You are on page 1of 2

TO,

GROUND FLOOR + 3 1/2 P + 10 FLOOR BUILDING DOC NUM: ABT-21-11-498


ATTN:
Engr. Reza,
Dubai, United Arab Emirates
27-Nov-21

Subject : Quotation
Dear Sir,
We are pleased to quote against your inquiry raised in the meeting regarding MEP Works for your Project. The specific terms and conditions on
this quotation are given in below. We would like to quote at the following rates:

ITEM DESCRIPTION UNIT QTY RATE TOTAL VAT 5% VAT TOTAL

ELECTRICAL SCOPE OF WORK

INSTALLATION OF CONCEALED PENDENT SPRINKLE HEAD NOS L/S

INSTALLATION OF SPRINKLE LINE PIPING FOR THE FIRE FIGHTING


NOS L/S
SYSTEM -PIPE 25mm WITH SUPPORTS, FITTINGS ETC
INSTALLATION OF SPRINKLE LINE PIPING FOR THE FIRE FIGHTING
NOS L/S
SYSTEM -PIPE 50mm WITH SUPPORTS, FITTINGS ETC
INSTALLATION OF SPRINKLE LINE PIPING FOR THE FIRE FIGHTING
NOS L/S
SYSTEM -PIPE 100mm WITH SUPPORTS, FITTINGS ETC
237,500
TOTAL 237,500
TOTAL INCL 5% VAT 250,000
BOQ can be more or less as per quote will calculate as per actual site
a
Installations
All material are not on our scope.
a

Comply to Scope of work, All Installations work to be done. a


All Hand tools & Power tools are provided by AL BURJ AL THAKI
a
WARNING & CONTROL DEVICES TR.
You will be responsible in for all material in case of any steal and theft
a
while we and our staff is not on site.

By your means a
Material shifting to work place/ Logistic

1 of 2
Yes a
Supervision of their work & Single point of contact
24 Hours a
Mobilization Start with
Maximum Strength to allocate 40 a

Trade Licence/ Visa/ Work Comp Yes a

Previous work with ALEC Yes a


Work with Major MEP Company: Alstom, CSCES,JLW,ALEC,GECO,InterMass,Al Waha,Buildwell
Recommendations:
Proposed Location of works.
Quotation referecne By your means
Remarks

Terms
General Conditions Applicable
5% payment to be released advance for mobilization. Payment will be released every seven days off
after the sumbition of the envice .
Dewa approval is not in our scope.
No retention of bill /invoice amount from your end.

Accommodation and transportation will be provided by our Company for our workers.
PPE will be provided by our company.
Our all AL BURJ AL THAKI WARNING &CONTROLDEVICES TR workers are insured.
We will replace the worker if he is not suitable as per work requirement.
In case if you wish to remove our worker after start of work, please provide us at least 2 days written
We can increase / decrease any no. of workers or add sub contractors to our work without side
Any dispute in future will be settled as per UAE law and under UAE court judiciary/direction.
If the LPO gets expired due to operation of time or exhaust of LPO amount, and you do not give us
notice of de-hire, then our workers shall continue works and your Company shall send us extension
of the LPO. The LPO shall be considered as extended unless otherwise communicated to us in
Vat 5% from Client
Our scope of work is limited to MEP only all civil works will be from main contractor.

We are waiting for your LPO/Agreement. We trust you will find our quotation satisfactory and look

Regards,

General Manager
AL BURJ AL THAKI WARNING & CONTROL DEVICES TR
00971-52-4881475
00971-56-7699917

2 of 2

You might also like