1. Measured Value Test:


Inject current in the relay as per the table below. Observe the reading on the relay display,
in primary values.

Current Primary Current Displayed on Relay


Phase Injected
(A) IL1 IL2 IL3 IN
L1-E 1
L2-E 1
L3-E 1
L1-L2-L3 1

2. PHIPTOC1 : ( INSTANTANEOUS OVERCURRENT )

START VALUE :
OPERATE DELAY TIME :

Injected Current Operating Time Calculated Time


Phase Remarks
(A) In Relay (mSec) (mSec)
R OK
Y OK
B OK
RYB OK

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

Operating Time Operating Time


Ip Pick Remarks
Phase @ 2 x Ip in Sec @ 5 x Ip in Sec
UP
(A) Measured Calculated Measured Calculated
R
Y
B
RYB

3. EFHPTOC : ( DMT E/F )

START VALUE :
OPERATE DELAY TIME :

Operating
Injected Current Calculated Time
Phase Time In Relay Remarks
(A) (mSec)
(mSec)
N

4. INRPHAR1 ( INRUSH PROTECTION )

START VALUE :
OPERATE DELAY TIME :

Injected Injected Operating


Calculated
Phase Current (A) @ Current (A) Time In Relay Remarks
Time (mSec)
50HZ @ 100 HZ (mSec)
R OK
Y OK
B OK
RYB OK

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

5. UBI/BO & LED CHECK :

BINARY INPUT BI NAME CHECK METHOD REMARKS


1 Breaker Off Open TB : 501 / 503 PASS
2 Breaker in Service Short TB : 501 /505 PASS
3 86 Relay Operated Short TB : 501 /507 PASS
4 Spring Charged Short TB : 501 /508 PASS
Trafo Door Open
5 Short TB : 420 /421 PASS
Trip
Winding Temp. High
6 Short TB : 422 /423 PASS
Trip
Winding Temp. High
7 Short TB : 424 /425 PASS
Alarm
8 LV Side E/F Trip Short TB : 511 /512 PASS

BINARY OUTPUT BO NAME CHECK METHOD REMARKS


Open TB : 440 &
X100- IRF Internal Relay Fail Continuity between PASS
518-519
BI1, BI2, Trip coil
healthy, 86 Coil
X100- PO1 Close Permissive PASS
healthy, no restart
inhibit, no trafo trips
X100- PO2 86 Operated Short TB : 414 /415 PASS
Any protection
X100- SO1 Fault operated PASS
operate
Master Trip Relay
X100- SO2 Short TB : 414 /415 PASS
Operated
X100- PO3* Trip ckt Supervision OPEN TB : 130 FAIL
Master Trip relay
X100- PO4* OPEN TB : 531 FAIL
Supervision
X110- SO1 Ready to close Not Configured
FAIL
Master Trip Relat Ckt Inverted output of
X110- SO2 FAIL
Healthy X100- PO4

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

Inverted output of
X110- SO3 Trip ckt Supervision FAIL
X100- PO3
X110- SO4 SPARE - -

LED LED NAME CHECK METHOD REMARKS


1 50 TRIP PHIPTOC PASS
2 50N TRIP EFHPTOC PASS
3 51 TRIP PHLPTOC PASS
TRIP CKT PO3 WRONG
4 FAIL
UNHEALTHY CONFIGURED
5 Trafo Door Open Trip BINARY INPUT- 08 PASS
Winding Temp. High
6 BINARY INPUT- 08 PASS
Alarm
Winding Temp. High
7 BINARY INPUT- 08 PASS
Trip
8 LV Side E/F Trip BINARY INPUT- 08 PASS

6. Final Checklist:

1 All Protection settings verified as per actual settings

2 Relay keypad Function checked

3 Relay display Found healthy

4 LED reset button, label and Function checked

5 All CT/PT links are verified

6 Relay Found Healthy

7. Instrument Used:

Equipment
Sr. No. Description Make
Sr. No.
1. Secondary Injection Kit Omicron 356

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:

You might also like