EXPO - C38 DISTRICT & PARKS

C.326 STARLIGHT ARENA PROJECT SUMMARY


TOTAL INSTALLED LOAD TOTAL STANDBY LOAD TOTAL CONNECT
TOTAL DEMAND LOAD
: 186.59 KW
: 23.20 KW

: 163.39 KW

: 130.72 KW
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS DETAILS OF CONNECTED LOAD, MAX. DEMAND & kWHr METERING

SMDB-01 OWNER : EXPO 2020

FED FROM: ATS-01


S CONSULTANT : PARSONS INTERNATIONAL
H
CIRCUIT ACB/MCCB FAULT E CABLE SIZE, TYPE AND NO. OF CORES ECC LENGTH CONNECTED LOAD (kW)
FEEDER ISOLATOR DUTY E SIZE OF CABLES
T
SP/TP 1 NO. OF
O CORES TYPE R-PH Y-PH
F
1 SIZE
SMDB / DB NO. RATIN kA 1C/2C/4C XLPE/PVC/SWA 1C, mm2 (Mtrs.) kW kW
G
INCOMER TP (AMPS)
400 MCCB 50 4C FIRE RATED 300 150 20 62.12 62.37

OUTGOING

DB-01 TP 160 36 4C XLPE/SWA/LSF 70 35 15 22.89 22.89

DB-EXT-01 TP 40 36 4C XLPE/SWA/LSF 10 10 20 2.58 2.48

DB-02 TP 63 36 4C XLPE/SWA/LSF 35 16 221 9.27 9.51

DB-03 TP 63 36 4C XLPE/SWA/LSF 50 25 291 9.27 9.25

DB-04 TP 63 36 4C XLPE/SWA/LSF 16 16 100 9.13 9.25

MBP (FOR SMDB-UPS) TP 160 36 4C XLPE/SWA/LSF 70 35 20 27.76 27.28

ISO. FOR TICKET STATION-1 TP 40 36 4C XLPE/SWA/LSF 10 10 140 3.33 3.33

ISO. FOR TICKET STATION-2 TP 40 36 4C XLPE/SWA/LSF 10 10 200 3.33 3.33

ISOLATOR FOR ATM SP 32 36 2C XLPE/SWA/LSF 6 6 82 1.67 1.67

SPARE TP 63 36 0.67 0.67

MDB CONNECTED TO: DEWA LV DB/TRANSFORMER: 62.12 ###


TOTAL CONNECTED LOAD PER PHASE
SMDB CONNECTED TO: ATS-01 400A 4P
DEMAND FACTOR:…………………….. 0.80 MAX. DEMAN D: ------------- 130.72 kW * L TOTAL CONNECTED / INSTALLED LOAD (TCL) : 186.59 kW
OVER
AL
TOTAL STAND BY LOAD
23.20 kW TOTAL CONNECTED LOAD 163.39 kW

NOTE: 23.20 kW is Stand-by load (not used as assisting load) and at one time only one load will be operative.
CONSULTANT / CONTRACTOR: ………… TEL:…………
* TCL - shall include all loads proposed to be installed including standby, spare and future load provisions.
(1) Upto 60A (2) Upto

Type of Meter (Rating of Incomer): (1 Phase)


125A (3) LV CT ………./………A / HV CT ………/ ……….A (* 200/5Amps CT Metering)
(3 Phase)

SUBMAIN DISTRUBATION BOARD


PROJECT:EXPO C38 DISTRICT&PARKS DETAILS OF CONNECTED LOAD, MAX. DEMAND & kWHr METERING
SMDB-UPS OWNER : EXPO 2020
FED FROM: MBP CONSULTANT : PARSONS INTERNATIONAL

SHEET 1 OF 1
CIRCUIT FEEDER ACB/MCCB FAULT CABLE SIZE, TYPE AND NO. OF CORES ECC SIZE LENGTH OF CONNECTED LOAD (kW
SMDB / DB NO. ISOLATOR DUTY 1C, mm2 CABLES
kA (Mtrs.)
NO. OF TYPE R-PH
SP/T CORES XLPE/PVC/SWA kW
P 1C/2C/4C SIZE
RATING
(AMPS)
INCOMER TP 160A 4C XLPE/SWA/LSF 70 35 20 27.76
ISOLATOR

OUTGOING

DB-UPS-01 TP 63 36 4C XLPE/SWA/LSF 16 16 20 7.48

DB-UPS-02 TP 40 36 4C XLPE/SWA/LSF 25 16 225 6.84

DB-UPS-03 TP 40 36 4C XLPE/SWA/LSF 35 16 294 6.60

DB-UPS-04 TP 40 36 4C XLPE/SWA/LSF 16 16 138 6.84

27.76

MDB CONNECTED TO: DEWA LV DB/TRANSFORMER:


TOTAL CONNECTED LOAD PER PHASE
SMDB CONNECTED TO:
DEMAND FACTOR:…………………….. 0.80 MAX. DEMAND: -------------
56.45 kW * OVERALL TOTAL CONNECTED / INSTALLED LOAD (TCL) :
70.56 kW

CONSULTANT / CONTRACTOR: ………… TEL:…………


* TCL - shall include all loads proposed to be installed including standby, spare and future load provisions.
(1) Upto 60A (2) Upto

Type of Meter (Rating of Incomer): (1 Phase)


125A
(3 Phase)
(3) LV CT ………./………A / HV CT ………/ ……….A (* 200/5Amps CT Metering)
SUBMAIN DISTRUBATION BOARD
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA LOAD DISTRIBUTION SCHEDULE (3
DB NO.
DB-01
FED FROM:
SMDB-01 PHASE)
LOCATI

RATING OF Rating of CIR MCB RTG. CCT WIRE ECC WIRE EX FAN SH. 13A S. COO SPU "W" "S" WAT
INCOMER No. (A) SIZE mm2 SIZE LTG S/O S/O W/H H/D KER R A/C A/C . FCU OTHERS
RCD mm2
/RCBO
SL No. Room/Area OUT PUM W/Unit
L P
ET
1 R1 10 2.5 2.5 LIGHTING ELE. ROOM GF (TYPE-S) 0/0/3 20/30/40

2 Y1 10 2.5 2.5 LIGHTING BATTERY/UPS RM. GF (TYPE-S) 0/0/3 20/30/40


40A, 4P, 100mA ELCB

3 B1 10 2.5 2.5 LIGHTING BMS ROOM.GF (TYPE-S) 0/0/3 20/30/40

4 R2 10 2.5 2.5 LIGHTING IDF ROOM.GF (TYPE-S) 0/0/2 20/30/40

5 Y2 10 2.5 2.5 LIGHTING IDF ROOM.GF (TYPE-S) 0/0/2 20/30/40

6 B2 10 2.5 2.5 LIGHTING ROOF (TYPE-D1) 0/5/0 20/30/40

7 R3 20 4 4 SOCKETOUTLET ELE. ROOM GF 2 200

8 Y3 20 4 4 SOCKETOUTLET BATTERY/UPS ROOM GF 2 200


40A, 4P, 30mA ELCB

9 B3 20 4 4 SPUR OUTLET BATTERY/UPS ROOM GF 1 100

10 R4 20 4 4 SOCKETOUTLET IDF ROOM GF 4 200

11 Y4 20 4 4 SOCKETOUTLET FOR PRINTER BMS ROOM GF LCS 2 200


WORK STATION
12 B4 20 4 4 SOCKETOUTLET FOR PRINTER BMS ROOM GF BMS 2 200
WORKSTATION
A TPN ISOLATOR

13 R5 32 6 6 INDUSTRIAL SOCKET OUT LET FOR RACK-1 IDF 1 6600


ROOM GF.
30mA ELCB
40A, 4P,
160A TPN ISOLATOR

30mA ELCB
14 Y5 20 4 4 SOCKET OUTLET FOR PAVA RACK BMS ROOM 1 1000

40A, 4P,
15 B5 20 4 4 ACS FOR ELEC ROOM GF 1 100

16 R6 20 4 4 ICT SWITCH 1 240

30mA ELCB
17 Y6 32 6 6 INDUSTRIAL SOCKET OUT LET FOR RACK-2 IDF 1 6600
40A, 4P, ROOM GF.
18 B6 20 4 4 ACS FOR UPS/BATTERY ROOM GF 1 100

19 R7 20 4 4 ICT SWITCH 1 240


30mA ELCB

20 Y7 20 4 4 ACS FOR BMS ROOM GF 1 100


40A, 4P,

21 B7 32 6 6 INDUSTRIAL SOCKET OUT LET FOR RACK-3 IDF 1 6600


ROOM GF.
22 R8 20 ACS FOR IDF ROOM GF 1 100
30mA ELCB

23 Y8 20 ACS FOR IDF ROOM GF 1 100


40A, 4P,

24 B8 32 6 6 INDUSTRIAL SOCKET OUT LET FOR RACK-3 IDF 1 6600


ROOM GF.
100mA ELCB

25 R9 20 4 4 OUT DOOR UNIT-1 FOR ELE. ROOM 1 1700


40A, 4P,

26 Y9 20 SPARE 800

27 B9 20 SPARE 100

28 R10
100mA ELCB
40A, 4P,

29 Y10
32 6 6 OUT DOOR UNIT-2 FOR BATTERY/ UPS ROOM 1 5800

30 B10

TOTAL LOAD PER PHASE


CABLE SIZE: 1x4C70 mm2 CU/XLPE/SWA/LSF + 1C 35 mm2 CU/LSF/ ECC
C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC SHEET 1 OF 2

PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA LOAD DISTRIBUTION SCHEDULE (3


DB NO.
DB-01
FED FROM:
SMDB-01 PHASE)
LOCATI

RATING OF Rating of CIR MCB RTG. CCT WIRE ECC WIRE EX FAN SH. 13A S. COO SPU "W" "S" WAT
INCOMER No. (A) SIZE mm2 SIZE LT S/O S/O KER R A/C A/C .
RCD W/H H/D FCU OTHERS
mm2 G
/RCBO
SL No. Room/Area OUT PUM W/Unit
L P
ET
31 R11 20 4 4 IDU-1, FOR BATTERY/ UPS ROOM 1 180
100mA ELCB
40A, 4P,

32 Y11 20 4 4 OUT DOOR UNIT-3 FOR BMS ROOM 1 2200

33 B11 20 4 4 IDU-1, FOR IDF ROOM 1 1 180

34 R12
100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB
40A, 4P,

35 Y12
32 6 6 OUT DOOR UNIT-4 FOR IDF ROOM 1 1 5800

36 B12

37 R13
40A, 4P,

38 Y13
32 6 6 OUT DOOR UNIT-5 FOR IDF ROOM 1 1 5800

39 B13

40 R14
40A, 4P,

41 Y14
32 6 6 OUT DOOR UNIT- 6 (1DUTY/) FOR IDF ROOM 1 1 5800

42 B14

43 R15
160A TPN ISOLATOR

40A, 4P,

44 Y15
32 6 6 OUT DOOR UNIT- 7 (STANDBY) FOR IDF ROOM 1 1 5800

45 B15

46 R16 20 4 4 IDU-2, FOR IDF ROOM 1 1 180


100mA ELCB
14-40A, 4P,

47 Y16 20 4 4 IDU-3, FOR IDF ROOM 1 1 180

48 B16 20 4 4 IDU-4, FOR IDF ROOM 1 1 180

49 R17 20 4 4 SPUR OUT LET FOR FM-200 BMS ROOM 1 100


30mA ELCB

50 Y17 20 4 4 ICT SWITCH-05 1 240


40A, 4P,

51 B17 20 4 4 SOCKET OUTLET FOR LCP-DB-EXT-01 1 100

52 R18 20 4 4 SOCKETOUTLET FOR FACP BMS ROOM GF 2 200


30mA ELCB

53 Y18 20 4 4 SOCKETOUTLET FOR DCD PANEL BMS ROOM GF 1 200


40A, 4P,

54 B18 20 4 4 ACS IDF 1 100

55 R19 20 4 4 ISO. FOR DOOR CONTROL-1 1 500


30mA ELCB

56 Y19 20 4 4 ISO. FOR DOOR CONTROL-2 1 500


40A, 4P,

57 B19 20 4 4 ISO. FOR DOOR CONTROL-3 1 500

58 R20 20 4 4 ISO. FOR ACCESS GATE 1 500


30mA ELCB

59 Y20 20 4 4 ISO. FOR SIGNAGE-1 1 200


40A, 4P,

60 B20 20 4 4 ISO. FOR SIGNAGE-2 1 200

61 R21 20 4 4 ISO. FOR SIGNAGE-3 1 200


30mA ELCB
40A, 4P,
30mA ELCB
62 Y21 20 4 4 PTZ CAMERA 1 100

40A, 4P,
63 B21 20 4 4 PTZ CAMERA 1 100

TOTAL LOAD PER PHASE


TOTAL STAND BY LOAD 5.80 KW
N5.80 KW is Stand-by load (not used as assisting load) and at one time only one load will be operative.
O
CABLE SIZE: 1x4C70 mm2 CU/XLPE/SWA/LSF + 1C 35 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
T
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
E
CABLE SIZE: 2/4 x 1 C………….mm 2 Cu./PVC + 1 x 1C, ……………………mm 2 Cu, G/Y PVC, ECC
SHEET 2 OF 2
:
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA
DB NO.
DB-02
FED FROM:
SMDB-01 LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of CIR MCB CCT WIRE ECC


LT
EX SH. 13A
W/
COO SP "W" "S" WAT.
INCOMER RCD No. RTG. SIZE mm2 WIRE FAN S/O S. H/D KER UR A/C A/C PUM FCU
G H
SL No. (A) SIZE Room/Area S/O OU P
/RCBO mm2 TL
ET
1 R1 10 2.5 2.5 LIGHTING IDF ROOM-2 CN/PSN (TYPE-L1) 0/
0/
2 Y1 10 2.5 2.5 LIGHTING IDF ROOM-2 CN/PSN ROOF 2
0/
2/
40A, 4P, 100mA ELCB

(TYPE-D1)
0
3 B1 10 SPARE

4 R2 10 SPARE

5 Y2 10 4 4 SOCKET OUTLET FOR LCP IDF. RM-2 ###

6 B2 20 4 4 ICT SWITCH-06

7 R3 32 6 6 INDUSTRIAL SOCKET OUT LET


30mA ELCB

FOR CN RACK IDF ROOM -2.


8 Y3 20 4 4 ACCESS CONTRIL PANEL CN/PSN IDF-2 2
40A, 4P,

9 B3 20 4 4 PTZ CAMERA-3
63A TPN ISOLATOR

10 R4 20 4 4 ICT SWITCH-07
30mA ELCB

11 Y4 32 6 6 INDUSTRIAL SOCKET OUT LET


40A, 4P,

FOR PSN RACK IDF ROOM-2


12 B4 20 4 4 ICT SWITCH-08

13 R5 20 4 4 SOCKETOUTLET IDF ROOM-2 CN/PSN 2


100mA ELCB 30mA ELCB

14 Y5 20 4 4 ISO. FOR DOOR CONTROL-1


40A, 4P,

15 B5 20 4 4 ISO. FOR DOOR CONTROL-2

16 R6 20 4 4 IDU-1, FOR IDF ROOM

17 Y6 20 4 4 IDU-2, FOR IDF ROOM


40A, 4P,

18 B6 20 4 4 ACS FOR CN/PSN IDF-2 ###

19 R7
100mA ELCB

20 Y7 32 6 6 OUT DOOR UNIT- 1 (1DUTY) FOR IDF


40A, 4P,

ROOM-2

21 B7

22 R8

23 Y8 32 6 6 OUT DOOR UNIT- 2 (STANDBY) FOR IDF


40A, 4P,

ROOM-2
ELCB

24 B8

TOTAL LOAD PER


TOTAL STAND BY LOAD
N
5.80 KW is Stand-by load (not used as assisting load) and at one time only one load will be operative.
O
CABLE SIZE: 1x4C35 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
T
ISO : Isola DtoIrSTRUBATION BOARD SPUR OUTLET FCU: FAN COIL UNIT
E SHEET 1 OF 1
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
:
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA LOAD DISTRIBUTION SCHEDULE (3
DB NO.
DB-03
FED FROM:
SMDB-01

RATING OF Rating of SL No. CIR MCB CCT ECC WIRE EX SH. 13A COO SPUR "W" "S"
INCOMER RCD No. RTG. WIRE SIZE SIZE LTG FAN S/O S. W/H H/D KER OUTL A/C A/C
/RCBO
(A) mm2 mm2 Room/Area S/O ET

1 R1 10 2.5 2.5 LIGHTING IDF ROOM-3 CN/PSN (TYPE-L1) 0/0/2

2 Y1 10 2.5 2.5 LIGHTING IDF ROOM-3 CN/PSN ROOF 0/2/0


(TYPE-D1)
40A, 4P, 100mA ELCB
40A, 4P, 100mA ELCB
3 B1 10 SPARE

4 R2 10 SPARE

5 Y2 10 SPARE

6 B2 10 4 4 SOCKET OUTLET FOR LCP IDF. RM-3 1

7 R3 32 6 6 INDUSTRIAL SOCKET OUT LET


FOR CN RACK IDF ROOM -3
30mA ELCB

8 Y3 20 4 4 ACCESS CONTRIL PANEL CN/PSN IDF-3 2


40A, 4P,

9 B3 20 4 4 PTZ CAMERA-4
63A TPN ISOLATOR

10 R4 20 4 4 ICT SWITCH-09
30mA ELCB

11 Y4 32 6 6 INDUSTRIAL SOCKET OUT LET


40A, 4P,

FOR PSN RACK IDF ROOM-3

12 B4 20 4 4 ICT SWITCH-10

13 R5 20 4 4 SOCKETOUTLET IDF ROOM-3 CN/PSN 2


30mA ELCB

14 Y5 20 4 4 ICT SWITCH-11
40A, 4P,

15 B5 20 4 4 ICT SWITCH-12

16 R6 20 4 4 IDU-1, FOR IDF ROOM


100mA ELCB 100mA ELCB 100mA ELCB
40A, 4P,

17 Y6 20 4 4 IDU-1, FOR IDF ROOM

18 B6 20 4 4 ACS FOR CN/PSN IDF-3 1

19 R7
40A, 4P,

20 Y7
32 6 6 OUT DOOR UNIT- 1(1DUTY) FOR IDF ROOM- 3

21 B7

22 R8
40A, 4P,

23 Y8
32 6 6 OUT DOOR UNIT- 2 (STANDBY) FOR IDF ROOM-3

24 B8

TOTAL
TOTAL STAND B
N 5.80 KW is Stand-by load (not used as assisting load) and at one time only one load will be operative.
O
CABLE SIZE: 1x4C50 mm2 CU/XLPE/SWA/LSF + 1C 25 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator
T SPUR OUTLET FCU: FAN COIL UNIT
E
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC SHEET 1 OF 1

DISTRUBATION BOARD :
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA
DB NO.
DB-04
FED FROM:
SMDB-01
LOAD DISTRIBUTION SCHEDULE (3 PHASE)

RATING OF Rating of CIR MCB CCT ECC EX SH. 13A COO SPUR "W" "S" WAT.
INCOMER RCD No. RTG. (A) WIRE WIRE LTG FAN S/O S. W/H H/D KER OUTL A/C A/C PUM FCU OTHERS
SL No. SIZE SIZE Room/Area S/O ET P
/RCBO mm2 mm2

1 R1 10 2.5 2.5 LIGHTING IDF ROOM-4 CN/PSN (TYPE-L1) 0/0/2

2 Y1 10 2.5 2.5 LIGHTING IDF ROOM-4 CN/PSN ROOF 0/2/0


40A, 4P, 100mA ELCB

(TYPE-D1)
3 B1 10 SPARE

4 R2 10 SPARE

5 Y2 10 SPARE

6 B2 10 SPARE

7 R3 32 6 6 INDUSTRIAL SOCKET OUT LET 1


30mA ELCB

FOR CN RACK IDF ROOM -4


8 Y3 20 4 4 ACCESS CONTRIL PANEL CN/PSN IDF-4 2
40A, 4P,

9 B3 20 4 4 PTZ CAMERA-4 1
63A TPN ISOLATOR

10 R4 20 SPARE
30mA ELCB

11 Y4 32 6 6 INDUSTRIAL SOCKET OUT LET 1


40A, 4P,

FOR PSN RACK IDF ROOM-4


12 B4 20 4 4 SOCKET OUTLET FOR LCP IDF. RM-4 1

13 R5 20 4 4 SOCKETOUTLET IDF ROOM-4 CN/PSN 2


100mA ELCB 30mA ELCB

14 Y5 20 ICT SWITCH-1 1
40A, 4P,

15 B5 20 ICT SWITCH-2 1

16 R6 20 4 4 IDU-1, FOR IDF ROOM 1

17 Y6 20 4 4 IDU-2, FOR IDF ROOM 1


40A, 4P,
63A TP

100mA ELCB
40A, 4P,
18 B6 20 4 4 ACS FOR CN/PSN IDF-3 1

19 R7

100mA ELCB
20 Y7 32 6 6 OUT DOOR UNIT- 1 (1DUTY) FOR IDF ROOM-4 1

40A, 4P,
21 B7

22 R8

23 Y8 32 6 6 OUT DOOR UNIT- 2 (STANDBY) FOR IDF ROOM-4 1


40A, 4P,
ELCB

24 B8

TOTAL LOAD PER PHASE


TOTAL STAND BY LOAD
N 5.80 KW is Stand-by load (not used as assisting load) and at one time only one load will be operative.
O
CABLE SIZE: 1x4C16 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
T
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
E
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
SHEET 1 OF 1
DISTRUBATION BOARD :

PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA


DB NO.
DB-EXT-01
FED FROM:
SMDB-01 LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of SL CIR MCB CCT WIRE ECC EX SH. 13A S. COO SPUR "W" "S"
INCOMER RCD No. No. RTG. SIZE WIRE LTG FAN S/O S/O W/H H/D KER OUTL A/C A/C
(A) mm2 SIZE Room/Area ET
/RCBO mm2

1 R1 4C-16 12
100mA ELCB 100mA ELCB 100mA ELCB

Cu/XLPE/
2 Y1 SWA 12
40A, 4P,

40 16 LIGHTING EXTERNAL (TYPE-P1)


40A TPN ISOLATOR

3 B1 12

4 R2 4C-16 16
Cu/XLPE/
5 Y2 SWA 15
40A, 4P,

40 16 LIGHTING EXTERNAL (TYPE-P1)

6 B2 15

7 R3

8 Y3
40A, 4P,

SPACE

9 B3

TOTAL LOAD P
CABLE SIZE: 1x4C10 mm2 CU/XLPE/SWA/LSF + 1C 10 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC SHEET 1 OF 1

PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA LOAD DISTRIBUTION SCHEDULE (3


DB NO.
DB-UPS-01
FED FROM:
SMDB-UPS

RATING OF Rating of SL No. CIR MCB CCT ECC WIRE EX SH. 13A COO SPUR "W" "S"
INCOMER RCD No. RTG. WIRE SIZE SIZE LTG FAN S/O S. W/H H/D KER OUTL A/C A/C
/RCBO
(A) mm2 mm2 Room/Area S/O ET

1 R1 20 4 4 BMS WORK STATION BMS ROOM GF 2


30mA ELCB

2 Y1 20 4 4 LCS WORK STATION BMS ROOM GF 2


40A, 4P,

3 B1 20 4 4 BMS TOWER RACK BMS ROOM GF 2

4 R2 32 6 6 INDUSTRIAL SOCKET OUT LET


FOR CN RACK-1 IDF ROOM GF.
30mA ELCB

5 Y2 20 4 4 SECURITY SWITCH-01
40A, 4P,

6 B2 20 4 4 SECURITY SWITCH-02

7 R3 20 4 4 SECURITY SWITCH-03
30mA ELCB

8 Y3 32 6 6 INDUSTRIAL SOCKET OUT LET


40A, 4P,

FOR PSN RACK-1 IDF ROOM GF.

9 B3 20 4 4 SECURITY SWITCH-04
63A TPN ISOLATOR

10 R4 20 4 4 SECURITY SWITCH-05
30mA ELCB

11 Y4 SPACE
40A, 4P,

12 B4 32 6 6 INDUSTRIAL SOCKET OUT LET


FOR PSN RACK-2 IDF ROOM GF.
63A TPN ISOLATOR 13 R5 SPACE

30mA ELCB
14 Y5 20 4 4 SECURITY SWITCH-06

40A, 4P,
15 B5 32 6 6 INDUSTRIAL SOCKET OUT LET
FOR PSN RACK-3 IDF ROOM GF.

TOTAL
CABLE SIZE: 1x4C16 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC
C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC SHEET 1 OF 1

PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA


DB NO.
DB-UPS-02
FED FROM:
SMDB-01 LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of CIR MCB CCT ECC


LT
EX SH. 13A S. CO SPUR "W" "S" WAT.
INCOMER RCD No. RTG. (A) WIRE WIRE FAN S/O S/O W/H H/D O OUTL A/C A/C PUM FCU OTHERS
G
SL No. SIZE SIZE Room/Area KE ET P
/RCBO mm2 mm2 R

1 R1 32 6 6 INDUSTRIAL SOCKET OUT LET FOR CN RACK IDF 1


30mA ELCB

ROOM -2.
2 Y1 SPACE
40A, 4P,

3 B1 20 4 4 SECURITY SWITCH-07 1

4 R2 SPACE
30mA ELCB

5 Y2 32 6 6 INDUSTRIAL SOCKET OUT LET FOR PSN RACK IDF 1


40A, 4P,

ROOM-2
6 B2 20 4 4 SECURITY SWITCH-08 1

7 R3 SPACE

8 Y3 SPACE
40A, 4P, 30mA ELCB

9 B3 20 4 4 SECURITY SWITCH-09 1

10 R4 20 4 4 SECURITY SWITCH-10 1

11 Y4 SPACE
40A TPN ISOLATOR

12 B4 20 4 4 SECURITY SWITCH-11 1

TOTAL LOAD PER PHASE


CABLE SIZE: 1x4C25 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
SHEET 1 OF 1
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA
DB NO.
DB-UPS-03
FED FROM:
SMDB-01 LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of CIR MCB CCT ECC EX SH. 13A S. CO SPUR "W" "S" WAT.
LT
INCOMER RCD No. RTG. (A) WIRE WIRE FAN S/O S/O W/H H/D O OUTL A/C A/C PUM FCU OTHERS
G
SL No. SIZE SIZE Room/Area KE ET P
/RCBO mm2 mm2 R

1 R1 32 6 6 INDUSTRIAL SOCKET OUT LET FOR CN RACK IDF 1


30mA ELCB

ROOM -3
2 Y1 20 SPACE
40A, 4P,

3 B1 20 SPACE

4 R2 20 SPACE
30mA ELCB

5 Y2 32 6 6 INDUSTRIAL SOCKET OUT LET FOR PSN RACK IDF 1


40A, 4P,

ROOM-3
6 B2 SPACE

7 R3 SPACE

8 Y3 SPACE
40A, 4P, 30mA ELCB

9 B3 20 4 4 SECURITY SWITCH-12 1

10 R4 SPACE

11 Y4 SPACE
40A TPN ISOLATOR

12 B4 20 4 4 SECURITY SWITCH-13 1
40A TPN ISOLATOR

TOTAL LOAD PER PHASE


CABLE SIZE: 1x4C25 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
SHEET 1 OF 1
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA
DB NO.
DB-UPS-04
FED FROM:
SMDB-01 LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of CIR MCB CCT ECC EX SH. 13A S. CO SPUR "W" "S" WAT.
LT
INCOMER RCD No. RTG. (A) WIRE WIRE FAN S/O S/O W/H H/D O OUTL A/C A/C PUM FCU OTHERS
G
SL No. SIZE SIZE Room/Area KE ET P
/RCBO mm2 mm2 R

1 R1 32 6 6 INDUSTRIAL SOCKET OUT LET FOR CN RACK IDF 1


30mA ELCB

ROOM -4
2 Y1 20 SPACE
40A, 4P,

3 B1 20 SPACE

4 R2 20 SPACE
30mA ELCB

5 Y2 32 6 6 INDUSTRIAL SOCKET OUT LET FOR PSN RACK IDF 1


40A, 4P,

ROOM-4
6 B2 SPACE

7 R3 20 4 4 SECURITY SWITCH-14 1

8 Y3 SPACE
40A, 4P, 30mA ELCB

9 B3 SPACE

10 R4 SPACE

11 Y4 SPACE
40A TPN ISOLATOR

12 B4 SPACE

TOTAL LOAD PER PHASE


CABLE SIZE: 1x4C25 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
SHEET 1 OF 1
PROJECT:EXPO EVENT PHASE C38 DISTRICT&PARKS C.326 STARLIGHT ARENA
DB NO.
DB-GSM
FED FROM:
FEEDER PILLER 400A LOAD DISTRIBUTION SCHEDULE (3
PHASE)

RATING OF Rating of CIR MCB CCT ECC EX SH. 13A S. CO SPUR "W" "S" WAT.
INCOMER RCD No. RTG. (A) WIRE WIRE LTG FAN S/O S/O W/H H/D O OUTL A/C A/C PUM FCU OTHERS
SL No. SIZE SIZE Room/Area KE ET P
/RCBO mm2 mm2 R

1 R1 10 2.5 2.5 LIGHTING GSM ROOM (TYPE-S) 0/0/2


100mA ELCB 100mA ELCB

2 Y1 10 SPARE
40A, 4P,

3 B1 10 SPARE

4 R2 32 4 4 AC 1

5 Y2 32 4 4 AC 1
40A, 4P,

6 B2 32 4 4 AC 1

7 R3
30mA ELCB

8 Y3
40A, 4P,

32 6 6 GSM EQUIPMENT 1

9 B3

10 R4
30mA ELCB

11 Y4
40A, 4P,

32 SPARE
40A TPN ISOLATOR

12 B4

13 R5 20 4 4 SOCKETOUTLET GSM ROOM 2

14 Y5 20 SPARE
40A, 4P, 30mA ELCB

15 B5 20 SPARE

16 R6 SPACE
40A TPN ISOLAT

40A, 4P, 30mA ELCB


17 Y6 SPACE

18 B6 SPACE

TOTAL LOAD PER PHASE


CABLE SIZE: 1x4C16 mm2 CU/XLPE/SWA/LSF + 1C 16 mm2 CU/LSF/ ECC C.Fan: Ceililng fan EX. Fan : Exhaust Fan SH. S/O : Shaver socket outlet W/H : Water Heater H/D : Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR
ISO : Isolator SPUR OUTLET FCU: FAN COIL UNIT
CABLE SIZE: 2/4 x 1 C………….mm2 Cu./PVC + 1 x 1C, ……………………mm2 Cu, G/Y PVC, ECC
SHEET 1 OF 1
TAL CONNECTED LOAD

PLOT NO. : C.326 STARLIGHT ARENA

LOCATION OF SMDB: ELECTRICAL ROOM (GF)

CONNECTED LOAD (kW) Total Max. Stand-By Proposed Type &


Connected / Demand / Load No. of kWHr Meters
Installed Load Operation
(TCL) * al Load * LV/HV REMARKS
(MDL) CT
B-PH 1-PH 3-PH

kW kW kW (1) (2) (3)

62.10 186.59 149.28 AMMETER,VOLTMETER WITH


SELECTOR SWITCH R,Y,B
INDICATION LAMP

22.92 68.69 54.95 5.80

2.48 7.54 6.04

9.55 28.32 22.66 5.80

9.15 27.66 22.13 5.80

9.01 27.38 21.90 5.80

15.52 70.56 56.45

3.33 10.00 8.00 30mA ELCB

3.33 10.00 8.00 30mA ELCB

1.67 5.00 4.00 100mA ELCB

0.67 2.00 1.60

62.10
186.59 149.28 23.20

ED / INSTALLED LOAD (TCL) : 186.59 kW TOTAL BUILD-UP AREA: ………….

TED LOAD 163.39 kW

ive.
FAX :…… FAX :……

mps CT Metering)

PLOT NO. : C.326 STARLIGHT ARENA


LOCATION OF SMDB:ELECTRICAL ROOM, ZONE-2 ELE.KIOSK

CONNECTED LOAD (kW) Total Max. Proposed Type & No.


Connected / Demand of kWHr Meters
Installed / Operati
Y-PH B-PH Load onal Load 1-PH 3-PH * LV/HV
kW kW (TCL) * kW (1) (2) CT REMARKS
kW (3)

27.28 15.52 70.56 56.45 UPS 70KVA @ UNITY PF


AMMETER,VOLTMETER WITH
SELECTOR SWITCH R,Y,B
INDICATION LAMP

7.48 14.08 29.04 23.23

6.60 0.96 14.40 11.52

6.60 0.48 13.68 10.94

6.60 0.00 13.44 10.75

27.28 15.52 70.56


56.45

L CONNECTED / INSTALLED LOAD (TCL) :


70.56 kW TOTAL BUILD-UP AREA: ………….

FAX : FAX :……


……

…….A (* 200/5Amps CT Metering)

LOCATION OF DB: ELECTRICAL ROOM (GF)

Circuit Load (W) REMARKS


W/Unit
R Y B
20/30/40 120

20/30/40 120

20/30/40 120

20/30/40 80

20/30/40 80

20/30/40 150

200 400

200 400

100 100

200 800

200 400

200 400

6600 6600
1000 1000

100 100

240 240

6600 6600

100 100

240 240

100 100

6600 6600

100 100

100 100

6600 6600

UVR+TIMER+CONTACTOR DOL
1700 1700 STARTER WITH BMS &
FIRE ALARM INTERFAC
800 800

100 100

1933

1933 UVR+TIMER+CONTACTOR DOL STARTER WITH


5800
BMS & FIRE ALARM INTERFACE
1933

TAL LOAD PER PHASE 12913 11533 14003 38450

LOCATION OF DB: ELECTRICAL ROOM (GF)

Circuit Load (W) REMARKS


W/Unit
R Y B
180 180 UVR+TIMER +CONT

UVR+TIMER+CONTACTOR DOL
2200 2200 STARTER WITH BMS &
FIRE ALARM INTERFACE

180 180 UVR+TIMER +CONT

1933

1933 UVR+TIMER+CONTACTOR DOL STARTER WITH


5800
BMS & FIRE ALARM INTERFACE
1933

1933

1933 UVR+TIMER+CONTACTOR DOL STARTER WITH


5800
BMS & FIRE ALARM INTERFACE
1933

1933 UVR+TIMER+CONTACTOR DOL STARTER WITH


BMS &
FIRE ALARM INTERFACE. WITH DUTY SELECTOR
1933 SWITCH
5800

1933

1933 UVR+TIMER+CONTACTOR DOL STARTER WITH


BMS &
FIRE ALARM INTERFACE. WITH DUTY SELECTOR
1933 SWITCH
5800

1933

180 180 UVR+TIMER +CONT

180 180 UVR+TIMER +CONT

180 180 UVR+TIMER +CONT

100 100 UVR+TIMER +CONT

240 240

100 100

200 400

200 200

100 100

500 500

500 500

500 500

500 500

200 200

200 200

200 200
100 100

100 100

TAL LOAD PER PHASE 22887 22887 22917 68690


5.80 KW TCL: 62.890 KW

UTION SCHEDULE (3 LOCATION OF DB: CN/PSN IDF ROOM-2

Circuit Load (W) REMARKS


FCU OTHERS
W/Unit
R Y B
20/30/40 80

20/30/40 60

4500 4500

100 100

100 100

1 240 240

1 6600 6600

200 400

1 100 100

1 240 240

1 6600 6600

1 240 240

200 400

1 500 500

1 500 500

1 180 180 UVR+TIMER +CONT

1 180 180 UVR+TIMER +CONT

100 100

1933
UVR+TIMER+CONTACTOR

1 5800 1933 DOL STARTER WITH BMS &


FIRE ALARM INTERFACE. WITH DUTY

1933 SELECTOR SWITCH

1933
UVR+TIMER+CONTACTOR

1 5800 1933 DOL STARTER WITH BMS &


FIRE ALARM INTERFACE. WITH DUTY

1933 SELECTOR SWITCH

TOTAL LOAD PER PHASE 9267 9507 9547 28320


TOTAL STAND BY LOAD 5.80 KW TCL: 22.520 KW

A/C : Window A/C 'S' A/C: Split A/C OR

TRIBUTION SCHEDULE (3 PHASE)

LOCATION OF DB: CN/PSN IDF ROOM-3

"S" WAT. Circuit Load (W) REMARKS


A/C PUMP FCU OTHERS
W/Unit
R Y B
20/30/40 80

20/30/40 60
4500 4500

100 100

100 100

100 100

1 6600 6600

200 400

1 100 100

1 240 240

1 6600 6600

1 240 240

200 400

1 240 240

1 240 240

1 180 180 UVR+TIMER +CONT

1 180 180 UVR+TIMER +CONT

100 100

1933 UVR+TIMER+CONTACTOR DOL STARTER


WITH BMS & FIRE ALARM INTERFACE.
WITH DUTY SELECTOR SWITCH
1933
1 5800

1933

1933 UVR+TIMER+CONTACTOR DOL STARTER


WITH BMS & FIRE ALARM INTERFACE.
WITH DUTY SELECTOR SWITCH
1933
1 5800

1933

TOTAL LOAD PER PHASE 9267 9247 9147 27660


TOTAL STAND BY LOAD 5.80 KW TCL: 21.860 KW

er 'W' A/C : Window A/C 'S' A/C: Split A/C OR

HEDULE (3 PHASE) LOCATION OF DB: CN/PSN IDF ROOM-4

Circuit Load (W)


OTHERS REMARKS
W/Unit
R Y B
20/30/40 80

20/30/40 60

2100 2100

100 100

100 100

2500 2500

1 6600 6600

200 400

1 100 100

100 100

1 6600 6600

100 100

200 400

1 240 240

1 240 240

1 180 180 UVR+TIMER +CONT

1 180 180 UVR+TIMER +CONT


100 100

1933
UVR+TIMER+CONTACTOR

1 5800 1933 DOL STARTER WITH BMS &


FIRE ALARM INTERFACE. WITH DUTY
1933 SELECTOR SWITCH

1933
UVR+TIMER+CONTACTOR

1 5800 1933 DOL STARTER WITH BMS &


FIRE ALARM INTERFACE. WITH DUTY
1933 SELECTOR SWITCH

TOTAL LOAD PER PHASE 9127 9247 9007 27380


OTAL STAND BY LOAD 5.80 KW TCL: 21.580 KW

'S' A/C: Split A/C OR

UTION SCHEDULE (3 LOCATION OF DB: ELECTRICAL ROOM ZONE-1

"S" WAT. OTH Circuit Load (W) REMARKS


A/C PUM FCU ERS
P W/Unit
R Y B
92 1104

92 1104

92 1104

92 1472

92 1380

92 1380

TOTAL LOAD PER PHASE 2576 2484 2484 7544


Hand Dryer 'W' A/C : Window A/C 'S' A/C: Split A/C OR

TRIBUTION SCHEDULE (3 PHASE)

LOCATION OF DB: ELECTRICAL ROOM (GF)

"S" WAT. Circuit Load (W) REMARKS


A/C PUMP FCU OTHERS
W/Unit
R Y B
200 400

200 400

200 400

1 6600
6600

1 240 240

1 240 240

1 240 240

1 6600
6600

1 240 240

1 240 240

1 6600
6600
1 240 240

1 6600
6600

TOTAL LOAD PER PHASE 7480 7480 14080 29040


er 'W' A/C : Window A/C 'S' A/C: Split A/C OR

HEDULE (3 LOCATION OF DB: CN/PSN IDF ROOM-2

Circuit Load (W)


OTHERS REMARKS
W/Unit
R Y B
1 6600 6600

1 240 240

1 6600 6600

1 240 240

1 240 240

1 240 240

1 240 240

TOTAL LOAD PER PHASE 6840 6600 960 14400


'S' A/C: Split A/C OR

HEDULE (3 LOCATION OF DB: CN/PSN IDF ROOM-3

Circuit Load (W)


OTHERS REMARKS
W/Unit
R Y B
1 6600 6600

1 6600 6600

1 240 240

1 240 240
TOTAL LOAD PER PHASE 6600 6600 480 13680
'S' A/C: Split A/C OR

HEDULE (3 LOCATION OF DB: CN/PSN IDF ROOM-2

Circuit Load (W)


OTHERS REMARKS
W/Unit
R Y B
1 6600 6600

1 6600 6600

1 240 240

TOTAL LOAD PER PHASE 6840 6600 13440


'S' A/C: Split A/C OR

HEDULE (3 LOCATION OF DB: GSM ROOM

Circuit Load (W)


OTHERS REMARKS
W/Unit
R Y B
20/30/40 80

100 100

100 100

1 4000 4000 UVR+TIMER+CONTACT


OR
1 4000 4000 UVR+TIMER+CONTACT
OR
1 4000 4000 UVR+TIMER+CONTACT
OR
1667

1667
1 5000

1667

333

333
1000

333

200 400

100 100

100 100
TOTAL LOAD PER PHASE 6480 6200 6200 18880