You are on page 1of 1

HEADROOM LVL.

+ 20.70 M

1.7000
HEADROOM LVL.
+ 20.70 M
PARAPET LVL.
+ 19.00 M
1.7000
1.0000
TERRACE FLOOR 2.7000
PARAPET LVL.
+ 18.00 M + 19.00 M
1.0000
TERRACE FLOOR
+ 18.00 M
3.0000

3.0000
FIFTH FLOOR
+ 15.00 M

FIFTH FLOOR
+ 15.00 M
3.0000

3.0000

FOURTH FLOOR
+ 12.00 M
FOURTH FLOOR
+ 12.00 M
A A'
3.0000

3.0000

THIRD FLOOR
+ 9.00 M
THIRD FLOOR
+ 9.00 M

3.0000

3.0000

SECOND FLOOR
+ 6.00 M
SECOND FLOOR
+ 6.00 M

3.0000
3.0000

FIRST FLOOR
+ 3.00 M FIRST FLOOR
+ 3.00 M

3.0400
3.0000

GROUND LVL
GROUND LVL

FRONT ELEVATION
LEFT SIDE ELEVATION

HEADROOM LVL.
+ 20.70 M HEADROOM LVL.
+ 20.70 M
1.7000
1.7000
PARAPET LVL. 2.7000
+ 19.00 M PARAPET LVL.
+ 19.00 M HEADROOM
1.0000
1.0000 + 20.70 M LVL.
TERRACE FLOOR
TERRACE FLOOR
+ 18.00 M
+ 18.00 M STAIRCASE
2.70
TRADE = 0.25 M PARAPET
RISER = 0.15 M + 16.00 M LVL.
3.0000 3.0000 TERRACE FLOOR
+ 15.00 M LVL.

FIFTH FLOOR FIFTH FLOOR


+ 15.00 M + 15.00 M

FIFTH FLOOR
3.0000 + 15.00 M LVL.
3.0000

FOURTH FLOOR
FOURTH FLOOR + 12.00 M
+ 12.00 M
FOURTH FLOOR
+ 12.00 M LVL.
3.0000
3.0000

THIRD FLOOR
THIRD FLOOR + 9.00 M
THIRD FLOOR
+ 9.00 M + 9.00 M LVL.

3.0000

3.0000

SECOND FLOOR
SECOND FLOOR
+ 6.00 M
SECOND FLOOR
+ 6.00 M LVL.
+ 6.00 M

3.0000

3.0000
FIRST FLOOR
FIRST FLOOR
+ 3.00 M + 3.00 M LVL.

FIRST FLOOR
+ 3.00 M
3.0000

LIFT GROUND FLOOR


3.0400
GROUND LVL

SECTION ON A-A'
GROUND LVL RIGHT SIDE ELEVATION

REAR ELEVATION

You might also like