DETAILS OF CONNECTED LOAD MAX.

DEMAND

OWNER : M/S TURNKEY PLUSE CONTRACTING L.L.C


PROPOSED G+1 WAREHOUSE ON PLOT NO 597-1203 AT INVESTMENTS PARK,DUBAI.
CONSULTANT : Ecogreen Arch& Engg.
DESIGNATION : MDB-01 FED FROM : METER CABINET-01 PLOT: 597-1203
CIRCUIT RATING -AMPS FAULT PVC / CABLE SIZE ECC CONNECTED LOAD (kW) KWH METER
FEEDER SP TP ISO MCCB ACB DUTY XLPE 2/4 x 1C 2/3/4C SIZE 1C R-PHASE Y-PHASE B-PHASE TOTAL 1-F 3F 3-F CT REMARKS
DB NO. N/A DOT kA SWA/PVC MM2 MM2 MM2 (kW) (kW) (kW) KW (1) (2) (3) (4)
INCOMER TP 350 50 XLPE 4C,240 1C,120 57.63 57.85 57.51 173.00
OUTGOING:-
DB-GF-P TP 40 35 XLPE 4C,10 1C,10 3.40 3.20 3.40 10.00
DB-GF-L TP 40 35 XLPE 4C,10 1C,10 7.58 7.09 7.33 22.00
DB-GF-AC TP 63 35 XLPE 4C,16 1C,16 7.90 7.40 7.70 23.00
DB-FF-AC TP 100 35 XLPE 4C,35 1C,25 14.53 14.23 14.23 43.00
DB-FF TP 63 35 XLPE 4C,16 1C,16 8.32 9.88 8.80 27.00
DB-TEL TP 32 35 XLPE 4C,10 1C,10 1.62 1.67 1.72 5.00
DB-PUMP TP 32 35 XLPE 4C,10 1C,10 1.62 1.72 1.67 5.00
CARGO LIFT TP 32 35 XLPE 4C,6 1C,6 2.67 2.67 2.67 8.00 300 mA 4P ELCB
LIFT TP 32 35 XLPE 4C,6 1C,6 2.67 2.67 2.67 8.00 300 mA 4P ELCB
SMOKE VENT. FAN CONTROL PANEL TP 32 35 XLPE 4C,6 1C,6 2.67 2.67 2.67 8.00
SPARE TP 40 35 4.67 4.67 4.67 14.00
CAP BANK TP 125 35 XLPE 4C,50 1C,25 50 KVAR
NOTE:- TOTAL CONNECTED LOAD PER PHASE
57.63 57.85 57.51 173.00
SHEET 1 OF 1
ENSURE THAT F/S DOES NOT ALLOW
REPLACEMENT OF FUSE RATED HIGHER THAN
THAT 'SPECIFIED FOR' THE CIRCUIT CABLES

PROVIDE CT-METER ABOVE MAX. DEMAND > 160A/80kW

(1) 20 - 30 A (2) 30 - 90 A (3) 100 - 200 A (4) 2500 / 5A