DETAILED UNIT PRICE ANALYSIS

Item No. : B.9 Quantity = ALL


Description : Mobilization / Demobilization Unit = LUMPSUM

A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)

1% OF Total Direct Cost of Civil Works 7,474.04

A. SUB-TOTAL, EQUIPMENT P 7,474.04

B. Designation Personnel No. of Men No. of Hours Unit Rate/Hour Total Cost (Pesos)

B. SUB-TOTAL, LABOR P

C. Name and Description Qty Unit Unit Price Total Cost (Pesos)
-
-
C. SUB-TOTAL, MATERIALS P -

SUMMARY:
A Equipment P 7,474.04
B Labor -
C Materials -
D TOTAL DIRECT COST P 7,474.04
DIRECT UNIT COST 7,474.04
E OCM 0% of D -
F Profit 0% of D -
G VAT 5% of (D+E+F) 373.70
H Total Cost (D+E+F+G) 7,847.74
I Unit Cost H/Quantity P 7,847.74