Ref: AN/MEP/Q/110270/21 27-11-2021

Attn : Project Manager

Project : Proposed Ground + 3½ P + 10 Floor Building

Dear Sir,
With reference to above subject and further to our discussion, we are pleased to submit our
best offer for Installation of Fire Fighting works clarified as mentioned below:

1. Price& Scope of work:

Sl Total
Description Unit Qty
No. Amount
1 Installation of Concealed Pendent Sprinkler head Nos 632
Installation of Sprinkler line piping for the Fire
2 Fighting system- Pipe Ø 25mm with supports, Mtr 2853.5
fittings etc.
Installation of Sprinkler line piping for the Fire
3 Fighting system- Pipe Ø 50 mm with supports, Mtr 1103 180,000.00
fittings etc.
Installation of Sprinkler line piping for the Fire
4 Fighting system- Pipe Ø 100 mm with supports, Mtr 25
fittings etc.
2. Terms of payment:
Progressive payment to be settled within 15 Days from the Invoice date.
3. Exclusion:
• Any other work not mentioned in our scope.
• Supply of all kind of materials
• Complete pumproom works.
• Installation of riser piping works not included in our scope.
• Installation of Fire Cabinet & related piping works, Fire Extinguishers, breaching
inlets etc.
• Any kind of civil works, i.e. foundation, cutting and chasing, wall opening and Sleeves
for pipes and making good of the surfaces etc
5. Notes:
• Price quoted does not include VAT or any other taxes. Those will be charged extra.
• Temporary water and electricity as applicable to predetermined points at site.
• Safe and robust scaffolding to our erectors requirements.
Thanks & Regards