You are on page 1of 6

CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

Panel Name
Panel Location
Feeder No & Name
Relay MLFB
Relay Sr. No
Relay Aux. Supply 220 VDC
CT Ratio (A)

1. Measured Value Test:


Inject current in the relay as per the table below. Observe the reading on the relay display,
in primary values.

Current Primary Current Displayed on Relay


Phase Injected
(A) IL1 IL2 IL3 IN
L1-E 1
L2-E 1
L3-E 1
L1-L2-L3 1

Operating Time Operating Time


Ip Pick Remarks
Phase @ 2 x Ip in Sec @ 5 x Ip in Sec
UP
(A) Measured Calculated Measured Calculated
R
Y
B
RYB

2. EFHPTOC : ( DMT E/F )

START VALUE :
OPERATE DELAY TIME :

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

Operating
Time In Relay
(mSec)
Injected Current Calculated Time
Phase Remarks
(A) (mSec)

EFLPTOC : (IDMT E/F )

START VALUE :
TIME MULTIPLIER :
OPERATING CURVE TYPE :

Operating Time Operating Time


IEp Pick Remarks
Phase @ 2 x IEp in Sec @ 5 x IEp in Sec
UP
(A) Measured Calculated Measured Calculated
N

3. BI/BO & LED CHECK :

BINARY INPUT BI NAME CHECK METHOD REMARKS


X304- 01 Breaker Off Open TB : 501 / 503 PASS
X304- 02 Breaker in Service Short TB : 501 /505 PASS
X304- 03 86 Relay Not Operated Open TB : 506 PASS
X304- 04 L/R in Remote External L/R Switch PASS
Spring charge
X304- 05 Spring Charged PASS
Discharging
X304- 06 AIM in Independent AIM Switch PASS
X304- 07 AIM in Manual AIM Switch PASS
X304- 08 AIM in Auto AIM Switch PASS
X304- 09 BPT Dead Bus PT Dead Check PASS

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

X304- 10 BPT Healthy Bus PT Healthy Check PASS


UT1A off & 86 Not PASS
X304- 11 Test mode- BO4
operated
ST1A off & 86 Not PASS
X304- 12 Open TB : 425
operated
X304- 13 TSS on UT1A Feeder TSS Switch PASS

X304- 14 SSS on UT1A Feeder SSS Switch PASS

X319- 01 Station B/C ON Open TB : 427 PASS


Station Bus PT PASS
X319- 02 Open TB : 429
Healthy
X319- 03 UT1B Breaker OFF Short TB : 430 / 431 PASS

X319- 04 UT2A Breaker OFF Short TB : 432 / 433 PASS

X319- 05 UT2B Breaker OFF Open TB : 435 PASS

X319- 06 ST1B Breaker OFF Short TB : 436 / 437 PASS

X319- 07 ST2A Breaker OFF Short TB : 438 / 439 PASS

X319- 08 ST2B Breaker OFF Open TB : 441 PASS

X319- 09 TSS on UT1A Feeder TSS Switch PASS


AIM in MANUAL PASS
X324- 01 UT1A Breaker ON
(Short TB : 484 / 486 )
AIM in MANUAL PASS
X324- 02 Breaker ON
( Short TB : 501 /522 )

BINARY OUTPUT BO NAME CHECK METHOD REMARKS


Continuity between
IRF Internal Relay Fail PASS
533 - 534
X327- BO1 Close Permissive - -
X327- BO2* Trip ckt Supervision Not configured FAIL
Master Trip
X327- BO3* Not configured FAIL
Supervision
Trip Commands
X327- BO4 TEST MODE PASS
(SYNCH / LBB / UV )
X327- BO5 Fault Operated TEST MODE PASS

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

X327- BO6 Auto Close - -


Master Trip Inverted Output from
Supervision X327- BO3
X327- BO7 FAIL

X327- BO8 Ready to Close Not Configured -


Inverted output of
X327- BO9 Trip ckt Supervision FAIL
X327- BO2
X310- BO1 L/R Switch in Remote L/R Switch PASS
X310- BO4 Auto Close - -
UT1A BKR OFF & 86 PASS
X321- BO1 Short TB : 105/133
not Operated
UT1A BKR OFF & 86 PASS
X321- BO2 Short TB : 105/133
not Operated
UT1A BKR OFF & 86 PASS
X321- BO3 Short TB : 105/133
not Operated
UT1A BKR OFF & 86 PASS
X321- BO4 Short TB : 105/133
not Operated
X321- BO9 AIM in Auto Not Configured -

LED LED NAME CHECK METHOD REMARKS


1 51 TRIP PHLPTOC PASS
2 51N TRIP EFLPTOC PASS
3 Trip Ckt Unhealthy BO2 Check -
Master Trip Relay
4 BO3 Check -
Unhealthy
5 Sync OK Momentary paralleling -
6 TSS on UT1A BINARY INPUT- 13 PASS
7 SSS on UT1A BINARY INPUT- 14 PASS
Momentary Paralleling
8 Momentary paralleling -
Operated

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

9 TSS on UT1A BINARY INPUT- 19 PASS


BINARY INPUT- 03,11 PASS
UT1A OFF & 86 not
10
operated

11 Auto Close BO4 Check -

4. Final Checklist:

1 All Protection settings verified as per actual settings

2 Relay keypad Function checked

3 Relay display Found healthy

4 LED reset button, label and Function checked

5 All CT/PT links are verified

6 Relay Found Healthy

5. Instrument Used:

Equipment
Sr. No. Description Make
Sr. No.
1. Secondary Injection Kit Omicron 356

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:
CUSTOMER ESSAR POWER HAZIRA LTD

LOCATION HAZIRA
PERFECT POWER SWITCHBOAR
D
FEEDER NAME
Date FEEDER NO. -

PERFECT POWER ESSAR POWER


Name: Name :
Signature & Date: Signature & Date:

You might also like