N° OS DATE OF EXECUTION
I – General Data
Inspection - Inspection -
Type of Service ✘ Operative mode
Mechanic 1st Levell
Electri InstrumentSpecific Producti
Specialty ✘ ✘ Lubrication Safety
al cal ation on
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Routine / Operative
Hour(s) ✘ Month Year(s) ✘
Systematic mode
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
Between Compressor Room and Clay Crusher - Grass / Weeds Overgrown (Yes/No)
Lights Working
1
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
101LV100 +
5 NA01 Low Voltage Distribution Board
2
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
101LV100 +
16 NA12 Low Voltage Distribution Board
3
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
4
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
28 101UP110A01 UPS
5
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 191 IDEAL SETTING COMMENTS
30 101CS120A01 Profibox
31 101CS120A02 Profibox
6
AREA 194 Substation - Mix Storage Area
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 194 IDEAL SETTING COMMENTS
2
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
Lights Working
3
101LV200T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
7
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 194 IDEAL SETTING COMMENTS
4
113AF060U01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
5 101LV200 + NA01
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
6 101LV200 + NA02
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
7 101LV200 + NA03
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
8
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 194 IDEAL SETTING COMMENTS
8 101LV200 + NA04
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
9 101LV200 + NA05
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
10 101LV200 + NA06
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
11 101LV200 + NA07
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
12 101LV200 + NA08
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
13 101LV200 + NA09
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
14 101LV200 + NA10
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
9
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 194 IDEAL SETTING COMMENTS
15 101LV200 + NA11
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
16 101LV200 + NA12
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
17 101LV200 + NA13
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
18 LDB101LG200A1
Low Voltage Distribution Board
19
101MV200Q01 MV Distribution Board
Door locks / locking mechanism In good working order
20
101CS100A01 PLC
Door locks / locking mechanism In good working order
10
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 194 IDEAL SETTING COMMENTS
21
101CS100A02 I/O Cabinet
Door locks / locking mechanism In good working order
22
101UP210A01 UPS
Door locks / locking mechanism In good working order
23
101UP210A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
11
AREA 291 Substation - Gypsum Crusher
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
2
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
Lights Working
3
201LV100T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
12
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
5
LDB201LG100A01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
6
201MV100Q01 MV Distribution Board [355 kW)
Door locks / locking mechanism In good working order
7
201MV100Q02 MV Distribution Board [Incoming Feeder]
Door locks / locking mechanism In good working order
8
201MV100Q03 MV Distribution Board [Department 2000 kVA]
Door locks / locking mechanism In good working order
13
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
9 LDB-500LG102A01
Low Voltage Distribution Board
201LV100 + F01
Low Voltage Distribution Board (Paper Bag Plant]
Door locks / locking mechanism In good working order
201LV100 + F02
Low Voltage Distribution Board [Cantene]
Door locks / locking mechanism In good working order
10 201LV100 + NA01
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
11 201LV100 + NA02
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
12 201LV100 + NA03
Low Voltage Distribution Board (Capacitor Bank]
Door locks / locking mechanism In good working order
13 201LV100 + NA04
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
14
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
14 201LV100 + NA05
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
15 201LV100 + NA06
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
16 201LV100 + NA07
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
17 201LV100 + NA08
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
18 201LV100 + NA09
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
19 201LV100 + NA10
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
20 LDB201LG100A1
Low Voltage Distribution Board
15
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
21
201UP100 110V DC Battery & Charger
Door locks / locking mechanism In good working order
22
101CS200A01 PLC
Door locks / locking mechanism In good working order
23
101CS200A02 I/O Cabinet
Door locks / locking mechanism In good working order
24
212AF060U01 Apron Feeder Frequency Drive Cabinet
Door locks / locking mechanism In good working order
25
212AF060U02 Apron Feeder Frequency Drive Cabinet
Door locks / locking mechanism In good working order
Working
Display Unit - 1
26
201UP110A01 UPS
Door locks / locking mechanism In good working order
Working
Display Unit - 1
16
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 291 IDEAL SETTING COMMENTS
27
201UP110A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
17
AREA 391 Substation - Raw Mill
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
2
301LV100T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
3
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
Lights Working
18
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
5
301LV100-1 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
6
301LV100-2 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
7 301LV100 + NA01
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
8 301LV100 + NA02
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
19
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
9 301LV100 + NA03
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
10 301LV100 + NA04
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
11 301LV100 + NA05
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
12 301LV100 + NA06
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
13 301LV100 + NA07
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
14 301LV100 + NA08
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
15 301LV100 + NA09
Low Voltage Distribution Board
20
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
16 301LV100 + NA10
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
17 301LV100 + NA011
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
18 301LV100 + NA12
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
19 301LV100 + NA13
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
20 301LV100 + NA14
Low Voltage Distribution Board
Door locks / locking mechanism In good working order
21
301MV100Q01 MV Distribution Board
Door locks / locking mechanism In good working order
21
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
22
301MV100Q02 MV Distribution Board
Door locks / locking mechanism In good working order
23
301MV100Q03 MV Distribution Board
Door locks / locking mechanism In good working order
24
301UP100A01 110V DC Battery & Charger
Door locks / locking mechanism In good working order
25
301CS100A01 PLC
Door locks / locking mechanism In good working order
26
301CS100A02 I/O Cabinet
Door locks / locking mechanism In good working order
27
311AFC160U01 Apron Feeder Frequency Drive Cabinet
Door locks / locking mechanism In good working order
22
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 391 IDEAL SETTING COMMENTS
28
311AF160U02 Apron Feeder Frequency Drive Cabinet
Door locks / locking mechanism In good working order
29
311SH162U01 Shredder Cabinet
Door locks / locking mechanism In good working order
30 Panel
ACS 800
No Doors - locked with screws In good working order
31
321MD152U01 Apron Feeder Frequency Drive Cabinet
Door locks / locking mechanism In good working order
32
LDB301LG100A01Lighting Distribution Board
33
301UP110A01 UPS
Door locks / locking mechanism In good working order
34
301UP110A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
23
AREA 491 Substation - Kiln
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
2
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
Lights Working
3
401LV100T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
24
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
4
331EP300T01 1000 KVA Distribution Transformer
Enclosure - Safety Locked
5
431FN140T01 1000 KVA Converter Transformer
Enclosure - Safety Locked
6
331FN400T01 600 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
7
331FN110T01 2600 KVA Convertor Transformer & Enclosure
25
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
9
401MV100Q1 MV Distribution Board [ID Fan - 1950 kW]
Door locks / locking mechanism In good working order
10
401MV100Q2 MV Distribution Board [Filter Fan - 460 Kw]
Door locks / locking mechanism In good working order
11
401MV100Q3 MV Distribution Board [Incoming Feeder)
Door locks / locking mechanism In good working order
26
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
12
401MV100Q4 MV Distribution Board [Kiln Drive - 750kW]
Door locks / locking mechanism In good working order
13
401MV100Q5 MV Distribution Board [ESP Filter - 1000 kVA]
Door locks / locking mechanism In good working order
14
401MV100Q6 MV Distribution Board[ Compressor - 1000 kVA]
Door locks / locking mechanism In good working order
15
401MV100Q7 MV Distribution Board [Kiln Department - 2000 kVA]
Door locks / locking mechanism In good working order
16
401LV100 + NA01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
17
401LV100 + NA02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
18
401LV100 + NA03Low Voltage Distribution Board
27
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
19
401LV100 + NA04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
20
401LV100 + NA05Low Voltage Distribution Board
Door locks / locking mechanism In good working order
21
401LV100 + NA06Low Voltage Distribution Board
Door locks / locking mechanism In good working order
22
401LV100 + NA07Low Voltage Distribution Board
Door locks / locking mechanism In good working order
23
401LV100 + NA08Low Voltage Distribution Board
Door locks / locking mechanism In good working order
24
401LV100 + NA09Low Voltage Distribution Board
Door locks / locking mechanism In good working order
28
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
25
401LV100 + NA10Low Voltage Distribution Board
Door locks / locking mechanism In good working order
26
401LV100 + NA11Low Voltage Distribution Board
Door locks / locking mechanism In good working order
27
401LV100 + NA12Low Voltage Distribution Board
Door locks / locking mechanism In good working order
28
401LV100 + NA13Low Voltage Distribution Board
Door locks / locking mechanism In good working order
29
401LV100 + NA14Low Voltage Distribution Board
Door locks / locking mechanism In good working order
30
401LV100 + NA15Low Voltage Distribution Board
Door locks / locking mechanism In good working order
31
401LV100 + NA16Low Voltage Distribution Board
Door locks / locking mechanism In good working order
29
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
32
401LV100 + NA17Low Voltage Distribution Board
Door locks / locking mechanism In good working order
33
401LV100 + NA18Low Voltage Distribution Board
Door locks / locking mechanism In good working order
34
401LV100 + NA19Low Voltage Distribution Board
Door locks / locking mechanism In good working order
35
401LV100 + NA20Low Voltage Distribution Board
Door locks / locking mechanism In good working order
36
401LV100 + NA21Low Voltage Distribution Board
Door locks / locking mechanism In good working order
37
401LV100 + NA22Low Voltage Distribution Board
Door locks / locking mechanism In good working order
38
401LV100 + NA23Low Voltage Distribution Board
Door locks / locking mechanism In good working order
30
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
39
401LV100 + NA24Low Voltage Distribution Board
Door locks / locking mechanism In good working order
40
401LV100 + NA25Low Voltage Distribution Board
Door locks / locking mechanism In good working order
41
331EP300A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
42
331EP301A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
43
331EP302A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
44
331EP303A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
45
331EP304A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
31
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
46
331FN110U01 ID Fan Frequency Drive Cabinet - Unit 1
Door locks / locking mechanism In good working order
47
331FN110U01 ID Fan Frequency Drive Cabinet - Unit 2
Door locks / locking mechanism In good working order
48
331FN110U01 ID Fan Frequency Drive Cabinet -Unit 3
Door locks / locking mechanism In good working order
49
331FN110U01 ID Fan Frequency Drive Cabinet - Unit 4
Door locks / locking mechanism In good working order
50
819LV100 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
51
819LV100 + NA01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
32
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
52
819LV100 + NA02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
53
819LV100 + NA03Low Voltage Distribution Board
Door locks / locking mechanism In good working order
54
819LV100 + NA04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
55
401MV100 MV Distribution Board
Door locks / locking mechanism In good working order
56
401UP100 110V DC Battery & Charger
Door locks / locking mechanism In good working order
57
401CS100A01 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
58
401CS100A02 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
33
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
59
401CS100A03 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
60
331RF620U01 Rotary Air Lock Frequency Drive Cabinet
Door locks / locking mechanism In good working order
61
LDB401LG100A01Lighting Distribution Board
62
401UP110A01 UPS
Door locks / locking mechanism In good working order
34
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 491 IDEAL SETTING COMMENTS
In working order
Vent / Louvres
35
AREA 492 Substation - Cooler
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
2
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
Lights Working
3
441LV335T01 2400 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
36
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
4
401LV200T01 2000 KVA Distribution Transformer
Enclosure - Safety Locked
5
801LV200T01 1000 KVA Distribution Transformer
Enclosure - Safety Locked
7
401MV200Q01 MV Distribution Board [Cooler Department - 2000 kVA]
Door locks / locking mechanism In good working order
37
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
8
401MV200Q02 MV Distribution Board [Incoming Feeder]
Door locks / locking mechanism In good working order
9
401MV200Q03 MV Distribution Board [Cooler Fans (VFD) - 2400 kVA]
Door locks / locking mechanism In good working order
10
401LV200 + AN01Low Voltage Distribution Board [CCR & Lab - 1000 kVA]
Door locks / locking mechanism In good working order
11
401LV200 + AN02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
12
401LV200 + AN03Low Voltage Distribution Board
Door locks / locking mechanism In good working order
13
401LV200 + AN04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
14
401LV200 + AN05Low Voltage Distribution Board
Door locks / locking mechanism In good working order
38
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
15
401LV200 + AN06Low Voltage Distribution Board
Door locks / locking mechanism In good working order
16
401LV200 + AN07Low Voltage Distribution Board
Door locks / locking mechanism In good working order
17
401LV200 + AN08Low Voltage Distribution Board
Door locks / locking mechanism In good working order
18
401LV200 + AN09Low Voltage Distribution Board
Door locks / locking mechanism In good working order
19
401LV200 + AN10Low Voltage Distribution Board
Door locks / locking mechanism In good working order
20
401LV200 + AN11Low Voltage Distribution Board
Door locks / locking mechanism In good working order
21
441LV300 + AN01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
39
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
22
441LV300 + AN02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
23
441LV300 + AN03Low Voltage Distribution Board
Door locks / locking mechanism In good working order
24
441LV300 + AN04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
25
441LV300 + AN05Low Voltage Distribution Board
Door locks / locking mechanism In good working order
26
441LV350 + NA01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
27
441LV350 + NA02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
28
441LV350 + NA03Low Voltage Distribution Board
40
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
29
441LV350 + NA04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
30
LDB401LV200A1 Low Voltage Distribution Board
Meter 1 60,208.36
Meter 2 14,870.90
31
441FN300U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
32
441FN305U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
33
441FN310U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
34
441FN315U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
41
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
35
441FN320U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
36
441FN325U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
37
441FN330U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
38
441FN590U01 Cooler Fan Frequency Drive Cabinet
Door locks / locking mechanism In good working order
39
401UP200 110V DC Battery & Charger
Door locks / locking mechanism In good working order
40
401CS200A01 PLC & I/O Cabinet
42
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
41
401CS200A02 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
42
401CS200A03 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
43
401UP210A01 UPS
Door locks / locking mechanism In good working order
44
401UP210A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
45
441EP551A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
46
441EP552A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
43
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 492 IDEAL SETTING COMMENTS
47
441EP550A01 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
44
AREA 497 Substation - Clinker Transport
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 497 IDEAL SETTING COMMENTS
2
401LV400T01 1000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
3
Ground Floor - Cable Trays & Cables
Fire Extinguishers Available & up to date
45
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 497 IDEAL SETTING COMMENTS
Lights Working
5
401LV400-1 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
7
401MV400 MV Distribution Board
Door locks / locking mechanism In good working order
8
501CS110A01 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
46
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 497 IDEAL SETTING COMMENTS
9
501CS120A01 Profibox
Door locks / locking mechanism In good working order
10
501CS120A02 Profibox
Door locks / locking mechanism In good working order
11
401LG400A01 Lighting Distribution Board
Door locks / locking mechanism In good working order
12
401UP710A01 UPS
Door locks / locking mechanism In good working order
13
401UP710A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
47
591/592 Substation - Cement Mills
AREA 1&2
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
2
501LV100T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
3
502LV100T01 2000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
48
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
4
Ground Floor - Cable Trays & Cables
Lights In working order
Lights Working
Lights Working
6
501MV100Q01 MV Distribution Board
Door locks / locking mechanism In good working order
7
501MV100Q02 MV Distribution Board
Door locks / locking mechanism In good working order
49
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
8
501MV100Q03 MV Distribution Board
Door locks / locking mechanism In good working order
9
501MV100Q04 MV Distribution Board
Door locks / locking mechanism In good working order
10
502MV100Q01 MV Distribution Board
Door locks / locking mechanism In good working order
11
502MV100Q02 MV Distribution Board
Door locks / locking mechanism In good working order
12
502MV100Q03 MV Distribution Board
Door locks / locking mechanism In good working order
13
501LV100 + NA01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
50
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
14
501LV100 + NA02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
15
501LV100 + NA03Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
16
501LV100 + NA04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
17
501LV100 + NA05Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
18
501LV100 + NA06Low Voltage Distribution Board
Door locks / locking mechanism In good working order
51
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
19
501LV100 + NA07Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
20
501LV100 + NA08Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
21
501LV100 + NA09Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
22
501LV100 + NA10Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
23
501LV100 + NA11Low Voltage Distribution Board
Door locks / locking mechanism In good working order
52
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
24
501LV100 + NA12Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
25
501LV100 + NA13Low Voltage Distribution Board
Door locks / locking mechanism In good working order
26
501LV100 + NA14Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
27
502LV100 + NA01Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
28
502LV100 + NA02Low Voltage Distribution Board
Door locks / locking mechanism In good working order
53
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
29
502LV100 + NA03Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
30
502LV100 + NA04Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
31
502LV100 + NA05Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
32
502LV100 + NA06Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
33
502LV100 + NA07Low Voltage Distribution Board
Door locks / locking mechanism In good working order
54
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
34
502LV100 + NA08Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
35
502LV100 + NA09Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
36
502LV100 + NA10Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
37
502LV100 + NA11Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
38
502LV100 + NA12Low Voltage Distribution Board
Door locks / locking mechanism In good working order
55
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
General Racks
39
502LV100 + NA13Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
40
502LV100 + NA14Low Voltage Distribution Board
Door locks / locking mechanism In good working order
General Racks
41
531MD302U01 Frequency Drive Cabinet
Door locks / locking mechanism In good working order
42
532MD302U01 Frequency Drive Cabinet
Door locks / locking mechanism In good working order
43
531FN350U01 Frequency Drive Cabinet
Door locks / locking mechanism In good working order
44
532FN350U01 Frequency Drive Cabinet
Door locks / locking mechanism In good working order
56
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
45
501UP100A01 110V DC Battery & Charger
Door locks / locking mechanism In good working order
46
501CS100A01 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
47
501CS100A02 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
48
501CS100A03 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
Wiring Earth-wire
49
502CS100A01 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
50
502CS100A02 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
57
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 591 - 592 IDEAL SETTING COMMENTS
51
501LG100A01 Lighting Distribution Board
52 Switch-board
LDB501LG100A01
53
501UP110A01 UPS
Door locks / locking mechanism In good working order
54
501UP110A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
55
502UP110A01 UPS
Door locks / locking mechanism In good working order
56
502UP110A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
57
502UP100A01 110V DC Battery & Charger
Door locks / locking mechanism In good working order
58
AREA 691 Substation - Packing Plant
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 22 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 691 IDEAL SETTING COMMENTS
59
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 691 IDEAL SETTING COMMENTS
60
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 691 IDEAL SETTING COMMENTS
10 601UP110A01 UPS
61
791 Substation - Compressor Room
AREA 1
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 22 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 791 IDEAL SETTING COMMENTS
2
701LV100T01 1000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
62
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 791 IDEAL SETTING COMMENTS
4
701LV100-1 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
5
701LV100-2 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
6
701LV100Q01 MV Distribution Board
Door locks / locking mechanism In good working order
7
401CS110A01 I/O Cabinet
Door locks / locking mechanism In good working order
8
701LG100A01 Lighting Distribution Board
Door locks / locking mechanism In good working order
9
701UP110A01 UPS
Door locks / locking mechanism In good working order
63
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 791 IDEAL SETTING COMMENTS
10
701UP110A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
11
401CS120A01 Profibus Box
Door locks / locking mechanism In good working order
12
401CS120A02 Profibus Box
Door locks / locking mechanism In good working order
64
792 Substation - Compressor Room
AREA 2
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st
Type of Service ✘ Inspection - Specific Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 792 IDEAL SETTING COMMENTS
2
702LV100T01 1000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
65
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 792 IDEAL SETTING COMMENTS
General Racks
General Racks
General Racks
General Racks
66
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 792 IDEAL SETTING COMMENTS
General Racks
General Racks
General Racks
6
702MV100Q01 MV Distribution Board
Door locks / locking mechanism In good working order
7
701CS110A01 I/O Cabinet
Door locks / locking mechanism In good working order
8
LDB702LG100A01Lighting Distribution Board
Door locks / locking mechanism In good working order
9
701UP210A01 UPS
Door locks / locking mechanism In good working order
67
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 792 IDEAL SETTING COMMENTS
10
701UP210A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
11
701CS120A02 Profibus Box
Door locks / locking mechanism In good working order
12
701CS120A03 Profibus Box
Door locks / locking mechanism In good working order
68
AREA 891 Substation - Main
N° OS DATE OF EXECUTION
I – General Data
Inspection - 1st Inspection - Specific
Type of Service ✘ Operative mode
Mechanica Levell Electric Instrumentat Productio
Specialty ✘ ✘ Lubrication Safety
l al ion n
Equipment
Operation Description
Duration Periodicidade
8 1 2 3 4 5 6 7 8 9 10
Day(s) Week(s) Year(s) Routine /
Hour(s) ✘ Month ✘ Operative mode
Systematic
1. According to the safety standards in force in the company.
2. Always use: helmet, goggles, hearing protection, gloves, safety footwear.
Security Measures
3. Security / Electrical Consignment
4. Consignment mechanical, hydraulic and / or pneumatic
Environmental measures 1. We aim to protect and respect the environment.
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 891 IDEAL SETTING COMMENTS
2
801LV200T01 1000 KVA Distribution Transformer & Enclosure
Enclosure - Safety Locked
69
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 891 IDEAL SETTING COMMENTS
4
801LV100 Low Voltage Distribution Board
Door locks / locking mechanism In good working order
5
801LV100 MV Distribution Board
Door locks / locking mechanism In good working order
6
801UP100A01 110V DC Battery & Charger
Door locks / locking mechanism In good working order
7
701CS100A01 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
8
701CS100A02 PLC & I/O Cabinet
Door locks / locking mechanism In good working order
9
801LG100A01 Lighting Distribution Board
Door locks / locking mechanism In good working order
10
801UP120A01 UPS
70
IMPLEMENTATION PROCEDURE
CHECK POINTS
INSPECTED
ROUTE ROUTE Nº 891 IDEAL SETTING COMMENTS
11
801UP120A04 UPS - Power Distribution Board
Door locks / locking mechanism In good working order
71