Professional Documents
Culture Documents
TABL
EA
Time of Flow Flow after Permissibl Site Primary Seconda
Concentrat before Developme e Site Storage Outlet ry
ion Developme nt Discharge Requireme Size Outlet
nt nt Size
Tcs Tc Q pre Q post PSD SSR P outlet S outlet
TABL
EB
Prepared by
Checking by
Confirmed by
(.................)
(.................)
(..................)
TABL
EC
NOTE:
FIRST FLUSH
1. Rooftops of 100m2 or smaller : 25 to 50 liters
2. Rooftops of 100m2 or larger : 50 liters per 100m2
3. Rooftops or surface catchments of 4356m2 or larger : 2500 liters
Prepared by Checking by
Confirmed by
(................)
(..............)
(.............)
TABL
EA
TABL
EB
Prepared by Checking by
Confirmed by