanical plant room doors and access panels in areas that are not noise sensitive such as
corridors.
• Install acoustically rated access panels with acoustic seals (e.g. Trafalgar).
• Design the ductwork to be oversized to allow lower air velocities to minimise regenerated noise.
• Locate outdoor units as far as possible away from noise-sensitive receivers.
• Design the outdoor plant decks so that acoustic barriers can be constructed as close as possible to the plant
while maintaining adequate airflow.
In order to minimise noise mitigation and control requirements, it is recommended that the mechanical equipment
selections comply with the following noise limits specified in Table 19 and Table 20. We note that where equipment
with higher noise levels than stated in this Acoustic specification or if the Mechanical equipment is relocated,
additional control measures must be incorporated as required.
Outdoor condenser units are required to be set to run on ‘night mode’ between the hours of 22:00 and 7:00. The
night mode noise limits are specified in Table 20.

Table 19: Indoor Unit Noise Limits

LEVEL MECHANICAL EQUIPMENT SOUND PRESSURE LIMITS (DBA) AT MAX


SPEED

L1 - Lower Basement FCU/N/L1/COMMUN 38 dBA at 1.5m

L1 - Lower Basement FCU/N/L1/GAMES 38 dBA at 1.5m

L1 - Lower Basement FCU/N/L1/GYM.A 32 dBA at 1.5m

L1 - Lower Basement FCU/N/L1/GYM.B 32 dBA at 1.5m

L1 - Lower Basement FCU/N/L1/LLB 34 dBA at 1.5m

L2 - Upper Basement FCU/N/L2/LLB 33 dBA at 1.5m

L2 - Upper Basement FCU/N/2A/BED2 34 dBA at 1.5m

L2 - Upper Basement FCU/N/2A/STUDY 32 dBA at 1.5m

L2 - Upper Basement FCU/N/2A/BED3 33 dBA at 1.5m

L2 - Upper Basement FCU/N/2A/LIV 43 dBA at 1.5m

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 32
LEVEL MECHANICAL EQUIPMENT SOUND PRESSURE LIMITS (DBA) AT MAX
SPEED

L2 - Upper Basement FCU/N/2A/BED1 34 dBA at 1.5m

L2 - Upper Basement FCU/N/2B/BED1 36 dBA at 1.5m

L2 - Upper Basement FCU/N/2B/LIV 42 dBA at 1.5m

L2 - Upper Basement FCU/N/2B/BED2 35 dBA at 1.5m

L2 - Upper Basement FCU/N/2B/STUDY 34 dBA at 1.5m

L3 - Ground Floor FCU/N/L3/GL.A 37 dBA at 1.5m

L3 - Ground Floor FCU/N/L3/GL.A 37 dBA at 1.5m

L3 - Ground Floor FCU/N/L3/LLB 34 dBA at 1.5m

L3 - Ground Floor FCU/S/L3/LLB 35 dBA at 1.5m

L3 - Ground Floor FCU/S/L3/GL 37 dBA at 1.5m

L3 - Ground Floor FCU/N/3A/STUDY 34 dBA at 1.5m

L3 - Ground Floor FCU/N/3A/BED2 32 dBA at 1.5m

L3 - Ground Floor FCU/N/3A/BED3 33 dBA at 1.5m

L3 - Ground Floor FCU/N/3A/LIV 43 dBA at 1.5m

L3 - Ground Floor FCU/N/3A/BED1 34 dBA at 1.5m

L3 - Ground Floor FCU/N/3B/BED1 36 dBA at 1.5m

L3 - Ground Floor FCU/N/3B/LIV 42 dBA at 1.5m

L3 - Ground Floor FCU/N/3B/BED2 35 dBA at 1.5m

L3 - Ground Floor FCU/N/3B/STUDY 35 dBA at 1.5m

North Typical Apartment FCU/N/4A/LIV 42 dBA at 1.5m

North Typical Apartment FCU/N/4A/BED1 36 dBA at 1.5m

North Typical Apartment FCU/N/4A/BED2 33 dBA at 1.5m

North Typical Apartment FCU/N/4A/BED3 36 dBA at 1.5m

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 33
LEVEL MECHANICAL EQUIPMENT SOUND PRESSURE LIMITS (DBA) AT MAX
SPEED

North Typical Apartment FCU/N/4A/STUDY 33 dBA at 1.5m

North Typical Apartment FCU/N/4A/TV 33 dBA at 1.5m

North Typical Apartment FCU/N/4B/TV 35 dBA at 1.5m

North Typical Apartment FCU/N/4B/LIV 42 dBA at 1.5m

North Typical Apartment FCU/N/4B/BED1 36 dBA at 1.5m

North Typical Apartment FCU/N/4B/BED2 33 dBA at 1.5m

North Typical Apartment FCU/N/4B/BED3 36 dBA at 1.5m

South Typical Apartment FCU/S/LIV1 39 dBA at 1.5m

South Typical Apartment FCU/S/BED1 37.5 dBA at 1.5m

South Typical Apartment FCU/S/BED2 32 dBA at 1.5m

South Typical Apartment FCU/S/LIV2 37.5 dBA at 1.5m

Table 20: Outdoor Unit Noise Limits

SOUND LIMITS (dBA)

LOCATION MECHANICAL EQUIPMENT SOUND PRESSURE SOUND POWER (LW)


(LP) AT MAX SPEED ON NIGHT MODE

Level 1 CU/N/2B 56 dBA at 1.5m 45 dBA

Level 1 CU/N/3B 56 dBA at 1.5m 45 dBA

North Apartments A CU/N/4A/01 - CU/N/14A/01 59 dBA at 1.5m 45 dBA

North Apartments B CU/N/4B/01 - CU/N/14B/01 59 dBA at 1.5m 45 dBA

South Apartments CU/S/L4 - CU/S/L6 57 dBA at 1.5m 45 dBA

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 34
8.2.2 Supply / Return Ducts
• Aim to duct return air back to the equipment using noise control measures similar to that used for the supply
air (i.e. 25mm internally lined ducts).
• Utilise rigid ductwork that is acoustically lined along its entire length wherever possible. An acoustic lining of
25mm to 50mm thickness should be used, depending on attenuation requirements.
• Maintain air velocities through attenuators less than 10m/s and select attenuators with static pressure losses
of 50Pa or less, including system effects, to minimise regenerated noise.
• Locate exhaust fans to maximise the duct length between the fan and the inlet.
• Design for smooth airflow to avoid noise associated with turbulent airflow. Use radius duct elbows, turning
vanes and gradual duct take-offs and branch-offs (8 degrees or less). Avoid installing turning vanes
immediately downstream of fans.
• Keep air velocities through ducts as low as possible (<7.5m/s through duct trunks). This usually requires the
use of larger ducts for a given airflow requirement. Where space requirements necessitate ducts that are
deeper than the ceiling void allows, replace the duct with multiple ducts of smaller size rather than a single
very wide and flat duct to prevent rumble noise breakout and oil canning. Aim for a width that is less than
three times the height of the duct (or vice versa). Size branch ducts equal to the diffuser/grille duct collar.
• Maintain separations equal to at least five (5) duct diameters between fan discharge, attenuators, elbows,
branch take-offs, tees, terminal boxes, cross-section transitions and dampers. This provides the airflow a
chance to straighten out before reaching the next obstruction, reducing both aerodynamic turbulence flow
and fan noise.
• Locate dampers as far upstream as possible from outlets. Try to avoid blade dampers wherever possible as
they may whistle and/or increase the static pressure in the system.
• Ensure that the flexible ducting has no kinks, harsh bends or offsets. Specify flexible ducts with a Spunbond
nylon liner rather than a polyethylene liner.
• Select grilles, registers and diffusers with NR ratings at least 5 points lower than the design room noise
criteria.
8.2.3 Structural Isolation
• Mount refrigeration pipework resiliently when attaching it to the building structure (refer to Section 8.1.1 for
examples).
• Ensure that the building structure that supports the plant is designed so that it has a static deflection of no
more than 20% of the vibration isolation system used to isolate plant items from the building structure.
• Isolate reciprocating, rotating and vibrating equipment using vibration isolators that have an isolation
efficiency of at least 95-98%. The vibration isolators must be selected on the basis of the lowest practical
speed of the plant item.
• Select isolators to ensure that resonant conditions are not possible within the range of excitation
frequencies.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 35
• Resiliently mount the nearest 100 pipe diameters or 10m of pipe or conduit (whichever is greater) serving
vibrating equipment. Use flexible conduits and pipe couplings to vibrating equipment such as pumps (e.g.
Victaulic).
8.3 Electrical Services
8.3.1 System Design
• Generally, electrical outlets, phone jacks, cable wall jacks, GPOs etc. should be located so that they do not
occupy the same inter-stud wall cavity. A minimum horizontal separation of 300mm is nominated in the NCC
2019 for lightweight walls separating SOUs. However, we understand that the layout of the apartments may
necessitate back-to-back GPOs in some cases. In these instances, the following acoustic treatment is
recommended:
– Install a separating septum (if an internal shaft-liner construction is not present) consisting of minimum
13mm plasterboard that extends at least 300mm (in all directions) beyond the outlet.
– Install fire-rated GPO boxes behind outlets such as Clipsal 157 Series Wall Boxes or HPM 435 Wall Boxes.
Wall boxes shall be installed in accordance with the Manufacturer’s Specification.
• Electrical services that are chased into concrete or masonry elements of sound rated walls or floors are to be
back-filled with grout.
• No electrical services are to be fixed in the 20mm discontinuous separation zone between concrete or
blockwork and the separate stud(s) of inter-tenancy walls.
• Cable penetrations through plasterboard ceiling for surface mounted lights, smoke detectors, etc must be
sealed using an approved acoustic sealant (e.g. Knauf BindEx or approved equal).
• Gimballed downlights and ceiling mounted speakers be fitted with acoustic covers (e.g. Tenmat) to maintain
the sound insulation of the floor / ceiling construction. Fixed / non-gimballed downlights with a closed-back
light fitting are acceptable without acoustic covers.
8.4 Vertical Transportation Services
8.4.1 System Design and Installation
• Guide rails are to be supported from the lift shaft at points coincident with the floor slabs rather than mid-
span points.
• The guide rails are to be resiliently isolated from the building structure, with all occurrences of noise bridging
eliminated.
• During the installation of the guide rails all joints are to be carefully aligned to ensure that there are no
offsets that may be a source of structure-borne noise due to rolling elements passing over them.
• The lifts must incorporate rubber rollers and vibration isolation fitted to the lift motor assembly and all
hydraulic drive mechanisms.
• Lift counterweights are to be located away from habitable spaces and bedrooms where possible.
• Lift car interiors, landing door panels and lift car steel superstructure shells should incorporate acoustically
absorptive finishes.
• It is recommended that lift bells be deactivated within apartments to minimise annoyance to occupants.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 36
8.5 Fire Protection Services
8.5.1 System Design
• Penetrations through fire rated walls and floors will need to be designed to ensure that both fire and
acoustic design requirements are satisfied.
• Noise from all plant during a fire emergency shall comply with the requirements of AS 1668, which requires
that noise levels during a fire emergency are not to exceed 80 dB(A) within fire-isolated passageways or 65
dB(A) within occupied spaces. Noise levels within a Fire Control Room shall not exceed 65 dB(A) during a fire
emergency.
8.6 Garbage Chute Design
• The garbage chute design should consider the potential acoustic impacts and incorporate noise attenuation
measures including structural isolation. An example construction is provided in Appendix D.
• In addition, administrative controls including a ban on glass bottle disposal through the garbage chute
should be considered.

Project No: 18423 Project Name: 8 Parker Street


Doc. No.: A18423 Project Location: 8 Parker St, South Perth
Date: 24th April 2020 Technical Specification for Acoustic Services
Issue No: A Page 37
Appendix A – Referenced Drawings

Project No: [00000]


Doc. No.: [00000]
Date: [Comments]
Issue No: [Issue No:]
Table 21: Referenced Architectural Documentation

DOCUMENT NUMBER TITLE REVISION NUMBER REVISION DATE

A000 COVER PAGE AND DRAWING LIST - 26/03/2020

A001 GENERAL NOTES AND LEGEND - 26/03/2020

A002 KEY NOTE - 26/03/2020

A201 L1 – LOWER BASEMENT LEVEL (OVERALL) - 26/03/2020

A202 L2 – UPPER BASEMENT LEVEL (OVERALL) - 26/03/2020

A203A L3 – GROUND FLOOR LEVEL (OVERALL) - 26/03/2020

A203B L3 – GROUND FLOOR – SUB LEVEL (OVERALL) - 26/03/2020

A211 L1 – COMMUNITY AREA - 26/03/2020

A212 L2N – U2A (TYPE 5) & U2B (TYPE 6) - 26/03/2020

A213 L3 – U3A (TYPE 5.1) & U3B (TYPE 6.1) - 26/03/2020

A214 L4N – 4A & 4B - 26/03/2020

A215 L5N – 5A & 5B - 26/03/2020

A216 L6N – 6A & 6B - 26/03/2020

A217 L7N – 7A & 7B - 26/03/2020

A218 L8N – FULL FLOOR APARTMENT - 26/03/2020

A219 L9N – 9A & 9B - 26/03/2020

A220 L10N – 10A & 10B - 26/03/2020

A221 L11N – FULL FLOOR APARTMENT - 26/03/2020

A222 L12N – 12A & 12B - 26/03/2020

A223 L13N SUB-PENTHOUSE (L13A & L13B) - 26/03/2020

A224 L14N – PENTHOUSE 1.1 13/03/2020

A225 L15N – ROOF TERRACE 1.0 13/03/2020

A241 L4S-TYPICAL – SOUTH BUILDING FLOOR PLAN - 26/03/2020

A242 L5S-TYPICAL – SOUTH BUILDING FLOOR PLAN - 26/03/2020

A243 L6S-TYPICAL – SOUTH BUILDING FLOOR PLAN 1.2 13/03/2020

Project No: 18423


Doc. No.: A18423
Date: 24th April 2020
Issue No: A Page 39
Table 22: Referenced Mechanical Documentation

DOCUMENT NUMBER TITLE REVISION NUMBER REVISION DATE

SK-M-01 L1 – HVAC LAYOUT P3 21/04/2020

SK-M-02 L2 – HVAC LAYOUT P3 21/04/2020

SK-M-03 L3 – HVAC LAYOUT P3 21/04/2020

SK-M-04 NORTH – TYPICAL APARTMENT – HVAC LAYOUT P3 21/04/2020

SK-M-05 SOUTH – TYPICAL APARTMENT – HVAC LAYOUT P3 21/04/2020

M-200 EQUIPMENT SCHEDULES 1 P1 17/10/2019

M-201 EQUIPMENT SCHEDULES 2 P1 17/10/2019

Project No: 18423


Doc. No.: A18423
Date: 24th April 2020
Issue No: A Page 40
Appendix B – Noise Contour Maps

Project No: 18423


Doc. No.: A18423
Date: 24th April 2020
Issue No: A Page 41
s
t
n
i
t
c
i
Calculation: ROAD TRAFFIC NOISE PREDICTION

l
f
o n
o
p c
s
l p t
c
i et
h
t
i
o e
c a t
c
i
l
l
f
n c w
t
b e
d
r
u a
M
f
n o
c npn
i n
i
m
f a
o c o
s e
r o
c h
t ee
r
o o
p
y
n
o
i g
o f
g r a
e e
d
a
n e
s
h
t
i
w
eec e
c
n n n c
f
Project: 8 PARKER ST, SOUTH PERTH

i
s t
a n
i
d
i
d
l u
a
o o r e c r
o
i
t i w t
n
t
n
ee
n n
e
d
e
n
i
v
r
e
s
g l
n
i i e i
u e
d u g b r
c e
c
o
c
r a
s u f e
c
e
v
i
a
l
u oot
n
i
t
n
i
i
o
p
i
o
p r
r
e
f
r
e
f
e
e
t
k
n s
i
x
l
n
e
r l
i b d l
u y e i
r s
u u a
a o o
o
s d
e
d
s d
a
e
r
r
u
o
e
c
e
c
l
a Nep
o
p d
l d
l
gi
r
g
r
g
e
f
f
aa a
d
o
i
s
s
e
c
a
l
a
r
t l
b r n r s s e a
n
a
i
l
i
i
a
t
s t t d f e a
f
s
t
r
t
c
e
s ecd
e
d
e
i
f
e
i
f
ni
i
n
d
n
i
d
e
n
e
sre a
o
i f
r n l i x r
r
e a a u e
u n i
i
d o
a
n c o b
o m
o
o
n
i n
i i
o daa a
c e
e
e
e
dB
l l
i d
nA R
m
E
u
S n P
C W M A T I
o a
P F R E R
o
P
o
P N aF
c
a
F r
F r
F l
i
u u
B
o
B
g
Customer: PARKER STREET

i a u
S F B
0.
. 0.
0.0.
0.0.
0
Project No.: 18423

) 5814703
A
( 4455566
B =======
d <<<<<<<
,
T
H
G
I
N
, <<<<<<<
q 0.
. 0.
0.0.
0.0.
0
e 5814703
A
L 4455566
O:\Acoustics Modelling\18423 8 Parker St\18423 - 8 Parker St\road traffic noise (building height variation & adjusted AADT).sgs
s
t
n
i
t
c
i
Calculation: ROAD TRAFFIC NOISE PREDICTION

l
f
o n
o
p c
s
l p t
c
i et
h
t
i
o e
c a t
c
i
l
l
f
n c w
t
b e
d
r
u a
M
f
n o
c npn
i n
i
m
f a
o c o
s e
r o
c h
t ee
r
o o
p
y
n
o
i g
o f
g r a
e e
d
a
n e
s
h
t
i
w
eec e
c
n n n c
f
Project: 8 PARKER ST, SOUTH PERTH

i
s t
a n
i
d
i
d
l u
a
o o r e c r
o
i
t i w t
n
t
n
ee
n n
e
d
e
n
i
v
r
e
s
g l
n
i i e i
u e
d u g b r
c e
c
o
c
r a
s u f e
c
e
v
i
a
l
u oot
n
i
t
n
i
i
o
p
i
o
p r
r
e
f
r
e
f
e
e
t
k
n s
i
x
l
n
e
r l
i b d l
u y e i
r s
u u a
a o o
o
s d
e
d
s d
a
e
r
r
u
o
e
c
e
c
l
a Nep
o
p d
l d
l
gi
r
g
r
g
e
f
f
aa a
d
o
i
s
s
e
c
a
l
a
r
t l
b r n r s s e a
n
a
i
l
i
i
a
t
s t t d f e a
f
s
t
r
t
c
e
s ecd
e
d
e
i
f
e
i
f
ni
i
n
d
n
i
d
e
n
e
sre a
o
i f
r n l i x r
r
e a a u e
u n i
i
d o
a
n c o b
o m
o
o
n
i n
i i
o daa a
c e
e
e
e
dB
l l
i d
nA R
m
E
u
S n P
C W M A T I
o a
P F R E R
o
P
o
P N aF
c
a
F r
F r
F l
i
u u
B
o
B
g
Customer: PARKER STREET

i a u
S F B
0.
. 0.
0.0.
0.0.
0
Project No.: 18423

) 5814703
A
( 4455566
B =======
d <<<<<<<
,
T
H
G
I
N
, <<<<<<<
q 0.
. 0.
0.0.
0.0.
0
e 5814703
A
L 4455566
O:\Acoustics Modelling\18423 8 Parker St\18423 - 8 Parker St\road traffic noise (night, building height variation & adjusted AADT).sgs
Appendix C – Acoustic Mark-Ups

Project No: 18423


Doc. No.: A18423
Date: 24th April 2020
Issue No: A Page 42
1 2 3 4 5 6 7 8 9 10 11 12 13 GENERAL NOTES:
5050 7150 3025 8100 5600 5186 7440 3910 2435 6270 3110 8330 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
S-B WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
-
- - AHD +16. ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
A401 60(COS) STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
PW−02
LANDSCAPE DRAWINGS AND OTHER RELEVANT
BOUNDARY LINE boundary line CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
A -
REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.

boundary line
SSL−12975 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
PW−02 CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
- ws ws ws ws ws ws ws ws 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
PW−02 MR−05 (slab COMPACTED AS PER STRUCTURAL ENGINEER’S

4169
penetration B90 B90 B90 SPECIFICATION
DEEP EARTH (RED 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
CROSS HATCHED) above) B140
CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
STR STR STR STR

BOUNDARY LINE
STANDARD

1)
C150

1)

1)
(L
-

(L

CO

(L
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

(L OL 1−L 04
28
27

L.

30
CC−01 AHD DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

1−L .2 11)
C (L D−
L.
B90

29
B90

L.

L.
CC−01 CC−01 B90 +13.7

11) 6

HR−01 LB
CO
CO
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

A(

CO
1−L .2

2) 9b
5 (C

L
B

( L OL
CC−01 RD−02 RD−02 RD−02 RD−02 OS) RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

1−L
S-D S-C

L01N−06
C
L01N−05A

2)

DF−11
L01N−05B L01N−05C L01N−05D AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
A403 PW−02 A403 C200 C200 C200
PW−02
BOUNDARY LINE 64 65 66 67 68 69 70 71
C150 DU−17 B140
B90 L01N−09B PE&S WATER PROOFING NOTES:
SSL−12875
SSL−12975
SSL−12975
PARTITION
1.
LEGEND -
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
REFER TOTO ACOUSTIC
STRUCTURAL ENGINEER’SBRIEF
BOUNDARY LINE

TO WATER. REFER
SSL−12975 STR SPECIFICATION AND RECOMENDATION.

S
SSL−12975 B90 RD−02
- 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
PW−02 L01N−05E OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
SSL−12945 SSL−12975 SSL−12975
Min R 45

11)
- CLNR AREA, AND LEVEL 3 OPEN SPACES
W

1−L
STR FH STR WET B140 3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION

8917
(L
PW−02 slab penetration above (hydraulic) B140 THROUGH THE WATERPROOF MEMBRANE

31
RD−02 SHW B140 A162

L.
C200

S
CO
L01S−04
SSL−12875
B140 Min RW 50

L HR−02T
CC−01
DF−24 RD−05(F)
DF−06
DP−13
FLOOR PLAN NOTES:
ws L01N−08
B90 L01N−03B L01N−04 L01N−07 DP−12 1. Min R 55
REFER TO FINISHES SCHEDULEW FOR FLOOR AND WALL

7 L
B140 AHD +12.00 (COS)

−L A
C200 L01N−09A

L4 W
SECURE CAR RD−05(F) FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
PW−02 38

T DE
2)
BAYS 36,37,38 C200 L01N−03A SSL−12875 CORRIDOR

1−l 36 A LA
−L
2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND

L1

B
SSL−12975
Min R + Ctr 50

A(
SPECIFICATION FOR LOCATION W OF CONTROL JOINT AND

2) 4
2) 0

2) 3
1−L .19

25
1−L .2

1−L .2
1−L .2

2)
56(A) 57 58 59 60 61 62 63 72 MOVEMENT JOINT.
2)

( L OL

( L OL
( L OL

( L OL

L.

11) 0
(DCTOwhere required)

1−L

( l OL .

600

1−L .5
2)
CO
C

1−L 33
3. SLAB SETDOWNS ARE BE READ INCONJUCTION WITH
C

( L OL
(L
ws
C

( L OL .
11) HR−03

7)
1)
C
C150 SSL−12975 STRUCTURAL ENGINEER’S DRAWINGS

(l

C
B
C150

25

C
CC−01 CC−01 CCR−01 CC−01
Min R 50 + DC

35
CC−01 CC−01 - 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE

L.
CC−01 POOL

L.
37 W
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE

CO
DRY

1−L 03

CO
B140 STR STR UAT
STR
)

MOUNTED

(L BD−
L1

SHW SHW FURN.

N
G
L
1
4
5
3
5
(

C200 5.*DC
ALL=THE FLOOR WASTESconstruction
INDICATES IN THE FLOOR PLAN

L
C200
01

Discontinuous according to NCC


STR
L.

SSL−12975 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC


SSL−12935
CO

PARKING
C200 DRAWINGS.

10 BIKE

N
G
L
1
4
4
1
0
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER

HR−04
SSL−12945 SSL−12945
ws CCR−02 C150 TO HYDRAULIC DRAWING AND SPECIFICATION)
RD−04(F)

6070
RD−04(F) SSL−11675 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
BRISBANE
36 L01N−25 DEEP

1−L 05
L01N−26 TO ALL THE SOIL STACKS
Level 2,WITH ARCHITECT
69 Robertson St PRIOR TO

HR−12
F/D
11)
(L BD−
ws EARTH INSTALATION Fortitude Valley QLD 4006

L
ws ws ws ws ws ws ws ws ws (RED 8. ALL SERVICES PASSEST +61 7 3513 8000
THROUGH FLOOR WHICH REQUIRES
B90 C200
B140 CROSS E bne@floth.com.au
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
SECURE LIFT 0 (COS)
3S 2

SSL−12975 HATCHED) AHD +10.9


1−L .0

AS SPECIFIED
)

1−L .18

C250
( L OL

-
2)
( L OL

ws
LOBBY Project:
9. ALL 8 Parker
CAVITIES, WASTESStreet
PIPES, SOIL STACKS AND

2) 7A
2) 7J
C

2) 7B
B140 B140 B90

2) 2

3) 9
C

2) 7C
C150

2) 1
ws

1−L .2
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.

1−L .4
1−L .2

1−L .3

1−L .3

1−L .3
56(B) STR STR STR SSL−12975 CC−01
Drawing: Sound Insulation
WAY AREMarkups

1−L 3
( L OL
( L OL

( L OL
( L OL
FHR

( L OL
PAUSE BAY

( L OL

HR−05(L OL.
HR−11 T 55 SSL−12975 ER−01 FIRE ISOLATED PASSAGE TO BE CLEARED OF

C
CC−01

C
SSL−12975

C
C

C
CC−01

C
SSL−12975
Revision:
SERVICECPENETRATIOS OTHER THAN ESSENTIAL

C
ws C150 CC−01 ANY
D - SUPPLIES FOR EMERGENCY EQUIPMENTS.

F/D
35 C150 C250 Date:
10. ALL 24/04/2020
TACTILE INDICATORS TO COMPLY WITH AS1428.4
S-A-
CC−01 B140 UP GYM Drawn
11. ALL by: GCAND BALUSTRADE TO COMPLY WITH
HANDRAILS

2) 7D
DF−23 C250 RELEVANT BCA REQUIREMENT AND AS1428.1

1−L .3
ws ws ws ws ws ws FSP LIFT −02 LIFT−01 SSL−12975 Checked by: JC

48 2650
SSL−12875 L03N−31D
2) 3B

( L OL
1−L .17

A402 FS−01

1)
B140 RD−04(F)
2)

CCR−02
1−L .0

C
( L OL

(L
FH C200
( L OL

1−L .16

TL+MS
C

B
L01N−24

2) 7G
2) 7H
2)
C

2) 7F
( L OL

SSL−12975 C150
2) 3a

A305 1

1−L .3

1)
HR−13
1−L .3

L.
1−L .3
C

F/D

(L
1−L .0

( L OL
Notes:

( L OL
PARKING

CO
( L OL
( L OL

HR−06
1 BIKE

CC−01 CC−01

A
C
C
C150
E 2500 2501

48
C

C - Colours may appear differently when printed

L.
C250 ( L OL. C150

CO
BR140

FHR
ELECT. DB 1−L 37

11) 2
-
CSM 2) E

1−L 0
PW−02

2060
1 ER−02 C250

(L BD−
A211 WADING

1−L .14
CCR−02 FURN.

L
C250
1−L .15

EL-01 A301

2)
POOL

( L OL
2)
( L OL

STR POOL

1620
STR

C
C

BR140 (300mm
F

−L 38
1−L .13
C200

1−L .12
54 53 52 51 50 49 SSL−12975 CLEARANCE SSL−12975 −REFER TO

HR−07(L1 L.
2)

2)
RA
CU P U

2)
WATER

( L OL

( L OL

O
PW−01 CC−01 LANDSCAPE PLAN -
M
RV P

C
C
CC−01 DEPTH)
E TO

-
RA L

KITCHENETTE
FFL−11675
MP EV

SSL−12935 FFL−12575

1−L 39
BR140
LEVEL 8,11,14

(L L .
2)
02 EL

C200

CO
COL.
− 2

PW−01 DF−01 C200


ORIENTATION
C200
L01S−01 STR C200
1−L 06
3) 4

FIRE SHUTTER SSL−12975 DEEP EARTH


( L OL .
3)

GT−06
1−L .0
( L OL

ABOVE (RED CROSS


C

L01N−14A
C

39 40 C200 HATCHED)

8005
C200 SSL−12975

2) A
FS−02

−L 40
TL+MS

1 .
COMMUNITY COMMUNITY

HR−08 (L OL
UP C200 C150

C
BR140 C150 PAUSE BAY INTERIOR EXTERIOR
1−L 08

41
C200
( L OL .
3)

C150

L.
HR−10 + HR−12

CO
C200
C

SSL−12975

11) 7
HR−09

1−L .4
1−L 0A

LB L1−L

( L OL
SSL−12875 C200

2)
(L L .4

(
D− 11)

C
C200

01
B90 CC−01

CO
MR−01 CC−01
C200
GAMES
2) 9

1−L .11
1−L .10
1−L .0
1−L 07

2)
41 42 43 44

( L OL
2)

45 46 47 48
3) 5

( L OL
( L OL

C150 RD−01
( L OL .
3)
1−L .0

C
ROOM 3 DIFFERENT ORIENTATIONS
C
C
( L OL

L01S−02
G
C

(L1; L2−L3 AND L4−L11)


C

BR140 FH GT−07
B90 CC−01 CC−01
STR F/D L01N−14B
(A WA ADE

F/D
MR−02 SSL−12875
CC−01
T LL
FALSE COL.
BL
SSL−12975

)
L3
BR140 FFL−12329

3010
B90 SSL−12975 ST−03
SSL−12975

1)
SLAB REV DATE DESCRIPTION

(L
ABOVE

46
2) 5
2) 4
CC−01

2) 2

2) 3

1−L .4

L.
1−L .4
1−L .4

1−L .4

( L OL

CO
( L OL
( L OL
RD−02 B140

(L L
CO

C
C
C
L01S−03 B140
H SSL−12975
RD−02
RD−02
L01N−17A
L01N−17B C200

SL01N−02
ws ws ws ws ws ws ws ws

SC−25
PW−02 B90
BULKY
SSL−12410
STORE
boundary line

boundary line
-

4023
B90 SSL−12975 5 bikes SC−14
BR140 A200 BR140 SSL−12975 B90 SL1N−01 DEEP EARTH PROJECT:
B90 (RED CROSS HATCHED) OS)
PW−01
PW−01
DEEP EARTH (RED CROSS HATCHED)
PW−02 STR PW−02 STR +10.69 (C
AHD Proposed Multiple Residential Development
B90

J boundary line boundary line

N
G
L
1
4
3
9
2
PW−01

N
G
L
1
0
0
5
9
EL-02 MR−06 (slab
SC−24
8 Parker Street, South Perth
penetration above) PILE/ PILE CAP COVER LEAF (RAKE ST−04 SL01N−03
A302
- CONCRETE SLAB AND MANSORY) CLIENT:
-
−TO BE RENDERED AS SCHEDULED
SITE NOTES: −EXTENT AS PART OF PROVISIONAL SUM
GT−11 PARKER STREET COMPANY
L01N−14C
1. REFER TO SURVEY DRAWING FOR ALL THE EXISTING WALL
SETOUT, TREE LOCATION, PAVEMENT EXTENT, TYPE,
LEVEL AND FALL. DRAWING:
2. MAINTAIN ALL NECESSARY SERVICES TO EXISTING LEGEND: Floor Plan - L1 - Lower Basement Level
PREMISES UNTIL NEW SERVICES ARE INSTALLED
3. PROVIDE SAFE AND TEMPORARY ACCESS AT ALL TIMES (Overall)
DURING CONSTRUCTION WORKS, INCLUDING TEMPORARY
DRAWN: DATE:
HOARDINGS, ROOF COVERING, TUNNELS, ETC. TO EXTENT OF GW, FO, YW 20/01/2020
SAFEGUARD ACCESS AT ALL TIMES APPLICATION

3/04/2020 8:43:10 AM
4. SITE BOUNDARY ARE NOT PERPENDICULAR TO EACH SCALE: REVISION:
As indicated @A1
OTHER AND NEED TO BE CONFIRMED ON SITE
5. ALL NATURAL GROUND LEVEL NEED TO BE CONFIRMED ON AUTHORISED: DRAWING NO:
COORDINATION LEGEND: (TEMP) PG
SITE
6. THE PROPOSED LOCATION FOR THE GREEN POWER
UNIPILLAR ARE TO BE CHECK ON SITE TO ENSURE IT
ELECTRICAL MECHANICAL HYDRAULICS L1−L3 PROJECT NO: 1602
A201
ALLOW FOR ENOUGH CLEARANCE FROM THE EXISTING VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
TREE ROOT. FIRE HYDRAULICS WORK
7. DRAWING ON FORECOURT HARD/ SOFT LANDSCAPE; AND AND SHOP DETAILING . DO NOT SCALE
POOL AREA ARE TO BE READ INCONJUCTION WITH DRAWING.
LANDSCAPE ARCHITECT DRAWING. STRUCTURAL N&S TOWER STRUCTURAL L1−L3 a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
1 2 3 4 5 6 7 8 9 10 11 12 13
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
5050 7150 3025 8100 5600 5186 7440 3910 2435 6270 3110 8330 3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
PROPOSED DEEP EARTH 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
S-B
LOCATION TO BE WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
DISCUSSED ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

N
G
L
1
7
6
3
4
A304
A401 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
1 boundary line LANDSCAPE DRAWINGS AND OTHER RELEVANT
BOUNDARY LINE CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
A -
REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.

boundary line
SSL−16360 PW−02 DROPPER 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
SSL−16481
1300mm B90 B190 CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
ws ws ws ws FULL 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
HEIGHT P. BOX COMPACTED AS PER STRUCTURAL ENGINEER’S
4169

SL2N−01
LOUVER SPECIFICATION

SC−13
DEEP EARTH (RED

3470
MR−05 (slab
CROSS HATCHED) PC150E PC150E 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
PW−02 penetration) C150 PC250E SSL−16425 CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN

BOUNDARY LINE
- 1:122 STANDARD

CO
PC250E

(L OL 1−L 04
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

L.
PC250E

1−L .2 11)
C (L D−
29
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

11) 6

HR−01 LB
A(
1−L .2

2) 9b
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

L
C150
B

( L OL
S-C SSL−16475

1−L
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

C
gpu/p

2)
A403 PW−02 SSL−16360 CC−01 SSL−16481 C200 GB−01 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
C200
PW−02
BOUNDARY LINE 31 32 33 34 C150

WATER PROOFING NOTES:


DP PLEASE CONFIRM WE HAVE ENOUGH HEAD CLEARANCE HERE
SSL−16475
BED 2 BED 3 LIVING PARTITION
1.
LEGEND -
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
PW−02 SSL−16350
BOUNDARY LINE

SSL−16235 EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE


S-D
A403 SSL−16445
REFER TOTO ACOUSTIC
TO WATER. REFER STRUCTURAL ENGINEER’SBRIEF
SPECIFICATION AND RECOMENDATION.
-
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
PW−02 SSL−16235 UNIT 2A OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
29300
Min R 45

11)
-

−L
AREA, AND LEVEL 3 OPEN SPACES
W

2 WAY VEHICULAR

L1
8917

A162 SSL−16475

LSIM.
1(
S-E 3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
ENS

.3
ENS THROUGH THE WATERPROOF MEMBRANE

6000

ACCESS

CO
A403 1:122 CC−01
PW−02 1:122
SSL−16475 Min RW 50

7 LL HR−02
TCE P. BOX
L’DRY DIN FLOOR PLAN NOTES:
SSL−16135 SSL−16235 A162
A162
SSL−16445
1. Min R 55
REFER TO FINISHES SCHEDULEW FOR FLOOR AND WALL

−L A
L4 W
SC−30 FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
STUDY /

T DE
2)
C200 CORRIDOR

1−l 36 A LA
−L
A162 SL2N−03
FLEXI−

L1

B
SSL−16235 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND

A(
Min R + Ctr 50

2) 4
2) 0

2) 3
1−L .19

25
1−L .2

1−L .2
SPECIFICATION FOR LOCATION W OF CONTROL JOINT AND

1−L .2
CC−01 21 22 23 24 25 26 27 28 29 30 ROOM

2)
2)

( L OL

( L OL
( L OL

( L OL

L.

11) 0
MOVEMENT JOINT.

1−L

( l OL .

1−L .5
2)
CO
C

1−L 33
(DCTOwhere required)
C

C
A162

( L OL
(L
3. SLAB SETDOWNS ARE BE READ INCONJUCTION WITH
C

( L OL .
11) HR−03

7)
C

C
C150 C150

B
STRUCTURAL ENGINEER’S DRAWINGS

25

C
CC−01 CC−01 CC−01 -
Min R 50 + DC

L.
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE

CO
SSL−16475 CC−01 W

1−L 03
KIT OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE

(L BD−
O.UN B−EX MOUNTED
C200 C200C−01 CCR−01
ENT WC WIR

L
A162 2500 5.*DC
ALL=THE FLOOR WASTESconstruction
Discontinuous INDICATES IN THE FLOOR PLAN
according to NCC
C200 C200 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
PUMP STR DRAWINGS.

HR−04
ROOM R−HD 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
RD−02 C150 TO HYDRAULIC DRAWING AND SPECIFICATION)
LC−A
6070

FHR
RD−02 L02−19B RD−02 SSL−16445 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
BRISBANE

1−L 05
C200

HR−12
UP DF−18 SSL−16283 L02N−19C L02N−19A TO ALL THE SOIL STACKS
Level 2,WITH ARCHITECT
69 Robertson St PRIOR TO

11)
(L BD−
5500

DF−13 ws
L02S−04 INSTALATION Fortitude Valley QLD 4006

SIM.
FS−04

L
ws ws ws ws ws ws ws ws ws
SW−04N L02S−05 8. ALL SERVICES PASSEST +61 7 3513 8000
THROUGH FLOOR WHICH REQUIRES
SSL−16414 SSL−16475
20 E bne@floth.com.au
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
3S 2
1−L .0
)

1−L .18

MR−04 ws A162 MASTER AS SPECIFIED


( L OL

2)
( L OL

B140 C200 DP ENS

2) 7A
2) 7J
C

Project: 8 Parker Street

2) 7B
9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND

2) 2

3) 9
C

STR STR

2) 7C
BED 1

2) 1
ws

1−L .2

1−L .4
1−L .2

1−L .3

1−L .3
B90

1−L .3

1−L .3
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.

( L OL
( L OL

( L OL
( L OL

( L OL
PAUSE BAY LLB A162 A162P−01

( L OL
Drawing: Sound Insulation
WAY AREMarkups

HR−05(L OL
HR−11 T B140 SSL−16380 SSL−16420 ER−01

C
C

C
FIRE ISOLATED PASSAGE TO BE CLEARED OF

C
B90

C
CC−01 CC−01

C
SSL−16300
D C150 A162 CC−01 -
C200 Revision:
ANY SERVICECPENETRATIOS OTHER THAN ESSENTIAL
SUPPLIES FOR EMERGENCY EQUIPMENTS.
CC−01 CC−01 UP A150 A150
A162 Date:
10. ALL 24/04/2020
TACTILE INDICATORS TO COMPLY WITH AS1428.4
S-A B140

2) D
bike DP Drawn
11. ALL by: GCAND BALUSTRADE TO COMPLY WITH
HANDRAILS
A303
- EL-03
SSL−16283

7
1500

ENS

1−L .3
ws ws ws ws ws ws FSP
MASTER RELEVANT BCA REQUIREMENT AND AS1428.1

NBN CPBD
2650

2) 3B

( L OL
1−L .17

A402
parking Checked by: JC

C150
A162 SSL−16414 LB
2)
1−L .0

C
LIFT−02 LIFT−01
( L OL

SPARE FH BED 1
( L OL

1−L .16
C

area DN

2) 7G
CARBAY C200

2) 7H
2)
C

2) 7F
( L OL
2) 3a

1−L .3

HR−13
1−L .3
FS−01

1−L .3
C200
C

TL+MS
1−L .0

F/D SSL−16445

( L OL
( L OL

( L OL
CSM CC−01
( L OL

Notes:

HR−06
C
C
E

C
C

CCR−02 C
CC−01 ( L OL. R−HD
SC−31 - Colours may appear differently when printed

FHR
C200 SMSB ER−02 1−L 37 SL2N−04

11) 2
-
A162 2) E

1−L 0
2060

(L BD−
C200
O NE L EVE

PW−02 CCR−02 SSL−16135 SSL−16235 SSL−16472 L’DRY

1−L .14

L
1−L .15

EL-01 A301

2)
( L OL
2)

CC−01 CC−01
( L OL

ENT
WA Y L 3 )

BR140 B90 C200−01 SC−30

C
WIR
C

73 O.UN B−EX
F

−L 38
CLEARANCE SL2N−05
1:122

HR−07(L1 L.
2)
RA M

19 18 17 16 15 14

O
BR140 SSL−16235 KIT

C
-
P (T

DF−12 DF−01 PDR


C200

1−L 39
O

B140 L02S−03 L02S−01 LEVELED THE AREA BETWEEN THE SLOPED LEVEL 8,11,14 LC−C

(L L .
2)
SSL−16235 CONCRETE SLAB AND UPPER RAMP − 01

CO
FIRE SHUTTER COL. SSL−7815
ABOVE −HATCH AREA SHOWN APPROXIMATE ORIENTATION SSL−16425
LOCATION. WORK TO BE CHECKED ON SITE
1−L 06

C200 STR
3) 4

( L OL .
3)
1−L .0

UNIT 2B
2 WAY VEHICULAR
( L OL

SSL−16235 SSL−16475
C

SSL−16475
FIRE SHUTTER ABOVE WITH 1:122 1:122
ACCESS
8005

SSL−16475
6000

PANEL FOLD DOOR

2) A
BR140 FS−02

−L 40
C200
BR140 STUDY/ FLEXI TCE

1 .
PW−01

HR−08 (L OL
ER−04 DN UP C200 C200 DIN
ROOM

C
PAUSE BAY

SIM.
SERVICES
1−L 08

C200

41
C150
( L OL .
3)

C200

L.
ROOM C150

SIM.
HR−10 + HR−12

CO
SW−01
C

SSL−16255 SC−30
2500

11) 7
HR−09

1−L .4
1−L 0A

LB L1−L
SL2N−06

( L OL
SH

2)
SSL−16292

(L L .4

(
D− 11)
C200 R-01
MR−01

C
SSL−16235 78 128

01
C150 5500 DP

CO
C200 200 CCR−03
ONE WAY RA tl+ms
C150 MP (TO SSL−16302 ENS CC−01
2) 9

1−L .11
1−L .10

LEVEL 1)
1−L .0
1−L 07

2)
CSM

( L OL
2)
( L OL
3) 5

( L OL

SSL−16253
( L OL .
3)
1−L .0

C
7 8 9 10 11 12 13 3 DIFFERENT ORIENTATIONS
STR
C
C
( L OL

155
G
C

470

(L1; L2−L3 AND L4−L11)


C

B90 CC−01
FH CC−01
C150 SSL−16445
100

C200 SSL−16350 BR140


100

(A WA ADE
MR−02 CC−01
T LL
BL
SSL−16475

)
L3
LIV
3010

BR140 B90

BR140
MECH. S BED 2 REV DATE DESCRIPTION
BR140 SSL−16308

2) 5
2) 4
2) 2
SSL−16475

2) 3

1−L .4
SSL−16472

1−L .4
1−L .4

1−L .4

( L OL
( L OL
( L OL

(L L
CO

C
C
C
STR
H RD−02
L02S−02 PW−02
RD−02
L02N−13B
RD−02
L02N−13A 1300MM FULL PC200
B90 ws ws ws ws ws ws ws
HEIGHT VENT
SSL−16477
LOUVER
SC−12
boundary line

boundary line
- PC150E PC200E
SL2N−02
4023

B90 SSL−16480
BR140 SSL−16302 SSL−16362 B90 PROJECT:
SSL−16480STR STR
DROPPER
SSL−16477 B90 B190
DEEP EARTH (RED CROSS HATCHED) B90 Proposed Multiple Residential Development

J boundary line PW−02 MR−06 (slab


boundary line
PW−01 EL-02
penetration) NAME: 8 Parker Street, South Perth
ST−05
A302
-
SITE NOTES: -

N
G
L
1
4
4
1
7
CLIENT:

1. REFER TO SURVEY DRAWING FOR ALL THE EXISTING WALL PARKER STREET COMPANY
SETOUT, TREE LOCATION, PAVEMENT EXTENT, TYPE,
LEVEL AND FALL.
2. MAINTAIN ALL NECESSARY SERVICES TO EXISTING DRAWING:
PREMISES UNTIL NEW SERVICES ARE INSTALLED LEGEND: Floor Plan - L2 - Upper Basement Level

NO
3. PROVIDE SAFE AND TEMPORARY ACCESS AT ALL TIMES
DURING CONSTRUCTION WORKS, INCLUDING TEMPORARY ( Overall)

RT
HOARDINGS, ROOF COVERING, TUNNELS, ETC. TO

H
DRAWN: DATE:
SAFEGUARD ACCESS AT ALL TIMES EXTENT OF GW, FO, YW 20/01/2020
4. SITE BOUNDARY ARE NOT PERPENDICULAR TO EACH
APPLICATION

3/04/2020 8:43:16 AM
OTHER AND NEED TO BE CONFIRMED ON SITE SCALE: REVISION:
As indicated @A1
5. ALL NATURAL GROUND LEVEL NEED TO BE CONFIRMED ON
SITE COORDINATION LEGEND: (TEMP) AUTHORISED: DRAWING NO:
6. THE PROPOSED LOCATION FOR THE GREEN POWER PG
UNIPILLAR ARE TO BE CHECK ON SITE TO ENSURE IT
ALLOW FOR ENOUGH CLEARANCE FROM THE EXISTING
ELECTRICAL MECHANICAL HYDRAULICS L1−L3 PROJECT NO: 1602
A202
TREE ROOT.
7. DRAWING ON FORECOURT HARD/ SOFT LANDSCAPE; AND VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
FIRE HYDRAULICS
POOL AREA ARE TO BE READ INCONJUCTION WITH WORK
LANDSCAPE ARCHITECT DRAWING. AND SHOP DETAILING . DO NOT SCALE
DRAWING.
STRUCTURAL N&S TOWER STRUCTURAL L1−L3 a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
1 2 3 4 5 6 7 8 9 10 11 12 13 OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
) ) ) ) )
S) OS OS OS OS OS
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR

AH
5050 7150 11125 CO
5600 5186 (C 7440
(C 3910
(C
2435 6270
(C
3110
(C 8330 LEVELS, SERVICES AND SERVICE DUCTS.

D
0 0 ( 0 0 0

+1
.6 .8 0 .0 0 0 3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
.8 .0 .0 .8 .6

7.
S-B
20 20 20 20 19 18 17 17 ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

40
+ + + + A304
- -
+ + + +
D SITE CONDITIONS AND DOCUMENTS.

(C
D D D D D A401 D D
AH AH AH AH AH AH AH AH

OS
OS) AND OTHER CONSULTANTS
4. REFER TO STRUCTURAL
00 (CFOR

)
BOUNDARY LINE 1 boundary line AHD +16.
DOCUMENTATION DETAILS REGARDING ASSOCIATED
A PEDESTRIAN 84 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
-
0. ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

boundary line
ENTRY
00 20 40 60 80 2 0 40 +2 B190 SC−26A STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
9. 9. 9. 9. 9. 0 0 0. 0. POINT − 01 D LWB−03 S) LANDSCAPE DRAWINGS AND OTHER RELEVANT
+1 +1 +1 +1 +1 0. +2 +2 (COVERED AH C200 SC−26B SC−26A
O

S)
SIM.
+2 VOID (C CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE

S)
D D D D D D D LWB−02 LWB−03

CO
ACCESS)
AH AH AH AH AH AH AH
SSL−20745

CO
GT−02 REFERED TO ARCHITECT FOR CLARIFICATION AND
D 30

0(
AH 7.

0(
4169

L03S−01 DECISION PRIOR TO PROCEEDING WITH THE WORK.


GB−02 +1

.0
DEEP EARTH (RED

2
O 5. ALL RETAINED ITEMS TO BE PROTECTED DURING

+17
HT

17.
CANOPY OVER CROSS HATCHED) LIFT−04 SC−30 D
PAT AH CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.

D+
OT PC150E

D
SL3N−01

BOUNDARY LINE
FO STING DN C150 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE

AH
PC250E

AH
- DO
IAN EXI COMPACTED AS PER STRUCTURAL ENGINEER’S

1−L 04
S-D DP−03 S-C T R H SPECIFICATION
ES TC

11)
(L D−
ST−01
L03N−13K PED MA BUILDING LOGO

11) 6

HR−01 LB
7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
60 ARTWORK/LETTER

1−L .2
T A403 A403 40 80 80 GPU/P
B

( L OL
68 0 20 0. 0. 0. 0. CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
80 .0 0. AHD−20400 +2 +2

C
S 9. 9. 20
AHD−20104 BOXES +2 +2 PC150E C200 STANDARD
T T
+1 +1 + +2 HD AHD−20600 D AHD−20600 D D SSL−19945 AHD−19945 CC−01 C200
D BR190 D D AHD−20319 A AH AH AH AN
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
AH
BOUNDARY HD
ALINE AH AH RI PC250E DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
ST −03 POND −02 PC250E
C150 9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
B140 DE P
1:20 1:65 PE RAM REFLECTIVE RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

1:2
POND AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
H
BED 3

75
BED 2

3
BR190

1:21
AHD−20675 LIV

0
p. box

10
DO
BOUNDARY LINE

AHD−19945

50
fs+hb cab B140 AHD−20393

2
CC−02 AHD−19940

3) .5
00
50 GT−01 ] SSL−19975 WATER PROOFING NOTES:

1:77
pe

[N
( L OL

1:21
SSL−19945
o PARTITION LEGEND -

o
-
WP+rpz L06S−24C1

C
Sl AHD−19940

Sl
B140 BR190 1.ALLOW FOR WATER STOP TO UNDERNEATH OF ALL

57
1:1
o

11)
op
00
-
[N EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE

8
REFER TOTO ACOUSTIC
STRUCTURAL ENGINEER’SBRIEF

1−L
e]
ACCESS
8917

TO WATER. REFER

(L
S-E PAUSE BAY GT−01 C200 A162−01 SSL−7815 CC−01

31
SPECIFICATION AND RECOMENDATION.

HTR
FFL−19295 FS−04B
ENS ENS

L.
AHD−20505
BR150 L06S−24C2 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP

CO
A403
BR190 00
AHD−20675
GUEST LOBBY TCE OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
Min R 45

3
22
p. box

1 :6
DO
STC AREA, AND LEVEL 3 OPEN SPACES
W

7 LL HR−02
72 DN ir. 3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
9.

1:2
+1
1103 IISA DIN

1:35
0
FF−01 CC−03 SC−30 THROUGH THE WATERPROOF MEMBRANE
D 2700 PC150 SSL−19925
H AHD−20675 SL3N −02
A SSL−19305 FS−04A
SSL−19975 L’DRY W/D SSL−19975
Min RW 50

−L A
L4 W
A162 4400

T DE
AHD−20680
DN A162 FLOOR PLAN NOTES:

1−l 36 A LA
1400

1:1

SIM.
815 FLEXI−

B
A200

3
2
46
1:2 AHD−20575 Min R 55
.0
0° 1:21 A162 ROOM 1. REFER TO FINISHES SCHEDULEW FOR FLOOR AND WALL

11) 0
( l OL .
GUEST

1−L .5
FFL−20490

2)

1−L 33
BR190 A162 A162 FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND

( L OL
D/W
M/V
C
80

( L OL .
11) HR−03

7)
A162

C
CORRIDOR

C
bin LOBBY
32

1:20

1 :2

C
SSL−20815 CC−01 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND

0
-
C150 A200
Min R + Ctr 50
R

SSL−20815 FFL−20005

O.UN
HR.O
SPECIFICATION FOR LOCATION W OF CONTROL JOINT AND

1−L 03
FFL−20845 SS A162 CCR−01
MR−03 E CC−01 MOVEMENT JOINT.

(L BD−

PTY
AHD−20505 ACC
1:20
A162 (DCTOwhere required)
U LA
R A162 LB WIR KIT 3. SLAB SETDOWNS ARE BE READ INCONJUCTION WITH

L
2
.0 C150 LLB VEH
IC RL−19995
CANOPY STRUCTURAL ENGINEER’S DRAWINGS
20 C150 AY A200

81.00°

FZ

FR

HP
D
+
ON GROUND A/P B90 2W OVER Min R 50 + DC
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
W
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
AH

HR−04
BUILDING (FIRE TANK) (TBA) SSL−19940
SIM

ws LINE A162 MOUNTED


6070

LC−A 5.*DC
ALL=THE FLOOR WASTESconstruction
INDICATES IN THE FLOOR PLAN
FFL−20490 LLB
.

ABOVE FFL−20870 A162 A162TC A200 Discontinuous according to NCC


CANOPY

1−L 05
DO
SSL−19945 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
F HR

HR−12
COVERED

11)
(L BD−
OVER DRAWINGS.

1:20
UP

L
ACCESSWAY 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
FFL−20015 1:101 FIP SSL−19975
TO HYDRAULIC DRAWING AND SPECIFICATION)
UP
BRIDGE
3S 2

SWC−01
1−L .0
)

B140 C150 A162 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS


BRISBANE
( L OL

-
SW−04N

SH
RFC A200 ENS MASTER TO ALL THE SOIL STACKS
Level 2,WITH ARCHITECT
69 Robertson St PRIOR TO
C

A162
PORTE−

3) 9
B140 1550 AHD−20225 1:37 INSTALATION

1−L .4
Fortitude Valley QLD 4006
SSL−19975

( L OL
FH ER−01 A200TC A162P−01 8. ALL SERVICES PASSEST +61THROUGH FLOOR WHICH REQUIRES
7 3513 8000
HR−11
ws T CC−01 COCHÈRE A162TC

C
21 A162 CC−01 E bne@floth.com.au
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR

SIM.
0. SOUTH FS−03
HR−11

B140
D

HR−05
-
+2 C200TC AS SPECIFIED
T

V1 BLDG A200
HD
A
FFL−20015 C.COL. UP FS−01 A162 Project:
9. ALL 8 Parker
CAVITIES, WASTESStreet
PIPES, SOIL STACKS AND
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
1:20
A150 775 1100 125
S-A A303
- EL-03
PARKING AHD−20180 (TBA) POND −01 ENS Drawing:
FIRE Sound
ISOLATED Insulation
PASSAGE WAY AREMarkups
TO BE CLEARED OF

1:19
A162 FSP A162
2000 MASTER
2650

2650
A402 FEATURED ANY
EXTENT OF FIRE 2 WAY VEHICULAR LB SERVICECPENETRATIOS OTHER THAN ESSENTIAL
Revision:

SH
TANK WALL UNDER ACCESS TL+MS SSL−20945 POND FH LIFT−02 LIFT−01 HTR BED 1 SUPPLIES FOR EMERGENCY EQUIPMENTS.

1:56
C200
Date: 24/04/2020
1:20

1:40 DN 8000
ws THE SLAB AHD−20790 AHD−20125 A305C200TC
1
A200−01 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4

HR−13
A162 A150 4150 SSL−19975 11. ALL HANDRAILS
LIFT −03 CFE SSL−19945 C150 Drawn by: GCAND BALUSTRADE TO COMPLY WITH

HR−06
A162 1:43 C.COL. RELEVANT BCA REQUIREMENT AND AS1428.1
E (TBA) C200 ER−02 FHR SC−31 Checked by: JC

W/D

L SIM.
AHD−19955 RANGEHOOD SL03N−07

11) 2
BR140

A162
EL-04 A303
-
ceiling mount points

A200
LLB

1−L 0
(L BD−
A200−01
BR190 AHD−20185 STONE CLADDING THROUGH OUT C200
FR
Notes:

FR
HP BBQ

FZ

FR
SSL−19975

HP
Recommended

AHD−20125 25 THE WALL (GREY DASHED LINE) EL-01 A301


ENT
00

STC
under

exhaust
built in
DO
BR190

IR.
ws A162 A162
WIR - Colours may appear differently when printed

PTY
bench oven
F

PTY
one way access

BBQ
HR−12

(ramp) AHD−19949 AHD−19985 A162TC KIT


T

28 AHD−19945
0.

SI
refer to detail

HR−07
SLAB

M.

S−PT
-
+2
1 :3

AHD−19995

M/V
DP−18 ABOVE
D PDR
2

EAVE D/W
AH L03S−17 DP−07 ABOVE AHD−19975 LEVEL 8,11,14 SSL−19945 LC−C
DP−07 L03S−15 AHD−20185 AHD−19910 COL. SSL−19975 A162

SIM.
L03S−16 B90 V6 AHD−20000
ORIENTATION SC−30

1:127
BR190 AHD−20790 A200 A200TC A162
1−L 06

AHD−19975 SL3N −04


3) 4
10065

00
( L OL .
3)
1−L .0

AHD−19965
49

C200
( L OL

PA SSL−19945
SIM

C200
C

B90 US
O/F DP

EB
STUDY/ TCE
SIM.

C200 B140 VISITOR CARPARK DIN

SIM.
STR STR STR DF−03−A AY
1 :5 6 CARBAYS FLEXI

2 WAY VEHICULAR
B90 SW−04N
L03S−18
BR140
38 SLAB L’DRY

SIM.
DN RL−19875 ABOVE A200
A162
A200
AHD−19795 ROOM

ACCESS
9 AHD−19900 AHD−19950
1−L .08

6000

HR−08
.2 1:159 A162 SSL−19925

41
ER−04 A200 SSL−19975
3)

L.
FHR(L OL

+2

CO
FS−02 AHD−19905
C

11) 7
D AHD−19893 HR−09

1−L .4
A200
AH FLUE 1:303

LB L1−L
+ HR−12

( L OL
A162

RB
(
C200

D− 11)
SIM BWA

C
BR140 1
1 :1 7

01
MR−01 .
ON AHD−19950 CCR−03
BR190

SIM.
E AHD−19935 CC−01
BR140 W AHD−19955 ENS
1−L HR−10

AHD−19955 A162
LE A Y R

RB
1−L 07

AHD−19795 BIN STR


3) 5

( L OL .
3)
.0

VE A M 1000 3 DIFFERENT ORIENTATIONS


( L OL

L
G 2) P (T
C

EXTENT OF THE SSL−19945 (L1; L2−L3 AND L4−L11)


C

ws ws
UPPER SLAB FH O tl+ms SSL−19945
MR−02 B190−LSC

(A WA ADE
B90 1:16 730

T LL
ce Re V1 V2 V3 V4 V5

BL

)
6 A162−01

L3
A162 ilin co
gm m LIV
3010

2 ou men
.3 ENTRY GATE (FIRE BED 2

585
0 nt
po ded
+2 C200 int SHUTTER GATE) PC200 AHD−19995
D s 981 730 985
AH 59
BR190 p. box 1 :3
H
NEIGHBOURING
STRUCTURE

AHD−19965 REV DATE DESCRIPTION


BR140 4
DO
GT−03 1:17 PC200E
L03N−13B
PC200
BR190 AHD−19930 PC150E
ws ws ws AHD−19955 ws ws
boundary line

boundary line
-
B190−LSC GB−02
AHD−19985
4023

DP−14
B190−LSC
BR190
2113 AHD−19930 VOID NOTE:
SITE AREA : 2454 SQM
BR190 BR140 G. STR DEEP EARTH (RED CROSS HATCHED)
1:34
2 DEEP EARTH AREA: 167.02 SQM (6.81%) (INCLUDING LEVEL ONE DEEP EARTH AREA)
ST−02
DN
B190 p. box B190
865

J boundary line
B190 B190 DP−15 SC−28 RL−19990 boundary line
PROJECT:

2114 LEB−01 Proposed Multiple Residential Development


22
EL-02
AHD

AHD

VISUALLY PERMEABLE−
AHD

AHD
AHD

0.
AHD

AHD

AHD
GT−04 SC−27 ST−04

AHD

AHD
VERTICAL ALUMINIUM

AHD
+2

AHD
L03E−01 LEB−02
+20.2

+20.2

GATED SLATS @ 100mm


+20.4

D +20.0
+20.6

A302
-
+20.6

+19.0

+18.0
AH
-

+17.0

+15.0
SPACING

+16.0

+14.0
0

0
0

8 Parker Street, South Perth


0

0
0
0

0
0

0
CLIENT:
SITE NOTES:
PARKER STREET COMPANY
1. REFER TO SURVEY DRAWING FOR ALL THE EXISTING WALL
SETOUT, TREE LOCATION, PAVEMENT EXTENT, TYPE, LEGEND:
LEVEL AND FALL. DRAWING:
2. MAINTAIN ALL NECESSARY SERVICES TO EXISTING Floor Plan - L3 - Ground Floor Level
PREMISES UNTIL NEW SERVICES ARE INSTALLED
3. PROVIDE SAFE AND TEMPORARY ACCESS AT ALL TIMES EXTENT OF (Overall)
DURING CONSTRUCTION WORKS, INCLUDING TEMPORARY
HOARDINGS, ROOF COVERING, TUNNELS, ETC. TO
APPLICATION DRAWN:
GW, FO, YW
DATE:
20/01/2020
SAFEGUARD ACCESS AT ALL TIMES

3/04/2020 8:43:24 AM
4. SITE BOUNDARY ARE NOT PERPENDICULAR TO EACH SCALE: REVISION:
COORDINATION LEGEND: (TEMP) As indicated @A1
OTHER AND NEED TO BE CONFIRMED ON SITE
5. ALL NATURAL GROUND LEVEL NEED TO BE CONFIRMED ON AUTHORISED: DRAWING NO:
ELECTRICAL MECHANICAL HYDRAULICS L1−L3 PG
SITE
6. THE PROPOSED LOCATION FOR THE GREEN POWER
UNIPILLAR ARE TO BE CHECK ON SITE TO ENSURE IT
PROJECT NO: 1602
A203a
FIRE HYDRAULICS
ALLOW FOR ENOUGH CLEARANCE FROM THE EXISTING VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
TREE ROOT. WORK
7. DRAWING ON FORECOURT HARD/ SOFT LANDSCAPE; AND STRUCTURAL N&S TOWER STRUCTURAL L1−L3 AND SHOP DETAILING . DO NOT SCALE
POOL AREA ARE TO BE READ INCONJUCTION WITH DRAWING.
LANDSCAPE ARCHITECT DRAWING. a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B C D A402 E F G H
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
8917 6070 2650 2060 8005 3010 LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
SC−07 * FOLDING SC−05 ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SL4N−06 GLASS SCREEN SL4N−07 SITE CONDITIONS AND DOCUMENTS.

CO L1−L
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

170

CO L1−L
(
L. 11)

(
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED

50

L. 11)
210

47
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

210
12 SC−05
C200
HR−06
C200
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
CC−01 CC−01 LANDSCAPE DRAWINGS AND OTHER RELEVANT

LB L1−L
SC−05 SL4N−05

(
D− 11)
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
SL4N−04

02
C150 REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
BIN COMPACTED AS PER STRUCTURAL ENGINEER’S
3110

O/D LIV. O/D KIT. O/D DIN. O/D LIV. SPECIFICATION


7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
O/D DIN. SSL−23425 STANDARD
SSL−23425 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
FCW−01 FW−01 FCW−03 DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
SD−03 FW−07 DHW−03 FW−06 9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

CO
L04N−10B L04N−12D L04N−12E
L04N−10C L04N−10D L04N−11A L04N−11B

L.
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

31(
A162P−02 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

L1
11

−L
11)
CC−01 SW−03A FR−U
FW−04 SD−08 DHW−01 DHW−01 SD−08 FW−04
WATER PROOFING NOTES:
L04N−11C L04N−11D
O/D KIT. L04N−11E L04N−12A L10N−12B CEILING RECESS (T.B.A) L04N−12C PARTITION
1.ALLOW FOR WATER STOPLEGEND - ALL
TO UNDERNEATH OF
SW−03A
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
DHW−07
L04N−10A
SW−01 DHW−07
L04N−12F
REFER TO ACOUSTIC
TO WATER. REFER TO STRUCTURAL ENGINEER’S
SPECIFICATION AND RECOMENDATION. BRIEF
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEAL WTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE

A162P−01 Min RW 50
MASTER FLOOR PLAN NOTES:

Min R 55

3 DIFFERENT ORIENTATIONS
A200 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
6270

SSL−23475 FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND


LIVING DINING KIT. TV/ CORRIDOR
DINING LIVING FP

(L1; L2−L3 AND L4−L11)


KIT. 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
SSL−23475
SSL−23475
MOVEMENT JOINT. Min R + Ctr 50W
3. SLAB SETDOWNS ARE (DCTOwhere
BE READ INCONJUCTION WITH
required)
CS−25 HP STRUCTURAL ENGINEER’S DRAWINGS
SWC−01
L04N−28A 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
LB L1−

W
D− L11
(

MOUNTED
04 )

5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN


A200 ARE=TO
*DC BE READ IN CONJUCTION
Discontinuous construction WITH HYDRAULIC
according to NCC
DRAWINGS.
PC150 A162−02
SW−01 DU−03 LOT 4A LOT 4B AW−03 TTW−01 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
CCR−01

CO L1−L
L04N−27A CCR−04 L04N−14A L04N−13 TO HYDRAULIC DRAWING AND SPECIFICATION)
HR−01

(
L. 7)
SSL−23445 SW−02W SW−02W
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

33
PC150 PC200 SW−01 D/W
BRISBANE
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO

CO
SW−01 INSTALATION Level 2, 69 Robertson St

L.
AW−06 SW−01 SW−01 SW−02W 8. ALL SERVICES PASSESFortitude
THROUGH ValleyFLOOR
QLD 4006
WHICH REQUIRES

41
I.FR/FZ I.FR/FZ DC
L04N−09 ENS PT−01 T +61 7 3513 8000
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
10 S-B
SW−01
S-B AS SPECIFIED E bne@floth.com.au
PC150E 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
A401
CS−06 SWC−01 MOD−08 O SW−01 STUDY SW−02W
WC SSL−23425
A401 Project: 8 PIPES
RAINWATER ParkerTO Street
BE ACOUSTICALLY LAGGED.
DU−17 DU−17 FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
L04N−29B L04N−29A
L04N−28B PB BIN
SW−01
CS−06 SW−02W
DU−17
L04N−35C
SD−04
L04N−14B
Drawing:
ANY SERVICESound Insulation
PENETRATIOS OTHERMarkups
THAN ESSENTIAL
SW−02W SW−02W SC’LY L04N−34B Revision:
SUPPLIES C EMERGENCY EQUIPMENTS.
FOR
SW−02W FD
SSL−23425 SC’LY SC−05 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
DU−06 SW−04N ENS Date: 24/04/2020
2435

FD SL4N−08 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH


MASTER CS−05
MASTER ST

S.TCE
SW−04N L04N−32
L04N−27B PDR PTY SW−04N Drawn by:
RELEVANT GCREQUIREMENT AND AS1428.1
BCA
FOYER ROBE DU−05
W Checked by: JC
N E 20 2 0
S.TCE

AW−05 SWC−01 SW−04N DU−17


L04N−26

HR−09
L04N−08 SW−01 SW−04N L04N−35B
A162

D
SW−04N HR−07 LC−D SW−04N SHW HTR
SW−03B DWRS

E /
SW−04N HR−05

OS 2 1 / 0 1
A200
SC−05
SL4N−03 SW−02W SW−02W
Notes:
SW−01
9 SW−02W - Colours may appear differently when printed
A200 CS−07b SW−03A
P
P R O IN G −
HR−04 A200
A200 A200 A200−01 L04N−31B A162C−01 A200 SSL−23445
CS−06
A162 A162 SW−02W L04N−35A
SW−02W SW−02W SW−03B

D
618 DU−03
L’DRY PDR

UI L
DW−05 SW−01 SW−01 L04N−34A SWC−01
L04N−07 SW−02W LIFT−01 A200−01 SSL−23445 SW−01
FCW−05
L04N−14B

BConc
L B L 1−
SW−01 D− L11) SSL−23475 SSL−23445
(

05
STC CA-240
SW−01 DU−05
A200−01 CS−07a SW−02W
SSL−23425 ENTRY W/D
L04N−31A STC L04N−33
SSL−23445
3910

SSL−23475 DU−16 LOBBY twl


SW−02W
CS−06 DWRS SW−01
MASTER
BED 2 BATH TV/ L04N−20
A
L04N−34C
*RB BED 1
A
FAMILY A150 SW−02W SWC−01 SW−02W
DW−08
A200−01 WIR A SSL−23475 TTW−01
L04N−02A SW−01
SW−02W DU−08 SSL−23475 L04N−15A
L04N−23A CS−09
SW−01
SW−02W
HR−02
LIFT−02 ENTRY L04N−30
DU−01

11) 1
1−L 0
SW−01 SSL−23475

(L BD−
L04N−36 SW−01 A162 SW−02W SW−01
FW−09

L
A200 A200−01
DU−03 L04N−02B
BL T L

AW−04 A150 DW−06


8 L04N−24 FSP
A
AD 4−

L04N−06 CS−19 SC−06 L04N−18 HR−08


E L7

DU−03 CS−04 A200 A200


W

A162C−01 L03N−31CC A162C−01 SL04N−02 RB


AL

SW−01 L04N−22 L04N−21


L

FH A200
F/D TTW−01
L04N−15B
DU−03
PC150E SW−01 B90 A162E SSL−23445
L04N−25 SW−02W
DF−04
L04N−01 FS−01 DF−04 SC−06−N

HTR
L04N−19 SL4N−10
SW−01
2246

DN REV DATE DESCRIPTION


SW−02W UP BATH SW−02W

SW−01 DF−04 SW−02W


BED 3 STUDY L’DRYL04N−03A SERVICE A200
A200 BED 2
TV/ SSL−23475
SSL−23475 SW−01 SSL−23475 CT. DU−03
FAMILY
SSL−23475 L04N−39
SW−03 SERVICE
L04N−03B SW−02W
CT DU−05
TTW−01
L04N−37
L04N−15C
FCW−07 SD−01 DHW−07 SD−05 A162 ER+NBN+ SW−01
DU−03
7440

L04N−05C L04N−05B L04N−05A L04N−04 DRY CT. PROJECT:


MATV SW−01 L04N−38
A200 A200
DHW−03 FW−05 SD−01 Proposed Multiple Residential Development
PW+WF L04N−17C L04N−17B L04N−17A
A162 SSL−23425
HR−03 PW+WF TTW−01
L04N−15D
A/C ER+NBN+
LB L1−

SC−05 MATV 8 Parker Street, South Perth


D− L11
(

TCE SL4N−02
03 )

BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
SSL−23425 DOWN PIPE CLIENT:
CC−01
CO L1−L

BED 3

COL.
BALCONY DRAIN
(
L. 11)

DOWN PIPE
26

A/C SW−01 SSL−23475 PARKER STREET COMPANY


SSL−23425 RB

BL AL L3
AD L )
W T
DRAWING:

(A

E
L4N- 4A & 4B
FCW−08 SD−01
L04N−16B L04N−16A DRAWN: DATE:
GW, YW 20/01/2020
TCE

3/04/2020 8:43:48 AM
SCALE: REVISION:
As indicated @A1
7 AUTHORISED: DRAWING NO:
PG

FROSTED SC−05
PROJECT NO: 1602
A214
GLASS SL4N−09
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
CANOPY
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B C D A402
E F G H
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
8917 6070 2650 2060 8005 3010 LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
SC−07 * FOLDING ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SL5N−08 GLASS SCREEN SITE CONDITIONS AND DOCUMENTS.
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

CO L1−L
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED

CO L1−L
(
L. 11)

(
50

L. 11)
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

47
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
12 SC−05 HR−06 C200 SC−05 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
C200 SL5N−09

LB L1−L
SL5N−07 CC−01 CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE

(
D− 11)
REFERED TO ARCHITECT FOR CLARIFICATION AND

02
CC−01 C150 DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
COMPACTED AS PER STRUCTURAL ENGINEER’S
BIN SPECIFICATION
3110

O/D LIV. SSL−26690 O/D KIT. O/D DIN. O/D LIV. 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
SSL−26690 CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
STANDARD
BBQ & HOOD
O/D DIN. OVER
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
FCW−01 SD−03 DHW−03 FW−06 FW−01 FCW−03 9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

CO
L05N−10B L05N−10C L05N−11A L05N−11B L05N−12D L05N−12E RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

L.
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

3 1(
A162P−02

L1
11

−L
11)
FW−04
CC−01 SW−03A
L05N−11C
FR−U WATER PROOFING NOTES:
SD−08 O/D KIT. SD−08 CEILING RECESS (T.B.A)
1. PARTITION
ALLOW FOR WATER STOP LEGEND - ALL
TO UNDERNEATH OF
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
SW−03A L05N−11D L05N−12B
DHW−07
L05N−10A SW−01 DHW−07
REFER TO ACOUSTIC
TO WATER. REFER TO STRUCTURAL ENGINEER’S
SPECIFICATION AND RECOMENDATION. BRIEF
L05N−12F 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
DHW−01
L05N−11E
DHW−01
L05N−12A
Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE
SC−05
SL5N−06 Min RW 50
A162P−01 FLOOR PLAN NOTES:
MASTER
1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
SSL−26740 Min R 55

3 DIFFERENT ORIENTATIONS
FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND
6270

CORRIDOR
TV/
LIVING SSL−26740 DINING KIT. HP 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
DINING LIVING FP

(L1; L2−L3 AND L4−L11)


PC150E KIT. SPECIFICATION FOR LOCATION OF CONTROL JOINT AND

SSL−26740
PC150E MOVEMENT JOINT. Min R + Ctr 50
W
3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH
CS−08 (DC where required)
STRUCTURAL ENGINEER’S DRAWINGS
PC150

L05N−28
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
SWC−01
Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
W
LB L1−

MOUNTED
D− L11
(

5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN


04 )

ARE=TO
*DC BE READ IN CONJUCTION
Discontinuous construction WITH HYDRAULIC
according to NCC
A200 DRAWINGS.
SW−02W TTW−01 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
DU−03 CCR−04 TO HYDRAULIC DRAWING AND SPECIFICATION)
L05N−13

CO L1−L
A162−02 L05N−27A SW−02W 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
PC150

HR−01
(
L. 7)
CCR−01

33
D/W PC150E BRISBANE
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
SSL−26690 INSTALATION Level 2, 69 Robertson St
SW−02W

CO
8. ALL SERVICES PASSESFortitude
THROUGH Valley QLD 4006
FLOOR WHICH REQUIRES

L.
AW−06 SW−01 T +61 7 3513 8000

41
I.FR/FZ I.FR/FZ DC FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
L05N−09 ENS SW−01 AW−03 AS SPECIFIED E bne@floth.com.au
10 SW−01 SW−02W
PC200

S-B L05N−14A S-B 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
SSL−26690
A401 PC150E SW−01 WC A401 Project: 8PIPES
RAINWATER Parker
TO Street
BE ACOUSTICALLY LAGGED.
O FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
DU−17 DU−17 SWC−01
SW−01 SW−02W SW−01
SW−02W Drawing:
ANY SERVICESound Insulation
PENETRATIOS OTHERMarkups
THAN ESSENTIAL
SW−02W BIN DU−17 SC−05
SC−05 L05N−29B L05N−29A SW−02W
SC’LY L05N−35C SL5N−11 Revision:
SUPPLIES C EMERGENCY EQUIPMENTS.
FOR
SL5N−05 SD−04 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
SC’LY SW−01
SW−02W
L05N−14B
FD
Date:
11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
ENS
2435

CS−05 SW−04N
Drawn by: GCREQUIREMENT AND AS1428.1
FD
RELEVANT BCA
MASTER MASTER ST DU−06

S.TCE
W
L05N−27B
PDR PTY L05N−32
Checked by: JC
N E 20 2 0
SW−04N SW−04N
PC150E FOYER ROBE DU−05 SW−04N DU−17
S.TCE

CS−07b
AW−05 SW−04N WIR B L05N−35B

HR−09
SSL−26740 L07N−21K A162 L05N−31B SW−04N SW−04N
SSL−26690 L05N−08
A200
SW−04N
HR−07 LC−D SW−04N SHW HTR
E D /
OS 2 1 / 0 1
SW−01 HR−05 SW−03B DWRS
Notes:
SWC−01 - Colours may appear differently when printed
P
SW−02W SW−02W SWC−01
9
P R O IN G −
HR−04 A162C−01 SW−02W
A200 A200 A200−01 A200 SSL−26690 SSL−26690
CS−06
A200 A162 DU−03 L05N−35A
A162 SW−01
CS−06

IL D
SW−02W SW−04N L05N−34A SW−02W
SW−02W L05N−34B FCW−05
DW−05
SW−01 SW−03B SW−01 L’DRY PDR SSL−26690 L05N−14B

BU
L05N−07 A200−01 SWC−01
LIFT−01
L B L 1−

SW−01 SW−01
D− L11)
(

SW−02W SW−01 SSL−26690


05

STC
SW−01 A200−01 DU−05
A150 SW−02W L05N−33
SW−02W ENTRY W/D STC PC150E
3910

twl CS−06 SW−01


SW−02W LOBBY L05N−34C DWRS
MASTER
BED 2 BATH TV/ DU−16 SSL−26740 A SW−01 *RB BED 1
SSL−26690 L05N−20 A
FAMILY DW−08 A200−01 CS−07a SW−02W WIR A SSL−26740 TTW−01
SSL−26740 SW−02W SWC−01 L05N−15A
SSL−26740 L05N−02A L05N−31A
SW−04N CS−09
SW−04N SW−01 DU−01
SW−02W
HR−02 A200 LIFT−02 ENTRY L05N−30 L05N−36
A162
SW−04N

11) 1
1−L 0
SW−01

(L BD−
SW−01
A200−01

L
DU−08 SW−04N SSL−26740
BL T L

FW−09
8 L05N−23 FSP
A
AD 4−

AW−04 L05N−02B SC−06 A150


DU−03 HR−08
E L7

DU−03 SW−01 A200


W

L05N−06 L05N−24 A162C−01 CCR−06 SL5N−02 SW−03A A162E A200 RB PC150E


AL

L05N−22
L

FH A200 SW−02W
286

F/D
DU−03 DW−06 TTW−01
SW−01
L05N−25 SW−01 CS−04 400 L05N−18 L05N−15B
CS−19 DF−04
L05N−21A SW−02W SW−02W
L05N−21C L05N−01 DF−04
SW−02W
A162E FS−01 L05N−19

HTR
PC150E
SSL−26690 B90 A162E REV DATE DESCRIPTION
SW−01
2246

SW−01 UP DN BATH PC150E


SSL−26690
A200 SSL−26690
SW−02W
SC−06−N
SC−05 BED 3 STUDY
SSL−26740 L’DRY SERVICE SL5N−13 BED 2
SL5N−04
SSL−26740 TV/
DF−04 CT. SW−04N FAMILY
SSL−26740 -
L05−03A SSL−26740
SW−01
SERVICE
TTW−01
A162 CT SW−02W DU−05 L05N−15C
FCW−07 SD−01 SD−05 L05N−37
A162
1189

L05N−05C L05N−05B L05N−04 ER+NBN+ DU−03 DU−03 PROJECT:


7440

SW−04N DRY CT. PC150E


MATV L05N−38 L05N−39
A200 SW−04N Proposed Multiple Residential Development
A200
PW+WF
SW−03 SW−01 TTW−01
HR−03 PW+WF SW−04N SW−01 L05N−15D
L05N−03B SW−04N
SSL−26690 A162E A162 A/C ER+NBN+
A200 8 Parker Street, South Perth
LB L1−

DHW−07 A200 MATV


D− L11
(

L05N−05A
TCE
03 )

BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
CLIENT:
2135

DOWN PIPE DHW−03 FW−05 SD−01


CO L1−L

L05N−17C L05N−17B A162E BED 3 PC150E

COL.
CC−01 BALCONY DRAIN L05N−17A
(
L. 11)

DOWN PIPE PARKER STREET COMPANY


26

SC−05 A/C
SL5N−03 SSL−26740
RB

BL AL L3
DRAWING:

AD L )
W T
L5N - 5A & 5B

(A
SC−02

E
SL5N−01
SSL−26690
FCW−08 SD−01 DRAWN: DATE:
L05N−16B L05N−16A GW, YW 20/01/2020

TCE

3/04/2020 8:43:53 AM
SCALE: REVISION:
As indicated @A1
7 1
SC−05
SL5N−12
AUTHORISED:
PG
DRAWING NO:

A305
PC150E PROJECT NO: 1602
A215
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au

-
S-A
B C D E F G H GENERAL NOTES:
A402
8917 6070 2650 2060 8005 3010 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
FOLDING 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
GLASS SCREEN SC−07 SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR

L
CO
SL6N−06 LEVELS, SERVICES AND SERVICE DUCTS.

CO L1−L

C.
CO L1−L
(
L. 11)
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

(
50

L. 11)
SLIDING PRIVACY ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

47
SCREEN SITE CONDITIONS AND DOCUMENTS.
12 HR−06
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
SC−05 SC−05 DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
CC−01 CC−01

LB L1−L
SL6N−05 SL6N−07 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

(
D− 11)
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

02
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
SC−05 REFERED TO ARCHITECT FOR CLARIFICATION AND
SL6N−04 DECISION PRIOR TO PROCEEDING WITH THE WORK.
3110

P/O 5. ALL RETAINED ITEMS TO BE PROTECTED DURING


BIN O/D KIT. O/D DIN. O/D LIV. CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
O/D LIV. SSL−29955
O/D DIN. SSL−29955
COMPACTED AS PER STRUCTURAL ENGINEER’S
SPECIFICATION
FW−01 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FW−07 DHW−03 FW−06 BBQ L06N−12D CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN

CO
L06N−10D L06N−11A L06N−11B STANDARD

L.
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

3
hood

1(
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

L1
over
11

−L
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

11)
FW−04 RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
CC−01 L06N−11C FR−U AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SW−03A
FCW−01 SD−03
CEILING RECESS (T.B.A) FCW−03
L06N−10B L06N−10C SW−03A CEILING RECESS (T.B.A) FR−U FW−04 L06N−12E
O/D KIT. L06N−12C
WATER PROOFING NOTES:
DHW−07 DHW−07
1. PARTITION
ALLOW FOR WATER STOP LEGEND - ALL
TO UNDERNEATH OF

SH
L06N−10A SW−01 L06N−12F
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
TO WATER. REFER TO STRUCTURAL ENGINEER’S
4590 689
SD−08 DHW−01 DRW SD−08
REFER TO ACOUSTIC
SPECIFICATION AND RECOMENDATION. BRIEF
DHW−01 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
L06N−11D L06N−11E L06N−12A L06N−12B OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
sh over
opt.
Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
stool THROUGH THE WATERPROOF MEMBRANE
recess/ HP
SW−01 st
PC150E Min RW 50

3 DIFFERENT ORIENTATIONS
MASTER
6270

PC150E SSL−30005 TV & F/P LIVING DINING drawers p/o FLOOR PLAN NOTES:
below caddy DINING LIVING

(L1; L2−L3 AND L4−L11)


KIT KIT.
SSL−30005
1.
Min R 55
REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
FINISHES IN SOLE OCCUPANCY UNIT, W PUBLIC SPACES AND
CS−25 SSL−30005 CORRIDOR
L06N−28B 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
PC150 MOVEMENT JOINT. Min R + Ctr 50
W
LB L1−

3. SLAB SETDOWNS ARE (DC TOwhere


BE READ INCONJUCTION WITH
required)
D− L11
(

opt. m/wo
SH

STRUCTURAL ENGINEER’S DRAWINGS


04 )

D/W
d/w
LOT 6A or cup’d LOT 6B 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
under
SH A200 A162−02 Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
SH

DU−03 CCR−04 W
CCR−01 TTW−01 MOUNTED
L06N−27A SW−02W SW−01 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN

CO L1−L
FR ZIP TAP UNIT SSL−30005 bin L06N−13
HR−01

(
L. 7)
*DC
ARE=TODiscontinuous construction
BE READ IN CONJUCTION according to NCC
WITH HYDRAULIC

33
AW−06 UNDER PC150E DRAWINGS.
SW−01
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER

CO
L06N−09

L.
900 o/s TO HYDRAULIC DRAWING AND SPECIFICATION)

41
PC200 SSL−29975 DU−03 SWC−01 F/F SW−01 AW−03 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
ENS CS−06 SW−01 760
10 S-B PC150E L06N−29D
L06N−28A SW−01
HR−13
L06N−14A S-B INSTALATION
BRISBANE
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
Level 2, 69 Robertson St
A401 DU−17 SW−01
bench
SW−01 DU−17 A401 8. ALL SERVICES PASSESFortitude
THROUGH Valley QLD 4006
FLOOR WHICH REQUIRES
DU−17 space SW−01 T +61 7 3513 8000
L06N−29B L06N−29A SW−01 PTY + L06N−35C FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
SW−02W E bne@floth.com.au
APP. SC’LY SW−01 DU−06 SSL−29955 AS SPECIFIED
HTR L06N−32 DU−17 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
PC150E SD−04
SSL−30020 sh over
SC’LY SW−02W L06N−35C
L06N−14B
FD Project: 8PIPES
RAINWATER Parker
TO Street
BE ACOUSTICALLY LAGGED.
ENS FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
Drawing:
SERVICESound Insulation
OTHERMarkups
2435

FD CS−05
MASTER MASTER SW−04N SW−04N ST ANY PENETRATIOS THAN ESSENTIAL

S.TCE
AW−05 L06N−27B DU−05 SW−04N
L06N−08 FOYER ROBE ST PDR L06N−26A pull
SW−01 Revision:
SUPPLIES C EMERGENCY EQUIPMENTS.
FOR
SSL−29955 SW−04N CS−07b SW−04N 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
out sh
sh over
WIR B SW−04N DU−17 Date: 24/04/2020
S−TCE

SWC−01

HR−09
L06N−31B 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH
L06N−35B
WC SHW A200 HR−07 Drawn by:
RELEVANT BCAGC
REQUIREMENT AND AS1428.1
SW−04N HR−05 st/sh SW−03B SW−04N
W
Checked by: JC
N E 20 2 0
SWC−01
SW−02W SH ADJSW−02W
SH SW−02WADJ SH DRWS DRWS
9 A200 HR−04 A162C−01 SW−02W
E D /
OS 2 1 / 0 1
A200
A200 A200−01 A200 CS−06 SSL−29975
SWC−01 Notes:
A162 SW−02W FCW−05
A162 L06N−35A - Colours may appear differently when printed
P
PC150E A162
SW−02W SW−01 L06N−14B

P R O IN G −
SW−01 CS−06 SW−02W
DW−05 DU−03
L06N−07 SW−02W ENTRY L’DRY PDR L06N−34A SWC−01
L06N−34B OPTIONAL
SW−02W DU−16
LIFT−01 ROBE SC−05
SSL−30005 A200−01

L B L 1−
SSL−29975 SSL−29975 SL6N−08

IL D
L06N−20B SW−01

D− L11)
(

05
CS−03 A200−01
SSL−29975

BU
L06N−20A SW−02W DU−05
L06N−33
CS−06
3910

PC150E
SW−01
L06N−34C SW−01 MASTER
TV/ hanging stacked BED 1
ST rail wm SW−02W
BED 2 SW−02W BATH FAMILY SWC−01 A150
SW−01
CS−07a
SWC−01 WIR A SSL−30005
L06N−31A TTW−01
SSL−30005 SW−04H
PC150E SSL−30005 SW−01 L06N−15A
WC ir. A162
SW−04H SW−04H center CS−09
LIFT−02A200−01 ENTRY L06N−30
HR−02 L’DRY SW−02W SW−01

11) 1
DU−03

1−L 0
A200−01 SSL−30005 PC150E

(L BD−
DU−03 ST ir. board
L06N−22 SW−01 DW−06

L
L06N−24 SSL−29975
DU−08 st. l’dry L06N−18
BL T L

AW−04 A150
8 L06N−23A hamper FSP
A
AD 4−

L06N−06 SW−03A HR−08


E L7

SW−04H SW−03B A162E SW−01 A200 A200


CO l1−l
W

LC st. l’dry
AL

L. 2)
(

hamper DU−01
L

36

FH L06N−36
A200
DU−03 SSL−30065 B90 A162E
SW−01 TTW−01
L06N−25 BIN
A162E
A162C−01 SD−06 DW−04 SSL−29975 L06N−15B
SW−01 CS−04 1 SC−06−N SW−02W
L06N−21A L06N−03 L06N−02 DF−04 SC6N−10
PC150E L06N−19
BIN DF−04
SW−01 SW−01 2 L06N−01 UP FS−01 DN BATH
A162E TV PC150E
PRELAY SERVICE CT BIN BIN
BED 2 REV DATE DESCRIPTION
BED 3 STUDY SERVICES A200 1 2
TV/ SW−02W
SSL−30005
SSL−30005 FOR FUTURE A200 -
SSL−30005 SSL−29955 FAMILY
SSL−30005
DR SW−01 CLOTH SERVICE
HANGER SW−02W
CT A162E DU−03
TTW−01
A162 DU−08 L06N−15C
FCW−07 SD−01 DHW−07 L06N−39
SD−05 L06N−37A
L06N−05C L06N−05B L06N−05A ER+NBN+
7440

L06N−04 DU−03
A200 MATV L06N−38 PC150E
A200 DHW−03 FW−05 SD−01
L06N−17C L06N−17B L06N−17A
PW+WF TTW−01 PROJECT:
HR−03 PW+WF SW−03A SW−01 L06N−15D
SW−03A Proposed Multiple Residential Development
A162E ALLOW 30MM A162 A/C ER+NBN+
PC150E
LB L1−

SETDOWN TO MATV
D− L11
(

03 )

SSL−29955 FUTURE ENS


BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
DOWN PIPE
A162E 8 Parker Street, South Perth
CO L1−L

BED 3

COL.
BALCONY DRAIN
TCE
(

CC−01
L. 11)

DOWN PIPE SSL−29955


26

A/C SSL−30005
SC−05 CLIENT:
SL6N−02

BL AL L3
SC−01

AD L )
PARKER STREET COMPANY

W T
(A
SL6N−01

E
FCW−08 SD−01 DRAWING:
L06N−16B L06N−16A
PC150E L6N - 6A & 6B
TCE
7 DRAWN:
GW, YW
DATE:
20/01/2020

3/04/2020 8:43:58 AM
SCALE: REVISION:
As indicated @A1
SC−05 AUTHORISED: DRAWING NO:
SL6N−09 PG

H
PROJECT NO: 1602
A216
RT
NO
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
* REPRESENTS VARIATIONS TO BE CONFIRMED 6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B 8917
C 6070
D A402
2650
E 2060
F 8005
G 3010
H
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
* FOLDING SC−05 3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
SC−07 SL7N−09
GLASS SCREEN ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SL7N−08
SITE CONDITIONS AND DOCUMENTS.

CO L1−L

CO L1−L
(
L. 11)
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

(
50

L. 11)
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED

47
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
12 SC−05
HR−06 C200 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
SL7N−07 C200 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND

LB L1−L
LANDSCAPE DRAWINGS AND OTHER RELEVANT

(
D− 11)
CC−01

02
C150 CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
CC−01 REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
BIN 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
3110

O/D LIV. SSL−33220 COMPACTED AS PER STRUCTURAL ENGINEER’S


O/D KIT. O/D DIN. O/D LIV. SPECIFICATION
SSL−33220 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
BBQ & HOOD CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
O/D DIN. OVER STANDARD
FW−07 DHW−03 FW−06 FW−01 FCW−03 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
L07N−10D L07N−11A L07N−11B L07N−12D L07N−12E DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

CO
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

L.
3
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

1(
FW−04 A162P−02 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

L1
11

−L
L07N−11C

11)
CC−01 SW−03A FR−U
SD−03 SD−08 SD−08
FCW−01
L07N−10C WATER PROOFING NOTES:
L07N−10B L07N−11D O/D KIT. L07N−12BCEILING RECESS (T.B.A)
1. ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
SC−05
SL7N−06
SW−03A PARTITION LEGEND
EXTERNAL WALL AND ALL - EXPOSURE
WALL WITH DIRECT
DHW−07 DHW−07 TO WATER. REFER TO STRUCTURAL ENGINEER’S
L07N−10A L07N−12F REFER
SPECIFICATIONTO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
DHW−01 OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
DHW−01 AREA, AND LEVEL 3 OPEN SPACES
L07N−11E L07N−12A Min R 45
3. ALLOW FOR WATERTIGHT SEAL WTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE

A162P−01 Min RW
FLOOR PLAN NOTES: 50
MASTER
SSL−33270

3 DIFFERENT ORIENTATIONS
1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
6270

LIVING DINING KIT. HP


TV/ CORRIDOR
Min R 55
FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
W
DINING LIVING FP

(L1; L2−L3 AND L4−L11)


PC150E KIT. 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SSL−33270 PC150E SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
SSL−33270 MOVEMENT JOINT.
Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
PC150

STRUCTURAL ENGINEER’S
(DC whereDRAWINGSrequired)
SWC−01 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
LB L1−

Min R 50 + DC
D− L11
(

MOUNTED W
04 )

5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN


A200 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
CS−08 SW−02W
L07N−28
*DC = Discontinuous construction according to NCC
DRAWINGS.
DU−03 TTW−01 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
CCR−01

CO L1−L
A162−02 L07N−27A CCR−04 SW−02W L07N−13 TO HYDRAULIC DRAWING AND SPECIFICATION)
PC150

HR−01

(
L. 7)
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

33
D/W PC150E
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
SW−02W

CO
INSTALATION BRISBANE

L.
AW−06 SW−01 8. ALL SERVICES PASSESLevel 2, 69 Robertson
THROUGH FLOOR St WHICH REQUIRES

41
I.FR/FZ I.FR/FZ DC Fortitude Valley QLD
L07N−09 ENS SW−01 AW−03 FIRE RATING TO BE PROTECTED BY A 4006
FIRE RATED COLLAR
10 SW−01 SW−02W T +61 7 3513 8000
PC200

S-B L07N−14A S-B AS SPECIFIED


SSL−33220 E bne@floth.com.au
9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
A401 SW−01 WC DU−17 A401 RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
O
PC150E SWC−01
SW−01 SW−02W
SW−02W BIN
SW−01
SW−02W L07N−35C
SC−05
Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
ANY SERVICE PENETRATIOS OTHER THAN ESSENTIAL
SC−05
DU−17 DU−17 SW−02W
SC’LY SL7N−10 Drawing:FOR
SUPPLIES Sound Insulation
EMERGENCY Markups
EQUIPMENTS.
L07N−29B L07N−29A SW−02W SD−04
Revision:
TACTILEC INDICATORS TO COMPLY WITH AS1428.4
FD
SL7N−05 SSL−33220 SC’LY SW−01
ENS
10. ALL
2435

FD DU−06 SW−04N L07N−11D 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH
MASTER CS−05
MASTER ST Date: 24/04/2020

S.TCE
L07N−27B PDR PTY L07N−32 DU−17 SSL−33220 RELEVANT BCA REQUIREMENT AND AS1428.1
SW−04N
PC150E AW−05 FOYER ROBE DU−05 SW−04N L07N−35B Drawn by: GC
W
SW−04N
S.TCE

L07N−26 CS−07b SW−04N WIR B Checked by: JC


N E 20 2 0
L07N−08

HR−09
SSL−33270 A162 SW−04N SW−04N CS−06
SSL−33220 SW−04N L07N−31B
A200 HR−07 LC−D SW−04N SHW L07N−35A HTR
HR−05 SW−03B DWRS
CA-240 Conc
SW−01 CS−06

E D /
OS 2 1 / 0 1
SW−02W SW−02W SWC−01
SWC−01 L07N−34B Notes:
9 A162C−01 SW−02W - Colours may appear differently when printed
P
A200 HR−04 l’dry hanging TV SSL−33220
A200

P R O IN G −
A200 A200 A200−01 hamper rail
A162 A162 SW−01
DW−05 SW−02W SW−04N SW−02W
SW−02W ir. DU−03 FCW−05
L07N−07
L’DRY center PDR

IL D
SW−03B SW−01 A200−01 L07N−34A L07N−14B
SWC−01
L B L 1−
LIFT−01

BU
ir. SSL−33220
D− L11) SW−01
(

SW−02W SW−01
05 SSL−33220
STC
A200−01
SW−02W CS−07a SW−02W DU−05
SSL−33220 A150
CA-210 Conc ENTRY W/D
L07N−31A STC L07N−33 CS−06 PC150E
3910

twl SW−01
SW−02W LOBBY L07N−34C DWRS
MASTER
BED 2 BATH TV/ DU−16 SSL−33270 A SW−01 *RB BED 1
L07N−20 SSL−33270
FAMILY DW−08
A200−01 SW−02W WIR A TTW−01
SSL−33270 SW−02W SWC−01
SSL−33270 L07N−02A L07N−15A
SW−04N
SW−02W SW−04N CS−09
HR−02 A200 LIFT−02 ENTRY L07N−30
A162
SW−04N

11) 1
1−L 0
SW−01

(L BD−
A200−01

L
D.SHC
SW−04N SSL−33270
DU−03
BL T L

DU−08 DU−03 FW−09


8 AW−04 FSP
A
AD 4−

L07N−24 L07N−23 L07N−22 L07N−02B A150


HR−08
E L7

L07N−06 CS−19 SW−01 A200


W

A162C−01 SW−03A A162E A200 RB PC150E


AL

CCR−06 L7N−21C DU−01


L

L07N−36 A200
FH SW−02W
F/D
ART
SW−01 DU−03 SC−06 TTW−01
SW−01 CS−04 DW−06 L7N−15B
L07N−25 SL7N−02
L07N−21A L07N−18 SW−02W SW−02W
DF−04 DF−04 SC−06−N
A162E
L07N−01
FS−01 L−7N19 SL7N−12

HTR
PC150E SW−02W SSL−33220
B90 A162E
SW−01 SW−01 SSL−33220 UP DN BATH PC150E
REV DATE DESCRIPTION
A200 TV
SW−02W
BIN BIN
BED 3 STUDY
SSL−33270 L’DRY
DF−04
SERVICE 1 2 BED 2
SSL−33270 L07N−03A TV/
SC−05
CT. FAMILY
SSL−33270
SSL−33270
SL7N−04
SW−01
SERVICE TTW−01
SD−05
A162 CT SW−02W DU−05 L07N−15C
L07N−37
FCW−07 L07N−04 A162
SD−01 ER+NBN+ DU−03 DU−03
7440

L07N−05C DRY CT.


DRY PC150E
L07N−05B MATV L07N−38 L07N−39
CT. PROJECT:
A200
A200
SSL−33220 PW+WF
SW−03A
Proposed Multiple Residential Development
SW−03A
HR−03 SW−03 PW+WF TTW−01
SW−01 L7N−15D
A162E A162 L07N−03B
A/C A200 ER+NBN+
LB L1−

DHW−07 A200 MATV


D− L11
(

L07N−05A
TCE 8 Parker Street, South Perth
03 )

BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
DOWN PIPE DHW−03 FW−05 SD−01
CC−01 SSL−33220
CO L1−L

L07N−11G L07N−17B L07N−17A A162E BED 3 PC150E CLIENT:

COL.
SC−05 BALCONY DRAIN
(
L. 11)

SL7N−03 DOWN PIPE


26

A/C
SSL−33270 PARKER STREET COMPANY
SC−02 RB

BL AL L3
SL7N−01

AD L )
W T
SSL−33220

(A
FCW−08

E
DRAWING:
L7N−16B
L7- 7A & 7B
SC−05 SD−01
SL7N−11 L07N−16A
DRAWN: DATE:
TCE TV GW, YW 20/01/2020

3/04/2020 8:44:03 AM
SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
PC150E PG
PROJECT NO: 1602
A217
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B C D A402 E F G H
8917 6070 2650 2060 8005 3010 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
CA-240 Conc FIXED GLASS 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SC−07
PANELS SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
SL8N−06 C200 LEVELS, SERVICES AND SERVICE DUCTS.

CO L1−L
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

CO L1−L
(
L. 11)
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

(
50

L. 11)
47
SITE CONDITIONS AND DOCUMENTS.
12 SC−05 C200 HR−06 SC−05
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
SL8N−05 SL8N−07 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

LB L1−L
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

(
D− 11)
CC−01

02
CC−01 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
C150
LANDSCAPE DRAWINGS AND OTHER RELEVANT
SC−05 FOLDING GLASS SCREEN CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
RECESSED RECESSED LIGHTING STRIP
SL8N−04 RECESSED LIGHTING STRIP LIGHTING STRIP O/H REFERED TO ARCHITECT FOR CLARIFICATION AND
O/H FW−14 FW−15 O/H DECISION PRIOR TO PROCEEDING WITH THE WORK.
L08N−10I L08N−10J SSL−36485 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
3110

CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.


O/D DIN. 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
A162E
O/D LIV. O/D LIV. PC150 COMPACTED AS PER STRUCTURAL ENGINEER’S
FW−07 SSL−36485 SPECIFICATION
L08N−10D 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
SD−01 STANDARD

CO
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

L.
TERRACE L08N−14B

3
A162E DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

1(
SH

BBQ
L1
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
11

−L
FCW−09 RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

11)
FW−04 O/D KIT. L08N−14A FCW−03 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
L08N−10E SD−09 SD−09
COFF. L08N−14C
L08N−10F L08N−10G SD−13
FCW−01 FW−01 CASUAL M
A162E L08N−12
FW−12 DHW−04
L08N−10B L08N−10C L08N−13A L08N−13B
CC−01 MEALS A162E BIN P/O P/O P/O
FR BULKHEAD & LIGHTING EDGE OVER SC−05 WATER PROOFING NOTES:
SD−14 PTY PTY PTY
DHW−07 L08N−10H PTY M/V.O O/S SW−02W FW−16 SL8N−08
1. ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
L08N−10A C−PT L08N−14D
PARTITION LEGEND -
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
TO WATER. REFER TO STRUCTURAL ENGINEER’S
CURTAINS SPECIFICATION AND RECOMENDATION.
2.REFER TOLAYER
ALLOW FOR DOUBLE ACOUSTIC
WATERPROOFING ONBRIEF
THE TOP
C−PT OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
BULKHEAD & LIGHTING EDGE OVER AREA, AND LEVEL 3 OPEN SPACES
D/W 3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
SW−01
SSL−36535
Min R 45
THROUGH THE WATERPROOF MEMBRANE
W
SW−03A

DRW SCLY MASTER BED


C.SP/AB
Min RW
FLOOR PLAN NOTES: 50

3 DIFFERENT ORIENTATIONS
PC150E
6270

C−PT
SW−03A SW−02W
SW−01 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL

(L1; L2−L3 AND L4−L11)


FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
PC150E S/P FZ
SW−02W DHW−06
L08N−15A
CORRIDOR Min R 55
2. REFER TO STRUCTURAL ENGINEER’S W DRAWING AND
HP SSL−36535
PC150E SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
FLUE LOT 8 SSL−36535 MOVEMENT JOINT.
A. Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH

F/D
STUDY SW−03A W
LB L1−

TMX STRUCTURAL ENGINEER’S DRAWINGS


TV/ LIVING DINING KIT
D− L11
(

A200E (DC where


4. ALLOW FOR ADDITIONAL BRACINGrequired)
ON INTERNAL SOLE
04 )

FP DW OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE


SSL−36535 R/O
A200 UNIT PTY SSL−36505 MOUNTED
PC150
SWC−01
CS−14
L08N−34 SD−07
SSL−36485
Min R 50 + DC
5. ALL THE FLOOR WASTES INDICATES W IN THE FLOOR PLAN
L08N−15B ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
A162−02 CS−13 DRAWINGS.
HR−01 SW−01
FR L08N−31
SW−01 SW−03A CCR−04 ENS 6. FALL ALL THE LINEAR DRAIN TO DRAIN according
*DC = Discontinuous construction to NCC
OUTLET (REFER
PC150 TO HYDRAULIC DRAWING AND SPECIFICATION)

CO
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

L.
PC200

41
SPA BATH SC−05 TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
HTR DU−18 DU−18
INSTALATION
10 S-B
FW−10
L08N−08B SW−01 SWC−01
SWC−01
L08N−35A
L08N−35B SL8N−09
S-B 8. ALL SERVICES PASSESBRISBANE
THROUGH FLOOR WHICH REQUIRES
Level 2, 69 Robertson St
A. FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
Fortitude Valley QLD 4006
A401 SW−03A A401

F/D
DU−12 DU−09 AS SPECIFIED
DHW−02 L08N−28 L08N−32
S.TCE T +61 7 3513 8000
9. ALL CAVITIES, WASTESE bne@floth.com.au
PIPES, SOIL STACKS AND
SH/SPEAKER L08N−08A DU−03 FW−17 RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
SW−02W FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
ABV. A.
L08N−27 L08N−26 SW−01 SW−01 SW−02W
WC SHW
FD
Project:
ANY 8 Parker
SERVICE StreetOTHER THAN ESSENTIAL
PENETRATIOS
2435

SW−04N SW−04N SW−01 SW−01 SW−02W SWC−01


Drawing: Sound Insulation Markups
FD
C.SP/AB SW−01 SW−01 C.SP/AB DC SH OVER CS−16 SUPPLIES FOR EMERGENCY EQUIPMENTS.
SW−04N F/D 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
SW−03A L08N−15C
Revision: C AND BALUSTRADE TO COMPLY WITH
S.TCE

S−PT SW−04N A200C−01 11. ALL HANDRAILS


SW−03B D/C D/C
F/D
Date: 24/04/2020
RELEVANT BCA REQUIREMENT AND AS1428.1

HR−09
FR SW−03A FCW−06
ART SW−02W

LC−D
/U SW−01
HR−05
ST HR−07 SW−04N CS−15
SW−02W L08N−15D Drawn by: GC
SSL−36485 SW−01 SW−04N
Checked by: JC
W
TV/FP L08N−33
SW−04N

N E 20 2 0
SW−01
9 PC150E
cabinet cabinet SW−01 HR−04
SSL−36505 SW−01
SW−04N SC−05
(speakers (speakers DU−03 A200 A200−01
DU−05 SL8N−10

E D Notes:
/
OS 2 1 / 0 1
/sh) /sh) TINTED GLASS
SSL−36535
L08N−25
A200−01
PDR L08N−29
- Colours may appear differently when printed
WIR
DW−05 SW−01
P
P R O IN G −
L08N−07A TASTING ENTRY 1 SSL−36535 DHW−07
SW−01 BENCH L B L 1− SSL−36535
LIFT−01 SW−02W L08N−15E
D− L11)
(
THEATRE CELLAR SH 05
CS−24

IL D
SW−01 A200−01 L08N−40 PC150E
SW−01
SSL−36535 SW−02WSW−02W SW−02W SW−03B

BU
F/D LIN SW−02W LIN SW−03A SWC−01 SW−01
3910

SW−03A C−PT
SW−03A
SW−01
F/D SH
S−PT A150
COATS/ LIN
SW−02W TTW−01
SW−04H ELEC/V SSL−36505 DU−04 L08N−16A
PC150E ST L08N−30 SSL−36505
SHW DU−18
HR−02T SSL−36535 SSL−36535 LIFT−02 L’DRY SW−02W DU−08
SW−04H HR−02 ST L08N−37B
L08N−37A

11) 1
LIN

1−L 0
(L BD−
PC150E
AW−04 HTR ENS

L
L08N−06 A200−01 A200−01
SW−04H SW−04H DU−08
8 SW−02W L08N−21 FSP A150 BED 3
SW−01 SW−01 SW−01 HR−08 LIN SW−02W SSL−36535
DU−03
SW−02W A200
SW−02W
SW−01 SWC−01 L08N−20 FH
DU−10 TTW−01
DU−08 TR L08N−36 SW−02W SW−02W
TR SW−01 L08N−16B
L08N−22
CS−01 fire hydrant
L08N−23
CCR−05
SHW DW−07 DF−04 SD−07
PC150E WM
SSL−36505 L08N−02 L08N−01 L08N−19 SW−01
DU−17 RB lin.
L08N−24A UP FS−01 DN sh above

BED 2 SITTING ENS PDR A162E GUEST WING


DU−17 SSL−36535 DU−17 PC150E REV DATE DESCRIPTION
L08N−40B
SSL−36535 L08N−24B AW−06 SERVICE SW−02W SW−02W -
SSL−36505
HTR L08N−03B CT
A162E ENS
TTW−01
D/C DU−17
L08N−16C
FCW−07 SD−01 DHW−07 L08N−40A
A162E A162E DHW−05 FW−05 SD−01 DU−03 SHW
L08N−05C L08N−05B L08N−05A SSL−36485 ER+NBN+
7440

L08N−18C L08N−18B L08N−18A SW−03A


MATV L08N−38 HTR
A200 A162E
A200 AW−06
L08N−03A CT YARD PW+WF
DU−05 PC150E PROJECT:
SW−02W
HR−03 A162 PW+WF L08N−39
CCR−05 TTW−01
AW−01
A162 ER+NBN+ L08N−16D
Proposed Multiple Residential Development
A200
LB L1−

TERRACE L08N−04 A200 MATV C−PT


D− L11
(

03 )

SSL−36485 BALCONY DRAIN


A/C

ORIENTATION
LEVEL 8,11,14
DOWN PIPE TERRACE
CO L1−L

8 Parker Street, South Perth

COL.
CC−01 BALCONY DRAIN A162E BED 4/
(

SSL−36485
L. 11)

PC150E
DOWN PIPE
26

A/C
UTILITY
SC−05 CLIENT:
SL8N−02 SC−03 SSL−36535 RB
SL8N−01 FCW−08 PARKER STREET COMPANY
L08N−17B

SC−05 SD−01 DRAWING:


SH
SL8N−12 L08N−17A PC150E L-8N- Full Floor Apartment

7 1
DRAWN:
GW, YW
DATE:
20/01/2020

3/04/2020 8:44:08 AM
SCALE: REVISION:
A305 As indicated @A1

SC−05 AUTHORISED: DRAWING NO:


PG
SL8N−11
PROJECT NO: 1602
A218
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
- 6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B C D A402 E F G H
8917 6070 2650 2060 8005 3010 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
FIXED GLASS LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
SC−07 * FOLDING OR ORDERING MATERIAL.
SL9N−07 GLASS SCREEN 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR

CO L1−L

CO L1−L
(
L. 11)
LEVELS, SERVICES AND SERVICE DUCTS.

(
50

L. 11)
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

47
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
12 SC−05
C200 HR−06
SC−07
SL9N−07
SC−05
SL9N−08
SITE CONDITIONS AND DOCUMENTS.
CC−01 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

LB L1−L
SL9N−06 DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED

(
D− 11)
CC−01 C200 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

02
C150 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
P/O BIN LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
BIN REFERED TO ARCHITECT FOR CLARIFICATION AND
3110

DECISION PRIOR TO PROCEEDING WITH THE WORK.


O/D KIT. O/D DIN. O/D LIV. 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
O/D LIV. O/D DIN. A162P−02
BBQ BBQ & HOOD SSL−39750
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
SSL−39750 OVER COMPACTED AS PER STRUCTURAL ENGINEER’S
FW−07 DHW−03 FW−06 SPECIFICATION
FCW−01 CEILING RECESS L09N−10D L09N−11A L09N−11B 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING

CO
L09N−10B (T.B.A) CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN

L.
FW−04 STANDARD

3
1(
L09N−11C DRW 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

L1
11

−L
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

11)
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
F/F FR−U FW−04 RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
SW−03A SW−03A L09N−12C
SD−03 FW−01 FCW−03 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SD−08
L09N−10C CEILING RECESS (T.B.A) L09N−12D L09N−12E
SW−03A L09N−12B
CC−01 F/Z
O/D KIT.
DHW−07 DHW−07 WATER PROOFING NOTES:

SH
L09N−10A L09N−12F
1. ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
TO WATER. REFER TO STRUCTURAL ENGINEER’S
SD−08 DRW DHW−01
L09N−11D
DRW DHW−01
L09N−12A
PARTITION LEGEND -
SPECIFICATION AND RECOMENDATION.
L09N−11C 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
SC−05
SL9N−05
REFER TO ACOUSTIC BRIEF
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE
P/O BIN Min RW 45
PC150E

3 DIFFERENT ORIENTATIONS
MASTER
6270

SSL−39800 SW−01 LIVING DINING P/O


TV/ FLOOR PLAN NOTES:
DRW HP HP DINING LIVING FP Min R 50

(L1; L2−L3 AND L4−L11)


KIT KIT. 1. REFER TO FINISHES SCHEDULEW FOR FLOOR AND WALL
SSL−39800 FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
P/O SSL−39800 CORRIDOR
A200 CS−18
L09N−28 SWC−01 DRW DRW Min R 55
2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SPECIFICATION FOR LOCATION W OF CONTROL JOINT AND
MOVEMENT JOINT.
LB L1−

3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH


D− L11
(

STRUCTURAL ENGINEER’S DRAWINGS


04 )

LOT 9A
DRW
A162P−01 LOT 9B Min R + Ctr 50
4. ALLOW FOR ADDITIONAL BRACING W ON INTERNAL SOLE
SH

SSL−39770 OCCUPANCY UNIT STUD


(DC WALL
where WHERE THE TV ARE TO BE
required)
spice TTW−01 MOUNTED
PC150

DU−03 cabinet L09N−13


INT 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
L09N−27A
HR−01 A162−02
AW−06
SW−01 DW
D/W
CCR−04
SW−02W SW−02W PC150E DRAWINGS.
Min R 50 + DC
ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
W
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER

CO
L09N−09

L.
SW−02W F&F TO =
*DC HYDRAULIC DRAWINGconstruction
Discontinuous AND SPECIFICATION) according to NCC

41
SWC−01 I.FR/FZ I.FR/FZ DC AW−03 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
ENS
PC200

SW−01
10 S-B L09N−14A S-B
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
INSTALATION
SW−01
A401 SW−02W O/S WC SW−02W A401 8. ALL SERVICES PASSES THROUGH FLOOR WHICH REQUIRES
P/O O SSL−39770 SSL−39750 BRISBANE
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
SSL−39770 SW−01 SW−01
PC150E SC’LY BIN X3 BIN DU−06 SW−02W AS SPECIFIED Level 2, 69 Robertson St
SL9N−04

L09N−32 Fortitude
PIPES,Valley
SOILQLD 4006 AND
SC−05

HTR 9. ALL CAVITIES, WASTES STACKS


DU−17
F SW−02W SD−04 FD RAINWATER PIPES TO TBE+61ACOUSTICALLY
7 3513 8000 LAGGED.
SC’LY

SL9N−09
L09N−35C E bne@floth.com.au
SW−01 ENS FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
2435

SC−05
FD L09N−14B
MASTER MASTER ST ANY SERVICE PENETRATIOS OTHER THAN ESSENTIAL

S.TCE
SW−02W P/O DRW PTY SW−04N SW−04N
PC150E FOYER CS−05
mirrors ROBE mirrors
ST PDR ST Project: 8 Parker Street
SUPPLIES FOR EMERGENCY EQUIPMENTS.

SW−04N
L09N−27B SW−04N A162C−01 DU−17 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
above doors WIR B Drawing: Sound
AND Insulation
BALUSTRADEMarkups

SW−04N
S−TCE

HR−09
SSL−39750 DU−05 A162 L09N−35B 11. ALL HANDRAILS TO COMPLY WITH
WC SHW A200 L09N−26A SW−04N
SW−04N
HR−07 SW−04N
LC−D SW−03B DWRS SHW HTR Revision:BCA
RELEVANT C REQUIREMENT AND AS1428.1
TWR HR−05 CS−06
L09N−34B
Date: 24/04/2020
SW−03A
9 PC150E SH ADJ SH SW−02W ADJ SH DRWS DRWS
SW−01 Drawn by: GC
HR−04 CS−07b
W
Checked by: JC
N E 20 2 0
A200 l’dry hanging SW−02W
A200 A200 A200−01 hamper L09N−31B rail A162 CS−06 SWC−01 FCW−05
L09N−35A

D
A200 L09N−14B
RB SW−02W RB
/
SW−01 SWC−01
E
A162 ir. SW−02W

OS 2 1 / 0 1
DW−05 L’DRY center PDR
DU−03
Notes:
L09N−07 ENTRY LIFT−01
L09N−34A
- Colours may appear differently when printed
P
SSL−39770 SWC−01

P R O IN G −
AW−05 DU−16
L B L 1−
D− L11) SSL−39800 A200−01 SSL−39770 ir. SW−01
(

L09N−08 L09N−20B 05
STC
SWC−01 A200−01 DU−05
SW−02W SW−02W W/D SW−02W L09N−33

IL D
STC PC150E
HTR
3910

SSL−39770 twl CS−06 DWRS SW−01


MASTER
BU
SW−01 L09N−34C
SW−02W
TV/ hanging
W/D
A
A SW−01
*RB BED 1
STC rail CS−03 A150
BED 2 BATH FAMILY L09N−20A CS−07a WIR A
SSL−39800 TTW−01
SW−02W SWC−01 SW−02W L09N−15A
SSL−39800 L09N−31A
TRH SW−04N SSL−39800
SSL−39800 CS−09 DU−01
SW−04N
SW−04H
SW−02W
LIFT−02 ENTRY L09N−30 L09N−36 A162
HR−02 L’DRY A200−01

11) 1
PC150E

1−L 0
DU−03 STC SSL−39770 SW−02W SW−01

(L BD−
IRON B. A200−01
L09N−22

L
DU−03 DW−06 D.SHC
AW−04 L09N−24 DU−08
BL T L

SW−04N L09N−18
8 L09N−06 DW−04 P/O FSP A150
A
AD 4−

L09N−23
HR−08
E L7

SW−03B L09N−02 L’DRY SW−03A A162E A200 A200


SW−01
CO l1−l

SW−01
W

LC−A ST HAMPER RB
AL

L. 2)
(
L

36

FH
A200 F/D SW−02W
SSL−39860 TTW−01
DU−03 L09N−15B
L09N−25 CS−04 A162E B90 A162E SW−02W
A162C−01 SW−02W
SW−01 L09N−21A
SD−06
DF−04 DF−04
L09N−01 L09N−19 SC−06−N SSL−39770
L09N−03

HTR
SL9N−11
PC150E
SW−01 SW−01 PC150E
SC−05
UP FS−01 DN BATH
SL9N−03

SERVICE CT BIN BIN


BED 2
BED 3 STUDY 1 2
TV/ SW−02W DU−03 SSL−39800 -
SSL−39800
SSL−39800 RB SSL−39750 FAMILY
SSL−39800 L09N−39 REV DATE DESCRIPTION
SW−01
A162E
CLOTH SERVICE
HANGER TTW−01
CT DU−05 L09N−15C
A162 L09N−37
FCW−07 SD−01 SD−05
ER+NBN+
7440

L09N−05C L09N−05B L09N−04 DRY CT. SW−02W PC150E


AREA: 12.61M 2 MATV
CONC.COL.
A200 A200 TBA DHW−03 FW−05 SD−01
PW+WF L09N−17C L09N−17B L09N−17A SW−03A DU−03
HR−03 A162 PW+WF L09N−38 SW−01 TTW−01
DRY CT L09N−15D
SC−05
A162E A/C A200 ER+NBN+ PROJECT:
SL9N−02
LB L1−

MATV SW−03A
D− L11
(

DHW−07 A200 Proposed Multiple Residential Development


03 )

BALCONY DRAIN

ORIENTATION
L09N−05A

LEVEL 8,11,14
CC−01 DOWN PIPE
A162E PC150E
SSL−39750
CO L1−L

BED 3

COL.
BALCONY DRAIN
TCE
(
L. 11)

DOWN PIPE
26

A/C SSL−39800
RB 8 Parker Street, South Perth

BL AL L3
AD L )
W T
(A

E
CLIENT:
SSL−39750
FCW−08 SD−01 PARKER STREET COMPANY
L09N−16B L09N−16A PC150E
TCE DRAWING:
7 L9N- L9A & L9B

DRAWN: DATE:
GW, YW 20/01/2020

3/04/2020 8:44:13 AM
SC−05 SCALE: REVISION:
As indicated @A1
SL9N−10
AUTHORISED: DRAWING NO:
PG
PROJECT NO: 1602
A219
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
S-A GENERAL NOTES:
B C D A402
E F G H
*FOLDING GLASS 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
8917 6070 SCREENS 2650 2060 8005 3010
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
FIXED GLASS SC−07 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
* FOLDING
SL10N−06 GLASS SCREEN SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR

L
CO
LEVELS, SERVICES AND SERVICE DUCTS.

CO L1−L

C.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

CO L1−L
(
L. 11)

(
50

L. 11)
SLIDING PRIVACY ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

47
SCREEN SITE CONDITIONS AND DOCUMENTS.
12 CC−01 SC−05 HR−06 C200
CC−01 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
SL10N−05 C200 SC−05

LB L1−L
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

(
D− 11)
SL10N−07 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

02
C150 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
P/O BIN REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
SC−05 O/D LIV. BIN 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
3110

SL10N−04 A162P−02 O/D KIT. O/D DIN. O/D LIV. CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
O/D KIT. COMPACTED AS PER STRUCTURAL ENGINEER’S
BBQ BBQ & HOOD SPECIFICATION
OVER 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FW−07 DHW−03 FW−06
CEILING RECESS CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
L10N−10D L010N−11A L10N−11B

CO
(T.B.A) STANDARD

L.
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

3
1(
DRW DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

L1
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
11

−L
11)
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
F/F FW−04 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SW−03A SW−03A FR−U L10N−12C
FCW−01 SD−03 FW−01
L10N−10B L10N−10C CEILING RECESS (T.B.A) FCW−03
L10N−12D
SW−03A CC−01 L10N−12E
F/Z WATER PROOFING NOTES:
DHW−07 DHW−07 1. ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
PARTITION LEGEND - EXPOSURE

SH
L10N−10A FW−04 L10N−12F EXTERNAL WALL AND ALL WALL WITH DIRECT
L10N−11C TO WATER. REFER TO STRUCTURAL ENGINEER’S
SD−08
DHW−01 DRW DHW−01
SD−08
REFER
SPECIFICATIONTO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
L10N−11D L10N−12A
L10N−11C DRW L10N−12B OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
AREA, AND LEVEL 3 OPEN SPACES
Min R 45
3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
W
THROUGH THE WATERPROOF MEMBRANE

MASTER BED 1 P/O BIN


Min RW 50

3 DIFFERENT ORIENTATIONS
FLOOR PLAN NOTES:
6270

PC150E SSL−43065 P/O PC150E


TV/
LIVING DRW KIT HP HP DINING LIVING FP 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL

(L1; L2−L3 AND L4−L11)


DINING KIT.
SW−01 SSL−43065
SSL−43065 CORRIDOR
Min R 55
FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
W
P/O 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
CS−18 SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
DRW DRW
L10N−28B MOVEMENT JOINT.
SWC−01 Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
LB L1−

STRUCTURAL ENGINEER’S
(DC whereDRAWINGSrequired)
D− L11
(

04 )

4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE


DRW
A200 LOT 10A LOT 10B OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
Min R 50 + DC
SH

A162P−01 TTW−01 MOUNTED W


DU−03 spice 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
cabinet L10N−13
L10N−27A INT ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
HR−01 A162−02 DW CCR−04
PC150 D/W
SW−02W *DC = Discontinuous construction according to NCC
DRAWINGS.
PC150E 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
PC200 SSL−43035 TO HYDRAULIC DRAWING AND SPECIFICATION)

CO
L.
F&F 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

41
AW−06 SWC−01 I.FR/FZ I.FR/FZ SW−01 DC AW−03 TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
ENS SW−01
10 S-B L10N−09
SW−02W
L10N−14A S-B
INSTALATION BRISBANE
8. ALL SERVICES PASSESLevel 2, 69 Robertson
THROUGH FLOORStWHICH REQUIRES
SW−02W SW−02W Fortitude Valley
FIRE RATING TO BE PROTECTED BYQLD 4006 RATED COLLAR
A FIRE
A401 O/S WC A401
SW−01 P/O O AS SPECIFIED T +61 7 3513 8000
PC150E SW−01
SC’LY BIN X3 BIN SW−01
SW−02W
DU−17 9. ALL CAVITIES, WASTESE bne@floth.com.au
PIPES, SOIL STACKS AND
HTR L10N−35C SSL−43035 RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
SC−05 F
SC’LY SW−01 SW−02W
SD−04
L10N−14B
FD Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
SSL−43035
ENS ANY SERVICE PENETRATIOS OTHER THAN ESSENTIAL
Drawing: Sound Insulation Markups
2435

SL10N−03

SW−04N
FD
MASTER CS−05 MASTER ST DU−06 SW−04N SUPPLIES FOR EMERGENCY EQUIPMENTS.

S.TCE
SW−04N
L10N−27B SW−02W
ST PDR SW−04N P/O SW−04N DRW PTY SW−04N L10N−32 Revision:
10. ALL TACTILECINDICATORS TO COMPLY WITH AS1428.4
PC150E FOYER mirrors ROBE mirrors ST SW−02W DU−17 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH
above doors DU−05 CS−07b
WIR B Date: 24/04/2020

HR−09
L10N−26A SW−04N A162 L10N−31B L10N−35B RELEVANT BCA REQUIREMENT AND AS1428.1
WC SHW A200 HR−07 SW−03B SW−04N HTR Drawn by: GC
W
LC−D DWRS SHW
TWR SW−03A HR−05
Checked by: JC
N E 20 2 0
CS−06
PC150E SW−01 L10N−34B
SH ADJ SH SW−02W ADJ SH DRWS SW−01
DRWS
9 A200 HR−04 l’dry A162C−01 hanging
E D /
OS 2 1 / 0 1
A200 SW−02W Notes:

SL10N−08
A200 A200−01 hamper rail CS−06

SC−05
A162
SWC−01
L10N−35A - Colours may appear differently when printed
P
A200 DU−03 SWC−01 FCW−05
RB SW−02W RB A162 SW−01 SW−02W

P R O IN G −
DW−05 AW−05 ir. L10N−34A L10N−14B
L10N−07 L10N−08 SSL−43065 A200−01 L’DRY center PDR
LIFT−01
DU−16 SSL−43035

L B L 1−
ir.
ENTRY SSL−43035 SW−01

D− L11)
IL D
L10N−20B (

05
STC SW−02W DU−05
SW−02W

BU
A200−01 L10N−33
SW−02W SWC−01 A150 W/D STC
SWC−01
HTR
3910

SSL−43035 twl CS−06 PC150E


DWRS
L10N−34C MASTER
SW−02W TV/ SW−01 SW−03A
BED 2 hanging A
A *RB BED 1
BATH FAMILY STC rail CS−03 W/D
SSL−43065 TTW−01
L10N−20A SW−02W CS−07a SWC−01
PC150E
L10N−31A
WIR A L10N−15A
SSL−43065 SW−04N SSL−43065 A200−01
TRH SSL−43065 SW−01 SW−01
SW−02W CS−09
SW−04N HR−02 SW−02W L’DRY LIFT−02 ENTRY L10N−30
SW−04H LIFT−02

11) 1
1−L 0
STC

(L BD−
IRON B. PC150E
A200−01 A162 SW−02W SW−01

L
AW−04 SW−04N DW−06 D.SHC
L10N−06 DU−03
BL T L

DU−03 DU−08 A150 L10N−18


8 P/O FSP
A
AD 4−

L10N−24 L10N−23 L10N−22


HR−08
E L7

L’DRY SW−03A SW−01 A200 A200


CO l1−l
W

LC−A ST HAMPER DU−01 RB


AL

L. 2)
(

L10N−36
L

36

SW−03B
FH
A200 F/D
SW−02W
DU−03 SSL−43125 TTW−01
SW−01 L10N−25 L10N−15B
SW−01 CS−04 A162C−01 A162E B90 A162E SW−02W
L10N−21A
SD−06 DW−04 DF−04 DF−04 SC−06−N SSL−43035
L10N−02L10N−01 FS−01

HTR
PC150E L10N−03 L10N−19 SL10N−10
SW−01 SW−01
UP DN BATH
PC150E
BED 3 STUDY
A162E SERVICE CT BIN
1
BIN
2 BED 2 REV DATE DESCRIPTION
TV/ SW−02W SSL−43065 -
SSL−43065
SSL−43065 RB FAMILY
SSL−43065
CLOTH SERVICE
SW−01 HANGER
CT SW−02W DU−05 TTW−01
SD−05 A162 L10N−37 DU−03 L10N−15C
FCW−07
L10N−05C L10N−04 ER+NBN+ DU−03 L10N−39
7440

DRY CT.
A200 MATV L10N−38 PC150E
CONC.COL.
A200 TBA DHW−03 FW−05 SD−01
PW+WF L10N−17C L10N−17B L10N−17A SW−03A PROJECT:
SW−01 TTW−01
HR−03 A162 PW+WF
DRY CT SW−03A L10N−15D Proposed Multiple Residential Development
DHW−07
A162E TERRACE A/C A200 ER+NBN+
SD−01 A200
LB L1−

L10N−05B L10N−05A MATV


D− L11
(

03 )

SC−05 BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
SL10N−02 DOWN PIPE
8 Parker Street, South Perth
CO L1−L

CC−01 BED 3 PC150E

COL.
BALCONY DRAIN A162E
(
L. 11)

DOWN PIPE
26

A/C SSL−43065
CLIENT:
RB

BL AL L3
AD L )
SC−01 PARKER STREET COMPANY

W T
(A

E
SL10N−01
FCW−08
SC−05 L10N−16B DRAWING:
SD−01
SL10N−09 L-10N - L10A & L10B
L10N−16A PC150E
TCE
7 DRAWN:
GW, YW
DATE:
20/01/2020

3/04/2020 8:44:17 AM
SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
PG
NOTE: FOR NORTH BUILDING L4, L6, L9 & L11 PROJECT NO: 1602
A220
WILL EITHER BE TYPICAL FLOOR PLAN OPTION A
OR TYPICAL FLOOR PLAN OPTION B TH VERIFY ALL DIMENSIONS PRIOR TO COMMENCING

N OR WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
* REPRESENTS VARIATIONS TO BE CONFIRMED a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
S-A
B C D A402 F G H 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
8917 6070 4710 8005 3010 LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
SC−07 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SL11N−07 C200
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR

CO L1−L

CO L1−L
LEVELS, SERVICES AND SERVICE DUCTS.

(
L. 11)

(
50

L. 11)
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

47
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
12 CC−01 C200 HR−06
SITE CONDITIONS AND DOCUMENTS.
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
SC−05 SC−05 SC−05 CC−01

LB L1−L
SL11N−05 SL11N−06 DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED

(
SL11N−08

D− 11)
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

02
C150 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
3110

O/D DIN. 5. ALL RETAINED ITEMS TO BE PROTECTED DURING


A162 CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
O/D LIV. O/D LIV. A162 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
COMPACTED AS PER STRUCTURAL ENGINEER’S
SPECIFICATION
SD−01 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FW−07

CO
L11N−14B CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
TERRACE L11N−10D

L.
STANDARD

3
A162

1(
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

L1
11

−L
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

11)
FW−04 FCW−09 9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
CC−01 L11N−10E L11N−14A RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
FW−01 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
FCW−01
L11N−10C
SD−09 SD−08 CASUAL FW−32 FCW−03
L11N−10F L11N−10G A162E L11N−14C
L11N−10B MEALS L11N−10H SD−28 FW−34 DHW−04
L11N−12 L11N−13A L11N−13B SC−05
DHW−07 PREVIOUS WALL SW−01 FW−16 SL11N−09 WATER PROOFING NOTES:
L11N−10A L11N−14D
NEW WALL PARTITION
1.ALLOW FOR WATER STOPLEGEND - ALL
TO UNDERNEATH OF
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
A162E
REFER TO ACOUSTIC
TO WATER. REFER TO STRUCTURAL ENGINEER’S
SPECIFICATION AND RECOMENDATION. BRIEF
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
SW−01
SW−03A SSL−46330 Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEAL WTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE
SCLY MASTER BED
Min RW 50

3 DIFFERENT ORIENTATIONS
PC150E
6270

SW−03A SW−02W FLOOR PLAN NOTES:


SW−01

(L1; L2−L3 AND L4−L11)


1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
PC150E
SSL−46330
Min R 55
FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND
PC150E SW−02W DHW−06 CORRIDOR
LOT 11 SSL−46330 L11N−15A 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
STUDY MOVEMENT JOINT. Min R + Ctr 50
LB L1−

LIVING DINING KIT W


D− L11
(

A200E 3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH


(DC where required)
04 )

STRUCTURAL ENGINEER’S DRAWINGS


SSL−46330 PTY SW−01 LOT 11B 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
A200 CS−14 SSL−46300
PC150
SWC−01 L11N−34
SD−27
MOUNTED Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
W
A162−02 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
HR−01 SW−01 CS−13
L11N−31
SW−01 CCR−04 ENS L11N−15B ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
*DC = Discontinuous construction according to NCC
DRAWINGS.
SL11N−04

PC150

CO
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
SC−05

L.
PC200 TO HYDRAULIC DRAWING AND SPECIFICATION)
DU−18

41
DU−18
L11N−35B 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
10 S-B
FW−10 SW−01 SWC−01
SWC−01 L11N−35A
S-B TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
BRISBANE
INSTALATION Level 2, 69 Robertson St
A401 L11N−08B SW−03A A401 8. ALL SERVICES PASSESFortitude
THROUGH ValleyFLOOR WHICH REQUIRES
QLD 4006
DU−12
L11N−28
DU−09
L11N−32
S.TCE T +61 7 3513 8000
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
AS SPECIFIED E bne@floth.com.au

SL11N−10
SC−05
SC−06−O DU−11 DU−16 SW−02W 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
SW−02W FD
L11N−27B L11N−26 SW−01 L11N−25 SW−01 SW−01 CS−16
Project: 8 Parker Street
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
2435

FD SW−04N SW−04N SW−01 SW−01 SW−02W SWC−01 L11N−15C FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
SW−01 SW−04N
SW−03A Drawing:
ANY SERVICESound Insulation
PENETRATIOS OTHERMarkups
THAN ESSENTIAL
S.TCE

SW−04N A200C−01 Revision: C


SUPPLIES FOR EMERGENCY EQUIPMENTS.
10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4

HR−09
SW−03A
SW−02W FCW−06 Date:
11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
SW−03B SW−01 HR−07 SW−02W RELEVANT BCA REQUIREMENT AND AS1428.1
HR−05 SW−04N CS−15 L11N−15D Drawn by: GC
W
SW−03A SW−04N
L11N−33
Checked by: JC
N E 20 2 0
DW−11 SW−04N
SW−01
9 PC150E L11N−27A SW−01
HR−04
SSL−46300 SW−01
SW−04N
A200 A200−01

E D /
OS 2 1 / 0 1
PDR
DU−05
L11N−29
Notes:
A200−01
WIR - Colours may appear differently when printed
DW−05
P
P R O IN G −
SW−01
L11−07A SSL−46330 ENTRY 1 SSL−46330 DHW−07
LIFT−01 SW−02W

L B L 1−
SSL−46330 L11N−15E

D− L11)
THEATRE CELLAR (

05
IL D
SW−01 A200−01 PC150E
SW−01
SSL−46330 SW−02W

BU
SW−02W SW−03A SW−01
3910

SW−03A
SW−03A

COATS/ A150 SW−02W


SSL−46300 CS−24 SWC−01 SW−02W TTW−01
SW−04H
PC150E
ST L11N−40
SSL−46300
L11N−16A

DU−08 DU−04
SW−04H HR−02
SSL−46330 SSL−46330
L11N−21
LIFT−02 L’DRY L11N−30
SW−02W DU−18
SW−01

11) 1
1−L 0
L11N−37B

(L BD−
ENS PC150E

L
A200−01 A200−01 DU−08 A162
AW−04 SW−04H SW−04H
8 L11N−06 SW−02W
FSP A150 L11N−37A BED 3
SW−01 DU−03 HR−08
SW−02W A200 SSL−46330
L11N−20
SW−02W
SW−01 SWC−01
FH A200 A200
DU−08 TTW−01
L11N−22 SW−01 L11N−16B
DU−04
CS−01
L11N−36
L11N−23 DW−07 DF−04
PC150E SW−02W
SSL−46300 L11N−02 L11N−01
SC−05 DU−17
SL11N−03 L11N−24A UP DN
SW−01
BED 2 SITTING ENS PDR A162E GUEST WING SW−01
PC150E

SSL−46300 REV DATE DESCRIPTION


SSL−46330 DU−17 AW−06 AW−06 SERVICE SSL−46330
SW−02W TTW−01 -
DU−04 L11N−16C
L11N−24B L11N−03B L11N−03A CT L11N−38 ENS
A162E
DU−17 DU−08
FCW−07 L11N−39B L11N−39A
L11N−05C SD−01 DHW−07 A162E A162E ER+NBN+ FW−05 DHW−05 SD−01
7440

L11N−05B L11N−05A MATV L11N−18C L11N−18B L11N−18A


A200 A162E
A200 PC150E
CT YARD PW+WF SW−02W

TTW−01 PROJECT:
HR−03 A162 PW+WF
AW−01 A162 L11N−16D
L11N−04
ER+NBN+ Proposed Multiple Residential Development
TERRACE A200
LB L1−

A200 CA-210
MATV Conc
D− L11
(

03 )

BALCONY DRAIN A/C

ORIENTATION
LEVEL 8,11,14
CC−01
DOWN PIPE TERRACE
CO L1−L

COL.
BALCONY DRAIN A162E BED 4/ 8 Parker Street, South Perth
(
L. 11)

PC150E
DOWN PIPE
26

A/C UTILITY
SC−05
SL11N−02 CLIENT:
SC−03
SSL−46330
FCW−08
SL11N−01
L11N−17C
PARKER STREET COMPANY
FW−05 FW−05
L11N−17B L11N−17A DRAWING:
PC150E L-11N- Full Floor Apartment
7 SC−05 DRAWN: DATE:
SL11N−11 YW 20/01/2020

3/04/2020 8:44:22 AM
SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
PG
PROJECT NO: 1602
A221
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
B C D E F G H OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
8917 6070 2650 2060 8005 3010 SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
S-A
SC−07 * FOLDING LEVELS, SERVICES AND SERVICE DUCTS.
A402 SL12N−06 GLASS SCREEN 3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

CO L1−L
C200 SITE CONDITIONS AND DOCUMENTS.

CO L1−L
(
L. 11)

(
50

L. 11)
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

47
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
12 CC−01 SC−05
SC−07
SL12N−06 HR−06
SC−05 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
C200 SL12N−07 CC−01

LB L1−L
SL12N−05 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND

(
D− 11)
LANDSCAPE DRAWINGS AND OTHER RELEVANT

02
C150 CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
SC−05 DECISION PRIOR TO PROCEEDING WITH THE WORK.
SL12N−04 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
O/D LIV. CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
BIN 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
3110

O/D KIT. COMPACTED AS PER STRUCTURAL ENGINEER’S


SSL−49545 O/D KIT. SPECIFICATION
A162P−02 SSL−49545 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
BBQ & HOOD CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
OVER STANDARD
FW−07 DHW−03 FW−06
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
L12N−10D L12N−11A O/D LIV. L12N−11B

CO
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

L.
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

3 1(
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

L1
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
11

−L
11)
FW−04
CC−01 L12N−11C FR−U FW−04
FCW−01 SD−03 L12N−12C FCW−03
L12N−10B L12N−10C CEILING RECESS (T.B.A)
FW−01
L12N−12E WATER PROOFING NOTES:
L12N−12D
SW−03A O/D KIT. PARTITION
1.
ALLOW FOR WATER STOPLEGEND - ALL
TO UNDERNEATH OF
DHW−07 DHW−07 EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
L12N−10A L12N−12F REFER TO ACOUSTIC
TO WATER. REFER TO STRUCTURAL ENGINEER’S
SPECIFICATION AND RECOMENDATION. BRIEF
DHW−01 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
SD−08 DHW−01 L12N−12A OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
L12N−11D L12N−11E SD−08
L12N−12B
Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEAL WTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE

SW−01 PC150E Min RW 50


FLOOR PLAN NOTES:
MASTER LIVING DINING KIT

3 DIFFERENT ORIENTATIONS
6270

1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL


SSL−49595
HP
TV/ Min R 55
FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND
DINING LIVING FP

(L1; L2−L3 AND L4−L11)


CORRIDOR
KIT. 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SSL−49595 SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
PC150E
CS−06
SSL−49595 MOVEMENT JOINT. Min R + Ctr 50
W
3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH
SWC−01 (DC where required)
L12N−28B STRUCTURAL ENGINEER’S DRAWINGS
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
LB L1−

Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
D− L11
(

04 )

MOUNTED W
LOT 12A LOT 12B 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
A200 SSL−49565 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
PC150
DU−03 TTW−01 *DC = Discontinuous construction according to NCC
DRAWINGS.
L12N−27A SW−02W L12N−13
CO L1−L
A162−02 CCR−04 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
HR−01 (
L. 7)
TO HYDRAULIC DRAWING AND SPECIFICATION)
33
D/W
PC200 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

CO
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
BRISBANE

L.
AW−06 INSTALATION Level 2, 69 Robertson St

41
SWC−01 DU−03 SWC−01 I.FR/FZ I.FR/FZ DC AW−03 PC150E
L12N−09 ENS 8. ALL SERVICES PASSESFortitude
THROUGH ValleyFLOOR WHICH REQUIRES
QLD 4006
10 S-B
L12N−28A
BAR
SW−02W L12N−14A
AS SPECIFIED
T +61 7 3513 8000
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
E bne@floth.com.au
SW−02W SW−01
PC150E

A401 SW−01 WC SSL−49565 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
DU−17 CS−26 O
SW−02W
L12N−29A L12N−27C SSL−49565
BIN SW−01
SW−01 DU−06
L12N−32
DU−17
L12N−35C
Project: 8 Parker Street
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
SW−01 SW−02W Drawing:
SERVICESound InsulationOTHERMarkups
S.TCE

SD−04 ANY PENETRATIOS THAN ESSENTIAL


SW−04N FD
ART SC’LY A162P−01 SW−01 ENS L12N−14B Revision: C
SUPPLIES FOR EMERGENCY EQUIPMENTS.
SL12N−03
2435

10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4


FD
SC’LY ST
SC−05

DU−17 MASTER CS−05 MASTER PTY SW−04N Date:


11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
SW−04N RELEVANT BCA REQUIREMENT AND AS1428.1
PC150E
L12N−29B
FOYER L12N−27B ROBE SW−04N
WIR
SW−02W SSL−49545 Drawn by: GC
DU−17
W

HR−09
SWC−01
PDR Checked by: JC
N E 20 2 0
SSL−49595 SW−04N A200 SW−04N L12N−35B
SSL−49545 DU−05 A162
A200
L12N−26 SW−03A HR−05
HR−07 LC−D
SW−03B DWRS SHW HTR S.TCE
SW−02W
CS−06

E D /
OS 2 1 / 0 1
SWC−01 SC−05
9
PC150E SW−02W
L12N−34B
SL12N−08 Notes:
A200 HR−04 SSL−49595 SW−04N l’dry CS−07b hanging SW−02W TV - Colours may appear differently when printed
A200
hamper L12N−31B rail
P
P R O IN G −
A200 A200−01 A162 CS−06
SW−01 SW−02W SWC−01 L12N−35A
SW−02W SW−02W SW−01 ir. FCW−05
DU−03 SW−02W
A162 DU−16 L’DRY center PDR L12N−14B

IL D
DW−05 AW−05 L12N−34A
L12N−07 L12N−08 L12N−20B LIFT−01 A200−01 SSL−49565
ENTRY
L B L 1−

ir. SSL−49565 SW−01

BU
D− L11)
(

05

STC
A200−01 DU−05
SW−02W SWC−01 CS−07a
W/D STC SW−02W L12N−33
L12N−31A CS−06 PC150E
3910

SSL−49565 twl SW−01


DWRS
SW−01 SWC−01
L12N−34C MASTER
SW−01 CS−03
A
A *RB BED 1
TV/ L12N−20A A150 SW−02W WIR SSL−49595 TTW−01
BATH SWC−01 SW−02W
L12N−15A
PC150E GUEST SUITE 2 SWC−01
FAMILY
SSL−49595 SW−04N SSL−49595 A200−01
SSL−49595 CS−09 A162
SW−04N LIFT−02 ENTRY
L12N−30 SW−01
HR−02 SW−04H L’DRY

11) 1
SW−01

1−L 0
(L BD−
A200−01 PC150E

L
DW−06 D.SHC
DU−03 SW−03B
BL T L

SW−04N A150 L12N−18


8 L12N−24 FSP
A
AD 4−

HR−08
E L7

SW−03A SW−01 A200


CO l1−l
W

DU−03 DU−01 RB
AL

L. 2)
(

L12N−22 A200
L

L12N−36
36

FH
A200 F/D SW−02W
DU−03 ART
CS−04 A162E SSL−49655
SW−01 L12N−25A SW−01 A162E
AW−04 L12N−21 TTW−01
SWC−01 SD−06 DW−04 DF−04 SW−02W SW−02W
DF−04 L12N−15B
L12N−06 SSL−49565
L12N−03 L12N−02 L12N−01 L12N−19 SC−06−N
KITCHENETTE

HTR
FS−01 SL12N−12 B90 A162E
PC150E
AW−07 UP DN
SW−02W L12N−04A SSL−49545 REV DATE DESCRIPTION
TV/ BATH TV SSL−49595
PC150E
BIN BIN FAMILY
BED 3 1 2
SSL−49595
SSL−49595
SW−02W BED 2 -
CS−06 AREA: 30.38M2 SERVICE CT DU−03
L12N−25B ENS AREA: 11.35M2
SERVICE CT L12N−39
SWC−01 A162E DU−05 TTW−01
A200 SW−02W
A162 L12N−37 L12N−15C
FCW−07 SD−01 SW−02W ER+NBN+ A200
7440

L12N−05C L12N−05B DRY CT.


DRY DU−03
MATV PC150E
CT. DHW−03 L12N−38 PROJECT:
FW−05 SD−01
A200 L12N−17C L12N−17B L12N−17A
PW+WF SW−03A Proposed Multiple Residential Development
SW−03A
A200 HR−03 PW+WF SW−01 TTW−01
A162E L12N−15D
A162 A/C ER+NBN+
LB L1−

AW−07 MATV
D− L11
(

DHW−07 L12N−04B
03 )

BALCONY DRAIN 8 Parker Street, South Perth

ORIENTATION
LEVEL 8,11,14
L12N−05A
CC−01 DOWN PIPE
CO L1−L

TCE A162E BED 3 PC150E


COL.
BALCONY DRAIN CLIENT:
(
L. 11)

DOWN PIPE
26

SSL−49545 A/C SSL−49595


SSL−49545
RB PARKER STREET COMPANY

BL AL L3
AD L )
W T
(A
SC−01 FCW−08

E
SL12N−01 DRAWING:
L12N−16B
SC−05 L-12N - L12A & L12B
SL12N−02 SD−01
S-A L12N−16A
TV DRAWN: DATE:
A402 YW 20/01/2020
TERRACE
7

3/04/2020 8:44:27 AM
1
SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
A305 PG
PC150E
PROJECT NO: 1602
A222
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
SC−05 a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
SL12N−11 6010.
t 08 93852858 e admin@colliere.com.au

-
S-A GENERAL NOTES:
B C D A402 E F G H 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
8917 6070 2650 2060 8005 3010 OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
SC−07 * FOLDING LEVELS, SERVICES AND SERVICE DUCTS.
SL13N−07 GLASS SCREEN 3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
C200 C200
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

CO L1−L

CO L1−L
(
SITE CONDITIONS AND DOCUMENTS.

L. 11)

(
50

L. 11)
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS

47
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
12 CC−01 HR−06
SC−07 SC−05
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
SC−05 SL13N−07 CC−01 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
SC−05 SL13N−08

LB L1−L
SL13N−06 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND

(
D− 11)
SL13N−05 LANDSCAPE DRAWINGS AND OTHER RELEVANT

02
C150 CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
O/D LIV. 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
O/D LIV. BIN BIN
O/D KIT.
3110

6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE


COMPACTED AS PER STRUCTURAL ENGINEER’S
SSL−52810 O/D KIT. SPECIFICATION
BBQ & HOOD SSL−52810 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
OVER CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
FW−07 BBQ & HOOD STANDARD
OVER A162P−02 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
L13N−10D

CO
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

L.
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE

3 1(
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

L1
FW−04
11

−L
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

11)
L13N−11C
SW−03A CC−01 FR−U FR−U
DHW−07
FCW−01 SD−03 DHW−03
SW−03A CEILING RECESS (T.B.A) FW−04 FW−01 FCW−03 L13N−12F WATER PROOFING NOTES:
L13N−10B L13N−10C L13N−11A L13N−12C L13N−12D
SW−03A
FW−06
L13N−11B
FR−U
L13N−12E
PARTITION
1.ALLOW FOR WATER STOPLEGEND - ALL
TO UNDERNEATH OF
EXTERNAL WALL AND ALL WALL WITH DIRECT EXPOSURE
DHW−07
REFER TO ACOUSTIC
TO WATER. REFER TO STRUCTURAL ENGINEER’S
BRIEF

SH
L13N−10A SC−05
SW−01 SPECIFICATION AND RECOMENDATION.
DHW−01 DHW−01 SL13N−09 2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
L13N−11E L13N−12A OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
SD−08
L13N−11D
sh over SD−08
L13N−12B
Min R 45
AREA, AND LEVEL 3 OPEN SPACES
3. ALLOW FOR WATERTIGHT SEAL WTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE

open
under HP Min RW 50
A162P−01 FLOOR PLAN NOTES:
MASTER
TV/FP

3 DIFFERENT ORIENTATIONS
6270

SSL−52860 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL


HP DINING LIVING
TV/
FP
Min R 55
FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND

(L1; L2−L3 AND L4−L11)


PC150E SW−01 LIVING DINING KIT KIT. CORRIDOR
2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SSL−52860 SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
CS−25
L13N−28B
drawers
below
SSL−52860 PC150E
MOVEMENT JOINT. Min R + Ctr 50
W
3. SLAB SETDOWNS ARE TO BE READ INCONJUCTION WITH
(DC where
STRUCTURAL ENGINEER’S DRAWINGS required)
A200 SWC−01
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
LB L1−
D− L11

Min R 50 + DC
(

OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE


04 )

d/w MOUNTED W
sh LOT 13A LOT 13B TTW−01 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
SH

SSL−52830 DU−03 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC


PC150 L13N−13 *DC = Discontinuous construction according to NCC
L13N−27A
DRINK CENTER KITCHEN DRAWINGS.

CO L1−L
HR−01 A162−02 bin 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER

(
CCR−04 SW−02W SW−02W PC150E

L. 7)
PC150

33
D/W TO HYDRAULIC DRAWING AND SPECIFICATION)
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

CO
PC200 SB & B.SH OVER TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
STC FR−U STC BRISBANE

L.
AW−06 DU−03 SWC−01 SW−01 900 o/s INSTALATION

41
SWC−01 SW−01 SW−02W F&F I.FR/FZ I.FR/FZ DC Level 2, 69 Robertson St
AW−03
L13N−09 ENS
SL13N−04

L13N−28A 760 8. ALL SERVICES PASSESFortitude


THROUGH ValleyFLOOR WHICH REQUIRES
QLD 4006
10
SC−05

S-B L13N−14A T +61 7 3513 8000


FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
AS SPECIFIED E bne@floth.com.au
A401
SW−02W coffee+ SW−01 WC 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
CS−06 A. wt O SW−01 SW−01
DU−17 DU−17 SSL−52830 PTY +
PC150E L13N−29B L13N−29A
L13N−27C
APP. 600 BIN DU−06 DU−17 Project: 8 Parker Street
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
FIRE ISOLATED PASSAGE WAY ARE TO BE CLEARED OF
HTR SW−02W L13N−35C
L13N−32 SW−02W Drawing:
SERVICESound InsulationOTHERMarkups
S.TCE

ANY PENETRATIOS THAN ESSENTIAL

SL13N−10
SH FD

SW−04N
SW−04N
SC’LY SW−02W

SC−05
SW−02W SW−01
ENS SD−04 Revision: C
SUPPLIES FOR EMERGENCY EQUIPMENTS.
2435

OVER
FD SEAT
MASTER
MIRROR
PDR SC’LY ST SW−04N L13N−14B 10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
PC150E MASTER CS−05 DOORS OPTIONAL PTY
SSL−52830 Date:
11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
FOYER ROBE SLIDING DOOR SW−04N pull RELEVANT BCA REQUIREMENT AND AS1428.1
Drawn by: GC

A162
L13N−27B SW−04N
sh over WIR DU−17
out sh
W

HR−09
SSL−52810 CS−07b
Checked by: JC
N E 20 2 0
WC SWC−01 SWC−01 SW−04N L13N−35B
SHW DU−05 L13N−31B
A200 twl L13N−26 SW−04N
HR−05 stc/sh
HR−07 LC−D SW−03B DWRS SHW HTR S.TCE
SSL−52810

D
SW−02W SW−02W CS−06
PC150E

E /
OS 2 1 / 0 1
SW−03A L13N−34B
9 SH
SW−02W DRWS DRWS
A162C−01 SW−02W
Notes:
HR−04 l’dry hanging CS−06 TV - Colours may appear differently when printed
P
A200 A200−01 A200 A200−01 SWC−01
hamper rail

P R O IN G −
SW−02W L13N−35A
A200 SW−04N
AW−05 SW−02W SW−01 SW−01 SWC−01 SW−01 SW−02W FCW−05
SH A162 ir. DU−03
L13N−08 L13N−14B
SSL−52860 L’DRY center PDR L13N−34A

IL D
DU−16
DW−05
L13N−20B
L B L 1−
LIFT−01 SSL−52830 SWC−01
L13N−07 ENTRY SSL−52830 ir. SW−01

BU
D− L11)
(

05 A200−01 STC
insert stained art glass by
A200−01 DU−05
SW−03A others CS−07a SW−02W
HTR

PC150E W/D L13N−33


SW−02W A150 L13N−31A STC CS−06
3910

SW−02W SSL−52830 twl PC150E


DWRS
L13N−34C MASTER
TV/ SW−01 SW−01
BATH
hanging
SWC−01
A
A *RB BED 1
BED 2 FAMILY rail CS−03
W/D
SW−02W SWC−01 SW−02W SSL−52860 TTW−01
SSL−52860 SW−01 L13N−20A WIR L13N−15A
SSL−52860 SW−04N
TRH STC ir. SSL−52860
SW−02W center CS−09 A162
SW−04H LIFT−02 ENTRY
SW−04N HR−02 OPTIONAL L’DRY L13N−30 SW−01

11) 1
DU−03 SW−01 PC150E

1−L 0
(L BD−
L13N−24 KITCHENETTE ir.
SW−02W

L
SW−04N A200−01 A200−01 D.SHC
SW−03B STC l’dry A150 DW−06
BL T L

DU−08
8 FSP
A

hamper
AD 4−

L13N−18
L13N−23 DU−03 SW−01 HR−08
E L7

AW−04 SW−03A A200


CO l1−l
W

L13N−22 LC−A STC A200 RB


AL

L13N−06
L. 2)
(

A162E DU−01
L

36

SW−03B
FH L13N−36 A200
F/D SW−02W
ART A162E
SW−01 DU−03 SSL−52920
TTW−01
L13N−25 SW−01 A162E B90 SW−02W L13N−15B
CS−04 A162C−01 SD−06 DW−04 DF−04 DF−04 SW−02W
PC150E SW−01 L13N−21A L13N−03 L13N−02 L13N−01 L13N−19 SC−06−N SSL−52830

HTR
SW−01
FS−01 SL13N−12
UP DN PC150E
SC−05 BATH REV DATE DESCRIPTION
SL13N−03
TV/ TV SSL−52860
A162E BIN BIN FAMILY SW−02W
BED 3 STUDY SERVICE CT 1 2
SSL−52860
SSL−52860 BED 2 -
SSL−52860 SW−01 AREA: 30.38M2
RB SSL−52810 SERVICE CT
SW−02W DU−03 TTW−01
FCW−07 DU−05 SW−02W
L13N−39 L13N−15C
L13N−05C SD−01 A162 L13N−37
SD−05 ER+NBN+
7440

L13N−05B L13N−04 DRY CT.


DRY SW−01
MATV PC150E
CT. SW−03A PROJECT:
A200 A200 DHW−03 FW−05 SD−01
PW+WF L13N−17C L13N−17B L13N−17A SW−03A
A162
Proposed Multiple Residential Development
TTW−01
HR−03 PW+WF DU−03
A162E L13N−38 L13N−15D
A/C A200 ER+NBN+
LB L1−

MATV PC150E
D− L11
(

SSL−52810 A200
03 )

DHW−07 8 Parker Street, South Perth


BALCONY DRAIN

ORIENTATION
LEVEL 8,11,14
L13N−05A DOWN PIPE
CC−01 A162E
CO L1−L

TCE BED 3

COL.
BALCONY DRAIN
(

CLIENT:
L. 11)

DOWN PIPE
26

SC−05 A/C SSL−52860


SSL−52810
SL13N−02 RB PARKER STREET COMPANY

BL AL L3
AD L )
W T
(A
SC−01

E
FCW−08
SL13N−01 L13N−16B DRAWING:
L-13N Sub-Penthouse (L13A & L13B)
SD−01
L13N−16A PC150E
TV DRAWN: DATE:
TERRACE GW, YW 20/01/2020
7

3/04/2020 8:44:32 AM
1 SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
A305 SC−05 PG
SL13N−11 PROJECT NO: 1602
A223
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au

-
S-A
1-
DA
A402
---08
GENERAL NOTES:
NR-05
B C D A410 E F G H 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
4
8917 6070 2650 2060 8005 3010 OR ORDERING MATERIAL.
A410 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SC−32 SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
SL14N−06 LEVELS, SERVICES AND SERVICE DUCTS.

CO L1−L
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS

CO L1−L
(
L. 11)
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN

(
50

L. 11)
47
SITE CONDITIONS AND DOCUMENTS.
12 LDD−02B (A831) LDD−02B (A831) C200 F/P
HR−06 C200 LDD−02B (A831) LDD−02B (A831)
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
TV WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS

LB L1−L
SC−29 SC−29 ARE TO BE READ INCONJUCTION WITH THE FULL SET OF

(
D− 11)
CC−01

02
CC−01 SL14N−05 SL14N−07 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
RECESSED RECESSED LIGHTING CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
SC−29 RECESSED LIGHTING STRIP REFERED TO ARCHITECT FOR CLARIFICATION AND
LIGHTING STRIP STRIP O/H
SL14N−04 O/H DECISION PRIOR TO PROCEEDING WITH THE WORK.
O/H
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
3110

CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.


TERRACE 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
O/D LIV. O/D DIN. COMPACTED AS PER STRUCTURAL ENGINEER’S
A162E SPECIFICATION
7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FW−07 SD−01 CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
FW−22 FW−15 L14N−14B STANDARD

CO
L14N−10D
L14N−10I L14N−10J 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL

L.
A162 LDD−02A (A831)

3
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

1(
L1
) 9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
11

−L
31 O/D KIT. RETAINED BY COLLIERE ARCHITECTURE. WRITTEN

11)
8 DHW−04 FCW−03
SD−09 SD−09−B (A BBQ L14N−13B L14N−14C
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
L14N−10F L14N−10G 2A A162E
FCW−01
D −0 FW−04
L14N−10B FW−16
FW−01 LD L14N−10H FCW−09 L14N−14D
L14N−10C OVEN
CC−01 FW−04 LDD−02A (A831)
DW BIN UNDER
FR L14N−14A BULKHEAD & LIGHTING EDGE OVER WATER PROOFING NOTES:
DHW−07 O WD A162E
L14N−10E curtain 1. ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
L14N−10A O/S M/V.O
pocket SW−01 PARTITION LEGEND
EXTERNAL WALL AND ALL - EXPOSURE
WALL WITH DIRECT
TO WATER. REFER TO STRUCTURAL ENGINEER’S
CURTAINS SW−01 CURTAIN SC−29 SPECIFICATION AND RECOMENDATION.
CURTAIN
SD−13 FW−13 FW−33−P
L14N−13C
POCKETSL14N−08 REFER
2. TO LAYER
ALLOW FOR DOUBLE ACOUSTIC
WATERPROOFING ONBRIEF
THE TOP
L14N−12 L14N−13A DR OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
POCKET
BULKHEAD & LIGHTING EDGE OVER HIGH LEVEL AREA, AND LEVEL 3 OPEN SPACES
SCLY 3. ALLOW FOR WATERTIGHT SEAL TO ALL PENETRATION
SW−01 DISPLAY SH
OVER TV
SSL−56125
oCL Min R 45
THROUGH THE WATERPROOF MEMBRANE
W
SW−03A
SH/SPEAKER
ABV. DR MASTER BED
DRW SW−01 PC150E
Min RW 50

3 DIFFERENT ORIENTATIONS
3 SSL−56125 FLOOR PLAN NOTES:
6270

SW−01
A410 SW−03A SW−02W SW−03A
CABINET/ VOID 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL

(L1; L2−L3 AND L4−L11)


& CURTAIN FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
RECESS
SUBJECT TO
BIN
UNDER
FZ
D/W FW−32−P
L14N−34B
DHW−06
L14N−15A
CORRIDOR Min R 55 W
PC150E HP SW−02W 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
FINAL GAS SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
LOG FIRE/ FLUE
STUDY MOVEMENT JOINT.
SHELVING
LIVING 1 DINING GREET KIT PTY Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
LB L1−

SELECTION P/O P/O SW−02W STRUCTURAL ENGINEER’S DRAWINGS


SSL−56125
D− L11
(

FP SSL−56125 (DC where required)


04 )

4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE


DRW A200E OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
A200
SWC−01 CS−14
L14N−34A
SD−07−P
L14N−15B
MOUNTED Min R 50 + DC
W
5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
PC150
BENCH DRW SW−01 ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
2 HR−01 A162−02
HEIGHT FR SW−01 SW−03A SW−03A SWC−01 ENS 1 SSL−56095 DRAWINGS.
*DC = Discontinuous construction according to NCC
A410 @ 900 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
TO HYDRAULIC DRAWING AND SPECIFICATION)

CO
D/C PC150
PC200

L.
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS

41
TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
HTR DU−18 SPA BATH
10 S-B SW−01 SWC−01
CS−13
CCR−04
SL14N−35A
DU−18
SL14N−35B
INSTALATION BRISBANE
8. ALL SERVICES PASSESLevel 2, 69 Robertson
THROUGH FLOORSt WHICH REQUIRES
A401 FW−11 SW−01 L14N−31 Fortitude Valley
FIRE RATING TO BE PROTECTED BYQLDA 4006
FIRE RATED COLLAR
L14N−08B T +61 7 3513 8000
DU−09 S.TCE AS SPECIFIED
E bne@floth.com.au
load centre 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
SH/SPEAKER FW−18 3 drawers 2 drawers 3 drawers L14N−32 RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
DHW−02 (powerpoint, SW−02W
ABV. L14N−26 SW−02W
L14N−08A nbn)
2 drawers 2 drawers
FSS-01B
2 drawers WC SHW
DHW−09 FD SC−29 Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
ANY SERVICE PENETRATIOS OTHER THAN ESSENTIAL
2435

SMALL L14N−15C SL14N−09


SW−04N Drawing: Sound Insulation Markups
FD SW−01 SW−01 SW−01 SW−01 SW−01 SW−01 SWC−01
A803
SC−29 BIN DRINK CENTER SUPPLIES FOR EMERGENCY EQUIPMENTS.
SW−02W
SL14N−03 A200 Revision:
10. ALL TACTILECINDICATORS TO COMPLY WITH AS1428.4
S.TCE

SW−01 SW−04N
SW−01 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH
FR SW−04N Date: 24/04/2020

HR−09
UNDER D/C RELEVANT BCA REQUIREMENT AND AS1428.1
DU−08 SW−02W
Drawn by: GC
W
HR−07 SW−04N SW−02W

LC
PC150E L14N−25 SW−04N SW−04N CS−20

N E 20 2 0
2 drawers SW−01 HR−05
SW−01
STONE PORTAL
SW−04N
L14N−33
Checked by: JC
9 2 drawers
HR−04 A200
SSL−56125 SW−04N
SC−29
D 1/ when printed
E 0differently
OSmay appear
SW−01 TINTED GLASS SL14N−10
A200 A200−01 FCW−06
Notes:
SSL−56125 A162 FSS-01A A200−01
L14N−15D

P
- Colours
2 1 /
PROING−
SW−01
DW−05 WIR
A803 LIN SW−02W SSL−56125
L14N−07A
CELLAR ENTRY DHW−07
- LIFT−01 SW−02W L14N−15E

LB L1−
ILD
SW−01 SSL−56125

D− L11)
SW−01 --- (

05
SW−03A
TV
LIVING 2
SSL−56125
SW−01 SW−02W SW−02W SW−02W SW−01 A200−01 SWC−01 SW−02W SW−03B SW−01 SW−01
PC150E

B U
3910

SW−01 STONE PORTAL


D/C SH
SW−01 SW−02W SW−02W
PC150E A150 DU−05 SW−02W
A200−01 L08N−40 LIN TTW−03
CS−15
SW−04H 2 drawers L14N−16A
L14N−30
WIR LIN SSL−56095
SHW DU−18 DU−08
3 drawers SW−04H HR−02T
HR−02
SSL−56125 SSL−56095 LIFT−02 L14N−37B
ENS 3 L08N−44

11) 1
1−L 0
L’DRY STC

( L B D−
HTR PC150E

L
A200−01
AW−04 SW−04H
SW−04H DU−06 SW−02W DU−08 A150 SWC−01
8 L14N−06
SW−01
L14N−20C L14N−21 DU−06
FSP
SW−01 SW−02W
A162 HR−08 SW−02W SSL−56125
L14N−22 A200
CS−01 SSL−56125
SWC−01 L14N−23 SWC−01 SW−02W
SW−01 - FH A200 BED 3
SW−02W
--- TTW−03
2 drawers SW−02W SW−02W L14N−16B
DF−04 SW−01 DU−10 TV
fire hydrant SD−07−P
PC150E DU−17 L14N−01 L08N−43
SW−02W L14N−19
L14N−24A CCR−05
WM
SSL−56095 SW−02W ADD−02 RB RB LIN
SSL−56095- FS−01 SW−02W
SW−02W TV
--- UP DN 1.1 13/03/2020 ISSUE FOR STRUCT. ENG'S COORDINATION
ENS 2 PDR LOBBY SW−02W DU−17 1.0 20/01/2020 ISSUE FOR CONSULTANTS COORDINATION
BED 2 SITTING LDD−02A (A831) SSL−56125 L14N−40B
PC150E
DU−17 A162E REV DATE DESCRIPTION
SW−02W WC
SSL−56125 L14N−24B SSL−56095
SW−02W AW−06−P FW−27 DHW−07 SERVICE SW−02W BATH
L14N−03B L14N−02B L14N−02A
CT GUEST WING TBA
ENS 4
TTW−03
1 (A593) L14N−16C
FCW−07 SD−01 DRY DU−17
L14N−05B A200 RACK DHW−05 FW−05 SD−01 DU−03 L14N−40A
L14N−05C ER+NBN+ FR
7440

A162E AW−06−P MATV CCR−05 L14N−18C L14N−18B L14N−18A SW−03A L08N−41 SHW
A200 L14N−03A PC150E
A200 CT YARD
A162E PW+WF
SW−02W TTW−03 PROJECT:
A162 DU−05
LDD−02A (A831) HR−03 PW+WF
AW−01−P LDD−02A (A831) L14N−39 L14N−16D
DHW−07
A162
A200 ER+NBN+ Proposed Multiple Residential
L14N−04
LB L1−

L14N−05A TERRACE MATV Development


D− L11
(

A200
03 )

BALCONY DRAIN A/C


TERRACE

ORIENTATION
LEVEL 8,11,14
DOWN PIPE
PC150E
CO L1−L

A162E 8 Parker Street, South Perth

COL.
BALCONY DRAIN
CC−01 BED 4/
(
L. 11)

DOWN PIPE
26

A/C
UTILITY
CLIENT:
31)
LDD−02B (A8 SSL−56125 RB
SC−29 SC−04 DHW−07
SL14N−01 L14N−17C PARKER STREET COMPANY
SL14N−02

FCW−12 SD−01−B DRAWING:


L14N−17B L14N−17A SH
PC150E L-14N-Penthouse
TV

7 DRAWN:
GW, YW
DATE:
20/01/2020

16/04/2020 5:34:02 PM
SC−29 LDD−02A (A831)
SL14N−12 SCALE: REVISION:
As indicated @A1 1.1
AUTHORISED: DRAWING NO:
PG
SC−29
SL14N−11
PROJECT NO: 1602 A224
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING WORK
AND SHOP DETAILING . DO NOT SCALE DRAWING.
DRAWINGS COPYRIGHT OF COLLIERE ARCHITECTURE.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT. 6010.
t 08 93852858 e admin@colliere.com.au
NR-05
GENERAL NOTES:
S-A
1-
B 8917 4
C 6070
D DA
A402
---08 A410
2650
E 2060
F 8005
G 3010
H 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
A410 SHAFT LOCATION 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
BELOW SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
12 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
BENCH WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
PRIVATE REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
PENTHOUSE 5. ALL RETAINED ITEMS TO BE PROTECTED DURING
3110

TERRACE CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.


6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
COMPACTED AS PER STRUCTURAL ENGINEER’S
SPECIFICATION
SSL−60025 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
BR190

PL
PIZZA STANDARD

AN
OVEN 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED

TE
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
11

R
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SSL−60025

BR190
WATER PROOFING NOTES:

P DF−04 BI−01 PARTITION


1.
LEGEND
EXTERNAL WALL AND ALL - EXPOSURE
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
WALL WITH DIRECT
L−RT−05A L−RT−05B BR190 TO WATER. REFER TO STRUCTURAL ENGINEER’S
REFER
SPECIFICATIONTO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
M/V.O
O/S OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
AREA, AND LEVEL 3 OPEN SPACES
Min R 45
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
CEILING LINE THROUGH THE WATERPROOF MEMBRANE
OVER

Min RW 50
6270

FLOOR PLAN NOTES:


1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
ROOF LINE CORRIDOR
Min R 55
FINISHES IN SOLE OCCUPANCY W UNIT, PUBLIC SPACES AND
HP
OVER (TBA) 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SSL−60125 NUTMEG COTTAGE SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
MOVEMENT JOINT. Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
PV CELLS PV CELLS (DC where
STRUCTURAL ENGINEER’S DRAWINGS required)
4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE

MOUNTED Min R 50 + DC
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
W
5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
FR ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
*DC = Discontinuous construction according to NCC
DRAWINGS.
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
TO HYDRAULIC DRAWING AND SPECIFICATION)
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
DU−06 HTR TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
10 S-B
L−RT−06A DU−17 INSTALATION
BRISBANE
Level 2, 69 Robertson St
ENTRY L−RT−07B 8. ALL SERVICES PASSESFortitude
THROUGH ValleyFLOOR WHICH REQUIRES
QLD 4006
A401 FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
T +61 7 3513 8000
AS SPECIFIED E bne@floth.com.au
RB 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
GUEST
SSL−60095 WCDU−17 GLASS ROOF RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
LINE OVER Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
L−RT−07A SHW & WC
Drawing:
SERVICESound InsulationOTHERMarkups
2435

ANY PENETRATIOS THAN ESSENTIAL


DU−NEW SUPPLIES FOR EMERGENCY EQUIPMENTS.
L−RT−04 A200−01 Revision: C
10. ALL TACTILE INDICATORS TO COMPLY WITH AS1428.4
Date:
11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
LINEN RELEVANT BCA REQUIREMENT AND AS1428.1
ST Drawn by: GC
TRANSFER TO HR−05
DUCT BELOW Checked by: JC
9 HR−04
A200−01 Notes:
FSS-01A - Colours may appear differently when printed
A803

- LIFT−01
---
DW−09 A150 PV CELLS
L−RT−02
3910

FSD−02b
A802
COMMON
HR−02T
HR−02 LIFT−02 A200
LOBBY AREA
FUTURE DRONE
LANDING AREA
8 A200 FSP

SSL−60025
- FH
A150
DF−04 --- DF−03
L−RT−01a L−RT−01b
FS−01

- DN
--- PV CELLS 1.0 13/03/2020 ISSUE FOR STRUCT. ENG'S COORDINATION
REV DATE DESCRIPTION
-
A200
---

A200
7440

PW+WF
PROJECT:

Proposed Multiple Residential


ER+NBN+
MATV Development
BALCONY DRAIN A/C
DOWN PIPE
247 248
8 Parker Street, South Perth
A/C
CLIENT:
-
---
PARKER STREET COMPANY

FSS-01B DRAWING:
A803
L-15N- Roof Terrace

7 DRAWN:
YW
DATE:
02/06/20

16/04/2020 5:23:25 PM
SCALE: REVISION:
As indicated @A1 1.0
AUTHORISED: DRAWING NO:
PG
PROJECT NO: 1602 A225
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING WORK
AND SHOP DETAILING . DO NOT SCALE DRAWING.
DRAWINGS COPYRIGHT OF COLLIERE ARCHITECTURE.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT. 6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
C D E F G H 1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
6070 2650 2060 8005 3010 2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
A303 WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
S-A STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
A402
EL-04 LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
FW−23 6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
L04S−18 COMPACTED AS PER STRUCTURAL ENGINEER’S
SPECIFICATION
7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
SC−16 CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
SL4S−10 STANDARD
SC−15 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
A162 SL4S−01 DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

A162
A162 A162
WATER PROOFING NOTES:
LIFT−03
FW−25
TOW +23630 PARTITION
1.
LEGEND - EXPOSURE
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
EXTERNAL WALL AND ALL WALL WITH DIRECT
A162 TO WATER. REFER TO STRUCTURAL ENGINEER’S
L04S−02
A200E
REFER
SPECIFICATIONTO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
AREA, AND LEVEL 3 OPEN SPACES
4 FD
Min R 45
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
FD THROUGH THE WATERPROOF MEMBRANE
A162 A162−01
DN SW−01 A162E

FS−03 FLOOR PLAN NOTES:


Min RW 50
DU−03 SD−25

30
LC−A
L04S−19 APT 1A L04S−03

.0
SW−03A A162E 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL


Min R 55
3025

LOBBY FINISHES IN SOLE OCCUPANCY W


CORRIDOR
UNIT, PUBLIC SPACES AND

SSL−23965 SW−01 TCE 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND


SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
A162
DF−04
DU−03 FW−03
MOVEMENT JOINT.
Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
SD−24 L04S−26 L04S−04 (DC where
STRUCTURAL ENGINEER’S DRAWINGS required)
L04S−01 SW−01 SW−02W
L04S−17 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
MOUNTED Min R 50 + DCW
3 5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN

30.0
ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
*DC = Discontinuous construction according to NCC
DRAWINGS.

° 0
FD
6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
DC Required TO HYDRAULIC DRAWING AND SPECIFICATION)
SW−02W SSL−23915 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
SW−02W
FD TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
BRISBANE
SD−23 INSTALATION
LIVING/ Level 2, 69 Robertson St
L04S−16 LIVING DINING KIT. L’DRY A162E 8. ALL SERVICES PASSESFortitude
THROUGH ValleyFLOOR WHICH REQUIRES
QLD 4006
SSL−23965 DINING SC−08 FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
T +61 7 3513 8000
TCE SSL−23965 SSL−23935 SSL−23965 SD−20 SL4S−02 AS SPECIFIED E bne@floth.com.au
SW−02W L04S−05 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
A162E RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
DU−04 Drawing:
ANY SERVICESound Insulation
PENETRATIOS OTHERMarkups
THAN ESSENTIAL
SUPPLIES FOR EMERGENCY EQUIPMENTS.
CC−02 SSL−23915 L04S−20 Revision:
10. ALL TACTILECINDICATORS TO COMPLY WITH AS1428.4
SCUL. DU−03
Date:
11. ALL 24/04/2020
HANDRAILS AND BALUSTRADE TO COMPLY WITH
L04S−28
RELEVANT BCA REQUIREMENT AND AS1428.1
C SW−01 Drawn by: GC
(L OL . 5 Checked by: JC
3) 2 SW−01 SW−02W DU−05
SW−01 SW−04H
7150

L04S−27

Notes:
HR−12
SW−01
DRW DRW
T SW−04H - Colours may appear differently when printed
FW−26 SW−02W
S-C L04S−15 A162E
A403 DU−03 SW−04H
L04S−23 SW−04H
CS−06 DU−08 FLEXI ENS BED 3
WIR L04S−24A L04S−22
SD−22 SWC−01 SW−02W ROOM
SSL−23965 SSL−23935 SSL−23965
L04S−14

TWL
DU−03 SW−02W
L04S−21 SW−01 FW−24
SW−01
FD C.SP L04S−06
SW−02W
AW−08
A162E
SSL−23935 SD−21 HR−10 + HR−12 A200E
MASTER SW−03A
SW−02W
BED 2 L04S−08
L04S−07 85
00
TWL A162E A162E
DU−17
SSL−23965 SW−02W SSL−23965
L04S−24B SW−02W
TWL

BATH
DU−15

MR−01
SW−02W
L04S−24C ENS SSL−23935
A162E
2 SERVICE
SW−04N
SW−04N
A162E BALCONY
C200RE HR−11 A162
T C200RE SSL−23915 FD

OFD
B90
C150

C200RE C200RE B140 O/F DP


C200RE C200RE SC−20 B140
SC−17 SC−23 SC−19 SC−22 SC−18 SL4S−04
AW−10 AW−11 AW−11 AW−09 AW−10
SL4S−09 SL4S−08 SL4S−07 SL4S−06 SL4S−05
L04S−13 L04S−12 L04S−11 L04S−10 L04S−09
5050

S-A
7.00°

A402 REV DATE DESCRIPTION


SC−10 SSL−23050
BOUNDARY LINE

3647

SL3S−01
MR−03

4870

S-D 14325 4950

boundary line
A403
PROJECT:

Proposed Multiple Residential Development


1
BOUNDARY LINE EL-03

[No Slope] 8 Parker Street, South Perth

402
A303
conc.
CLIENT:
ROOF NOTES:
boundary line PARKER STREET COMPANY
1. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR WATER
TIGHTNESS AND STRUCTURAL INTEGRITY OF THE ROOF
2. ENSURE ROOF SYSTEM INCLUDING GUTTERS, DOWNPIPES AHD−23095
DRAWING:
AND FLASHINGS ARE WITHOUT DEFECT OR WATER LEAKS
AND THAT THE ROOF AREA IS CLEANED DOWN AND FREE
L4S-Typical- South Building Floor Plan
OF DEBRIS AT ALL TIMES. PREVENT RUBBISH ENTERING
DOWNPIPES AND OVERFLOW PIPES.
3. AL ROOFING TO BE INSTALLED IN STRICT ACCORDANCE DRAWN: DATE:
GW, YW 20/01/2020
WITH THE MANUFACTURERS INSTRUCTIONS AND RELEVANT

3/04/2020 8:44:47 AM
AUSTRALIAN STANDARDS. SCALE: REVISION:
As indicated @A1
4. OVERFLOW PIPES TO BE INSTALLED TO ALL SUMPS AND
RAINWATER HEADS TO PREVENT FLOOD DAMAGE AUTHORISED: DRAWING NO:
5. DOWNPIPES ARE TO BE FULLY HYDRAULICALLY SEALED PG
BETWEEN RAINWATER HEAD/ SUMP AND BELOW THE
GROUND DRAIN.
PROJECT NO: 1602
A241
6. CONSULT RELEVANT CONSULTANTS DOCUMENTATION AND
COORDINATE LOCATION AND TYPE OF PENETRATIONS VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WITH ALL TRADES. WORK
7. ALLOW FOR GUTTER GUARD TO ALL THE GUTTER. AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
B C D E F G H 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
8917 6070 2650 2060 8005 3010 STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
A303
- DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
EL-04
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
COMPACTED AS PER STRUCTURAL ENGINEER’S
SPECIFICATION
S-A 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FW−23 CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
A402 STANDARD
L05S−18
8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
SC−16 AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SL4S−10
SC−15
- A162 SL4S−01
WATER PROOFING NOTES:

A162 A162
PARTITION
1.
LEGEND - EXPOSURE
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
EXTERNAL WALL AND ALL WALL WITH DIRECT
TO WATER. REFER TO STRUCTURAL ENGINEER’S
A162 REFER
SPECIFICATIONTO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
LIFT−03 AREA, AND LEVEL 3 OPEN SPACES
FW−25
Min R 45
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE
L05S−02
A162−01 A162−01 A200E

A162 Min RW
FLOOR PLAN NOTES: 50
4 FD

FD 1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL


A162
SW−01 A162E CORRIDOR Min R 55
FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
W
2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
SD−24
FS−03 DF−04 SD−25 SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
MOVEMENT JOINT.
L05S−17 L05S−01
A162E
L05S−03
Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
STRUCTURAL ENGINEER’S
(DC whereDRAWINGSrequired)
3025

LOBBY 4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE


SW−03A OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
SSL−27165 TCE MOUNTED Min R 50 + DCW
5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
A162 SW−03A ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
DU−03 DU−03
DRAWINGS.
*DC = Discontinuous construction according to NCC
L05S−19 L05S−26 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
SW−01 SW−02W FW−03
L05S−04
TO HYDRAULIC DRAWING AND SPECIFICATION)
7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
3 TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
INSTALATION BRISBANE
8. ALL SERVICES PASSESLevel 2, 69 Robertson
THROUGH FLOORStWHICH REQUIRES
FD Fortitude Valley
FIRE RATING TO BE PROTECTED BYQLD 4006 RATED COLLAR
A FIRE
DC Required AS SPECIFIED T +61 7 3513 8000
SSL−27115 9. ALL CAVITIES, WASTESE bne@floth.com.au
PIPES, SOIL STACKS AND
SW−02W SW−02W RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
FD
SD−23 Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
L05S−16 LIVING/ ANY SERVICE PENETRATIOS OTHER THAN ESSENTIAL
Drawing: Sound Insulation Markups
LIVING DINING KIT. L’DRY SUPPLIES FOR EMERGENCY EQUIPMENTS.
DINING SC−08
TCE SSL−27115 SSL−27165
SSL−27165 SSL−27135 SSL−27165
A162E
SL4S−02 Revision:
10. ALL TACTILECINDICATORS TO COMPLY WITH AS1428.4
SD−20 11. ALL HANDRAILS AND BALUSTRADE TO COMPLY WITH
SW−02W L05S−05 Date: 24/04/2020
RELEVANT BCA REQUIREMENT AND AS1428.1
A162E
Drawn by: GC
DU−04 Checked by: JC
CC−02 L05S−20
SCUL. SW−01 DU−03
L05S−28 Notes:
FW−26
L05S−15 SW−02W DU−05 - Colours may appear differently when printed
SW−01 L05S−27
SW−04H
7150

A162E

SW−01 HR−12 SW−04H


SW−01 T SW−02W
SW−01 SW−01
S-C
-
DU−03 SW−04H
A403 SD−22 L05S−23 SW−04H
DU−08
L05S−14 CS−06 FLEXI ENS BED 3
WIR L05S−24A SWC−01 SW−02W L05S−22
ROOM
SSL−27165 SSL−27135 SSL−27165
SW−01
DU−03 FW−24
SW−01 SW−02W SW−03A L05S−21 L05S−06
FD SW−03A

SSL−27135 SW−02W A200E


MASTER BED 2 SD−21 HR−10 + HR−12
SW−02W L05S−08 A162E
SW−02W SW−02W SSL−27165
SSL−27165 DU−17 A162E A162E A162E
L05S−24B BATH
SW−02W

MR−01
DU−15 ENS SSL−27135 SW−04N 98
L05S−24C AW−08
2 SW−02W SERVICE
L05S−07
SW−04N
SW−04N
SC−09
A162E BALCONY SL4S−03
C200RE HR−11
T SW−04N FD
SSL−27115
C150
OFD A162

B90
C200RE O/F DP
SC−17 C200RE SC−23 SC−19 SC−18 C200RE
AW−10 AW−11 AW−09 AW−10
SL5S−09 SL5S−08 SL5S−07 SL5S−05 REV DATE DESCRIPTION
L05S−13 L05S−12 L05S−10 S-A L05S−09
SW−04N SC−20
C200RE A402 SL5S−04
AW−11 SC−22
L05S−11 SL5S−06
5050

3987

PROJECT:

Proposed Multiple Residential Development

8 Parker Street, South Perth


1 CLIENT:
EL-03

PARKER STREET COMPANY


A303

DRAWING:
L5S-Typical- South Building Floor Plan

DRAWN: DATE:
GW, YW 20/01/2020

3/04/2020 8:44:50 AM
SCALE: REVISION:
As indicated @A1
AUTHORISED: DRAWING NO:
PG
PROJECT NO: 1602
A242
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING
WORK
AND SHOP DETAILING . DO NOT SCALE
DRAWING.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT.
6010.
t 08 93852858 e admin@colliere.com.au
GENERAL NOTES:
B C D E F G -
---
H
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE
LEVELS ON ALL DRAWINGS PRIOR TO COMMENCING WORK
OR ORDERING MATERIAL.
2. ALL SETOUT WORKS ARE TO BE DONE BY A LICENSED
SURVEYOR TO ESTABLISH DATUMS AND FINISHED FLOOR
LEVELS, SERVICES AND SERVICE DUCTS.
3. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS
ONLY. INFORM ARCHITECT OF ANY CONFLICT BETWEEN
SITE CONDITIONS AND DOCUMENTS.
8917 6070 2650 2060 8005 3010 4. REFER TO STRUCTURAL AND OTHER CONSULTANTS
DOCUMENTATION FOR DETAILS REGARDING ASSOCIATED
WORKS. ALL ARCHITECTURAL AND INTERIOR DRAWINGS
ARE TO BE READ INCONJUCTION WITH THE FULL SET OF
STRUCTURAL, MECHANICAL, HYDRAULIC, ELECTRICAL AND
LANDSCAPE DRAWINGS AND OTHER RELEVANT
CONSULTANTS REPORT. ANY DESCREPENSIES SHALL BE
REFERED TO ARCHITECT FOR CLARIFICATION AND
DA
A303
07 DECISION PRIOR TO PROCEEDING WITH THE WORK.
5. ALL RETAINED ITEMS TO BE PROTECTED DURING
CONSTRUCTION. REPAIRS AND MAKE GOOD ALL DAMAGES.
EL-04
2
6. ALL SOIL BELOW THE FOOTING AND SLAB SHALL BE
COMPACTED AS PER STRUCTURAL ENGINEER’S
- SPECIFICATION
--- FSS-03B 7. ALL WORK MUST BE IN ACCORDANCE WITH THE BUILDING
FSS-03A S-A
1-
CODE OF AUSTRALIA AND ALL RELEVANT AUSTRALIAN
A808 DA
A402
---08 A808 STANDARD
FW−23 8. BUILDER’S RESPONSIBLE TO MARK ’SUPERCEEDED’ ON ALL
L06S−18 DRAWINGS FOR WHICH A REVISION HAVE BEEN ISSUED
9. COPYRIGHT OF ALL DESIGNS SHOWN HEREIN ARE
RETAINED BY COLLIERE ARCHITECTURE. WRITTEN
AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SC−16
SC−15
SL4S−10 A162 SL4S−01
WATER PROOFING NOTES:
1.
PARTITION LEGEND
WALL WITH DIRECT- EXPOSURE
ALLOW FOR WATER STOP TO UNDERNEATH OF ALL
EXTERNAL WALL AND ALL
A162 TO WATER. REFER TO STRUCTURAL ENGINEER’S
A162 A162
REFER
SPECIFICATION TO ACOUSTIC BRIEF
AND RECOMENDATION.
2. ALLOW FOR DOUBLE LAYER WATERPROOFING ON THE TOP
OF CONCRETE SLAB IN ALL BACONY/TERRACE, WET
LIFT−03 AREA, AND LEVEL 3 OPEN SPACES
FW−25
Min R 45
3. ALLOW FOR WATERTIGHT SEALWTO ALL PENETRATION
THROUGH THE WATERPROOF MEMBRANE
L06S−02
A200E
A162−01 A162−01
A162
FLOOR PLAN NOTES:
Min RW 50
4 FD

FD
1. REFER TO FINISHES SCHEDULE FOR FLOOR AND WALL
SW−01 A162E
CORRIDOR
Min R 55
FINISHES IN SOLE OCCUPANCY UNIT, PUBLIC SPACES AND
W
- UP 2. REFER TO STRUCTURAL ENGINEER’S DRAWING AND
FS03−L6S
SD−24
---
FS−03 DF−04
A808
SD−25
L06S−03
SPECIFICATION FOR LOCATION OF CONTROL JOINT AND
L06S−01
L06S−17
SW−03A
A162E
MOVEMENT JOINT.
Min R + Ctr 50
3. SLAB SETDOWNS ARE TO BE READ W INCONJUCTION WITH
(DC where required)
3025

LOBBY STRUCTURAL ENGINEER’S DRAWINGS


4. ALLOW FOR ADDITIONAL BRACING ON INTERNAL SOLE
SW−01
SSL−30365 TCE OCCUPANCY UNIT STUD WALL WHERE THE TV ARE TO BE
MOUNTED Min R 50 + DC
W
DU−03
5. ALL THE FLOOR WASTES INDICATES IN THE FLOOR PLAN
SW−03A ARE TO BE READ IN CONJUCTION WITH HYDRAULIC
A162 DU−03
L06S−26
L06S−19 *DC = Discontinuous construction according to NCC
DRAWINGS.
SW−01 6. FALL ALL THE LINEAR DRAIN TO DRAIN OUTLET (REFER
FW−03 TO HYDRAULIC DRAWING AND SPECIFICATION)
L06S−04 7. CONFIRM LOCATION OF INSPECTION/ CLEANOUT POINTS
3 TO ALL THE SOIL STACKS WITH ARCHITECT PRIOR TO
INSTALATION BRISBANE
Level 2, 69 Robertson St
8. ALL SERVICES PASSES Fortitude
THROUGH FLOOR WHICH REQUIRES
Valley QLD 4006
FD
FIRE RATING TO BE PROTECTED BY A FIRE RATED COLLAR
T +61 7 3513 8000
SW−02W DC Required SSL−30315 AS SPECIFIED E bne@floth.com.au
SW−02W 9. ALL CAVITIES, WASTES PIPES, SOIL STACKS AND
RAINWATER PIPES TO BE ACOUSTICALLY LAGGED.
FD
SD−23 Project:
FIRE 8 Parker
ISOLATED Street
PASSAGE WAY ARE TO BE CLEARED OF
L06S−16 LIVING/ Drawing:
ANY SERVICESound Insulation
PENETRATIOS OTHERMarkups
THAN ESSENTIAL
LIVING DINING KIT. L’DRY A162E
DINING SUPPLIES FOR EMERGENCY EQUIPMENTS.
Revision:
TCE SSL−30315 SSL−30365
SSL−30365 SSL−30335 SSL−30365 SD−20
SC−08 10. ALL TACTILECINDICATORS TO COMPLY WITH AS1428.4
SL4S−02
SW−02W L06S−05 Date: 24/04/2020
11. ALL HANDRAILS AND BALUSTRADE
RELEVANT BCA REQUIREMENT AND AS1428.1
TO COMPLY WITH
A162E
Drawn by: GC
DU−04 Checked by: JC
L06S−20
CC−02
SCUL.
Notes:
FW−26 SW−01
L06S−15 SW−02W DU−05
L06S−27
- Colours may appear differently when printed
SW−01
7150

SW−04H
DU−03
L06S−28 A162E
HR−12
SW−01 SW−01 SW−01 SW−01 SW−04H T SW−04H

S-C
DU−03 SW−04H
A403
L06S−23
CS−06
DU−08 FLEXI ENS BED 3
WIR SWC−01 L06S−22 SW−02W
SD−22 L06S−24A SW−02W ROOM
SSL−30365 SSL−30335 SSL−30365
L06S−14 SW−02W
SW−01 FW−24
DU−03 L06S−06
FD SW−01 SW−02W SW−03A SW−03A L06S−21
SW−02W
SSL−30335 SD−21 HR−10 +A200E
HR−12
MASTER BED 2 L06S−08
SW−02W
SW−02W A162E A162E A162E
SSL−30365 SW−02W SSL−30365 A162E
DU−17 SW−02W
L06S−24B
BATH

MR−01
DU−15 ENS SSL−30335 A200E
SW−04N
2 -
L06S−24C
SW−02W SERVICE
SW−04N
SW−04N
SC−09
--- A162E BALCONY SL4S−03
C200RE C200RE HR−11
SW−04N T SW−04N SSL−30315 FD
C150
OFD
A162
1.2 13/03/2020 ISSUE FOR STRUCT. ENG'S COORDINATION
C200RE O/F DPB140 1.1 26/03/2020 ISSUE FOR DEVELOPMENT APPROVAL
C200RE SC−20 B140 B90
SC−17 AW−10 SC−23 AW−11 C200RE AW−11 AW−09 AW−10 C200RE 1.0 20/01/2020 ISSUE FOR CONSULTANTS COORDINATION
SL6S−04
SL6S−09 L06S−13 SL6S−08 L06S−12 L06S−11 L06S−10 L06S−09 REV DATE DESCRIPTION
S-A
1- 1
SC−19
SL6S−07 SC−22 A402
---08
DA A594
SL6S−06
5050

PROJECT:

Proposed Multiple Residential


Development

8 Parker Street, South Perth


1 CLIENT:
EL-03
1

PARKER STREET COMPANY


DA
A303
07

DRAWING:
L6S-Typical- South Building Floor Plan

- DRAWN: DATE:
GW, YW 20/01/2020

16/04/2020 5:23:35 PM
---
SCALE: REVISION:
As indicated @A1 1.2
AUTHORISED: DRAWING NO:
PG
PROJECT NO: 1602 A243
VERIFY ALL DIMENSIONS PRIOR TO COMMENCING WORK
AND SHOP DETAILING . DO NOT SCALE DRAWING.
DRAWINGS COPYRIGHT OF COLLIERE ARCHITECTURE.
a SUITE 1&2, 57A BAY VIEW TERRACE, CLAREMONT. 6010.
t 08 93852858 e admin@colliere.com.au
Appendix D – Acoustic Treatment to Garbage Chute

Project No: 18423


Doc. No.: A18423
Date: 24th April 2020
Issue No: A Page 43
Notes:
This advice has considered the acoustic requirements (sound insulation) only.
Other requirements have not been considered, including but not limited to:
- Fire rating / combustibility
- Corrosion / dissimilar metals
- Facade engineering
- Seismic loading and / or restraint
- Structural integrity
- Architectural build-ability
- Waterproofing etc.

The Contractor must ensure these elements are considered as required.

Garbage chute structural framing mounted Garbage chute penetration (with 10 to


on vibration isolation pads at each slab 15mm clearance from structure) to be
(not at mid-span of riser walls) sealed with approved acoustic / fire
sealant (e.g. Knauf BindEx) to a depth of
10mm (min.) with a closed cell backing rod
as required.

Metal garbage chute wrapped in 25mm


acoustic lagging (e.g. AcoustiLag 45 or 10mm clearance between garbage chute
SoundLag 4525C) and slab edge

Garbage Chute Acoustic


Treatment

SKETCH - NOT TO SCALE


NOT FOR CONSTRUCTION

FORTITUDE VALLEY
MELBOURNE
CHATSWOOD
PERTH CLIENT ARCHITECT REV DATE DRN CHD DESCRIPTION DRAWING TITLE DRAWN PROJECT

GC
GARBAGE CHUTE ACOUSTIC 8 PARKER RESIDENTIAL APARTMENTS
A 25/04/2020 GC JC TENDER ISSUE
LEVEL 8,
2, TOWER A
13,
6,
69 ST
470
799
66 ROBERTSON
COLLINS
PACIFIC
GEORGESHIGHWAY,
STREET,
ST,
TERRACE, CHECKED
4006 NSW
3000
2067
6000 QLD
VIC
WA
618
T + 612
617 9406
613 6162 2396
3513 4555
9448 8000
8755
TREATMENT JC 8 PARKER STREET, SOUTH PERTH
perth@floth.com.au
E syd@floth.com.au
bne@floth.com.au
mel@floth.com.au ENGINEER

W www.floth.com.au GC
SERVICE DRAWING SCALE PROJECT No DRAWING No REVISION

18423 A
DETAILED REVISION DESCRIPTION
ACOUSTIC SERVICES NOT TO SCALE
floth.com.au

BRISBANE SYDNEY PERTH MELBOURNE JAKARTA


Level 2 Level 8, Tower A Level 6 Suite 13.04, Level 13 Wisma Kemang Level 2
69 Robertson St 799 Pacific Hwy 66 St Georges Tce 470 Collins St JL Kemang Selatan Raya No. 1
Fortitude Valley QLD 4006 Chatswood NSW 2067 Perth WA 6000 Melbourne VIC 3000 Jakarta Selatan 12560, Indonesia
+61 7 3513 8000 +61 2 9406 4555 +61 8 6162 2396 +61 3 9448 8755 +62 21 781 6326
bne@floth.com.au syd@floth.com.au perth@floth.com.au mel@floth.com.au floth@flothindonesia.com