CHECKLIST JPIF DBKL – STORMWATER MANAGEMENT

JPIF -SWM 01 : ONSITE STORMWATER DETENTION (OSD) – Below Ground


a. ONSITE STORMWATER DETENTION - Tank Design
i Setback 2.30 meter / 7ft 6in from the boundary line.
Building Act
ii Made of reinforced concrete structure (with water proofing insulation)MASMA
19.7.1 (a)
or material approved by manufacturer for OSD purpose.
iii Minimum freeboard 300mm (from top water level at ARI 50 years).
iv Inlet pipe entry above ARI 50 years top water level
v Outlet pipe size bigger than the Inlet pipe at ARI 50 years top water level
vi Ventilation / maintenance manhole minimum size 750mmx750mm at 30
meter interval
MASMA 19.7.1 (e)
vii Trash Screen covers both primary & secondary outlet
MASMA 19.8.6
viii Slope gradient minimum 2% (1:50) and maximum 10% (1:10)
MASMA 19.7.1 (d)
xi Primary pipe outlet at bottom-most point of the tank
MASMA 3.5.3.7
xii Invert -level at the primary outlet pipe h igher than receiving drain invert level
xiii Pump to be install if (xii) not comply.
xiv Step ladder for tank more than 1.2 meter depth MASMA
19.7.1 (g)
b. ONSITE STORMWATER DETENTION – Engineering Drawings
COLOUR CODE :
i Location on the Site Plan.
ii Indicate 100% flow from the perimeter drain & RWDP into the1.OSD.
Drainage Flow : Blue
iii Show plan, cross-section and long-section of the OSD. 2. OSD : Yellow
iv Show the receiving drain on the OSD long-section drawing.
3. Boundary Line : Dashed
v Show engineering calculation from Hydraulic Report on Tableoutline
A and B Red

AREA OF PERVIOUS SURFACE AREA IMPERVIOUS SURFACE AREA


DEVELOPMENT
Acres Sq. Before After Before After
Meter Developmen Developme Development Development
t nt

TABL
EA
Time of Flow Flow after Permissibl Site Primary Seconda
Concentrat before Developme e Site Storage Outlet ry
ion Developme nt Discharge Requireme Size Outlet
nt nt Size
Tcs Tc Q pre Q post PSD SSR P outlet S outlet

TABL
EB

Prepared by
Checking by
Confirmed by

(.................)
(.................)
(..................)

JPIF –SWM 02 : RAINWATER HARVESTING (RWH)


a. RAINWATER HARVESTING - Tank Design
i Rainwater MUST collected from the roof catchment.
ii Channel to the RHW Tank / Cistern by rain water down pipe (RWDP).
iii Filtering System.
iv First Flush System (flow from RWDP)
v Underground First Flush System (flow from Perimeter Drain)
vi Rain Water Harvesting Tank / Cistern (3m3 – Bungalow / Semi Detach or 1m3 – Terrance
House)
For commercial, apartments and other type of development – 30% of the SSR volume.
vii Conveyance system to usage point
viii Type of Usage point (Garden Tap / Toilet etc)
ix Overflow pipe (Into OSD tank : Commercial / Apartment. Into receiving drain : Residential
House)
x Scouring pipe and mosquito protection netting.
xi Pipe system (anti clog / inside cage)

b. RAINWATER HARVESTING – Engineering Drawings COLOUR CODE :

i Location on the Site / Floor Plan. 1. Drainage Flow : Blue


ii Indicate 100% flow from the RWDP into the RWH Tank.
2. RWH : Yellow
iii Show plan, cross-section and long-section of the RHW Tank.
3. Boundary Line : Dashed
iv Cross-section against the house or building being construct.
outline Red
v Schematic Drawing for the RWH Tank.
vi Show RWH engineering data on Table C

ROOF CATCHMENT FILTER CAPACITY FIRST FLUSH PUMP


AREA CAPACITY
Total Area Flow
No Capacit No Capacit Capacity
Catchmen into RWH
y y
t Tank

TABL
EC

NOTE:
FIRST FLUSH
1. Rooftops of 100m2 or smaller : 25 to 50 liters
2. Rooftops of 100m2 or larger : 50 liters per 100m2
3. Rooftops or surface catchments of 4356m2 or larger : 2500 liters

WORDING TO BE INCLUDE IN ALL STORM WATER MANAGEMENT PLAN


“ SAYA MENGESAHKAN SISTEM PENUAIAN AIR HUJAN YANG DI SEDIAKAN DAN AKAN DIBINA
MENGIKUT GARIS PANDUAN KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN DAN JABATAN
PENGAIRAN DAN SALIRAN (JPS)”

Prepared by Checking by
Confirmed by

(................)
(..............)
(.............)

JPIF - SWM 03: COMBINATION OF ONSITE STORMWATER DETENTION (OSD)


AND RAINWATER HARVESTING (RWH)
a. SEPARATE TANK - Tank Design
- Refer to JPIF01 (a)-OSD and JPIF02 (a)-RWH for Tank Design.
- Refer to JPIF01 (b)-OSD and JPIF02 (b)-RWH for Engineering Drawing.

b. COMBINE TANK - Tank Design


- Refer to JPIF01 (a)-OSD and JPIF02 (a)-RWH for Tank Design.
- Refer to JPIF01 (b)-OSD and JPIF02 (b)-RWH for Engineering Drawing.
EXTRA CHECKLIST – Combination of RWH & OSD using common TANK
i Separate compartment with 30% - RWH and 70% - OSD.
ii Primary & Secondary Outlet located at the OSD compartment.
iii RWDP must flow into RWH compartment & Perimeter DrainCOLOUR CODE
flow in OSD :
compartment.
iv Inlet Pipe (RWDP) above top height of compartment separator .
1. Drainage Flow : Blue
vi Secondary Pipe outlet below top height of compartment separator.
2. OSD & RWH : Yellow
vii Manhole (2 no) located above the Inlet Pipe and Outlet Pipe.
viii Include Table A, Table B & Table C in Engineering Drawing.3. Boundary Line : Dashed
outline Red
AREA OF PERVIOUS SURFACE AREA IMPERVIOUS SURFACE AREA
DEVELOPMENT
Acres Sq. Before After Before After
Meter Developmen Development Developmen Development
t t

TABL
EA

Time of Flow Flow after Permissibl Site Primary Second


Concentra before Developm e Site Storage Outlet ary
tion Developm ent Discharge Requirem Outlet
ent ent
Tcs Tc Q pre Q post PSD SSR P S
outlet outlet

TABL
EB

ROOF CATCHMENT FILTER CAPACITY FIRST FLUSH PUMP


TABL AREA CAPACITY
EC Total Area Flow
No Capacity No Capacit Capacity
Catchment into RWH
y
Tank

Prepared by Checking by
Confirmed by

(................) (..............) (.............)