SWITCHGEAR BASIC DATA ABB PROJECT REALIZATION TEAM
STANDARD IEC 62 271-200 PROJECT MANAGER: SZOLLOSI
RATED VOLTAGE 17.5kV PROJECT ENGINEER: HORNAK
SERVICE VOLTAGE 13.8kV DESIGN ENGINEER:
ISSUED BY:
E
INTERNAL ARC CLASSIFICATION (IAC) TIME 1s E
DEGREE OF PROTECTION IP4X
DEGREE OF PROTECTION - INTERNAL IP20
MV PHASE DESIGNATION L1, L2, L3
AMBIENT TEMPERATURE -5°C ... 40°C
ALTITUDE ≤1000m
F During the installation, commissioning period and the time of operation, client is obliged to follow all instructions and recommendation given by manufacturers of individual instruments installed inside supplied equipment F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 +
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name PROJECT TITLE PAGE DCC Code &EAA Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458349 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
B B
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 +
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458349 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SWITCHGEAR TYPE UniGear Single busbar system COATING COLOR RAL 7035
NUMBER OF CUBICLES 10 Cu BARS DESIGN
A A
PACKING Sea-freight wooden case withstanding HORIZONTAL BUSBARS COATING NO
open air for 12 months COATING OF T-OFFS AND CABLE CONNECTION PTS.None
SECONDARY WIRES PARAMETERS BUSBAR PARTITIONING YES - each panel
INSULATED T-OFFS AND BUSBARS YES
SEC. WIRES TYPE AND NOMINAL VOLTAGE PVC - Flame retardant low smoke emission,
LOW VOLTAGE COMPARTMENT
0.45/0.75 kV, operating temperature 70°C
LV COMPARTMENT DOORS DESIGN Standard
CONTROL CIRCUIT 1.5mm² BLACK
MIMIC DIAGRAM On LV comp. doors - self-adhesive
CURRENT CIRCUIT 4mm² BLACK
MIMIC DIAGRAM COLOR BLACK
B VOLTAGE CIRCUIT 2.5mm² BLACK B
LV ASSEMBLY PANEL MECH. DESIGN Aluminium profiles
HEATING, LIGHTING CIRCUIT 1.5mm² BLACK
LOCKS
EARTHING CIRCUIT 2.5mm² YELLOW GREEN
LV COMPARTMENT DOORS CLOSING VERSION T-Handle Double Bit 3.2 mm
SUPPLY INTERCONNECTION 2.5mm² BLACK
BREAKER COMPARTMENT DOORS CLOSING VERS. Handle Double Bit 5.2 mm
LOGIC/VOLTAGE INTERCONNECTION 2.5mm² BLACK/BLACK
CABLE COMPARTMENT DOORS CLOSING VERSION Handle Double Bit 5.2 mm
MARKING OF WIRE ENDS (MATERIAL) TERMINAL (Ring ferrules)
LABELS
czpebdz 25.6.2014
AUXILIARY VOLTAGES CONNECTION POSITION Outgoing Feeder 1 DEVICES INSIDE LV COMP. LABELS DESIGN Self-adhesive Brother tape
DEVICES INSIDE LV COMP. LABELS COLOR BLACK/WHITE
D
OTHER ELECTRICAL PARAMETERS D
TERMINALS TYPE Screw type
FAULT LIMITING DEVICE None
ANTICONDENS. HEATER IN COMP. LV/CB/CABLE NO/NO/NO
INTERNAL LIGHTING NO
REMOTE COMMUNICATION PROTOCOL None
IED COMMUNICATION PROTOCOL 1st / 2nd None / None
COMMUNICATION MEDIA None
E E
FINAL DOCUMENTATION
NUMBER OF COPIES 1
STRUCTURE For every panel
FORMAT PDF
CTs, VTs ROUTINE TEST REPORTS LANGUAGE English
CTs, VTs MAGNEZATION CURVES REQUIRED Yes
CTs, VTs CALIBRATION FOR TARIFF METTERING REQ. Yes
CTs, VTs CORRECTION CURVES REQUIRED Yes
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 +
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name GEN. SPECIFICATION OF SWGR. DCC Code &EEC Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page C01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458349 Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
B B
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + SLD
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458350 Pages 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D02/1A
© Copyright 2013 ABB. All rights reserved.
-BAT1,-BAT2,-BAT3 -BAT1,-BAT2,-BAT3 3 P2
TJC5 TJC5
Earthing balls
czpebdz 25.6.2014
13.8/√3//0.11/√3//0.11/3 kV 13.8/√3//0.11/√3//0.11/3 kV
-FA11 4x d=25mm -FA11 0.5, 15VA
-FA11 0.5, 15 VA -FA11
3P, 50 VA 3P, 50 VA -FA21
-FA21 -FA21 -FA21
-FA31 -FA31 -FA31 -FA31
C -QCE1 -QCE2 -QCE2 MWD16 -QCE3 C
MWD16 MWD16 MWD16 EK6
EK6 EK6 EK6
Earthing balls Earthing balls
4x d=25mm 4x d=25mm -BAT4,-BAT5,-BAT6
Earthing balls Single-pole fixed VT TJCH5, Up=13,8/V3kV
4x d=25mm 13,8/V3//0.11/√3//0.11/√3//0.11/3 kV
0.2, 15 VA PTB cert.
0.5, 15 VA
3x(1x300 sqmm) N2XSY 3x(1x300 sqmm) N2XSY 3x(1x300 sqmm) N2XSY 3x(1x300 sqmm) N2XSY 3x(1x300 sqmm) N2XSY 3P, 50 VA
ISSUED BY:
-BCN1
KOLA 06 D2 3x(1x400 sqmm) N2XSY
-BCN1 -BCN1
Under cubicle (accessory) 3x(1x400 sqmm) N2XSY
KOLA 06 D2 KOLA 06 D2
60/1 A 3x(1x400 sqmm) N2XSY
Under cubicle Under cubicle
cl. 3 1,2 VA
(accessory) (accessory)
D 60/1 A 60/1 A D
G cl. 3 1,2 VA G cl. 3 1,2 VA
-BCN2 -BCN2
KOLA 06 D2 KOLA 06 D2
(accessory) (accessory)
60/1 A 60/1 A
cl. 3 1,2 VA cl. 3 1,2 VA
D02/1E
-PFV2 -QCE4
© Copyright 2013 ABB. All rights reserved.
EK6
CPI VI-3P D03/1A
SGB 12
00BBA01
A 3 AC, 17.5kV, 60Hz, 3100A, 31.5kA/1s A
D01/8A 00BBA01
-BAT1,-BAT2,-BAT3 3 P2 -BAT1,-BAT2,-BAT3
TJC5 TJC5
13.8/√3//0.11/√3//0.11/3 kV 13.8/√3//0.11/√3//0.11/3 kV
czpebdz 25.6.2014
D01/8E D03/1E
-QAB3 -QAB1
VD4/P 17.12.32 P150 VD4/P 17.06.32 P150
17.5 kV 17.5 kV
M 1250 A M 630 A
31.5 kA 31.5 kA
-PFV1 -PFV1
-BAT1,-BAT2,-BAT3
TJC5
13.8/√3//0.11/√3//0.11/3 kV Earthing balls
czpebdz 25.6.2014
-FA11 0.5, 15 VA
-FA11 4x d=25mm
3P, 50 VA
-FA21 -FA21
-FA31 -FA31
C MWD16 -QCE2 MWD16 -QCE1 C
EK6 EK6
Earthing balls
4x d=25mm
KOLA 06 D2
-BCN1 Under cubicle (accessory)
KOLA 06 D2 60/1 A
Under cubicle cl. 3 1,2 VA
(accessory)
D 60/1 A D
G cl. 3 1,2 VA
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
D02/8E
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Switchgear room height - H: 3.5≤H<4 m
© Copyright 2013 ABB. All rights reserved.
A A
GAS DUCT
REAR OUTLET
C C
2200
ISSUED BY:
D D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name FRONT VIEW DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page F01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Switchgear room height - H: 3.5≤H<4 m
© Copyright 2013 ABB. All rights reserved.
A A
GAS DUCT
REAR OUTLET
C Dummy Panel C
Spacer
ISSUED BY:
D D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name FRONT VIEW DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page F02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
85 mm
© Copyright 2013 ABB. All rights reserved.
A A
C C
ISSUED BY:
D D
85 mm
© Copyright 2013 ABB. All rights reserved.
A A
C C
ISSUED BY:
D D
A A
B B
czpebdz 25.6.2014
35
C C
81
81
275
275
ISSUED BY:
843
843
560
560
1235
1235
1235
1340
1340
65 65
400
400
225
225
311
311
80
20
80
20
30
30
70
70
52 36 52 36
E 650 650 300 E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SWGR. FOOTPRINT DETAILS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page J01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
85
85
C C
81
81
205
205
ISSUED BY:
843
843
670
670
1390
1390
1235
1235
D 100 800 100 100 800 100 D
65 65
225
225
360
360
311
311
80
20
80
20
30
30
70
70
52 36 52 36
E 1000 1000 E
PANELS: PANELS:
00BBA01.04 00BBA01.06
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SWGR. FOOTPRINT DETAILS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page J02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
0<H<5
3
B B
50
czpebdz 25.6.2014
LEGEND:
C C
1 - BOLT M12 x 30
2 - SPECIAL NUT
3 - SPECIAL WASHER
4 - ANCHORING BOLT M10 x 90
ISSUED BY:
90
D D
E E
d 16
80
Tolerances for laying the floor frame are:
Evenness tolerance: ± 1 mm within a measuring length of 1 m
Straightness tolerance: 1 mm per 1 m, but not more than 3 mm over entire length of frame.
For more details refer to Installation, service and maintenance manual No.1VLM000363_rev6, section-5.2.1
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name FIXING DETAILS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page K01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8410785 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
85 mm 420 mm 400 mm
A No Description A
633
Gas Duct with Side Exhaust,
3
12/17,5kV, 31,5kA, 600mm
B B
705
czpebdz 25.6.2014
C C
2191 mm
205
1
2200
2100
ISSUED BY:
1495
D D
1040
438
535
35 1235 70
PANELS:
F 00BBA01.01 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SECTION VIEW DRAWINGS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A No Description A
633
600
Gas Duct with Side Exhaust,
3
12/17,5kV, 31,5kA, 600mm
705
czpebdz 25.6.2014
C C
205
1
2200
2100
ISSUED BY:
1495
D D
1040
438
5
535
35 1235 70
PANELS:
F 00BBA01.02, 00BBA01.03, 00BBA01.05, 00BBA01.07, 00BBA01.09 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SECTION VIEW DRAWINGS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A No Description A
Incoming/outgoing Feeder,
1
12/17.5kV, 3150A, 40kA
3
Low Voltage Compartment Standard,
2
Flat Door, Height 705 mm
633
600
6 Gas Duct,
502
3
12/17,5kV, 31,5kA, 600mm
90
B B
705
czpebdz 25.6.2014
C C
310
1
2200
2100
ISSUED BY:
1495
D D
990
363
455
E 329,5 90 90 90 90 90 455,5 E
85 1235 70
PANELS:
F 00BBA01.04 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SECTION VIEW DRAWINGS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A No Description A
Incoming/outgoing Feeder,
1
12/17.5kV, 3150A, 40kA
3
Low Voltage Compartment Standard,
2
6 Flat Door, Height 705 mm
633
600
Gas Duct,
502
3
12/17,5kV, 31,5kA, 600mm
225
B B
705
czpebdz 25.6.2014
C C
310
1
2200
2100
ISSUED BY:
1495
D D
990
363
455
E 329,5 90 90 90 90 90 455,5 E
85 1235 70
PANELS:
F 00BBA01.06 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SECTION VIEW DRAWINGS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
85 mm 420 mm 400 mm
A No Description A
633
Gas Duct with Side Exhaust,
3
12/17,5kV, 31,5kA, 600mm
B B
705
czpebdz 25.6.2014
C C
2191 mm
205
1
2200
2100
ISSUED BY:
1495
D D
1040
438
535
35 1235 70
PANELS:
F 00BBA01.10 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SECTION VIEW DRAWINGS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L05
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
GAS DUCT
REAR OUTLET
213 mm
B B
00BBA01.03
Variable to be adjusted on site
czpebdz 25.6.2014
2578 mm
2191 mm
ISSUED BY:
2116 mm
804 mm
423 mm
00BBA01.01
D D
E E
´´MAIL BOX´´
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name GASDUCT OUTLET DETAILS DCC Code &ELH Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page L06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BB - MV, TEST
B
LV, TEST - LVD REF,
(FOR DOUBLE BB SYSTEMS:
- BBA means BACK BB SYSTEM
- BBB means FRONT BB SYSTEM
B
(DEVICES ON DOOR OF LV COMPARTMENT) LCT, In specific markets can be found with the opposite order.)
LCR,
LVR, (ARC DETECTOR ON BUSBAR, Ith LIMITOR IN BB COMPARTMENT)
LV,
LCB,
PLG -
czpebdz 25.6.2014
see next
page
MV, TEST - CB
C (HEATER AND/OR ARC SENSOR IN BREAKER COMPARTMENT, C
WITHDRAWABLE VT METERING)
MV, TEST - MV
(LOAD BREAK SWITCH - NALFE)
ISSUED BY:
D D
CT - MV, MVT, TEST
(CURRENT TRANSFORMERS, CAPACITIVE DIVIDERS, C.D. CABLES)
E E
MV - MV production & Finalization
LV - LV production
WP - Withdrawable parts production
MVT - MV tester ES - MV, TEST
(LIMIT SWITCHES AND COIL OF EARTHING SWITCH)
TEST - Switchgear testing - complete material specification needed
* - GFCT also in case if are mounted under cubicle. For place of mounting see SLD diagram of switchgear
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + GA
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name Zones in Eplan - MV Compartments DCC Code &EFS Lang. English
F 09.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458351 Pages 17
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
B B
C C
LV - LV, TEST
(DEVICES AND TERMINALS INSIDE LV COMPARTMENT)
ISSUED BY:
D D
E E
A
DESCRIPTION OF EPLAN ZONES A
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
B B
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 10.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + ICL
C 17.04.2014 HORNAK MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458352 Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MAIN
Station Transformer Station Transformer
LABEL Alternator 1 Alternator 2 Outgoing Feeder 1 Alternator 3 Outgoing Feeder 2 Alternator 4 Spacer Alternator 5
1 2
© Copyright 2013 ABB. All rights reserved.
CUB. No: =00BBA01.01 =00BBA01.02 =00BBA01.03 =00BBA01.04 =00BBA01.05 =00BBA01.06 =00BBA01.07 =00BBA01.08 =00BBA01.09 =00BBA01.10
A A
REDUNDANT SUPPLY
-XI1 1 2BK -XI1 1 -XI1 1 -XI1 1 -XI1 1 -XI1 1 -XI1 1 -XI1 1 -XI1 1
-XCS 1
-XCS 3
-XI1 2 2,5BK -XI1 2 -XI1 2 -XI1 2 -XI1 2 -XI1 2 -XI1 2 -XI1 2 -XI1 2
-XCS 2
B -XCS 4
B
-XI1 3 2,5BK -XI1 3 -XI1 3 -XI1 3 -XI1 3 -XI1 3 -XI1 3 -XI1 3 -XI1 3
+
SPARE
-XI1 4 2,5BK -XI1 4 -XI1 4 -XI1 4 -XI1 4 -XI1 4 -XI1 4 -XI1 4 -XI1 4
czpebdz 25.6.2014
C C
-XI1 5 2,5BK -XI1 5 -XI1 5 -XI1 5 -XI1 5 -XI1 5 -XI1 5 -XI1 5 -XI1 5
+
SPARE
-XI1 6 2,5BK -XI1 6 -XI1 6 -XI1 6 -XI1 6 -XI1 6 -XI1 6 -XI1 6 -XI1 6
-
ISSUED BY:
-XI1 7 2,5BK -XI1 7 -XI1 7 -XI1 7 -XI1 7 -XI1 7 -XI1 7 -XI1 7 -XI1 7
+
D D
SPARE
-XI1 8 2,5BK -XI1 8 -XI1 8 -XI1 8 -XI1 8 -XI1 8 -XI1 8 -XI1 8 -XI1 8
-
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 10.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + ICL
C 17.04.2014 HORNAK MAN Diesel & Turbo SE Project name SUPPLY INTERCONNECTIONS DCC Code &EFF Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458352 Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MAIN
Station Transformer Station Transformer
LABEL Alternator 1 Alternator 2 Outgoing Feeder 1 Alternator 3 Outgoing Feeder 2 Alternator 4 Spacer Alternator 5
1 2
© Copyright 2013 ABB. All rights reserved.
CUB. No: =00BBA01.01 =00BBA01.02 =00BBA01.03 =00BBA01.04 =00BBA01.05 =00BBA01.06 =00BBA01.07 =00BBA01.08 =00BBA01.09 =00BBA01.10
A A
-BB2
-BT2
-BGC2
-XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1 -XDI2 1
-BB2
-BT2
-BGC2
-XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3 -XDI2 3
czpebdz 25.6.2014
-BB2
-BT2
ISSUED BY:
-BGC2
-XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5 -XDI2 5
D D
-KFA3 -KFA3 -KFA3 -KFA3 -KFA3 -KFA3 -KFA3 -KFA3
-BB2
-BT2
-BGC2
-XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7 -XDI2 7
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 10.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + ICL
C 17.04.2014 HORNAK MAN Diesel & Turbo SE Project name INTERCONNECTIONS -XDI2 DCC Code &EFF Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q08
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458352 Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MAIN
Station Transformer Station Transformer
LABEL Alternator 1 Alternator 2 Outgoing Feeder 1 Alternator 3 Outgoing Feeder 2 Alternator 4 Spacer Alternator 5
1 2
© Copyright 2013 ABB. All rights reserved.
CUB. No: =00BBA01.01 =00BBA01.02 =00BBA01.03 =00BBA01.04 =00BBA01.05 =00BBA01.06 =00BBA01.07 =00BBA01.08 =00BBA01.09 =00BBA01.10
A A
-BB2
-BT2
-BGC2
-XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9 -XDI2 9
-BB2
-BT2
-BGC2
-XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11 -XDI2 11
czpebdz 25.6.2014
-BB2
-BT2
ISSUED BY:
-BGC2
-XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13 -XDI2 13
D D
-KFA7 -KFA7 -KFA7 -KFA7 -KFA7 -KFA7 -KFA7 -KFA7
-BB2
-BT2
-BGC2
-XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15 -XDI2 15
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 10.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + ICL
C 17.04.2014 HORNAK MAN Diesel & Turbo SE Project name INTERCONNECTIONS -XDI2 DCC Code &EFF Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458352 Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MAIN
Station Transformer Station Transformer
LABEL Alternator 1 Alternator 2 Outgoing Feeder 1 Alternator 3 Outgoing Feeder 2 Alternator 4 Spacer Alternator 5
1 2
© Copyright 2013 ABB. All rights reserved.
CUB. No: =00BBA01.01 =00BBA01.02 =00BBA01.03 =00BBA01.04 =00BBA01.05 =00BBA01.06 =00BBA01.07 =00BBA01.08 =00BBA01.09 =00BBA01.10
A A
-BB2
-BT2
-BGC2
-XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17 -XDI2 17
BB ES OFF AND
CRANK NOT
-BGE3 INSERTED
D CB TRUCK -RLE3 D
IN TEST Busb. ES
OR PLUG Blocking
OUT magnet
-XDI2 -XDI2 -XDI2 -XDI2 -XDI2 -XDI2 -XDI2
-XDI2 21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22
CIRCUIT BREAKERS
IN TEST POSITION
OR PLUG OUT BB
-XDI2 -XDI2 -XDI2 -XDI2 -XDI2 -XDI2 -XDI2 E/S CLOSING
-XDI2 23 24 23 24 23 24 23 24 23 24 23 24 23 24 23 24 23 24
INTELOCKING
CB TRUCK CB TRUCK CB TRUCK CB TRUCK CB TRUCK CB TRUCK CB TRUCK CB TRUCK
IN TEST IN TEST IN TEST IN TEST IN TEST IN TEST IN TEST IN TEST
OR PLUG OR PLUG OR PLUG OR PLUG OR PLUG OR PLUG OR PLUG OR PLUG
E OUT OUT OUT OUT OUT OUT OUT OUT E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 10.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + ICL
C 17.04.2014 HORNAK MAN Diesel & Turbo SE Project name INTERCONNECTIONS -XDI2 DCC Code &EFF Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458352 Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
B B
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + LOG
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458362 Pages 2
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A LEGEND: A
P1
2 - Core
Current transformer Surge arrester
3
(3 pcs)
P2
B B
P1
3 - Core
Current transformer Earthing switch
(3 pcs)
3 P2
czpebdz 25.6.2014
E E
Earthing balls (for portable earthing set)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = K00
B 26.03.2014 HORNAK Customer Checked HAVELKA Approved BRAUN COMMON DRAWINGS 1000032473 + LOG
C 03.04.2014 HORNAK MAN Diesel & Turbo SE Project name SYMBOLS OVERVIEW DCC Code Lang. English
F 9.06.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page E01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458362 Pages 2
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
-QAB1
VD4/P 17.06.32 P150
17.5 kV
M 630 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P1
SGB12 -BCT1,-BCT2,-BCT3
C 150/1/1 A at 40°C C
Core 2: 5P20, 10 VA
Core 1: 0.5Fs5, 10 VA VALID FOR PANELS:
3 P2 POS. DESIGN. NAME
1 00BBA01.01 Station Transformer 1
Earthing balls
ISSUED BY:
-FA11 4x d=25mm
-FA21
-FA31
MWD16 -QCE1
D EK6 D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SPRING =NEXT
REDUNDANT CONTROL CHARGER CUBICLE
SIGNAL CIRCUIT
© Copyright 2012 ABB. All rights reserved.
A A
-XDI1 2
-XDI1 3
-XDI1 4
-XDI1 5
-XDI1 6
-XDI1 7
B B
-XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/6C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB1
-BS1
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q01/2D
M07/5C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/4C
X03/3C
X03/3C
X03/7C
X03/8C
X03/4C
X03/7C
X03/4C
X03/5C
X03/6C
X03/5C
+PLG
-QAB1
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/3D
X03/3D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/4D
X03/7D
X03/8D
X03/4D
M06/6E
M07/2E
M07/4E
X03/7D
Q01/2E
M09/3C
M09/3C
X03/5D
X03/6D
M09/4C
M09/4C
M07/5C
M07/6C
X03/4D
M06/3C
X03/5D
D D
+LCB 20 22 24 26 28
Q03/3C
Q01/3E
X03/1C
X03/1C
X03/2C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE1
EK6
M09/2B
Q10/4C
X02/2D
X02/3D
X02/4D
B B
40 42 44 46 48
-BGE2
41 43 45 47 49
M09/1B
Q10/3C
X02/5D
X02/6D
X02/7D
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/7C
12 14
1-2
-KFA2 -XDC 1 -XDC 7
B 3-4 Q01/3D 11 B
5-6 12 14
7-8
-KFA3
MAN CONTORL
MAN CONTORL
9 - 10 Q01/4D 11
STATION TFR CB
-XDX 217
STATION TFR CB
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL OPEN/TRIP LOOP
-KFA4 ON COMMAND -XDX 218 00BHT01GS103-YB32
Q01/5D 11 00BHT01GS103-YB01
12 14
M01/8B
-KFA5
czpebdz 25.6.2014
+PLG -XB 57
Q01/6D 11 -QAB1 -XDC 2 -XDC 8
12 14
-KFA6 53
-BT2
C Q02/3D 11 C
12 14 54
-KFA7
Q02/4D 11
12 14
-XB 58
M01/8D
-KFA8
Q02/5D 11
12 14 13
ISSUED BY:
-KFA9 -KFA10
Q02/6D 11 Q02/7D 14
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
4
-XB 14 -XB 46 -XB 44
M01/3D M01/2D M01/4D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
+LVD-SFS1
M06/2A 6
MAN CONTORL
B STATION TFR CB
B
SYSTEM
TRIPPING COIL
13 OFF COMMAND
+LVD
00BHT01GS103-YB02 XDX:321
-SFO1
14 Q01/2C
MCBH-20
M01/7B
-XDC 12 +PLG -XB 52
czpebdz 25.6.2014
-QAB1
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C 24 24 C
-XB 53 54
M01/7D M01/7D
M01/5B M01/5B
+PLG -XB 31 41 M01/5B
-QAB1 1 +PLG -XB 23 -RAR1 D C B A
D -BB2
13
-QAB1 D
-XDX1
14 M06/5E 21
1K2
4K7
22K
5K6
U -BB2
X01/8E
BY500-1000
5A 22
-MO1 1000V
E F G H
2 -XB 33 Q01/2C
-XB 30 M01/5D XDI2:2
M01/5D
A1 A1
-KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/5C 13 14 Q11/5C
23 24 Q03/2C 23 24
33 34 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
+LVR-XE 27 +LVR-XE 17
XE27
XE17
B M01/6B B
+ES-QCE1 +PLG -XB 11
26 46
-BGE3 -BGE2 -QAB1
M02/6C M02/6B
27 47 13 21 13 13
-BB3 -BB3 -BT2 -BT1
XE28
XE18
14 22 14 14
+LVR-XE 28 +LVR-XE 18
-XB
czpebdz 25.6.2014
22 21 50 51
M01/6D M01/6D M01/7D M01/7D
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE
-XDI2 1
A A
-XDI2 2
-XDI2 3
-XDI2 4
-XDI2 5
-XDI2 6
-XDI2 7
-XDI2 8
B -XDI2 9
B
-XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
XDI2:2 M07/7E
XDX:321 M07/7B
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BB ES OPEN =NEXT
© Copyright 2012 ABB. All rights reserved.
CUBICLE
-XDI2 11
A A
-XDI2 12
-XDI2 13
-XDI2 14
-XDI2 15
-XDI2 16
-XDI2 17
-XDI2 18
B -XDI2 19
B
-XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14
11 M06/2C 11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 12
23 24
24 24 24 24
21 21 21 21 33 34
E 22 22 22 22 43 44 E
34 34 34 34
31 31 31 31
32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=NEXT
CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 A
-XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/5E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 C
XE29
XE19
+ES-QCE1
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14
XE30
XE20
ISSUED BY:
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
00BHT01GS103-XB43
B B
czpebdz 25.6.2014
C C
M01/3B M01/3B
+PLG -XB 5 +PLG -XB 28
-QAB1 -QAB1
13 13 11
13 31
-BB1 -BB1 -KFA11 -KFA12 +LVD-SFS1
M07/5E 14 M07/6E 14 M06/2A 12
14 32
ISSUED BY:
-XB 15 -XB 38
M01/3D M01/3D
D D
-XDC 371 372 373 374 375 376 377 378 379
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 17
+CT 1002 2,5 GNYE
P1 P1 P1
2S1
B TPU 50.23., IP=150A -BCT1 B
150/1A 2S2
Core 2: 5P20, 10VA
-XDA 12
4 BK
-XDA 13
czpebdz 25.6.2014
4 BK
2S1
-BCT2
C 2S2 C
MAN
-XDA 14
4 BK CONTROL
SYSTEM
(CCP)
-XDA 15
4 BK
ISSUED BY:
2S1
-BCT3
2S2
D D
-XDA 16
4 BK
E E
PROTECTION
CT´s MV PANEL
00BHT01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 7
+CT 1001 2,5 GNYE DO NOT REMOVE THESE JUMPERS
UNTIL EXTERNAL DEVICES IN MAN CONTROL SYSTEM ARE SECURELY CONNECTED
+LVD
-PGA1
-XDA 1 -XDA 18
4 BK 4 BK A
1S1 FB96-1
B TPU 50.23 -BCT1 150/1A B
150/1A 1S2 0-150/300A
Core 1: 0.5Fs5, 10VA
-XDA 2 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 3 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S1 FB96-1
-BCT2 150/1A
C 1S2 0-150/300A C
MAN
-XDA 4 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 5 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S1 FB96-1
-BCT3 150/1A
1S2 0-150/300A
D D
-XDA 6 -XDA 23
4 BK 4 BK
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P2 P2 P2
L1 L2 L3 N
CURRENT
MEASURING MV
PANEL
00BHT01CE003A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
-BCN1
D KOLA 06 D2 P2 S2 D
Under cubicle (accessory)
60/1 A
cl. 3 1,2 VA, VA
E E
GROUND FAULT
CURRENT
00BHT01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.01+LV-00BBA01.01@PLD
=00BBA01.01+LV =00BBA01.01
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA9
-KFA2
-KFA3
-KFA4
-KFA5
-KFA6
-KFA7
-KFA8
-KFA6 PANEL 6 OFF
-RAR1 -KFA7 PANEL 7 OFF
-FCM2.1
-FCM3.1
-FCM4.1
+LVR-XE
-XDX1
-KFA8 PANEL 9 OFF
czpebdz 25.6.2014
-KFA10 BB ES OPEN
C C
-KFA11 CB IN TEST POSITION
-XDX -XDA
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.01+LVD-00BBA01.01@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.01+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
-SFC1 CB CLOSE
00BBA01.01
B -PFX3 CB IN TEST / SERVICE B
-SFT1 LAMP TEST
-SFO1 CB OPEN
-PGA1 -PGA2 -PGA3
-PGA1 L1
-PGA2 L2
czpebdz 25.6.2014
705 mm
-PGA3 L3
C -PFX3
C
-PFV1
-PFX1
-SFS1 -SFT1
ISSUED BY:
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
5
E E
-XDX1
M07/3D
A A
B B
czpebdz 25.6.2014
C C
XE13
XE15
XE21
XE23
XE25
+ES-QCE1
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
ISSUED BY:
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
D +LVR-XE 12 +LVR-XE 14 +LVR-XE 16 +LVR-XE 22 +LVR-XE 24 +LVR-XE 26 D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT PLUG OUT SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB CLOSED CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445 447 449
B B
czpebdz 25.6.2014
M01/1B M01/1B M01/4B M01/5B M01/8B M01/6B M01/6B M01/3B M01/5B M01/3B
C +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG C
-XB 24 -XB 26 -XB 27 -XB 6 -XB 55 -XB 9 -XB 32 -XB 7 -XB 8 -XB 3
-QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1
2 53
-BB11 -BB2
4 2 53 41 31 53 31 43
-BS2 -BS2 -BT1 -BB3 -BB3 -BB1 -BB2 -BB1
22 24 26 1 54
+LCB +LCB +LCB 4 33
3 1 -BB4 -BT1 54 42 32 54 32 44
-BGC2 -BGC2 -BGC2
23 25 27
M01/1F M01/2F M01/2F
1 34
-XB -XB -XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 19 42 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/6D M01/6D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446 448 450
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13
-FCM3.1 -FCM4.1
G01/4C 14 G01/6C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-PGA1 BK
+CT-BCT1 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
19 -XDA BK
+CT-BCT1 1S2 S02/4B
BK
Based on
3
+LVD-PGA2 BK
+CT-BCT2 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
+LVD-PGA3 BK
+CT-BCT3 1S1 S02/4D
BK
6
23 -XDA BK
+CT-BCT3 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4A
GNYE
12
+CT-BCT1 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/5B
BK
Date
19
-XDA 2 S02/5B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/5C
Approved BRAUN
21
-XDA 4 S02/5C
BK
10.3.2014
22
+LVD-PGA3 S02/5D
BK
5
5
23
-XDA 6 S02/5D
BK
Title
6
6
Station Transformer 1
7
7
1000032473
1VL8458353
+ LV
8
8
= 00BBA01.01
Page
Pages 37
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
71 PCS
+LVR-XE 30 Q10/3D
351
BK
352
BK
+LVR-XE 20 Q10/4D
353 BK
3
3
+LVR-XE 19 Q10/5D
TERMINAL UT 4 3044102
354
BK
-FCM2.1 14 Q10/6D
355
BK
-FCM2.1 13 Q10/7D
356
BK
Project name
+PLG-QAB1-XB 15 Q11/2D
371
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB1-XB 5 Q11/3D
372
BK
4
4
+PLG-QAB1-XB 38 Q11/4D
373
BK
Date
+PLG-QAB1-XB 28 Q11/4D
374
BK
13.8kV SWITCHGEAR
-KFA11 14 Q11/5D
BK
Approved BRAUN
-KFA12 14 Q11/5D
376
BK
10.3.2014
-KFA11 13 Q11/6D
377
BK
5
5
+LVD-SFS1 12 Q11/7D
378
BK
Title
+LVD-SFS1 11 Q11/7D
379
BK
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
+LVR-XE 13 X02/3B
403
BK
6
6
+LVR-XE 14 X02/3E
404
BK
Station Transformer 1
+LVR-XE 15 X02/4B
405
BK
ABB s.r.o., PPMV Brno
+LVR-XE 16 X02/4E
406
BK
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
Doc. No.
Order No.
7
7
+LVR-XE 23 X02/6B
409
BK
+LVR-XE 24 X02/6E
410
BK
1000032473
+LVR-XE 25 X02/7B
411
BK
1VL8458353
+LVR-XE 26 X02/7E
412
BK
+ LV
+LCB-BGC2 22 X03/1B
421
BK
8
8
+LCB-BGC2 23 X03/1E
422
BK
= 00BBA01.01
Page
Pages
+LCB-BGC2 24 X03/1B
423
BK
+LCB-BGC2 25 X03/1E
424
BK
37
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LCB-BGC2 26 X03/2B
425
BK
Name
21.5.2014 ABRLE
+LCB-BGC2 27 X03/2E
426
BK
Based on
X03/2B
427
428
2
2
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
X03/2B
429
X03/2E
430
71 PCS
+PLG-QAB1-XB 24 X03/3B
431
BK
432
BK
+PLG-QAB1-XB 26 X03/3B
433 BK
3
3
+PLG-QAB1-XB 36 X03/3E
TERMINAL UT 4 3044102
434
BK
+PLG-QAB1-XB 27 X03/4B
435
BK
+PLG-QAB1-XB 37 X03/4E
436
BK
Project name
+PLG-QAB1-XB 6 X03/4B
437
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB1-XB 16 X03/4E
438
BK
4
4
+PLG-QAB1-XB 55 X03/5B
439
BK
Date
+PLG-QAB1-XB 56 X03/5E
440
BK
13.8kV SWITCHGEAR
+PLG-QAB1-XB 9 X03/5B
BK
Approved BRAUN
+PLG-QAB1-XB 19 X03/5E
442
BK
10.3.2014
+PLG-QAB1-XB 32 X03/6B
443
BK
5
5
+PLG-QAB1-XB 42 X03/6E
444
BK
Title
+PLG-QAB1-XB 7 X03/7B
445
BK
+PLG-QAB1-XB 17 X03/7E
446
BK
+PLG-QAB1-XB 8 X03/7B
447
BK
+PLG-QAB1-XB 18 X03/7E
448
BK
6
6
+PLG-QAB1-XB 3 X03/8B
449
BK
Station Transformer 1
+PLG-QAB1-XB 13 X03/8E
450
BK
ABB s.r.o., PPMV Brno
-FCM3.1 13 X04/1B
501
BK
-FCM3.1 14 X04/1E
502
BK
-FCM4.1 13 X04/1B
503
BK
Doc. No.
Order No.
7
7
-FCM4.1 14 X04/1E
504
BK
X04/2B
505
1000032473
X04/2E
506
1VL8458353
X04/2B
507
+ LV
X04/2E
508
8
8
= 00BBA01.01
Page
Pages 37
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
BK
BK
BK
COLOR
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
=KNEXT-XDI1
DESIGNATION
DEVICE
E E
1
8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1 =ANEXT-XDI2 BK
-XDX 323 Q01/1C
BK
Name
21.5.2014 ABRLE
2
2 =ANEXT-XDI2 BK
-XDX 254 Q01/2C
BK
Based on
3
3 =ANEXT-XDI2 BK
-KFA2 A1 Q01/3C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5 =ANEXT-XDI2 BK
-KFA3 A1 Q01/4C
BK
6
6 =ANEXT-XDI2 BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7 =ANEXT-XDI2 BK
-KFA4 A1 Q01/5C
BK
9
9 =ANEXT-XDI2 BK
-KFA5 A1 Q01/6C
BK
3
3
10
10 =ANEXT-XDI2 BK
-KFA5 A2 Q01/6C
BK
11
11 =ANEXT-XDI2 BK
-KFA6 A1 Q02/3C
BK
12
Project name
13
13 =ANEXT-XDI2 BK
-KFA7 A1 Q02/4C
Prepared HORNAK
BK
Checked HAVELKA
14
14 =ANEXT-XDI2 BK
-KFA7 A2 Q02/4C
BK
4
4
15
15 =ANEXT-XDI2 BK
-KFA8 A1 Q02/5C
BK
Date
16
16 =ANEXT-XDI2 BK
-KFA8 A2 Q02/5C
BK
13.8kV SWITCHGEAR
17
Approved BRAUN
18
18 =ANEXT-XDI2 BK
-KFA9 A2 Q02/6C
BK
10.3.2014
19
19 =ANEXT-XDI2 BK
-KFA10 A1 Q02/7C
BK
5
5
20
20 =ANEXT-XDI2 BK
-KFA10 A2 Q02/7C
BK
Title
21
328 -XDX BK
Q03/2B
22
=KNEXT-XDI2 21 Q03/3B
BK
23
329 -XDX BK
Q03/3B
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Station Transformer 1
7
7
1000032473
1VL8458353
+ LV
8
8
= 00BBA01.01
Page
Pages 37
X09
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
55 PCS
14 +LVD-SFC1 +PLG-QAB1-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB1-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB1-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB1-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB1-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB1-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
+PLG-QAB1-XB 52 M07/5A
233
BK
6
6
BK
Station Transformer 1
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB1-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458353
2 -XDX1 M07/3F
252
BK
+ LV
BK BK
8
8
2 -XDI2 M07/7F
254
BK
= 00BBA01.01
Page
Pages
BK;BK BK
+PLG-QAB1-XB 11 M09/3A
302
BK
37
X10
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVD-SFT1 13 M09/7A
303
BK
Name
21.5.2014 ABRLE
M09/8A
304
Based on
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M09/7F
313
M09/8F
314
55 PCS
22 +PLG-QAB1-XB +LVD-PFX2 R M09/3D
315
BK BK
317
BK BK
3
3
TERMINAL UT 4 3044102
321
BK BK
+LCB-BGC2 28 Q01/3D
322
BK
BK BK
Project name
29 +LCB-BGC2 Q01/3E
324
BK
Prepared HORNAK
Checked HAVELKA
21 -XDI2 -KFA11 23 Q03/2C
328
BK BK
4
4
BK BK
Date
24 -XDI2 -KFA11 24 Q03/2D
330
BK BK
13.8kV SWITCHGEAR
+LCB-BGC2 21 Q03/3D
Approved BRAUN
21 +PLG-QAB1-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
10.3.2014
5
5
Title
6
6
Station Transformer 1
7
7
1000032473
1VL8458353
+ LV
8
8
= 00BBA01.01
Page
Pages 37
X11
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE1-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE1-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE1-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE1-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE1-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE1-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
20 PCS
XE17
17
46 +ES-QCE1-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE1-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE1-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE1-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE1-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE1-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE1-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE1-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE1-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE1-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE1-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE1-BGE3 BK
+LV-XDC 352 +LVQ10/3C
BK
5
5
XE30
30
29 +ES-QCE1-BGE3 BK
+LV-XDC 351 +LVQ10/3D
BK
Title
6
6
Station Transformer 1
7
7
1000032473
1VL8458353
+ LV
8
8
= 00BBA01.01
Page
Pages 37
X12
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X13
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
L1
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.01+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X14
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 3 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 7 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
CB IN TEST POSITION
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.01
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458353 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
-QAB3
VD4/P 17.12.32 P150
17.5 kV
M 1250 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P2
SGB12 -BCT4,-BCT5,-BCT6
C TPU 50.23 C
700/1/1 A at 40°C
Core 2: 5P20, 15 VA VALID FOR PANELS:
Core 1: 0.5Fs5, 10 VA
3 P1 POS. DESIGN. NAME
-BAT1,-BAT2,-BAT3 2 00BBA01.02 Alternator 1
TJC5
13.8/√3//0.11/√3//0.11/3 kV
ISSUED BY:
0.5, 15VA
-FA11
3P, 50 VA
-FA21
-FA31
MWD16 -QCE2
D EK6 D
Earthing balls
4x d=25mm
-BCN1
KOLA 06 D2
Under cubicle
(accessory)
60/1 A
E G cl. 3 1,2 VA E
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB3
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
CON- SIG-
E M06/1F -XB 35 M09/1F
E
M01/1D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q01/3D
M07/7C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/3C
Q11/6C
Q11/7C
X03/4C
X03/4C
X03/6C
X03/8C
X03/5C
X03/7C
X03/5C
X03/6C
+PLG
-QAB3
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/4D
X03/4D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/3D
X03/6D
X03/8D
X03/5D
M06/6E
M07/2E
M07/4E
X03/7D
Q01/3E
M09/3B
M09/3B
Q11/6D
Q11/7D
M09/4B
M09/4B
M07/7C
M07/7C
X03/5D
M06/3C
X03/6D
D D
+LCB 20 22 24 26 28
M07/6C
Q03/3C
Q01/4E
X03/1C
X03/1C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE2
EK6
M07/6D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/5C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 Q01/2D 11 B
5-6 12 14
7-8
-KFA3
MAN CONTORL
MAN CONTORL
9 - 10 Q01/4D 11
ALTERNATOR CB
-XDX 217
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL ALTERNATOR CB
-KFA4 M01/8B ON COMMAND -XDX 218
OPEN/TRIP LOOP
Q01/5D 11 01BAC01GS003-YB01
+PLG -XB 57 01BAC01GS003-YB32
12 14
-QAB3
-KFA5
czpebdz 25.6.2014
-KFA9
Q02/6D 11
13
-XDX 215 -XDX 216 -KFA10
D Q02/7D 14 D
13
+LVD
-SFC1
14
MP1-11C
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
-XDC 17
+LVD-SFS1
M06/2A 6
MAN CONTORL
MAN CONTORL
B B
SYSTEM
SYSTEM
ALTERNATOR CB
13 TRIPPING COIL EARTHING
+LVD OFF COMMAND SWITCH RELEASE
-SFO1 01BAC01GS003-YB02 01BAC01GS008-YB15
XDX:321
14 Q01/3C
KTC4-9004
M01/7B
-XDC 12 +PLG -XB 52
-XDC 18
czpebdz 25.6.2014
-QAB3
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C -XDX 241 -XDX 242 24 24 C
26 33 -XB 53 54
+LCB
-KFA11 M01/7D M01/7D
-BGC2 M07/7E
27 34
-XDX 239 -XDX 240 M01/2F
ISSUED BY:
XE31
M06/5E 21
1K2
4K7
22K
5K6
U -BB2
M07/6D
14 5
BY500-1000 +ES-QCE2
5A 22 G
1000V
E F G H M02/4B -RLE3 -XDX1
-MO1
2 -XB 33 H M07/3D Q01/3C
M01/5D XDI2:4
XE32
-XB 30 6
M01/5D
A1 A1
+LVR-XE 32 -KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/4C 13 14 Q11/4C
23 24 Q03/3C 23 24
33 34 M07/6C 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
XE17 -QAB3
B B
+ES-QCE2 13 21 13 13
26 46
-BB3 -BB3 -BT2 -BT1
-BGE3 -BGE2
M02/6C M02/6B 14 22 14 14
27 47
XE28
XE18
-XB 22 21 50 51
M01/6D M01/6D M01/7D M01/7D
+LVR-XE 28 +LVR-XE 18
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
XDI2:4 M07/8E
XDX:321 M07/8B
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14
11 M06/2C 11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 12
23 24
24 24 24 24
21 21 21 21 33 34
E 22 22 22 22 43 44 E
34 34 34 34
31 31 31 31
32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/7E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 13 C
-FCM11.4
XE29
XE19
S12/1C 14
+ES-QCE2
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14 13
-FCM14.1
XE30
XE20
ISSUED BY:
S10/6D 14
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
STATION
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS TRANSFORMER CB CLOSED CB CLOSED
POSITION POSITION CB REMOTE
COMMAND MODE
01BAC01GS003-XB01 01BAC01GS003-XB02 01BAC01GS003-XB41 01BAC01GS003-XB40 01BAC01GS003-XB43 01BAC01GS003-XB01 01BAC01GS003-XB01
B B
czpebdz 25.6.2014
15 38 19 42
M01/3D M01/3D M01/6D M01/6D
D D
-XDC 371 372 373 374 375 376 377 378 379 340 341 342 343
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+CT
P2 P2 P2
2S2
B TPU 50.23 -BCT4 B
700/1A 2S1
Core 2: 5P20, 15VA
-XDA 11
4 BK
-XDA 14
czpebdz 25.6.2014
4 BK
2S2
-BCT5
C 2S1 C
MAN
-XDA 13
4 BK CONTROL
SYSTEM
(CCP)
-XDA 16
4 BK
ISSUED BY:
2S2
-BCT6
2S1
D D
-XDA 15
4 BK
-XE
-XDA 17
1002 2,5 GNYE
E E
PROTECTION
CT´s MV PANEL
01BAC01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+LVD
-PGA1
-XDA 2 -XDA 18
4 BK 4 BK A
1S2 FB96-1
B TPU 50.23 -BCT4 700/1A B
700/1A 1S1 0-700/1400A
Core 1: 0.5Fs5, 10VA
-XDA 1 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 4 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S2 FB96-1
-BCT5 700/1A
C 1S1 0-700/1400A C
MAN
-XDA 3 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 6 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S2 FB96-1
-BCT6 700/1A
1S1 0-700/1400A
D D
-XDA 5 -XDA 23
4 BK 4 BK CURRENT
MEASURING MV
-XE PANEL
-XDA 7
1001 2,5 GNYE
01BAC01CE003A/B/C
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P1 P1 P1
L1 L2 L3 N
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
+CAB-BCN1
D KOLA 06 D260/1 A P2 S2 D
cl. 3 1,2 VA
S1
+CAB-BCN2
E KOLA 06 D2 S2 E
60/1 A
cl. 3 1,2 VA
GROUND FAULT
CURRENT
01BAC01CE021
01BAU01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
+VT A PE A PE A PE
N N N
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C C
-XDV 31
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
ISSUED BY:
1 13 21
-FCM14.1
S201-Z4 2 14 22
D D
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 1 2 3 4 5 6 -XDV 32 33 38 39 40
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
L1
E S12/4B L2
E
S12/4B L3
S12/4B
N
S12/2D 01BAC01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3E L1
S10/3E L2
S10/3E L3
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM11.4 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 8 9 10 11 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
01BAC01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.02+LV-00BBA01.02@PLD
=00BBA01.02+LV =00BBA01.02
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA3
-KFA4
-KFA5
-KFA6
-KFA7
-KFA8
-KFA9
-KFA4 PANEL 4 OFF
-FCM11.1
-FCM11.4
-KFA5 PANEL 5 OFF
-FCM2.1
-FCM3.1
-FCM4.1
-XDX1
+LVR-XE
-KFA6 PANEL 6 OFF
czpebdz 25.6.2014
-FCM14.1
-KFA7 PANEL 7 OFF
-XDX
-KFA11 CB IN TEST POSITION
-XDI1 -XDI2
-XDX1 DIODES
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.02+LVD-00BBA01.02@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.02+LVD
A A
DEVICE TAG TEXT
-PFX1 E/S OPEN / CLOSED
+TOP1
-PFX2 CB OPEN / CLOSED
-RAA1
-SFC1 CB CLOSE
-SFO1 CB OPEN
-PGA1 -PGA2 -PGA3
-PGA1 L1
-PGA2 L2
czpebdz 25.6.2014
705 mm
-PGA3 L3
-PGV1 VOLTMETER
C -PGV1
-PFX3 C
-PFV1 -PFV1 VOLTAGE INDICATOR
-SFO1 -PFX2 -SFC1
=00BBA01.02+TOP1
DEVICE TAG TEXT
-PFX1
-SFV1 -SFS1 -SFT1 -RAA1 ANTIFERORESONANCE DEVICE
ISSUED BY:
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C C
+ES-QCE2
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT SPARE SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445
B B
czpebdz 25.6.2014
1 34
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/6C 14 S12/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
19 -XDA BK
+CT-BCT4 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
+LVD-PGA1 BK
+CT-BCT4 1S2 S02/4B
BK
Based on
3
21 -XDA BK
+CT-BCT5 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
23 -XDA BK
+CT-BCT6 1S1 S02/4D
BK
6
+LVD-PGA3 BK
+CT-BCT6 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4D
GNYE
12
+CT-BCT4 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/6B
BK
Date
19
-XDA 1 S02/6B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/6C
Approved BRAUN
21
-XDA 3 S02/6C
BK
10.3.2014
22
+LVD-PGA3 S02/6D
BK
5
5
23
-XDA 5 S02/6D
BK
Title
6
6
Alternator 1
7
7
1000032473
1VL8458354
+ LV
8
8
= 00BBA01.02
Page
Pages 42
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
77 PCS
17
-XDX 233 M07/6B
BK
+PLG-QAB3-XB 19 Q11/6D
340 BK
3
3
+PLG-QAB3-XB 9 Q11/7D
TERMINAL UT 4 3044102
341
BK
+PLG-QAB3-XB 42 Q11/7D
342
BK
+PLG-QAB3-XB 32 Q11/8D
343
BK
Project name
+LVR-XE 30 Q10/2D
351
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 29 Q10/3D
352
BK
4
4
+LVR-XE 20 Q10/4D
353
BK
Date
+LVR-XE 19 Q10/4D
354
BK
13.8kV SWITCHGEAR
-FCM2.1 14 Q10/5D
BK
Approved BRAUN
-FCM2.1 13 Q10/6D
356
BK
10.3.2014
-FCM14.1 14 Q10/6D
357
BK
5
5
-FCM11.4 13 Q10/7D
358
BK
Title
+PLG-QAB3-XB 15 Q11/2D
371
BK
+PLG-QAB3-XB 5 Q11/2D
372
BK
+PLG-QAB3-XB 38 Q11/3D
373
BK
+PLG-QAB3-XB 28 Q11/3D
374
BK
6
6
Alternator 1
-KFA11 14 Q11/4D
375
BK
-KFA12 14 Q11/4D
376
BK
ABB s.r.o., PPMV Brno
-KFA11 13 Q11/5D
377
BK
+LVD-SFS1 12 Q11/5D
378
BK
+LVD-SFS1 11 Q11/6D
379
BK
Doc. No.
Order No.
7
7
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
1000032473
+LVR-XE 13 X02/3B
403
BK
1VL8458354
+LVR-XE 14 X02/3E
404
BK
+ LV
+LVR-XE 15 X02/4B
405
BK
8
8
+LVR-XE 16 X02/4E
406
BK
= 00BBA01.02
Page
Pages
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
42
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVR-XE 23 X02/6B
409
BK
Name
21.5.2014 ABRLE
+LVR-XE 24 X02/6E
410
BK
Based on
+LVR-XE 25 X02/7B
411
BK
412
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 22 X03/1B
421
BK
+LCB-BGC2 23 X03/1E
422
BK
77 PCS
+LCB-BGC2 24 X03/1B
423
BK
424
BK
X03/2B
425
3
3
X03/2E
TERMINAL UT 4 3044102
426
X03/2B
427
X03/2E
428
Project name
X03/3B
429
Prepared HORNAK
Checked HAVELKA
X03/3E
430
4
4
+PLG-QAB3-XB 24 X03/4B
431
BK
Date
+PLG-QAB3-XB 34 X03/4E
432
BK
13.8kV SWITCHGEAR
+PLG-QAB3-XB 26 X03/4B
BK
Approved BRAUN
+PLG-QAB3-XB 36 X03/4E
434
BK
10.3.2014
+PLG-QAB3-XB 27 X03/5B
435
BK
5
5
+PLG-QAB3-XB 37 X03/5E
436
BK
Title
+PLG-QAB3-XB 6 X03/5B
437
BK
+PLG-QAB3-XB 16 X03/5E
438
BK
+PLG-QAB3-XB 55 X03/6B
439
BK
+PLG-QAB3-XB 56 X03/6E
440
BK
6
6
Alternator 1
+PLG-QAB3-XB 7 X03/6B
441
BK
+PLG-QAB3-XB 17 X03/6E
442
BK
ABB s.r.o., PPMV Brno
+PLG-QAB3-XB 8 X03/7B
443
BK
+PLG-QAB3-XB 18 X03/7E
444
BK
+PLG-QAB3-XB 3 X03/8B
445
BK
Doc. No.
Order No.
7
7
+PLG-QAB3-XB 13 X03/8E
446
BK
-FCM3.1 13 X04/1B
501
BK
1000032473
-FCM3.1 14 X04/1E
502
BK
1VL8458354
-FCM4.1 13 X04/1B
503
BK
+ LV
-FCM4.1 14 X04/1E
504
BK
8
8
-FCM11.1 13 X04/2B
505
BK
= 00BBA01.02
Page
Pages
-FCM11.1 14 X04/2E
506
BK
X04/2B
507
42
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/3B
X04/2E
X04/3E
DEVICE
PIN
DESIGNATION
B B
DEVICE
POTENTIAL/
COLOR
czpebdz 25.6.2014
C C
508 509 510
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-XDX 323 Q01/2C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/4C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/5C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Alternator 1
7
7
1000032473
1VL8458354
+ LV
8
8
= 00BBA01.02
Page
Pages 42
X10
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S12/1D
S12/1D
S12/1D
S12/2D
S10/6D
S10/6D
S10/7D
S10/7D
S10/7D
S10/6C
DEVICE
1015
1017
PIN
dn
da
n
2
a
a
DESIGNATION
B B
DEVICE
+TOP1-RAA1
+VT-BAT1
+VT-BAT2
+VT-BAT3
+VT-BAT3
+VT-BAT1
+VT-BAT3
-FCM11.4
-FCM11.4
-FCM11.4
-FCM14.1
-XDV
-XG
-XG
POTENTIAL/
COLOR
czpebdz 25.6.2014
GNYE
GNYE
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 8 9 10 11 31 32 33 38 39 40
TERMINALS
-XDV
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
COLOR
-FCM11.1
-FCM11.1
-FCM11.1
-XDV
-FCM14.1
DESIGNATION
DEVICE
E E
1
11
1
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
59 PCS
14 +LVD-SFC1 +PLG-QAB3-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB3-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB3-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB3-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB3-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB3-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
17 -XDC M07/5A
233
BK
6
6
Alternator 1
BK BK
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB3-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458354
-KFA11 33 M07/6C
242
BK
+ LV
BK BK
8
8
BK BK
= 00BBA01.02
Page
Pages
BK BK;BK
BK BK
42
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
4 -XDI2 M07/8F
254
BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LVD-SFT1 13 M09/7A
303
BK
M09/8A
304
59 PCS
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
M09/7F
313
3
3
M09/8F
TERMINAL UT 4 3044102
314
BK BK
BK BK
Project name
51 +PLG-QAB3-XB +LVD-PFX3 G M09/4D
318
BK
Prepared HORNAK
BK
Checked HAVELKA
234 -XDX +PLG-QAB3-XB 29 Q01/3D
321
BK BK
4
4
+LCB-BGC2 28 Q01/4D
322
BK
Date
39 +PLG-QAB3-XB -XDI2 3 Q01/3E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q01/4E
BK
Approved BRAUN
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB3-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
6
6
Alternator 1
7
7
1000032473
1VL8458354
+ LV
8
8
= 00BBA01.02
Page
Pages 42
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE2-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE2-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE2-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE2-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE2-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE2-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE2-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE2-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE2-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE2-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE2-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE2-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE2-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE2-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE2-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE2-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE2-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE2-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE2-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE2-RLE3 BK
+LV-XDX 243 +LVM07/6D
BK
XE32
32
H +ES-QCE2-RLE3 BK
+LV-XDX 252 +LVM07/6E
BK
6
6
Alternator 1
7
7
1000032473
1VL8458354
+ LV
8
8
= 00BBA01.02
Page
Pages 42
X14
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.02+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 3 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 6 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
BB ES OPEN
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.02
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 1 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458354 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
-QAB3
VD4/P 17.12.32 P150
17.5 kV
M 1250 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P2
SGB12 -BCT4,-BCT5,-BCT6
C TPU 50.23 C
700/1/1 A at 40°C
Core 2: 5P20, 15 VA VALID FOR PANELS:
Core 1: 0.5Fs5, 10 VA
3 P1 POS. DESIGN. NAME
-BAT1,-BAT2,-BAT3 3 00BBA01.03 Alternator 2
TJC5
13.8/√3//0.11/√3//0.11/3 kV
ISSUED BY:
0.5, 15 VA
-FA11
3P, 50 VA
-FA21
-FA31
MWD16 -QCE2
D EK6 D
Earthing balls
4x d=25mm
-BCN1
KOLA 06 D2
Under cubicle
(accessory)
60/1 A
E G cl. 3 1,2 VA E
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB3
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
CON- SIG-
E M06/1F -XB 35 M09/1F
E
M01/1D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q01/4D
M07/7C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/3C
Q11/6C
Q11/7C
X03/4C
X03/4C
X03/6C
X03/8C
X03/5C
X03/7C
X03/5C
X03/6C
+PLG
-QAB3
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/4D
X03/4D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/3D
X03/6D
X03/8D
X03/5D
M06/6E
M07/2E
M07/4E
X03/7D
Q01/4E
M09/3B
M09/3B
Q11/6D
Q11/7D
M09/4B
M09/4B
M07/7C
M07/7C
X03/5D
M06/3C
X03/6D
D D
+LCB 20 22 24 26 28
M07/6C
Q03/3C
Q01/4E
X03/1C
X03/1C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE2
EK6
M07/6D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/5C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 Q01/2D 11 B
5-6 12 14
7-8
-KFA2
MAN CONTORL
MAN CONTORL
9 - 10 Q01/2D 11
ALTERNATOR CB
-XDX 217
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL ALTERNATOR CB
-KFA4 M01/8B ON COMMAND -XDX 218
OPEN/TRIP LOOP
Q01/5D 11 02BAC01GS003-YB01
+PLG -XB 57 02BAC01GS003-YB32
12 14
-QAB3
-KFA5
czpebdz 25.6.2014
-KFA9
Q02/6D 11
13
-XDX 215 -XDX 216 -KFA10
D Q02/7D 14 D
13
+LVD
-SFC1
14
MP1-11C
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
-XDC 17
+LVD-SFS1
M06/2A 6
MAN CONTORL
MAN CONTORL
B B
SYSTEM
SYSTEM
ALTERNATOR CB
13 TRIPPING COIL EARTHING
+LVD OFF COMMAND SWITCH RELEASE
-SFO1 02BAC01GS003-YB02 02BAC01GS008-YB15
XDX:321
14 Q01/4C
KTC4-9004
M01/7B
-XDC 12 +PLG -XB 52
-XDC 18
czpebdz 25.6.2014
-QAB3
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C -XDX 241 -XDX 242 24 24 C
26 33 -XB 53 54
+LCB
-KFA11 M01/7D M01/7D
-BGC2 M07/7E
27 34
-XDX 239 -XDX 240 M01/2F
ISSUED BY:
XE31
M06/5E 21
1K2
4K7
22K
5K6
U -BB2
M07/6D
14 5
BY500-1000 +ES-QCE2
5A 22 G
1000V
E F G H M02/4B -RLE3 -XDX1
-MO1
2 -XB 33 H M07/3D Q01/4C
M01/5D XDI2:6
XE32
-XB 30 6
M01/5D
A1 A1
+LVR-XE 32 -KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/4C 13 14 Q11/4C
23 24 Q03/3C 23 24
33 34 M07/6C 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
XE17 -QAB3
B B
+ES-QCE2 13 21 13 13
26 46
-BB3 -BB3 -BT2 -BT1
-BGE3 -BGE2
M02/6C M02/6B 14 22 14 14
27 47
XE28
XE18
-XB 22 21 50 51
M01/6D M01/6D M01/7D M01/7D
+LVR-XE 28 +LVR-XE 18
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
XDI2:6 M07/8E
XDX:321 M07/8B
ISSUED BY:
M01/5B
-KFA1 -KFA2 +PLG -KFA4 -KFA5
700-HA33Z1-3 A1 700-HA33Z1-3 A1 -XB 29
700-HA33Z1-3 A1 700-HA33Z1-3 A1
DC110V DC110V
-QAB3 DC110V DC110V
A2 A2 41 33 28 A2 A2
-BB2 +LCB
-BGC2
42 -BT2 34 29
14 14 M01/2F 14 14
11 M06/2B 11 M06/2B 11 M06/2B 11 M06/2C
12 12 12 12
24 24 -XB 39 24 24
21 21 M01/5D 21 21
E 22 22 22 22 E
34 34 34 34
31 31 31 31
32 32 -XDX 323 -XDX 324 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14
11 M06/2C 11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 12
23 24
24 24 24 24
21 21 21 21 33 34
E 22 22 22 22 43 44 E
34 34 34 34
31 31 31 31
32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/7E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 13 C
-FCM11.4
XE29
XE19
S12/1C 14
+ES-QCE2
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14 13
-FCM14.1
XE30
XE20
ISSUED BY:
S10/6D 14
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
STATION
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS TRANSFORMER CB CLOSED CB CLOSED
POSITION POSITION CB REMOTE
COMMAND MODE
02BAC01GS003-XB01 02BAC01GS003-XB02 02BAC01GS003-XB41 02BAC01GS003-XB40 02BAC01GS003-XB43 02BAC01GS003-XB01 02BAC01GS003-XB01
B B
czpebdz 25.6.2014
15 38 19 42
M01/3D M01/3D M01/6D M01/6D
D D
-XDC 371 372 373 374 375 376 377 378 379 340 341 342 343
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+CT
P2 P2 P2
2S2
B TPU 50.23 -BCT4 B
700/1A 2S1
Core 2: 5P20, 15VA
-XDA 11
4 BK
-XDA 14
czpebdz 25.6.2014
4 BK
2S2
-BCT5
C 2S1 C
MAN
-XDA 13
4 BK CONTROL
SYSTEM
(CCP)
-XDA 16
4 BK
ISSUED BY:
2S2
-BCT6
2S1
D D
-XDA 15
4 BK
-XE
-XDA 17
1002 2,5 GNYE
E E
PROTECTION
CT´s MV PANEL
02BAC01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+LVD
-PGA1
-XDA 2 -XDA 18
4 BK 4 BK A
1S2 FB96-1
B TPU 50.23 -BCT4 700/1A B
700/1A 1S1 0-700/1400A
Core 1: 0.5Fs5, 10VA
-XDA 1 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 4 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S2 FB96-1
-BCT5 700/1A
C 1S1 0-700/1400A C
MAN
-XDA 3 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 6 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S2 FB96-1
-BCT6 700/1A
1S1 0-700/1400A
D D
-XDA 5 -XDA 23
4 BK 4 BK CURRENT
MEASURING MV
-XE PANEL
-XDA 7
1001 2,5 GNYE
02BAC01CE003A/B/C
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P1 P1 P1
L1 L2 L3 N
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
+CAB-BCN1
D KOLA 06 D260/1 A P2 S2 D
cl. 3 1,2 VA
S1
+CAB-BCN2
E KOLA 06 D2 S2 E
60/1 A
cl. 3 1,2 VA
GROUND FAULT
CURRENT
02BAC01CE021
02BAU01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
+VT A PE A PE A PE
N N N
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C C
-XDV 31
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
ISSUED BY:
1 13 21
-FCM14.1
S201-Z4 2 14 22
D D
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 1 2 3 4 5 6 -XDV 32 33 38 39 40
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
L1
E S12/4B L2
E
S12/4B L3
S12/4B
N
S12/2D 02BAC01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3E L1
S10/3E L2
S10/3E L3
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM11.4 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 8 9 10 11 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
02BAC01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.03+LV-00BBA01.03@PLD
=00BBA01.03+LV =00BBA01.03
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA4
-KFA5
-KFA6
-KFA7
-KFA8
-KFA9
-KFA4 PANEL 4 OFF
-FCM11.1
-FCM11.4
-KFA5 PANEL 5 OFF
-FCM2.1
-FCM3.1
-FCM4.1
-XDX1
+LVR-XE
-KFA6 PANEL 6 OFF
czpebdz 25.6.2014
-FCM14.1
-KFA7 PANEL 7 OFF
-KFA10 BB ES OPEN
-XDX
-KFA11 CB IN TEST POSITION
-XDI1 -XDI2
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.03+LVD-00BBA01.03@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.03+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
+TOP1
-PFX1 E/S OPEN / CLOSED
-RAA1
-PFX2 CB OPEN / CLOSED
-PGA1 L1
00BBA01.03
B -PGA2 L2 B
-PGA3 L3
-PGV1 VOLTMETER
-PGA1 -PGA2 -PGA3
-SFC1 CB CLOSE
-SFO1 CB OPEN
czpebdz 25.6.2014
705 mm
-SFS1 LOCAL - REMOTE SWITCH
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C C
+ES-QCE2
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT SPARE SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445
B B
czpebdz 25.6.2014
1 34
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/6C 14 S12/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
19 -XDA BK
+CT-BCT4 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
+LVD-PGA1 BK
+CT-BCT4 1S2 S02/4B
BK
Based on
3
21 -XDA BK
+CT-BCT5 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
23 -XDA BK
+CT-BCT6 1S1 S02/4D
BK
6
+LVD-PGA3 BK
+CT-BCT6 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4D
GNYE
12
+CT-BCT4 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/6B
BK
Date
19
-XDA 1 S02/6B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/6C
Approved BRAUN
21
-XDA 3 S02/6C
BK
10.3.2014
22
+LVD-PGA3 S02/6D
BK
5
5
23
-XDA 5 S02/6D
BK
Title
6
6
Alternator 2
7
7
1000032473
1VL8458355
+ LV
8
8
= 00BBA01.03
Page
Pages 42
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
77 PCS
17
-XDX 233 M07/6B
BK
+PLG-QAB3-XB 19 Q11/6D
340 BK
3
3
+PLG-QAB3-XB 9 Q11/7D
TERMINAL UT 4 3044102
341
BK
+PLG-QAB3-XB 42 Q11/7D
342
BK
+PLG-QAB3-XB 32 Q11/8D
343
BK
Project name
+LVR-XE 30 Q10/2D
351
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 29 Q10/3D
352
BK
4
4
+LVR-XE 20 Q10/4D
353
BK
Date
+LVR-XE 19 Q10/4D
354
BK
13.8kV SWITCHGEAR
-FCM2.1 14 Q10/5D
BK
Approved BRAUN
-FCM2.1 13 Q10/6D
356
BK
10.3.2014
-FCM14.1 14 Q10/6D
357
BK
5
5
-FCM11.4 13 Q10/7D
358
BK
Title
+PLG-QAB3-XB 15 Q11/2D
371
BK
+PLG-QAB3-XB 5 Q11/2D
372
BK
+PLG-QAB3-XB 38 Q11/3D
373
BK
+PLG-QAB3-XB 28 Q11/3D
374
BK
6
6
Alternator 2
-KFA11 14 Q11/4D
375
BK
-KFA12 14 Q11/4D
376
BK
ABB s.r.o., PPMV Brno
-KFA11 13 Q11/5D
377
BK
+LVD-SFS1 12 Q11/5D
378
BK
+LVD-SFS1 11 Q11/6D
379
BK
Doc. No.
Order No.
7
7
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
1000032473
+LVR-XE 13 X02/3B
403
BK
1VL8458355
+LVR-XE 14 X02/3E
404
BK
+ LV
+LVR-XE 15 X02/4B
405
BK
8
8
+LVR-XE 16 X02/4E
406
BK
= 00BBA01.03
Page
Pages
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
42
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVR-XE 23 X02/6B
409
BK
Name
21.5.2014 ABRLE
+LVR-XE 24 X02/6E
410
BK
Based on
+LVR-XE 25 X02/7B
411
BK
412
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 22 X03/1B
421
BK
+LCB-BGC2 23 X03/1E
422
BK
77 PCS
+LCB-BGC2 24 X03/1B
423
BK
424
BK
X03/2B
425
3
3
X03/2E
TERMINAL UT 4 3044102
426
X03/2B
427
X03/2E
428
Project name
X03/3B
429
Prepared HORNAK
Checked HAVELKA
X03/3E
430
4
4
+PLG-QAB3-XB 24 X03/4B
431
BK
Date
+PLG-QAB3-XB 34 X03/4E
432
BK
13.8kV SWITCHGEAR
+PLG-QAB3-XB 26 X03/4B
BK
Approved BRAUN
+PLG-QAB3-XB 36 X03/4E
434
BK
10.3.2014
+PLG-QAB3-XB 27 X03/5B
435
BK
5
5
+PLG-QAB3-XB 37 X03/5E
436
BK
Title
+PLG-QAB3-XB 6 X03/5B
437
BK
+PLG-QAB3-XB 16 X03/5E
438
BK
+PLG-QAB3-XB 55 X03/6B
439
BK
+PLG-QAB3-XB 56 X03/6E
440
BK
6
6
Alternator 2
+PLG-QAB3-XB 7 X03/6B
441
BK
+PLG-QAB3-XB 17 X03/6E
442
BK
ABB s.r.o., PPMV Brno
+PLG-QAB3-XB 8 X03/7B
443
BK
+PLG-QAB3-XB 18 X03/7E
444
BK
+PLG-QAB3-XB 3 X03/8B
445
BK
Doc. No.
Order No.
7
7
+PLG-QAB3-XB 13 X03/8E
446
BK
-FCM3.1 13 X04/1B
501
BK
1000032473
-FCM3.1 14 X04/1E
502
BK
1VL8458355
-FCM4.1 13 X04/1B
503
BK
+ LV
-FCM4.1 14 X04/1E
504
BK
8
8
-FCM11.1 13 X04/2B
505
BK
= 00BBA01.03
Page
Pages
-FCM11.1 14 X04/2E
506
BK
X04/2B
507
42
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/3B
X04/2E
X04/3E
DEVICE
PIN
DESIGNATION
B B
DEVICE
POTENTIAL/
COLOR
czpebdz 25.6.2014
C C
508 509 510
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/2C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-XDX 323 Q01/3C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-XDX 254 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/5C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Alternator 2
7
7
1000032473
1VL8458355
+ LV
8
8
= 00BBA01.03
Page
Pages 42
X10
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S12/1D
S12/1D
S12/1D
S12/2D
S10/6D
S10/6D
S10/7D
S10/7D
S10/7D
S10/6C
DEVICE
1015
1017
PIN
dn
da
n
2
a
a
DESIGNATION
B B
DEVICE
+TOP1-RAA1
+VT-BAT1
+VT-BAT2
+VT-BAT3
+VT-BAT3
+VT-BAT1
+VT-BAT3
-FCM11.4
-FCM11.4
-FCM11.4
-FCM14.1
-XDV
-XG
-XG
POTENTIAL/
COLOR
czpebdz 25.6.2014
GNYE
GNYE
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 8 9 10 11 31 32 33 38 39 40
TERMINALS
-XDV
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
COLOR
-FCM11.1
-FCM11.1
-FCM11.1
-XDV
-FCM14.1
DESIGNATION
DEVICE
E E
1
11
1
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
59 PCS
14 +LVD-SFC1 +PLG-QAB3-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB3-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB3-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB3-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB3-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB3-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
17 -XDC M07/5A
233
BK
6
6
Alternator 2
BK BK
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB3-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458355
-KFA11 33 M07/6C
242
BK
+ LV
BK BK
8
8
BK BK
= 00BBA01.03
Page
Pages
BK BK;BK
BK BK
42
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
6 -XDI2 M07/8F
254
BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LVD-SFT1 13 M09/7A
303
BK
M09/8A
304
59 PCS
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
M09/7F
313
3
3
M09/8F
TERMINAL UT 4 3044102
314
BK BK
BK BK
Project name
51 +PLG-QAB3-XB +LVD-PFX3 G M09/4D
318
BK
Prepared HORNAK
BK
Checked HAVELKA
234 -XDX +PLG-QAB3-XB 29 Q01/4D
321
BK BK
4
4
+LCB-BGC2 28 Q01/4D
322
BK
Date
39 +PLG-QAB3-XB -XDI2 5 Q01/4E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q01/4E
BK
Approved BRAUN
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB3-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
6
6
Alternator 2
7
7
1000032473
1VL8458355
+ LV
8
8
= 00BBA01.03
Page
Pages 42
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE2-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE2-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE2-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE2-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE2-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE2-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE2-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE2-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE2-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE2-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE2-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE2-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE2-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE2-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE2-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE2-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE2-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE2-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE2-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE2-RLE3 BK
+LV-XDX 243 +LVM07/6D
BK
XE32
32
H +ES-QCE2-RLE3 BK
+LV-XDX 252 +LVM07/6E
BK
6
6
Alternator 2
7
7
1000032473
1VL8458355
+ LV
8
8
= 00BBA01.03
Page
Pages 42
X14
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.03+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 2 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 6 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
BB ES OPEN
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.03
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458355 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
-BAT7,-BAT8,-BAT9
B Single-pole fixed VT TJC5 B
Up=13,8/V3kV
13.8/√3//0.11/√3//0.11/3 kV
0.5, 15 VA
-QAB2 3P, 50 VA
VD4/Z 17.32.32 P275
17.5 kV
M 3150 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P1
SGB12 -BCT7,-BCT8,-BCT9
C 3200/1/1/1 A at 40°C KOKS A31 C
Core 3: 5P20, 10 VA
Core 2: 0.5Fs5, 10 VA VALID FOR PANELS:
Core 1: 0.2Fs5, 10 VA PTB cert.
POS. DESIGN. NAME
3 P2 4 00BBA01.04 Outgoing Feeder 1
ISSUED BY:
-FA11
-FA21
-FA31
MWD16 -QCE3
D EK6 D
-BAT4,-BAT5,-BAT6
Earthing balls Single-pole fixed VT TJCH5, Up=13,8/V3kV
4x d=25mm 13,8/V3//0.11/√3//0.11/√3//0.11/3 kV
0.2, 15 VA PTB cert.
0.5, 15 VA
3P, 50 VA
3x(1x400 sqmm) N2XSY
3x(1x400 sqmm) N2XSY
3x(1x400 sqmm) N2XSY
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
-XCS 5 6 -XCS 7 8 S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
K1/3 A2/2 K1/3 A2/2
ISSUED BY:
-V01 -V02
DV402-90-12 DV402-90-12
D D
A1/4 K2/1 A1/4 K2/1
M01/1B
+PLG -XB 25
-QAB2
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
-XCS 1 2 -XCS 3 4
CON- SIG-
M06/1F M09/1F
E -XB 35 E
M01/1D
-X _ -X _ -X _ -X _
=EXT =EXT
110V DC 110V DC
POWER POWER
SUPPLY 1 SUPPLY 2
F 00BBA01GS013 00BBA01GS014 F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q01/5D
M07/5C
M06/3C
M09/3B
G01/5D
M06/5E
M06/2E
M06/6E
M06/7E
M06/7E
Q11/2C
Q11/4C
X03/3C
X03/3C
X03/7C
X03/8C
X03/4C
X03/7C
X03/4C
X03/6C
X03/6C
X03/5C
+PLG
-QAB2
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 49 10 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 43 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 44 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 43 53
-BB4
4 14 24 34 44 54
C E C
POSITION
A 1
-RL2 -RL1 -MC -MU -MO1
TEST
-XB 34 36 35 46 20 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/3D
X03/3D
G01/5E
M06/5E
M06/7F
M06/2E
Q11/2D
Q11/4D
X03/7D
X03/8D
X03/4D
M06/6E
M07/2E
M07/4E
X03/7D
Q01/5E
M09/3C
M09/3C
X03/6D
X03/6D
M09/4C
M09/4C
M07/5C
M07/6C
X03/4D
M06/3C
X03/5D
D D
+LCB 20 22 24 26 28
Q03/3C
Q01/5E
X03/1C
X03/1C
X03/2C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE3
EK6
M06/8D
M09/2B
Q10/3C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/4E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/3A
5 6 M07/2B
FS943
7 8 M07/3A -XDC 427
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/7C
12 14
1-2
MAN CONTORL
-KFA1 -XDC 1 -XDC 7 -XDC 9 -XDC 11
B 3-4 B
SYSTEM
Q01/2D 11
5-6 12 14
7-8 EARTHING
-KFA2 SWITCH RELEASE
MAN CONTORL
MAN CONTORL
MAN CONTORL
MAN CONTORL
9 - 10 OUTGOING
Q01/2D 11 FEEDER CB -XDX 217
OUTGOING 00BBA01GS108-YB15
11 - 12
SYSTEM
SYSTEM
SYSTEM
SYSTEM
12 14 CLOSING COIL FEEDER CB
-KFA3 ON COMMAND -XDX 218 OPEN/TRIP LOOP
Q01/3D 11 00BBA01GS103-YB01 00BBA01GS103-YB32
12 14 -XDC 428
-KFA5
czpebdz 25.6.2014
M01/8B
Q01/6D 11 +PLG -XB 57 -XDC 2 -XDC 8 -XDC 10 -XDC 12
12 14
-QAB2
-KFA6
C Q02/3D 11 -BT2
53 C
12 14
-KFA7 54
Q02/4D 11
12 14
-XB 58
-KFA8
M01/8D
Q02/5D 11
12 14
ISSUED BY:
-KFA9 13 23
Q02/6D 11 -KFA10 -KFA10
Q02/7D 14 Q02/7D 24
-XDX 215 -XDX 216
D +LVR-XE 31 D
13
XE31
+LVD
-SFC1
14 +ES-QCE3
MP1-11C
G
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212 -XDX 219 -XDX 220 M02/4B -RLE3
H
XE32
M01/3B M01/2B M01/4B M01/8B M01/8B
+PLG -XB 4 +PLG -XB 45 +PLG -XB 43 +PLG -XB 10 49
-QAB2 -QAB2 -QAB2 -QAB2
43 43 +LVR-XE 32
3 -BT1 -BT2
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 13
5
+LVD-SFS1
M06/2A 6
MAN CONTORL
B OUTGOING
B
SYSTEM
FEEDER CB
13 TRIPPING COIL
+LVD
OFF COMMAND XDX:321
-SFO1
14 00BBA01GS103-YB02 Q01/5C
KTC4-9004
M01/7B
-XDC 14 +PLG -XB 52
czpebdz 25.6.2014
-QAB2
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C 24 24 C
-XB 53 54
M01/7D M01/7D
1K2
4K7
22K
5K6
U -BB2
X01/7E
14
BY500-1000
5A 22
1000V
E F G H
-MO1
2 -XB 33 Q01/5C
M01/5D XDI2:8
-XB 30
M01/5D
A1 A1
-KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/5C 13 14 Q11/5C
23 24 Q03/3C 23 24
33 34 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
+LVR-XE 27 +LVR-XE 17
XE27
XE17 M01/6B
B B
+PLG -XB 11
+ES-QCE3 -QAB2
26 46
-BGE3 -BGE2 13 21 13 13
M02/6C M02/6B -BB3 -BB3 -BT2 -BT1
27 47
14 22 14 14
XE28
XE18
-XB 22 21 50 51
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
XDI2:8 M07/6E
XDX:321 M07/6B
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14
11 M06/2C 11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 12
23 24 M06/7D
24 24 24 24
21 21 21 21 33 34
E 22 22 22 22 43 44 E
34 34 34 34
31 31 31 31
32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/5E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A OUTGOING A
FEEDER 1 MV BUSBAR 1
ES OPEN AND ES CLOSED CONTROL VOLTAGE MEASURING
CRANK NOT VOLTAGE MEASURING VOLTAGE
INSERTED MCB OFF MCB OFF MCB OFF
00BBA01GS108-XB02 00BBA01GS108-XB01 00BBA01GW103-XM84 00BBA01GS103-ZM85 00BBA01CE011-ZM85
B B
13
-FCM12.1
S13/1C 14
czpebdz 25.6.2014
13
+LVR-XE 29 +LVR-XE 19 -FCM12.2
C S11/1C 14 C
XE29
XE19
+ES-QCE3 +ES-QCE3 13
28 48 -FCM14.1
-BGE3 -BGE2
M02/6C M02/6B 13 S10/6D 14
29 49 -FCM2.1
G01/4C 14 13
XE30
XE20
-FCM14.2
ISSUED BY:
S12/7D 14
+LVR-XE 30 +LVR-XE 20
13
-FCM15.1
D S12/2D 14 D
-XDC 351 352 353 354 355 356 357 358 429 430
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
MV OUTGOING
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS FEEDER 1
POSITION POSITION CB REMOTE
COMMAND MODE
00BBA01GS103-XB01 00BBA01GS103-XB02 00BBA01GS103-XB41 00BBA01GS103-XB40 00BBA01GS103-XB43
B B
czpebdz 25.6.2014
M01/3B M01/3B
C +PLG -XB 5 +PLG -XB 28 C
-QAB2 -QAB2
13 31
-BB1 -BB1
11
14 32 13 13 +LVD-SFS1
M06/2A 12
-KFA11 -KFA12
M07/5E 14 M07/6E 14
-XB 15 -XB 38
ISSUED BY:
M01/3D M01/3D
D D
-XDC 371 372 373 374 375 376 377 378 379
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 27
+CT 1003 2,5 GNYE
P1 P1 P1 DO NOT REMOVE THESE JUMPERS
UNTIL EXTERNAL DEVICES IN MAN CONTROL SYSTEM ARE SECURELY CONNECTED
-XDA 21
4 BK
3S1
B CT KOKS 17A31, Ip=3200A, -BCT7 B
3200/1A 3S2
Core 3: 5P20, 10VA
-XDA 22
4 BK
-XDA 23
czpebdz 25.6.2014
4 BK
3S1
-BCT8
C 3S2 C
MAN
-XDA 24
4 BK CONTROL
SYSTEM
(CCP)
-XDA 25
4 BK
ISSUED BY:
3S1
-BCT9
3S2
D D
-XDA 26
4 BK
E E
PROTECTION
CT´s MV PANEL
00BBA01CE051A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 3 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 7
+CT 1002 2,5 GNYE DO NOT REMOVE THESE JUMPERS
UNTIL EXTERNAL DEVICES IN MAN CONTROL SYSTEM ARE SECURELY CONNECTED
+LVD
-PGA1
-XDA 1 -XDA 28
4 BK 4 BK A
2S1 FB96-1
B CT KOKS 17A31, Ip=3200A, -BCT7 3200/1A B
3200/1A 2S2 0-3200/6400A
Core 2: 0,5Fs5, 10VA
-XDA 2 -XDA 29
4 BK 4 BK
+LVD
-PGA2
-XDA 3 -XDA 30
A
czpebdz 25.6.2014
4 BK 4 BK
2S1 FB96-1
-BCT8 3200/1A
C 2S2 0-3200/6400A C
MAN
-XDA 4 -XDA 31
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 5 -XDA 32
4 BK 4 BK A
ISSUED BY:
2S1 FB96-1
-BCT9 3200/1A
2S2 0-3200/6400A
D D
-XDA 6 -XDA 33
4 BK 4 BK
E E
CURRENT
MEASURING MV
PANEL
00BBA01CE053A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
SEALABLE COVER
L1 L2 L3
A = A
+
-XE
-XDA 17
+CT 1001 2,5 GNYE
-XDA 11
4 BK
1S1
B KOKS 17.5A31 -BCT7 B
3200/1A 1S2
Core 1: 0,2Fs5, 10VA
-XDA 12
4 BK
-XDA 13
czpebdz 25.6.2014
4 BK
1S1
-BCT8
C 1S2 C
MAN
-XDA 14
4 BK CONTROL
SYSTEM
(CCP)
-XDA 15
4 BK
ISSUED BY:
1S1
-BCT9
1S2
D D
-XDA 16
4 BK
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P2 P2 P2
L1 L2 L3 N
METERING CT´s
MV PANEL
00BBA01CE052A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
© Copyright 2012 ABB. All rights reserved.
L2
A A
L3
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C -XDV 31 C
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
1 13 21
ISSUED BY:
-FCM14.1
4GNYE
S201-Z4 2 14 22
-XDV
Q10/7C
1 2 3 4 5
2,5BK
2,5BK
D D
-XE
2,5BK
2,5BK
2,5BK
2,5BK
4GNYE
-XDV 32 33 38 39 40
L1.2
S11/4B L2.2
-XG
S11/4B L3.2
S11/4B
N2
S11/2D
E E
00BBA01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name BUSBAR VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3D L1.2
S10/3D L2.2
S10/3D L3.2
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM12.2 -FCM11.2
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/7C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N2 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV2
-XDV 55 56 57 58 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
00BBA01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV2
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name BUSBAR VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
2,5 BK 2,5 BK
2,5 BK
2,5 BK 2,5 BK
czpebdz 25.6.2014
C C
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
-XDV 41
2,5BK
+TOP1-RAA2
1 2
ISSUED BY:
2,5 BK
SEALABLE COVER TR318 27R 500W
1 3 5 13 21
D -FCM15.1 1 13 21 D
S203-Z2 14 22
2 4 6 -FCM14.2
Q10/6D
S201-Z4 2 14 22
2,5BK
2,5BK
2,5BK
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 26 27 28 29 30
-XDV 21 22 23 24 25
4GNYE
-XDV 42 43 48 49 50
SEALABLE COVER
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
-XG
E E
L1.1
S13/4B L2.1
S13/4B L3.1
VOLTAGE S13/4B
MEASURING MV N1
PANEL S13/2D OPEN DELTA
00BBA01CE062A/B/C
MEASURING MV
PANEL
MAN CONTROL SYSTEM 00BBA01CE061D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yyd DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S12/4E L1.1
S12/4E L2.1
S12/5E L3.1
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM12.1 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S12/5E 5-6
N1 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 51 52 53 54 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
VOLTAGE
MEASURING MV
PANEL
2,5BK
00BBA01CE061A/B/C
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S13
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.04+LV-00BBA01.04@PLD
=00BBA01.04+LV =00BBA01.04
© Copyright 2012 ABB. All rights reserved.
-FCM14.1
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA3
-KFA5
-KFA6
-KFA7
-KFA8
-KFA9 -XDX1
-FCM11.2
-FCM12.1
-FCM12.2
-FCM15.1
-FCM3.1 SPRING CHARGER CIRCUIT
-FCM2.1
-FCM3.1
-FCM4.1
+LVR-XE
-V01 -V02
-FCM14.2
-FCM11.2 VT - Y WINDING
-XDC
D -FCM12.1 VT - Y WINDING D
-FCM12.2 VT - Y WINDING
-FCM15.1 VT - Y WINDING
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 1000x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.04+LVD-00BBA01.04@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.04+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
+TOP1
-PFX1 E/S OPEN / CLOSED
-RAA2 -RAA1
-PFX2 CB OPEN / CLOSED
-PGA1 L1
00BBA01.04
B -PGA2 L2 B
-PGA3 L3
-SFC1 CB CLOSE
czpebdz 25.6.2014
705 mm
-SFV2
-SFO1 CB OPEN
=00BBA01.04+TOP1
DEVICE TAG TEXT
D -RAA1 ANTIFERORESONANCE DEVICE D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 1000x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
5
E E
-XDX1
M07/3D
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C +ES-QCE3 +ES-QCE3 C
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
+LVR-XE 12 +LVR-XE 14 +LVR-XE 16 +LVR-XE 22 +LVR-XE 24 +LVR-XE 26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT PLUG OUT CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB CLOSED CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 431 433 435 437 439 441 443 445 447 449
B B
czpebdz 25.6.2014
M01/1B M01/1B M01/4B M01/5B M01/8B M01/6B M01/6B M01/3B M01/5B M01/3B
C +PLG +PLG +PLG +PLG +PLG -XB 55 +PLG +PLG +PLG -XB 7 +PLG +PLG C
-XB 24 -XB 26 -XB 27 -XB 6 -XB 9 -XB 32 -XB 8 -XB 3
-QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2
2 53
-BB11 -BB2 53 53
22 24 26 4 2 -BT1 41 31 -BB1 31 43
+LCB +LCB +LCB -BS2 -BS2 -BB3 -BB3 -BB2 -BB1
1 54
-BGC2 -BGC2 -BGC2 4 33 54 54
23 25 27 3 1 -BB4 -BT1 42 32 32 44
M01/1F M01/2F M01/2F
1 34 -XB 56 -XB 17
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 19 42 18 13
M01/8D M01/3D
M01/1D M01/1D -XB 37 -XB 16 M01/6D M01/6D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 432 434 436 438 440 442 444 446 448 450
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
MCB AUX. MCB AUX. MCB AUX. MCB AUX. SPARE SPARE
CONTACT CONTACT CONTACT CONTACT
B B
czpebdz 25.6.2014
C C
13 13 13 13
-FCM3.1 -FCM4.1 -FCM11.1 -FCM11.2
G01/5C 14 G01/6C 14 S13/4C 14 S11/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
G01/1C
G01/1C
G01/2C
G01/3C
G01/1E
G01/2E
G01/2E
G01/3E
DEVICE
A1/4
A1/4
K2/1
K2/1
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
-XDI1
-XDI1
-V01
-V01
-V02
-V02
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XCS
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
BK
BK
BK
COLOR
=EXT-X
=EXT-X
=EXT-X
=EXT-X
-V01
-V02
-V01
-V02
DESIGNATION
DEVICE
E E
_
K1/3
K1/3
A2/2
A2/2
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
E
G
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-PGA1 BK
+CT-BCT7 2S1 S02/4B
BK
Name
26.5.2014 ABRLE
2
29 -XDA BK
+CT-BCT7 2S2 S02/4B
BK
Based on
3
+LVD-PGA2 BK
+CT-BCT8 2S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
+LVD-PGA3 BK
+CT-BCT9 2S1 S02/4D
BK
6
33 -XDA BK
+CT-BCT9 2S2 S02/4D
BK
27 PCS
7
-XE 1002 S02/4A
GNYE
12
+CT-BCT7 1S2 S03/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
21
Date
22
13.8kV SWITCHGEAR
23
Approved BRAUN
24
10.3.2014
25
5
5
26
Title
27
+LVD-PGA1 S02/5B
BK
29
-XDA 2 S02/5B
BK
30
+LVD-PGA2 S02/5C
BK
6
6
31
-XDA 4 S02/5C
BK
Outgoing Feeder 1
32
+LVD-PGA3 S02/5D
BK
ABB s.r.o., PPMV Brno
33
-XDA 6 S02/5D
BK
Doc. No.
Order No.
7
7
1000032473
1VL8458356
+ LV
8
8
= 00BBA01.04
Page
Pages 46
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
1
+LVD-SFS1 3 M06/3B
BK
Name
ABRLE
2
-XDX 208 M06/3C
BK
Based on
7
-XDX 204 M06/6B
BK
ABRLE Customer
8
-XDX 212 M06/6C
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
9
-XDX 205 M06/7B
BK
10
-KFA10 23 M06/7C
BK
81 PCS
11
-XDX 205 M06/7B
BK
13
+LVD-SFS1 8 M07/3B
BK
3
3
14
TERMINAL UT 4 3044102
BK
+LVR-XE 30 Q10/2D
351
BK
+LVR-XE 29 Q10/2D
352
BK
Project name
+LVR-XE 20 Q10/3D
353
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 19 Q10/4D
354
BK
4
4
-FCM2.1 14 Q10/5D
355
BK
Date
-FCM2.1 13 Q10/5D
356
BK
13.8kV SWITCHGEAR
-FCM15.1 14 Q10/6D
BK
Approved BRAUN
-FCM12.1 13 Q10/6D
358
BK
10.3.2014
+PLG-QAB2-XB 15 Q11/2D
371
BK
5
5
+PLG-QAB2-XB 5 Q11/3D
372
BK
Title
+PLG-QAB2-XB 38 Q11/4D
373
BK
+PLG-QAB2-XB 28 Q11/4D
374
BK
-KFA11 14 Q11/5D
375
BK
-KFA12 14 Q11/5D
376
BK
6
6
-KFA11 13 Q11/6D
377
BK
Outgoing Feeder 1
+LVD-SFS1 12 Q11/7D
378
BK
ABB s.r.o., PPMV Brno
+LVD-SFS1 11 Q11/7D
379
BK
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
Doc. No.
Order No.
7
7
+LVR-XE 13 X02/3B
403
BK
+LVR-XE 14 X02/3E
404
BK
1000032473
+LVR-XE 15 X02/4B
405
BK
1VL8458356
+LVR-XE 16 X02/4E
406
BK
+ LV
+LVR-XE 21 X02/5B
407
BK
8
8
+LVR-XE 22 X02/5E
408
BK
= 00BBA01.04
Page
Pages
+LVR-XE 23 X02/6B
409
BK
+LVR-XE 24 X02/6E
410
BK
46
X07
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
+LVR-XE 25 X02/7B
411
BK
Name
ABRLE
+LVR-XE 26 X02/7E
412
BK
Based on
+LCB-BGC2 22 X03/1B
421
BK
ABRLE Customer
+LCB-BGC2 23 X03/1E
422
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 24 X03/1B
423
BK
+LCB-BGC2 25 X03/1E
424
BK
81 PCS
+LCB-BGC2 26 X03/2B
425
BK
426
BK
3
3
+LVR-XE 31 M06/8C
TERMINAL UT 4 3044102
428
BK
-FCM14.1 14 Q10/7D
429
BK
-FCM12.2 13 Q10/8D
430
BK
Project name
+PLG-QAB2-XB 24 X03/3B
431
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB2-XB 34 X03/3E
432
BK
4
4
+PLG-QAB2-XB 26 X03/3B
433
BK
Date
+PLG-QAB2-XB 36 X03/3E
434
BK
13.8kV SWITCHGEAR
+PLG-QAB2-XB 27 X03/4B
BK
Approved BRAUN
+PLG-QAB2-XB 37 X03/4E
436
BK
10.3.2014
+PLG-QAB2-XB 6 X03/4B
437
BK
5
5
+PLG-QAB2-XB 16 X03/4E
438
BK
Title
+PLG-QAB2-XB 55 X03/5B
439
BK
+PLG-QAB2-XB 56 X03/5E
440
BK
+PLG-QAB2-XB 9 X03/6B
441
BK
+PLG-QAB2-XB 19 X03/6E
442
BK
6
6
+PLG-QAB2-XB 32 X03/6B
443
BK
Outgoing Feeder 1
+PLG-QAB2-XB 42 X03/6E
444
BK
ABB s.r.o., PPMV Brno
+PLG-QAB2-XB 7 X03/7B
445
BK
+PLG-QAB2-XB 17 X03/7E
446
BK
+PLG-QAB2-XB 8 X03/7B
447
BK
Doc. No.
Order No.
7
7
+PLG-QAB2-XB 18 X03/7E
448
BK
+PLG-QAB2-XB 3 X03/8B
449
BK
1000032473
+PLG-QAB2-XB 13 X03/8E
450
BK
1VL8458356
-FCM3.1 13 X04/1B
501
BK
+ LV
-FCM3.1 14 X04/1E
502
BK
8
8
-FCM4.1 13 X04/1B
503
BK
= 00BBA01.04
Page
Pages
-FCM4.1 14 X04/1E
504
BK
-FCM11.1 13 X04/2B
505
BK
46
X08
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/2B
X04/3B
X04/3B
X04/2E
X04/2E
X04/3E
X04/3E
DEVICE
PIN
14
13
14
DESIGNATION
B B
DEVICE
-FCM11.1
-FCM11.2
-FCM11.2
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
BK
C C
506 507 508 509 510 511 512
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/2C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
7
DESIGNATION
B B
DEVICE
-XCS
-XCS
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/2C
BK
ABRLE Customer
4
4;4 =ANEXT-XDI2 -KFA2 A2 Q01/3C
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/3C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-XDX 323 Q01/4C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Outgoing Feeder 1
7
7
1000032473
1VL8458356
+ LV
8
8
= 00BBA01.04
Page
Pages 46
X11
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
E
G
D
TERMINALS
Rev. Code
-XDV
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1 -FCM11.2 BK
+VT-BAT7 a S10/3D
BK
Name
26.5.2014 ABRLE
2
3 -FCM11.2 BK
+VT-BAT8 a S10/3D
BK
Based on
3
5 -FCM11.2 BK
+VT-BAT9 a S10/3D
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
-XE 1015 S10/3D
GNYE
21
1 -FCM11.1 BK
+VT-BAT4 2a S12/4E
BK
35 PCS
22
3 -FCM11.1 BK
+VT-BAT5 2a S12/4E
BK
24
54 -XDV BK
+VT-BAT6 2n S12/5E
BK
3
3
25
-FCM15.1 2 S12/2D
BK
27
-FCM15.1 4 S12/2D
BK
Project name
28
-FCM15.1 6 S12/2D
Prepared HORNAK
BK
Checked HAVELKA
29
+VT-BAT6 1n S12/2D
BK
4
4
30
Date
31
1 -FCM14.1 BK
+VT-BAT7 da S10/6C
BK
13.8kV SWITCHGEAR
32
-FCM14.1 2 S10/6D
Approved BRAUN
33
S10/6D
10.3.2014
38
+TOP1-RAA1 2 S10/7D
BK
5
5
39
+VT-BAT9 dn S10/7D
BK
Title
40
1 -FCM14.2 BK
+VT-BAT4 da S12/7C
BK
42
-FCM14.2 2 S12/7E
BK
43
S12/7E
6
6
48
+TOP1-RAA2 2 S12/7E
BK
Outgoing Feeder 1
49
+VT-BAT6 dn S12/8E
BK
ABB s.r.o., PPMV Brno
50
-FCM12.1 2 S13/1D
BK
52
-FCM12.1 4 S13/1D
BK
Doc. No.
Order No.
7
7
53
-FCM12.1 6 S13/1D
BK
54
-XDV 24 S13/2D
BK
1000032473
55
-FCM12.2 2 S11/1D
BK
1VL8458356
56
-FCM12.2 4 S11/1D
BK
+ LV
57
-FCM12.2 6 S11/1D
BK
8
8
58
-XDV 4 S11/2D
BK
= 00BBA01.04
Page
Pages 46
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
201
BK BK
Name
ABRLE
M06/3A
202
Based on
-XDX 217 M06/5A
203
BK
ABRLE Customer
-XDC 7 M06/6A
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11 -XDC -XDC 9 M06/7A
205
BK BK
206
BK BK
57 PCS
14 +LVD-SFC1 +PLG-QAB2-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB2-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB2-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
24 -KFA10 +PLG-QAB2-XB 10 M06/7D
219
BK BK
10.3.2014
12 -XDC +PLG-QAB2-XB 49 M06/7D
220
BK BK
5
5
BK BK
Title
46 +PLG-QAB2-XB -XDX1 4 M06/5F
222
BK BK
44 +PLG-QAB2-XB M06/6F
223
BK
BK BK;BK
BK BK
6
6
+LVD-SFS1 7 M07/3A
232
BK
Outgoing Feeder 1
+PLG-QAB2-XB 52 M07/5A
233
BK
ABB s.r.o., PPMV Brno
BK
BK BK
14 -XDC M07/3C
236
BK
Doc. No.
Order No.
7
7
M07/3C
237
-RAR1 B M07/5C
238
BK
1000032473
BK BK
1VL8458356
+PLG-QAB2-XB 23 M07/4C
240
BK
+ LV
BK BK
8
8
2 -XDX1 M07/3F
252
BK
= 00BBA01.04
Page
Pages
BK BK
8 -XDI2 M07/6F
254
BK
46
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
301
BK;BK BK
Name
ABRLE
+PLG-QAB2-XB 11 M09/3A
302
BK
Based on
+LVD-SFT1 13 M09/7A
303
BK
ABRLE Customer
M09/8A
304
2
2
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
57 PCS
M09/7F
313
314
22 +PLG-QAB2-XB +LVD-PFX2 R M09/3D
BK 315 BK
3
3
TERMINAL UT 4 3044102
317
BK BK
BK BK
BK BK
Project name
+LCB-BGC2 28 Q01/5D
322
Prepared HORNAK
BK
Checked HAVELKA
39 +PLG-QAB2-XB -XDI2 7 Q01/5E
323
BK BK
4
4
29 +LCB-BGC2 Q01/5E
324
BK
Date
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
13.8kV SWITCHGEAR
+LCB-BGC2 20 Q03/3C
BK
Approved BRAUN
24 -XDI2 -KFA11 24 Q03/3D
330
BK BK
10.3.2014
+LCB-BGC2 21 Q03/3D
BK
5
5
21 +PLG-QAB2-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
Title
6
6
Outgoing Feeder 1
7
7
1000032473
1VL8458356
+ LV
8
8
= 00BBA01.04
Page
Pages 46
X14
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
E
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
9.6.2014
PIN COLOR COLOR PIN PAGE
26.5.2014
21.5.2014
DESIGNATION DESIGNATION
XE11
11
40 +ES-QCE3-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
ABRLE
XE12
12
41 +ES-QCE3-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE3-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
ABRLE Customer
XE14
14
43 +ES-QCE3-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE3-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE3-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE3-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE3-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE3-BGE2 BK
+LV-XDC 354 +LVQ10/3C
BK
3
3
XE20
20
49 +ES-QCE3-BGE2 BK
+LV-XDC 353 +LVQ10/3D
BK
XE21
20 +ES-QCE3-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE3-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE3-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE3-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE3-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE3-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE3-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE3-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE3-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE3-RLE3 BK
+LV-XDC 428 +LVM06/8D
BK
XE32
32
H +ES-QCE3-RLE3 BK
+LV-XDX 224 +LVM06/8E
BK
6
6
Outgoing Feeder 1
7
7
1000032473
1VL8458356
+ LV
8
8
= 00BBA01.04
Page
Pages 46
X15
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
L1
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.04+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
C =00BBA01.04+LVD SWITCH T0-2-8004/E T0-2-8004/E C
VOLTMETER SELECTOR SWITCH FEEDER
-SFV2 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.04+LVD SWITCH T0-2-8004/E T0-2-8004/E
VOLTMETER SELECTOR SWITCH BUSBAR
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 3 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 9 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X22
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
TCS MODUL
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.04
D 21.5.2014 ABRLE Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 1 1000032473 + LV
E 26.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X23
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458356 Pages 46
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
-QAB3
VD4/P 17.12.32 P150
17.5 kV
M 1250 A
31.5 kA
-PFV1
czpebdz 25.6.2014
CPI VI-3P P2
SGB12 -BCT4,-BCT5,-BCT6
TPU 50.23
C 700/1/1 A at 40°C C
Core 2: 5P20, 15 VA
Core 1: 0.5Fs5, 10 VA
VALID FOR PANELS:
3 P1
POS. DESIGN. NAME
-BAT1,-BAT2,-BAT3
TJC5 5 00BBA01.05 Alternator 3
13.8/√3//0.11/√3//0.11/3 kV
0.5, 15 VA
-FA11
ISSUED BY:
3P, 50 VA
-FA21
-FA31
MWD16 -QCE2
EK6
D D
Earthing balls
4x d=25mm
-BCN1
KOLA 06 D2
Under cubicle
(accessory)
60/1 A
E G cl. 3 1,2 VA E
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB3
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
CON- SIG-
E M06/1F -XB 35 M09/1F
E
M01/1D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q01/6D
M07/7C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/3C
Q11/6C
Q11/7C
X03/4C
X03/4C
X03/6C
X03/8C
X03/5C
X03/7C
X03/5C
X03/6C
+PLG
-QAB3
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/4D
X03/4D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/3D
X03/6D
X03/8D
X03/5D
M06/6E
M07/2E
M07/4E
X03/7D
Q01/6E
M09/3B
M09/3B
Q11/6D
Q11/7D
M09/4B
M09/4B
M07/7C
M07/7C
X03/5D
M06/3C
X03/6D
D D
+LCB 20 22 24 26 28
M07/6C
Q03/3C
Q01/7E
X03/1C
X03/1C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE2
EK6
M07/6D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/5C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 Q01/2D 11 B
5-6 12 14
7-8
-KFA2
MAN CONTORL
MAN CONTORL
9 - 10 Q01/2D 11
ALTERNATOR CB
-XDX 217
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL ALTERNATOR CB
-KFA3 M01/8B ON COMMAND -XDX 218
OPEN/TRIP LOOP
Q01/3D 11 03BAC01GS003-YB01
+PLG -XB 57 03BAC01GS003-YB32
12 14
-QAB3
-KFA4
czpebdz 25.6.2014
-KFA9
Q02/6D 11
13
-XDX 215 -XDX 216 -KFA10
D Q02/7D 14 D
13
+LVD
-SFC1
14
MP1-11C
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
-XDC 17
+LVD-SFS1
M06/2A 6
MAN CONTORL
MAN CONTORL
B B
SYSTEM
SYSTEM
ALTERNATOR CB
13 TRIPPING COIL EARTHING
+LVD OFF COMMAND SWITCH RELEASE
-SFO1 03BAC01GS003-YB02 03BAC01GS008-YB15
XDX:321
14 Q01/6C
KTC4-9004
M01/7B
-XDC 12 +PLG -XB 52
-XDC 18
czpebdz 25.6.2014
-QAB3
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C -XDX 241 -XDX 242 24 24 C
26 33 -XB 53 54
+LCB
-KFA11 M01/7D M01/7D
-BGC2 M07/7E
27 34
-XDX 239 -XDX 240 M01/2F
ISSUED BY:
XE31
M06/5E 21
1K2
4K7
22K
5K6
U -BB2
M07/6D
14 5
BY500-1000 +ES-QCE2
5A 22 G
1000V
E F G H M02/4B -RLE3 -XDX1
-MO1
2 -XB 33 H M07/3D Q01/6C
M01/5D XDI2:10
XE32
-XB 30 6
M01/5D
A1 A1
+LVR-XE 32 -KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/4C 13 14 Q11/4C
23 24 Q03/3C 23 24
33 34 M07/6C 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
XE17 -QAB3
B B
+ES-QCE2 13 21 13 13
26 46
-BB3 -BB3 -BT2 -BT1
-BGE3 -BGE2
M02/6C M02/6B 14 22 14 14
27 47
XE28
XE18
-XB 22 21 50 51
M01/6D M01/6D M01/7D M01/7D
+LVR-XE 28 +LVR-XE 18
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
XDI2:10 M07/8E
XDX:321 M07/8B
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14
11 M06/2C 11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 12
23 24
24 24 24 24
21 21 21 21 33 34
E 22 22 22 22 43 44 E
34 34 34 34
31 31 31 31
32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/7E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 13 C
-FCM11.4
XE29
XE19
S12/1C 14
+ES-QCE2
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14 13
-FCM14.1
XE30
XE20
ISSUED BY:
S10/6D 14
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
STATION
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS TRANSFORMER CB CLOSED CB CLOSED
POSITION POSITION CB REMOTE
COMMAND MODE
03BAC01GS003-XB01 03BAC01GS003-XB02 03BAC01GS003-XB41 03BAC01GS003-XB40 03BAC01GS003-XB43 03BAC01GS003-XB01 03BAC01GS003-XB01
B B
czpebdz 25.6.2014
15 38 19 42
M01/3D M01/3D M01/6D M01/6D
D D
-XDC 371 372 373 374 375 376 377 378 379 340 341 342 343
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+CT
P2 P2 P2
2S2
B TPU 50.23 -BCT4 B
700/1A 2S1
Core 2: 5P20, 15VA
-XDA 11
4 BK
-XDA 14
czpebdz 25.6.2014
4 BK
2S2
-BCT5
C 2S1 C
MAN
-XDA 13
4 BK CONTROL
SYSTEM
(CCP)
-XDA 16
4 BK
ISSUED BY:
2S2
-BCT6
2S1
D D
-XDA 15
4 BK
-XE
-XDA 17
1002 2,5 GNYE
E E
PROTECTION
CT´s MV PANEL
03BAC01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+LVD
-PGA1
-XDA 2 -XDA 18
4 BK 4 BK A
1S2 FB96-1
B TPU 50.23 -BCT4 700/1A B
700/1A 1S1 0-700/1400A
Core 1: 0.5Fs5, 10VA
-XDA 1 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 4 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S2 FB96-1
-BCT5 700/1A
C 1S1 0-700/1400A C
MAN
-XDA 3 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 6 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S2 FB96-1
-BCT6 700/1A
1S1 0-700/1400A
D D
-XDA 5 -XDA 23
4 BK 4 BK CURRENT
MEASURING MV
-XE PANEL
-XDA 7
1001 2,5 GNYE
03BAC01CE003A/B/C
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P1 P1 P1
L1 L2 L3 N
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
+CAB-BCN1
D KOLA 06 D260/1 A P2 S2 D
cl. 3 1,2 VA
S1
+CAB-BCN2
E KOLA 06 D2 S2 E
60/1 A
cl. 3 1,2 VA
GROUND FAULT
CURRENT
03BAC01CE021
03BAU01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
+VT A PE A PE A PE
N N N
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C C
-XDV 31
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
ISSUED BY:
1 13 21
-FCM14.1
S201-Z4 2 14 22
D D
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 1 2 3 4 5 6 -XDV 32 33 38 39 40
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
L1
E S12/4B L2
E
S12/4B L3
S12/4B
N
S12/2D 03BAC01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3E L1
S10/3E L2
S10/3E L3
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM11.4 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 8 9 10 11 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
03BAC01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.05+LV-00BBA01.05@PLD
=00BBA01.05+LV =00BBA01.05
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA3
-KFA4
-KFA6
-KFA7
-KFA8
-KFA9
-KFA3 PANEL 3 OFF
-FCM11.1
-FCM11.4
-KFA4 PANEL 4 OFF
-FCM2.1
-FCM3.1
-FCM4.1
-XDX1
+LVR-XE
-KFA6 PANEL 6 OFF
czpebdz 25.6.2014
-FCM14.1
-KFA7 PANEL 7 OFF
-KFA10 BB ES OPEN
-XDX
-KFA11 CB IN TEST POSITION
-XDI1 -XDI2
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.05+LVD-00BBA01.05@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.05+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
+TOP1
-PFX1 E/S OPEN / CLOSED
-RAA1
-PFX2 CB OPEN / CLOSED
-PGA1 L1
00BBA01.05
B -PGA2 L2 B
-PGA3 L3
-PGV1 VOLTMETER
-PGA1 -PGA2 -PGA3
-SFC1 CB CLOSE
-SFO1 CB OPEN
czpebdz 25.6.2014
705 mm
-SFS1 LOCAL - REMOTE SWITCH
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C C
+ES-QCE2
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT SPARE SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445
B B
czpebdz 25.6.2014
1 34
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/6C 14 S12/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
19 -XDA BK
+CT-BCT4 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
+LVD-PGA1 BK
+CT-BCT4 1S2 S02/4B
BK
Based on
3
21 -XDA BK
+CT-BCT5 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
23 -XDA BK
+CT-BCT6 1S1 S02/4D
BK
6
+LVD-PGA3 BK
+CT-BCT6 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4D
GNYE
12
+CT-BCT4 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/6B
BK
Date
19
-XDA 1 S02/6B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/6C
Approved BRAUN
21
-XDA 3 S02/6C
BK
10.3.2014
22
+LVD-PGA3 S02/6D
BK
5
5
23
-XDA 5 S02/6D
BK
Title
6
6
Alternator 3
7
7
1000032473
1VL8458357
+ LV
8
8
= 00BBA01.05
Page
Pages 42
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
77 PCS
17
-XDX 233 M07/6B
BK
+PLG-QAB3-XB 19 Q11/6D
340 BK
3
3
+PLG-QAB3-XB 9 Q11/7D
TERMINAL UT 4 3044102
341
BK
+PLG-QAB3-XB 42 Q11/7D
342
BK
+PLG-QAB3-XB 32 Q11/8D
343
BK
Project name
+LVR-XE 30 Q10/2D
351
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 29 Q10/3D
352
BK
4
4
+LVR-XE 20 Q10/4D
353
BK
Date
+LVR-XE 19 Q10/4D
354
BK
13.8kV SWITCHGEAR
-FCM2.1 14 Q10/5D
BK
Approved BRAUN
-FCM2.1 13 Q10/6D
356
BK
10.3.2014
-FCM14.1 14 Q10/6D
357
BK
5
5
-FCM11.4 13 Q10/7D
358
BK
Title
+PLG-QAB3-XB 15 Q11/2D
371
BK
+PLG-QAB3-XB 5 Q11/2D
372
BK
+PLG-QAB3-XB 38 Q11/3D
373
BK
+PLG-QAB3-XB 28 Q11/3D
374
BK
6
6
Alternator 3
-KFA11 14 Q11/4D
375
BK
-KFA12 14 Q11/4D
376
BK
ABB s.r.o., PPMV Brno
-KFA11 13 Q11/5D
377
BK
+LVD-SFS1 12 Q11/5D
378
BK
+LVD-SFS1 11 Q11/6D
379
BK
Doc. No.
Order No.
7
7
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
1000032473
+LVR-XE 13 X02/3B
403
BK
1VL8458357
+LVR-XE 14 X02/3E
404
BK
+ LV
+LVR-XE 15 X02/4B
405
BK
8
8
+LVR-XE 16 X02/4E
406
BK
= 00BBA01.05
Page
Pages
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
42
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVR-XE 23 X02/6B
409
BK
Name
21.5.2014 ABRLE
+LVR-XE 24 X02/6E
410
BK
Based on
+LVR-XE 25 X02/7B
411
BK
412
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 22 X03/1B
421
BK
+LCB-BGC2 23 X03/1E
422
BK
77 PCS
+LCB-BGC2 24 X03/1B
423
BK
424
BK
X03/2B
425
3
3
X03/2E
TERMINAL UT 4 3044102
426
X03/2B
427
X03/2E
428
Project name
X03/3B
429
Prepared HORNAK
Checked HAVELKA
X03/3E
430
4
4
+PLG-QAB3-XB 24 X03/4B
431
BK
Date
+PLG-QAB3-XB 34 X03/4E
432
BK
13.8kV SWITCHGEAR
+PLG-QAB3-XB 26 X03/4B
BK
Approved BRAUN
+PLG-QAB3-XB 36 X03/4E
434
BK
10.3.2014
+PLG-QAB3-XB 27 X03/5B
435
BK
5
5
+PLG-QAB3-XB 37 X03/5E
436
BK
Title
+PLG-QAB3-XB 6 X03/5B
437
BK
+PLG-QAB3-XB 16 X03/5E
438
BK
+PLG-QAB3-XB 55 X03/6B
439
BK
+PLG-QAB3-XB 56 X03/6E
440
BK
6
6
Alternator 3
+PLG-QAB3-XB 7 X03/6B
441
BK
+PLG-QAB3-XB 17 X03/6E
442
BK
ABB s.r.o., PPMV Brno
+PLG-QAB3-XB 8 X03/7B
443
BK
+PLG-QAB3-XB 18 X03/7E
444
BK
+PLG-QAB3-XB 3 X03/8B
445
BK
Doc. No.
Order No.
7
7
+PLG-QAB3-XB 13 X03/8E
446
BK
-FCM3.1 13 X04/1B
501
BK
1000032473
-FCM3.1 14 X04/1E
502
BK
1VL8458357
-FCM4.1 13 X04/1B
503
BK
+ LV
-FCM4.1 14 X04/1E
504
BK
8
8
-FCM11.1 13 X04/2B
505
BK
= 00BBA01.05
Page
Pages
-FCM11.1 14 X04/2E
506
BK
X04/2B
507
42
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/3B
X04/2E
X04/3E
DEVICE
PIN
DESIGNATION
B B
DEVICE
POTENTIAL/
COLOR
czpebdz 25.6.2014
C C
508 509 510
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/2C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/3C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/4C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-XDX 323 Q01/5C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Alternator 3
7
7
1000032473
1VL8458357
+ LV
8
8
= 00BBA01.05
Page
Pages 42
X10
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S12/1D
S12/1D
S12/1D
S12/2D
S10/6D
S10/6D
S10/7D
S10/7D
S10/7D
S10/6C
DEVICE
1015
1017
PIN
dn
da
n
2
a
a
DESIGNATION
B B
DEVICE
+TOP1-RAA1
+VT-BAT1
+VT-BAT2
+VT-BAT3
+VT-BAT3
+VT-BAT1
+VT-BAT3
-FCM11.4
-FCM11.4
-FCM11.4
-FCM14.1
-XDV
-XG
-XG
POTENTIAL/
COLOR
czpebdz 25.6.2014
GNYE
GNYE
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 8 9 10 11 31 32 33 38 39 40
TERMINALS
-XDV
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
COLOR
-FCM11.1
-FCM11.1
-FCM11.1
-XDV
-FCM14.1
DESIGNATION
DEVICE
E E
1
11
1
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
59 PCS
14 +LVD-SFC1 +PLG-QAB3-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB3-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB3-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB3-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB3-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB3-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
17 -XDC M07/5A
233
BK
6
6
Alternator 3
BK BK
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB3-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458357
-KFA11 33 M07/6C
242
BK
+ LV
BK BK
8
8
BK BK
= 00BBA01.05
Page
Pages
BK BK;BK
BK BK
42
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
10 -XDI2 M07/8F
254
BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LVD-SFT1 13 M09/7A
303
BK
M09/8A
304
59 PCS
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
M09/7F
313
3
3
M09/8F
TERMINAL UT 4 3044102
314
BK BK
BK BK
Project name
51 +PLG-QAB3-XB +LVD-PFX3 G M09/4D
318
BK
Prepared HORNAK
BK
Checked HAVELKA
234 -XDX +PLG-QAB3-XB 29 Q01/6D
321
BK BK
4
4
+LCB-BGC2 28 Q01/7D
322
BK
Date
39 +PLG-QAB3-XB -XDI2 9 Q01/6E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q01/7E
BK
Approved BRAUN
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB3-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
6
6
Alternator 3
7
7
1000032473
1VL8458357
+ LV
8
8
= 00BBA01.05
Page
Pages 42
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE2-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE2-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE2-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE2-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE2-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE2-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE2-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE2-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE2-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE2-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE2-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE2-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE2-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE2-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE2-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE2-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE2-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE2-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE2-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE2-RLE3 BK
+LV-XDX 243 +LVM07/6D
BK
XE32
32
H +ES-QCE2-RLE3 BK
+LV-XDX 252 +LVM07/6E
BK
6
6
Alternator 3
7
7
1000032473
1VL8458357
+ LV
8
8
= 00BBA01.05
Page
Pages 42
X14
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.05+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 2 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 6 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
BB ES OPEN
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.05
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 3 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458357 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
-PFV2 -QCE4
EK6
CPI VI-3P
SGB 12
3 AC, 17.5kV, 60Hz, 3100A, 31.5kA/1s
B B
-QAB2
VD4/Z 17.32.32 P275
17.5 kV
M 3150 A
31.5 kA
-PFV1
czpebdz 25.6.2014
CPI VI-3P P1
SGB12 -BCT7,-BCT8,-BCT9
3200/1/1/1 A at 40°C KOKS A31
C Core 3: 5P20, 10 VA C
Core 2: 0.5Fs5, 10 VA
Core 1: 0.2Fs5, 10 VA PTB cert.
VALID FOR PANELS:
POS. DESIGN. NAME
3 P2
6 00BBA01.06 Outgoing Feeder 2
-FA11
ISSUED BY:
-FA21
-FA31
MWD16 -QCE3
EK6
D D
-BAT10,-BAT11,-BAT12
Earthing balls Single-pole fixed VT TJCH5, Up=13,8/V3kV
4x d=25mm 13,8/V3//0.11/√3//0.11/√3//0.11/3 kV
0.2, 15 VA PTB cert.
0.5, 15 VA
3P, 50 VA
3x(1x400 sqmm) N2XSY
3x(1x400 sqmm) N2XSY
3x(1x400 sqmm) N2XSY
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
M01/1B
+PLG -XB 25
-QAB2
D D
-BS1
-MS
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
M07/5C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
M06/7E
M06/7E
Q11/2C
Q11/4C
Q02/2E
X03/3C
X03/3C
X03/7C
X03/8C
X03/4C
X03/7C
X03/4C
X03/6C
X03/6C
X03/5C
+PLG
-QAB2
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 49 10 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 43 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 44 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 43 53
-BB4
4 14 24 34 44 54
C E C
POSITION
A 1
-RL2 -RL1 -MC -MU -MO1
TEST
-XB 34 36 35 46 20 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/3D
X03/3D
G01/4E
M06/5E
M06/7F
M06/2E
Q11/2D
Q11/4D
X03/7D
X03/8D
X03/4D
M06/6E
M07/2E
M07/4E
X03/7D
Q02/2E
M09/3C
M09/4C
X03/6D
X03/6D
M09/4C
M09/5C
M07/5C
M07/6C
X03/4D
M06/3C
X03/5D
D D
+LCB 20 22 24 26 28
Q03/3C
Q02/3E
X03/1C
X03/1C
X03/2C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
© Copyright 2012 ABB. All rights reserved.
L2
A L3 A
+TES
-QCE4
EK6
B B
M09/3B
M07/7E
X05/2C
X05/3C
X05/4C
X05/5C
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
czpebdz 25.6.2014
M06/5C
M06/7C
M07/8C
M09/2B
X05/6C
C 20 22 24 26 28 C
-BGE3
21 23 25 27 29
ISSUED BY:
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
E -RLE3 EARTHING SWITCH BLOCKING COIL E
L1 L2 L3
A A
+ES-QCE3
EK6
M06/8D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M06/5D
M06/7D
M09/1B
Q10/2C
X02/5C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
-XDC 7 -XDC 9 -XDC 11
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
MAN CONTORL
MAN CONTORL
MAN CONTORL
LOCAL REMOTE 4 3 M06/3A
OUTGOING
SYSTEM
SYSTEM
SYSTEM
5 6 M07/2B
7 8 M07/3A FEEDER CB -XDC 427
FS943 OPEN/TRIP LOOP
9 10 -XDX 213 -XDX 214 -XDX 217
CONTACTS LOC. REM. 11 12 Q11/7C
12 14 00BBA02GS103-YB32
1-2
MAN CONTORL
-KFA1 -XDC 1 -XDX 218
B 3-4 B
SYSTEM
Q01/3D 11
5-6 12 14
-XDC 8 -XDC 10 -XDC 12
7-8 EARTHING
-KFA2 +LVR-XE 71 +LVR-XE 73
SWITCH RELEASE
MAN CONTORL
9 - 10 OUTGOING
Q01/4D 11 00BBA02GS108-YB15
XE71
XE73
11 - 12 FEEDER CB
SYSTEM
12 14 CLOSING COIL
-KFA3 ON COMMAND +TES +TES
Q01/5D 11 00BBA02GS103-YB01 20 22
M01/8B -QCE4 -BGE3 -QCE4 -BGE3
12 14 +PLG -XB 57 M02/5C M02/5C -XDC 428
-KFA4
czpebdz 25.6.2014
-QAB2 21 23
Q01/5D 11 -XDC 2
XE72
12 14 53
-BT2
XE74
-KFA5
C Q01/6D 11 54 +LVR-XE 72 +LVR-XE 74 C
12 14
-KFA7
Q02/4D 11
-XB 58
M01/8D
12 14 +LVR-XE 21 +LVR-XE 23
-KFA8
XE21
XE23
Q02/5D 11
12 14 +ES-QCE3 +ES-QCE3
ISSUED BY:
-KFA9 20 22
-BGE3 -BGE3
Q02/6D 11 M03/5C M03/5C
21 23
-XDX 215 -XDX 216
XE22
XE24
D +LVR-XE 31 D
13
XE31
+LVD
+LVR-XE 22 +LVR-XE 24
-SFC1
14 +ES-QCE3
MP1-11C
G
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212 -XDX 219 -XDX 220 M03/4B -RLE3
H
XE32
M01/3B M01/2B M01/4B M01/8B M01/8B
+PLG -XB 4 +PLG -XB 45 +PLG -XB 43 +PLG -XB 10 49
-QAB2 -QAB2 3 -QAB2 -QAB2
43 43 +LVR-XE 32
-BT1 -BT2
4 -RL1
-XB 14 -XB 46 -XB 44
M01/3D M01/2D M01/4D
-XB 20
M01/2D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 13
5
+LVD-SFS1 XDI2:21 XDX:321
M06/2A 6 Q03/2D Q02/3D
MAN CONTORL
B OUTGOING B
SYSTEM
FEEDER CB +LVR-XE 79
13 TRIPPING COIL
XE79
+LVD OFF COMMAND
-SFO1 00BBA02GS103-YB02
14 +TES
KTC4-9004
28
-QCE4 -BGE3
M02/6C
M01/7B
-XDC 14 +PLG -XB 52 29
czpebdz 25.6.2014
-QAB2
XE80
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238 +LVR-XE 80
C 24 24 C
-XB 53 54
M01/7D M01/7D Q03/3D Q02/3C
XDI2:22 XDI2:12
-XDX 239 -XDX 240
XDI2:19
Q02/7D
ISSUED BY:
1K2
4K7
22K
5K6
U -BB2 Q02/7C
M07/7E
14
BY500-1000 XDI2:20
5A 22
1000V
E F G H
-MO1 -XDX 241 -XDX 242
2 -XB 33
M01/5D +LVR-XE 81
-XB 30
XE81
M01/5D
A1 A1
-KFA11 -KFA12 5
+TES
KC6-40E KC6-40E G
E A2 A2 -QCE4 E
110-125VDC 110-125VDC M02/4C -RLE3 -XDX1
H M07/3D
13 14 Q11/5C 13 14 Q11/5C
XE82
23 24 Q03/2C 23 24 6
33 34 33 34
43 44 43 44
+LVR-XE 82
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED BB ES OPEN AND BB ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT CRANK NOT POSITION
INSERTED INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/5E -XDX 301 302 303 304
XE17
XE77
XE67
+ES M01/6B
+TES +PLG
B -QCE3 -BGE3
26
-BGE2
46
-BGE3
26
-BGE2
46 -XB 11 B
-QCE4 -QAB2
M03/6C M03/6B M02/6C M02/6C 23 24 M09/8C
27 47 27 47 33 34 M09/7C +LVD 13
13 21 13 13
-BB3 -BB3 -BT2 -BT1 43 44 M09/7C -SFT1
XE28
XE18
XE78
XE68
53 54 M09/7C MCB-10 14
14 22 14 14 63 64 M09/6C LAMP TEST
C C
13 23 33 63 53 43 33 23
+LVD +LVD +LVD +LVD +LVD
-KFA13 -KFA13 -KFA13
M09/8D M09/8D M09/8D
-SFT1 -SFT1 -SFT1 -SFT1 -SFT1
14 24 34 64 54 44 34 24
M09/8B M09/8B M09/8B M09/8B M09/8B
-XDD 2 -KFA13 A1
UKK 5-DIO/O-U KC6-40E
-XDD 3 110-125VDC A2
UKK 5-DIO/O-U
D 13 14 M09/5C D
23 24 M09/5C
33 34 M09/6C
43 44
+LVD R G
+LVD R G
+LVD R G +LVD R G
-PFX1 -PFX4 -PFX2 -PFX3
SUS-95 R/G SUS-95 R/G SUS-95-Q R/G SUS-95 R/G
DC110V DC110V DC110V DC110V
E E
- - - -
=NEXT =NEXT
© Copyright 2012 ABB. All rights reserved.
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14 14
11 M06/2B 11 M06/2B 11 M06/2B 11 M06/2C 11 M06/2C
12 12 12 12 12
24 24 24 24 24
21 21 21 21 21
E 22 22 22 22 22 E
34 34 34 34 34
31 31 31 31 31
32 32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C C
D D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
23 20
+LCB
-KFA11
M07/5E
-BGC2
24 21
M01/1F
ISSUED BY:
D D
XDI2:21 XDI2:22
M07/7B M07/7C
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
13
+LVR-XE 29 +LVR-XE 19 -FCM12.1
S13/1C 14
XE29
XE19
C C
+ES-QCE3 +ES-QCE3
28 48
-BGE3 -BGE2
M03/6C M03/6B 13
29 49 13 -FCM14.2
-FCM2.1 S12/7D 14
XE30
XE20
G01/2C 14
13
ISSUED BY:
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
MV OUTGOING
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS FEEDER 2
POSITION POSITION CB REMOTE
COMMAND MODE
00BBA02GS103-XB01 00BBA02GS103-XB02 00BBA02GS103-XB41 00BBA02GS103-XB40 00BBA02GS103-XB43
B B
czpebdz 25.6.2014
C M01/3B M01/3B C
+PLG -XB 5 +PLG -XB 28
-QAB2 -QAB2
13 13
13 31 11
-BB1 -BB1 -KFA11 -KFA12
M07/5E M07/6E
+LVD-SFS1
14 14
14 32 M06/2A 12
ISSUED BY:
-XB 15 -XB 38
M01/3D M01/3D
D D
-XDC 371 372 373 374 375 376 377 378 379
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 27
+CT 1003 2,5 GNYE
P1 P1 P1
3S1
B CT KOKS 17A31, Ip=3200A, -BCT7 B
3200/1A 3S2
Core 3: 5P20, 10VA
-XDA 22
4 BK
-XDA 23
czpebdz 25.6.2014
4 BK
3S1
-BCT8
C 3S2 C
MAN
-XDA 24
4 BK CONTROL
SYSTEM
(CCP)
-XDA 25
4 BK
ISSUED BY:
3S1
-BCT9
3S2
D D
-XDA 26
4 BK
E E
PROTECTION
CT´s MV PANEL
00BBA02CE051A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 3 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 7
+CT 1002 2,5 GNYE DO NOT REMOVE THESE JUMPERS
UNTIL EXTERNAL DEVICES IN MAN CONTROL SYSTEM ARE SECURELY CONNECTED
+LVD
-PGA1
-XDA 1 -XDA 28
4 BK A
2S1 FB96-1
B CT KOKS 17A31, Ip=3200A, -BCT7 3200/1A B
3200/1A 2S2 0-3200/6400A
Core 2: 0,5, 10VA
-XDA 2 -XDA 29
4 BK
+LVD
-PGA2
-XDA 3 -XDA 30
A
czpebdz 25.6.2014
4 BK
2S1 FB96-1
-BCT8 3200/1A
C 2S2 0-3200/6400A C
MAN
-XDA 4 -XDA 31
4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 5 -XDA 32
4 BK A
ISSUED BY:
2S1 FB96-1
-BCT9 3200/1A
2S2 0-3200/6400A
D D
-XDA 6 -XDA 33
4 BK
E E
CURRENT
MEASURING MV
PANEL
00BBA02CE053A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
SEALABLE COVER
L1 L2 L3
A = A
+
-XE
-XDA 17
+CT 1001
1S1
B KOKS 17.5A31 -BCT7 B
3200/1A 1S2
Core 1: 0,2Fs5, 10VA
-XDA 12
-XDA 13
czpebdz 25.6.2014
1S1
-BCT8
C 1S2 C
MAN
-XDA 14
CONTROL
SYSTEM
(CCP)
-XDA 15
ISSUED BY:
1S1
-BCT9
1S2
D D
-XDA 16
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P2 P2 P2
L1 L2 L3 N
METERING CT´s
MV PANEL
00BBA02CE052A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
BUSBAR
A A
L1 L2 L3
B B
+TES
czpebdz 25.6.2014
C C
-BAD4
Ck
-BAD5
1010
Ck
-BAD6
Ck 22
-XG
ISSUED BY:
D +LVD D
-PFV2 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
L1 L2 L3 N
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name BUSBAR VOLTAGE INDICATOR DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C -XDV 41 C
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
SEALABLE COVER 1 13 21
ISSUED BY:
1 3 5 13 21 -FCM14.2
-FCM15.1 S201-Z4 2 14 22
S203-Z2
Q10/6C
14 22
2 4 6
2,5BK
2,5BK
Q10/6D
D D
4GNYE
4GNYE
4GNYE
-XDV 42 43 48 49 50
-XDV 26 27 28 29 30 -XDV 21 22 23 24 25
2,5BK
2,5BK
2,5BK
2,5BK
SEALABLE COVER
-XG -XG -XG
L1.1
S13/4B L2.1
E S13/4B L3.1
E
OPEN DELTA
S13/4B MEASURING MV
VOLTAGE
MEASURING MV N1 PANEL
PANEL S13/2D 00BBA02CE061D
00BBA02CE062A/B/C
MAN CONTROL SYSTEM
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yyd DCC Code &EFS Lang. English
G 25.6.2014 BDZOCH Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S12/4E L1.1
S12/4E L2.1
S12/5E L3.1
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM12.1 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S12/5E
5-6
N1 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 55 56 57 58 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
VOLTAGE
MEASURING MV
PANEL
2,5BK
00BBA02CE061A/B/C
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S13
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.06+LV-00BBA01.06@PLD
=00BBA01.06+LV =00BBA01.06
© Copyright 2012 ABB. All rights reserved.
-XDX1
B -FCM15.1 VT - Y WINDING B
-XDD2
-XDD1-XDD3
-XDD1 -XDD3 -KFA1 PANEL 1 OFF
-KFA11
-KFA12
-KFA13
-KFA1
-KFA2
-KFA3
-KFA4
-KFA5
-KFA7
-KFA8
-KFA9
-KFA2 PANEL 2 OFF
+LVR-XE
-FCM11.1
-FCM12.1
-FCM15.1
-FCM14.2
-XDD2
-XDD3
-XDX1 DIODES
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 1000x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.06+LVD-00BBA01.06@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.06+LVD
A A
DEVICE TAG TEXT
-PFX4 E/S OPEN / CLOSED
+TOP1
-PFV1 VOLTAGE INDICATOR CABLE
-RAA1
-PFV2 VOLTAGE INDICATOR BUSBAR
-PGA1 L1
-SFC1 CB CLOSE
-PGA1 -PGA2 -PGA3
-PGA3 L3
705 mm
-PFV2
-PGV1 VOLTMETER
-PFX4
-PFX3 -SFV1 VOLTMETER SELECTOR SWITCH
C -PGV1
C
-PFV1 -SFS1 LOCAL - REMOTE SWITCH
-SFO1 -PFX2 -SFC1
-SFO1 CB OPEN
-PFX1 -SFT1 LAMP TEST
-SFV1 -SFS1 -SFT1
=00BBA01.06+TOP1
ISSUED BY:
D D
1000 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 1000x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE25
C C
+ES-QCE3
40 42 44 24
-BGE2 -BGE2 -BGE2 -BGE3
M03/5B M03/5B M03/5B M03/5C
41 43 45 25
XE12
XE14
XE16
XE26
+LVR-XE 12 +LVR-XE 14 +LVR-XE 16 +LVR-XE 26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT PLUG OUT SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB CLOSED CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 429 431 433 435 437 439 441 443 445 447 449
B B
czpebdz 25.6.2014
C C
M01/1B M01/1B M01/4B M01/5B M01/8B M01/6B M01/6B M01/3B M01/5B M01/3B
+PLG -XB 24 +PLG -XB 26 +PLG -XB 27 +PLG -XB 6 +PLG -XB 55 +PLG -XB 9 +PLG -XB 32 +PLG -XB 7 +PLG -XB 8 +PLG -XB 3
-QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2 -QAB2
2 53
-BB11 -BB2
22 24 26 4 2 53 41 31 53 31 43
+LCB +LCB +LCB -BS2 -BS2 -BT1 -BB3 -BB3 -BB1 -BB2 -BB1
1 54
-BGC2 -BGC2 -BGC2 4 33
23 25 27 3 1 -BB4 -BT1 54 42 32 54 32 44
M01/1F M01/2F M01/2F
ISSUED BY:
1 34
-XB 34 -XB 36 -XB 56 -XB 19 -XB 42 -XB 17 -XB 18 -XB 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/6D M01/6D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 430 432 434 436 438 440 442 444 446 448 450
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/5C 14 S13/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
XE63
XE65
XE69
XE75
C C
+TES
40 42 44 48 24
-QCE4 -BGE2 -BGE2 -BGE2 -BGE2 -BGE3
M02/5C M02/5C M02/5C M02/6C M02/5C
41 43 45 49 25
XE62
XE64
XE66
XE70
XE76
+LVR-XE 62 +LVR-XE 64 +LVR-XE 66 +LVR-XE 70 +LVR-XE 76
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name BB ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X05
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
G
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-PGA1 BK
+CT-BCT7 2S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
29 -XDA BK
+CT-BCT7 2S2 S02/4B
BK
Based on
3
+LVD-PGA2 BK
+CT-BCT8 2S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
+LVD-PGA3 BK
+CT-BCT9 2S1 S02/4D
BK
6
33 -XDA BK
+CT-BCT9 2S2 S02/4D
BK
27 PCS
7
-XE 1002 S02/4A
GNYE
12
+CT-BCT7 1S2 S03/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
21
Date
22
13.8kV SWITCHGEAR
23
Approved BRAUN
24
10.3.2014
25
5
5
26
Title
27
+LVD-PGA1 S02/5B
BK
29
-XDA 2 S02/5B
BK
30
+LVD-PGA2 S02/5C
BK
6
6
31
-XDA 4 S02/5C
BK
Outgoing Feeder 2
32
+LVD-PGA3 S02/5D
BK
ABB s.r.o., PPMV Brno
33
-XDA 6 S02/5D
BK
Doc. No.
Order No.
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.06
Page
Pages 47
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/3B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/3C
BK
Based on
7
-XDX 204 M06/6A
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
9
-XDX 205 M06/7A
BK
10
+LVR-XE 73 M06/7B
BK
91 PCS
11
-XDX 205 M06/7A
BK
13
+LVD-SFS1 8 M07/3B
BK
3
3
14
TERMINAL UT 4 3044102
BK
+LVR-XE 30 Q10/2D
351
BK
+LVR-XE 29 Q10/3D
352
BK
Project name
+LVR-XE 20 Q10/4D
353
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 19 Q10/4D
354
BK
4
4
-FCM2.1 14 Q10/5D
355
BK
Date
-FCM2.1 13 Q10/5D
356
BK
13.8kV SWITCHGEAR
-FCM15.1 14 Q10/6D
BK
Approved BRAUN
-FCM12.1 13 Q10/7D
358
BK
10.3.2014
+PLG-QAB2-XB 15 Q11/2D
371
BK
5
5
+PLG-QAB2-XB 5 Q11/3D
372
BK
Title
+PLG-QAB2-XB 38 Q11/4D
373
BK
+PLG-QAB2-XB 28 Q11/4D
374
BK
-KFA11 14 Q11/5D
375
BK
-KFA12 14 Q11/5D
376
BK
6
6
-KFA11 13 Q11/6D
377
BK
Outgoing Feeder 2
+LVD-SFS1 12 Q11/7D
378
BK
ABB s.r.o., PPMV Brno
+LVD-SFS1 11 Q11/7D
379
BK
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
Doc. No.
Order No.
7
7
+LVR-XE 13 X02/3B
403
BK
+LVR-XE 14 X02/3E
404
BK
1000032473
+LVR-XE 15 X02/4B
405
BK
1VL8458359
+LVR-XE 16 X02/4E
406
BK
+ LV
+LVR-XE 25 X02/5B
407
BK
8
8
+LVR-XE 26 X02/5E
408
BK
= 00BBA01.06
Page
Pages
X02/6B
409
X02/6E
410
47
X07
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
X02/7B
411
Name
21.5.2014 ABRLE
X02/7E
412
Based on
+LCB-BGC2 22 X03/1B
421
BK
422
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 24 X03/1B
423
BK
+LCB-BGC2 25 X03/1E
424
BK
91 PCS
+LCB-BGC2 26 X03/2B
425
BK
426
BK
3
3
+LVR-XE 31 M06/8C
TERMINAL UT 4 3044102
428
BK
X03/2B
429
X03/2E
430
Project name
+PLG-QAB2-XB 24 X03/3B
431
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB2-XB 34 X03/3E
432
BK
4
4
+PLG-QAB2-XB 26 X03/3B
433
BK
Date
+PLG-QAB2-XB 36 X03/3E
434
BK
13.8kV SWITCHGEAR
+PLG-QAB2-XB 27 X03/4B
BK
Approved BRAUN
+PLG-QAB2-XB 37 X03/4E
436
BK
10.3.2014
+PLG-QAB2-XB 6 X03/4B
437
BK
5
5
+PLG-QAB2-XB 16 X03/4E
438
BK
Title
+PLG-QAB2-XB 55 X03/5B
439
BK
+PLG-QAB2-XB 56 X03/5E
440
BK
+PLG-QAB2-XB 9 X03/6B
441
BK
+PLG-QAB2-XB 19 X03/6E
442
BK
6
6
+PLG-QAB2-XB 32 X03/6B
443
BK
Outgoing Feeder 2
+PLG-QAB2-XB 42 X03/6E
444
BK
ABB s.r.o., PPMV Brno
+PLG-QAB2-XB 7 X03/7B
445
BK
+PLG-QAB2-XB 17 X03/7E
446
BK
+PLG-QAB2-XB 8 X03/7B
447
BK
Doc. No.
Order No.
7
7
+PLG-QAB2-XB 18 X03/7E
448
BK
+PLG-QAB2-XB 3 X03/8B
449
BK
1000032473
+PLG-QAB2-XB 13 X03/8E
450
BK
1VL8458359
-FCM3.1 13 X04/1B
501
BK
+ LV
-FCM3.1 14 X04/1E
502
BK
8
8
-FCM4.1 13 X04/1B
503
BK
= 00BBA01.06
Page
Pages
-FCM4.1 14 X04/1E
504
BK
-FCM11.1 13 X04/2B
505
BK
47
X08
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/2B
X04/3B
X05/2B
X05/3B
X05/4B
X05/5B
X05/6B
X05/7B
X04/2E
X04/2E
X04/3E
X05/2E
X05/3E
X05/4E
X05/5E
X05/6E
X05/7E
DEVICE
PIN
14
61
62
63
64
65
66
69
70
75
76
DESIGNATION
B B
DEVICE
-FCM11.1
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
+LVR-XE
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
506 507 508 509 510 551 552 553 554 555 556 557 558 559 560 561 562
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/3C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/3C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/5C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/5C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/5C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
328 -XDX BK
=KPREV-XDI2 22 Q03/2B
BK
22
241 -XDX BK
=KNEXT-XDI2 21 Q03/3B
BK
23
=KPREV-XDI2 24 Q03/3B
BK
24
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Outgoing Feeder 2
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.06
Page
Pages 47
X11
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
G
D
TERMINALS
Rev. Code
-XDV
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
21
1 -FCM11.1 BK
+VT-BAT10 2a S12/4D
BK
Name
21.5.2014 ABRLE
22
3 -FCM11.1 BK
+VT-BAT11 2a S12/4D
BK
Based on
23
5 -FCM11.1 BK
+VT-BAT12 2a S12/5D
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
25
-XG 1020 S12/5D
GNYE
26
-FCM15.1 2 S12/2D
BK
20 PCS
27
-FCM15.1 4 S12/2D
BK
29
+VT-BAT12 1n S12/2D
BK
3
3
30
1 -FCM14.2 BK
+VT-BAT10 da S12/7C
BK
42
-FCM14.2 2 S12/7D
BK
Project name
43
S12/7D
Prepared HORNAK
Checked HAVELKA
48
+TOP1-RAA1 2 S12/7D
BK
4
4
49
+VT-BAT12 dn S12/8D
BK
Date
50
13.8kV SWITCHGEAR
55
-FCM12.1 2 S13/1D
Approved BRAUN
56
-FCM12.1 4 S13/1D
BK
10.3.2014
57
-FCM12.1 6 S13/1D
BK
5
5
58
-XDV 24 S13/2D
BK
Title
6
6
Outgoing Feeder 2
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.06
Page
Pages 47
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/3A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11 -XDC -XDC 9 M06/7A
205
BK BK
206
BK BK
59 PCS
14 +LVD-SFC1 +PLG-QAB2-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB2-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB2-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
+LVR-XE 71 M06/5B
BK
Approved BRAUN
24 +LVR-XE +PLG-QAB2-XB 10 M06/7D
219
BK BK
10.3.2014
12 -XDC +PLG-QAB2-XB 49 M06/7D
220
BK BK
5
5
BK BK
Title
46 +PLG-QAB2-XB -XDX1 4 M06/5F
222
BK BK
44 +PLG-QAB2-XB M06/6F
223
BK
BK BK;BK
BK BK
6
6
BK BK
Outgoing Feeder 2
BK BK
ABB s.r.o., PPMV Brno
+LVR-XE 79 M07/8A
234
BK
BK BK
14 -XDC M07/3C
236
BK
Doc. No.
Order No.
7
7
M07/3C
237
-RAR1 B M07/5C
238
BK
1000032473
BK BK
1VL8458359
+PLG-QAB2-XB 23 M07/4C
240
BK
+ LV
BK BK
8
8
-XDX1 5 M07/7E
242
BK
= 00BBA01.06
Page
Pages
BK BK;BK
BK BK
47
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
12 -XDI2 -XDI2 20 M07/7F
254
BK BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+PLG-QAB2-XB 11 M09/3A
303
BK
+LVD-SFT1 13 M09/8A
304
BK
59 PCS
- +LVD-PFX1 +LVD-PFX4 -;2 M09/1F
311
BK BK;BK
312
BK BK
M09/7F
313
3
3
A2 -KFA13 M09/8F
TERMINAL UT 4 3044102
314
BK
BK BK
BK BK
Project name
51 +PLG-QAB2-XB +LVD-PFX3 G M09/5C
318
BK
Prepared HORNAK
BK
Checked HAVELKA
233 -XDX +PLG-QAB2-XB 29 Q02/2D
321
BK BK
4
4
+LCB-BGC2 28 Q02/3D
322
BK
Date
39 +PLG-QAB2-XB -XDI2 11 Q02/2E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q02/3E
BK
Approved BRAUN
21 -XDI2 -KFA11 23 Q03/2C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB2-XB BK
+LVD-PFX2 G M09/4C
BK
331 3316
6
6
Outgoing Feeder 2
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.06
Page
Pages 47
X14
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE3-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE3-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE3-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE3-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE3-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE3-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
44 PCS
XE17
17
46 +ES-QCE3-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE3-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE3-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE3-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE3-BGE3 BK
-XE 72 +LVM06/5C
BK
XE22
22
21 +ES-QCE3-BGE3 BK
+LV-XDX 210 +LVM06/5D
BK
Project name
XE23
23
22 +ES-QCE3-BGE3 BK
-XE 74 +LVM06/7C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE3-BGE3 BK
+LV-XDX 219 +LVM06/7D
BK
4
4
XE25
25
24 +ES-QCE3-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
Date
XE26
26
25 +ES-QCE3-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE3-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE3-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE3-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE3-RLE3 BK
+LV-XDC 428 +LVM06/8D
BK
XE61
61
40 +TES-QCE4-BGE2 BK
+LV-XDC 551 +LVX05/2C
BK
XE32
32
H +ES-QCE3-RLE3 BK
+LV-XDX 224 +LVM06/8E
BK
XE62
62
41 +TES-QCE4-BGE2 BK
+LV-XDC 552 +LVX05/2D
BK
6
6
XE63
63
42 +TES-QCE4-BGE2 BK
+LV-XDC 553 +LVX05/3C
BK
Outgoing Feeder 2
XE64
64
43 +TES-QCE4-BGE2 BK
+LV-XDC 554 +LVX05/3D
BK
ABB s.r.o., PPMV Brno
XE65
65
44 +TES-QCE4-BGE2 BK
+LV-XDC 555 +LVX05/4C
BK
XE66
66
45 +TES-QCE4-BGE2 BK
+LV-XDC 556 +LVX05/4D
BK
XE67
67
46 +TES-QCE4-BGE2 BK
+LV-XDX 302 +LVM09/3B
BK
Doc. No.
Order No.
7
7
XE68
68
47 +TES-QCE4-BGE2 BK
+LVD-PFX4 G +LVM09/3C
BK
XE69
69
48 +TES-QCE4-BGE2 BK
+LV-XDC 557 +LVX05/5C
BK
XE70
1000032473
70
49 +TES-QCE4-BGE2 BK
+LV-XDC 558 +LVX05/5D
BK
1VL8458359
XE71
71
20 +TES-QCE4-BGE3 BK
+LV-XDX 218 +LVM06/5B
BK
XE72
+ LV
72
21 +TES-QCE4-BGE3 BK
-XE 21 +LVM06/5C
BK
XE73
8
8
73
22 +TES-QCE4-BGE3 BK
+LV-XDC 10 +LVM06/7B
BK
= 00BBA01.06
Page
XE74
Pages
74
23 +TES-QCE4-BGE3 BK
-XE 23 +LVM06/7C
BK
XE75
75
24 +TES-QCE4-BGE3 BK
+LV-XDC 559 +LVX05/6C
BK
47
X15
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
+LVM09/2C
+LVM07/8C
+LVM09/2B
+LVM07/8B
+LVM07/7E
+LVM07/7E
+LVX05/6D
A A
DEVICE
PIN
560
302
234
241
253
19
R
DESIGNATION
B B
DEVICE
+LVD-PFX4
+LV-XDI2
+LV-XDC
+LV-XDX
+LV-XDX
+LV-XDX
+LV-XDX
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
BK
BK
BK
BK
BK
C C
76 77 78 79 80 81 82
TERMINALS
+LVR-XE
ISSUED BY:
D D
POTENTIAL/
XE76
XE77
XE78
XE79
XE80
XE81
XE82
BK
BK
BK
BK
BK
BK
BK
COLOR
+TES-QCE4-BGE3
+TES-QCE4-BGE3
+TES-QCE4-BGE3
+TES-QCE4-BGE3
+TES-QCE4-BGE3
+TES-QCE4-RLE3
+TES-QCE4-RLE3
DESIGNATION
DEVICE
E E
25
26
27
28
29
H
DEVICE
PIN
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
CB IN TEST / SERVICE
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.06+LVD SWITCH T0-3-8222/E T0-3-8222/E
B LOCAL - REMOTE SWITCH
B
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.06+LVD SWITCH T0-2-8004/E T0-2-8004/E
VOLTMETER SELECTOR SWITCH
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 4 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X22
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 9 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X23
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
DIODES
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.06
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Outgoing Feeder 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X24
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 47
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
-QAB3
VD4/P 17.12.32 P150
17.5 kV
M 1250 A
31.5 kA
-PFV1
czpebdz 25.6.2014
CPI VI-3P P2
SGB12 -BCT4,-BCT5,-BCT6
TPU 50.23
C 700/1/1 A at 40°C C
Core 2: 5P20, 15 VA
Core 1: 0.5Fs5, 10 VA
VALID FOR PANELS:
3 P1
POS. DESIGN. NAME
-BAT1,-BAT2,-BAT3
TJC5 7 00BBA01.07 Alternator 4
13.8/√3//0.11/√3//0.11/3 kV
0.5, 15 VA
-FA11
ISSUED BY:
3P, 50 VA
-FA21
-FA31
MWD16 -QCE2
EK6
D D
Earthing balls
4x d=25mm
-BCN1
KOLA 06 D2
Under cubicle
(accessory)
60/1 A
E G cl. 3 1,2 VA E
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB3
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
CON- SIG-
E M06/1F -XB 35 M09/1F
E
M01/1D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q02/3D
M07/7C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/3C
Q11/6C
Q11/7C
X03/4C
X03/4C
X03/6C
X03/8C
X03/5C
X03/7C
X03/5C
X03/6C
+PLG
-QAB3
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/4D
X03/4D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/3D
X03/6D
X03/8D
X03/5D
M06/6E
M07/2E
M07/4E
X03/7D
Q02/3E
M09/3B
M09/3B
Q11/6D
Q11/7D
M09/4B
M09/4B
M07/7C
M07/7C
X03/5D
M06/3C
X03/6D
D D
+LCB 20 22 24 26 28
Q02/4D
M07/6C
Q03/3C
X03/1C
X03/1C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE2
EK6
M07/6D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/5C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 Q01/2D 11 B
5-6 12 14
7-8
-KFA2
MAN CONTORL
MAN CONTORL
9 - 10 Q01/3D 11
ALTERNATOR CB
-XDX 217
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL ALTERNATOR CB
-KFA3 M01/8B ON COMMAND -XDX 218
OPEN/TRIP LOOP
Q01/4D 11 04BAC01GS003-YB01
+PLG -XB 57 04BAC01GS003-YB32
12 14
-QAB3
-KFA4
czpebdz 25.6.2014
-KFA9
Q02/6D 11
13
-XDX 215 -XDX 216 -KFA10
D Q02/7D 14 D
13
+LVD
-SFC1
14
MP1-11C
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
-XDC 17
+LVD-SFS1
M06/2A 6
MAN CONTORL
MAN CONTORL
B B
SYSTEM
SYSTEM
ALTERNATOR CB
13 TRIPPING COIL EARTHING
+LVD OFF COMMAND SWITCH RELEASE
-SFO1 04BAC01GS003-YB02 04BAC01GS008-YB15
XDX:321
14 Q02/4C
KTC4-9004
M01/7B
-XDC 12 +PLG -XB 52
-XDC 18
czpebdz 25.6.2014
-QAB3
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C -XDX 241 -XDX 242 24 24 C
26 33 -XB 53 54
+LCB
-KFA11 M01/7D M01/7D
-BGC2 M07/7E
27 34
-XDX 239 -XDX 240 M01/2F
ISSUED BY:
XE31
M06/5E 21
1K2
4K7
22K
5K6
U -BB2
M07/6D
14 5
BY500-1000 +ES-QCE2
5A 22 G
1000V
E F G H M02/4B -RLE3 -XDX1
-MO1
2 -XB 33 H M07/3D Q02/4C
M01/5D XDI2:14
XE32
-XB 30 6
M01/5D
A1 A1
+LVR-XE 32 -KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/4C 13 14 Q11/4C
23 24 Q03/3C 23 24
33 34 M07/6C 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
XE17 -QAB3
B B
+ES-QCE2 13 21 13 13
26 46
-BB3 -BB3 -BT2 -BT1
-BGE3 -BGE2
M02/6C M02/6B 14 22 14 14
27 47
XE28
XE18
-XB 22 21 50 51
M01/6D M01/6D M01/7D M01/7D
+LVR-XE 28 +LVR-XE 18
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14 14
11 M06/2B 11 M06/2B 11 M06/2B 11 M06/2C 11 M06/2C
12 12 12 12 12
24 24 24 24 24
21 21 21 21 21
E 22 22 22 22 22 E
34 34 34 34 34
31 31 31 31 31
32 32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C XDI2:14 M07/8E C
XDX:321 M07/8B
ISSUED BY:
D D
M01/5B
+PLG -XB 29
-QAB3
-KFA6 -KFA8 -KFA9
700-HA33Z1-3 A1 700-HA33Z1-3 A1 700-HA33Z1-3 A1 A1
41 33 28
DC110V -BB2 +LCB DC110V DC110V -KFA10
KC6-40E
A2 -BGC2 A2 A2 A2
42 -BT2 34 29 110-125VDC
M01/2F
14 -XB 39 14 14
11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 M01/5D 12 12
23 24
24 24 24
21 21 21 33 34
E 22 22 22 43 44 E
34 -XDX 323 -XDX 324 34 34
31 31 31
32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/7E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 13 C
-FCM11.4
XE29
XE19
S12/1C 14
+ES-QCE2
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14 13
-FCM14.1
XE30
XE20
ISSUED BY:
S10/6D 14
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
STATION
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS TRANSFORMER CB CLOSED CB CLOSED
POSITION POSITION CB REMOTE
COMMAND MODE
04BAC01GS003-XB01 04BAC01GS003-XB02 04BAC01GS003-XB41 04BAC01GS003-XB40 04BAC01GS003-XB43 04BAC01GS003-XB01 04BAC01GS003-XB01
B B
czpebdz 25.6.2014
15 38 19 42
M01/3D M01/3D M01/6D M01/6D
D D
-XDC 371 372 373 374 375 376 377 378 379 340 341 342 343
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+CT
P2 P2 P2
2S2
B TPU 50.23 -BCT4 B
700/1A 2S1
Core 2: 5P20, 15VA
-XDA 11
4 BK
-XDA 14
czpebdz 25.6.2014
4 BK
2S2
-BCT5
C 2S1 C
MAN
-XDA 13
4 BK CONTROL
SYSTEM
(CCP)
-XDA 16
4 BK
ISSUED BY:
2S2
-BCT6
2S1
D D
-XDA 15
4 BK
-XE
-XDA 17
1002 2,5 GNYE
E E
PROTECTION
CT´s MV PANEL
04BAC01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+LVD
-PGA1
-XDA 2 -XDA 18
4 BK 4 BK A
1S2 FB96-1
B TPU 50.23 -BCT4 700/1A B
700/1A 1S1 0-700/1400A
Core 1: 0.5Fs5, 10VA
-XDA 1 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 4 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S2 FB96-1
-BCT5 700/1A
C 1S1 0-700/1400A C
MAN
-XDA 3 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 6 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S2 FB96-1
-BCT6 700/1A
1S1 0-700/1400A
D D
-XDA 5 -XDA 23
4 BK 4 BK CURRENT
MEASURING MV
-XE PANEL
-XDA 7
1001 2,5 GNYE
04BAC01CE003A/B/C
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P1 P1 P1
L1 L2 L3 N
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
+CAB-BCN1
D KOLA 06 D260/1 A P2 S2 D
cl. 3 1,2 VA
S1
+CAB-BCN2
E KOLA 06 D2 S2 E
60/1 A
cl. 3 1,2 VA
GROUND FAULT
CURRENT
04BAC01CE021
04BAU01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
+VT A PE A PE A PE
N N N
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C C
-XDV 31
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
ISSUED BY:
1 13 21
-FCM14.1
S201-Z4 2 14 22
D D
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 1 2 3 4 5 6 -XDV 32 33 38 39 40
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
L1
E S12/4B L2
E
S12/4B L3
S12/4B
N
S12/2D 04BAC01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3E L1
S10/3E L2
S10/3E L3
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM11.4 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 8 9 10 11 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
04BAC01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.07+LV-00BBA01.07@PLD
=00BBA01.07+LV =00BBA01.07
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA3
-KFA4
-KFA5
-KFA6
-KFA8
-KFA9
-KFA3 PANEL 3 OFF
-FCM11.1
-FCM11.4
-KFA4 PANEL 4 OFF
-FCM2.1
-FCM3.1
-FCM4.1
-XDX1
+LVR-XE
-KFA5 PANEL 5 OFF
czpebdz 25.6.2014
-FCM14.1
-KFA6 PANEL 6 OFF
-KFA10 BB ES OPEN
-XDX
-KFA11 CB IN TEST POSITION
-XDI1 -XDI2
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.07+LVD-00BBA01.07@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.07+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
+TOP1
-PFX1 E/S OPEN / CLOSED
-RAA1
-PFX2 CB OPEN / CLOSED
-PGA1 L1
00BBA01.07
B -PGA2 L2 B
-PGA3 L3
-PGV1 VOLTMETER
-PGA1 -PGA2 -PGA3
-SFC1 CB CLOSE
-SFO1 CB OPEN
czpebdz 25.6.2014
705 mm
-SFS1 LOCAL - REMOTE SWITCH
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C C
+ES-QCE2
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT SPARE SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445
B B
czpebdz 25.6.2014
1 34
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/6C 14 S12/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
19 -XDA BK
+CT-BCT4 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
+LVD-PGA1 BK
+CT-BCT4 1S2 S02/4B
BK
Based on
3
21 -XDA BK
+CT-BCT5 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
23 -XDA BK
+CT-BCT6 1S1 S02/4D
BK
6
+LVD-PGA3 BK
+CT-BCT6 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4D
GNYE
12
+CT-BCT4 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/6B
BK
Date
19
-XDA 1 S02/6B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/6C
Approved BRAUN
21
-XDA 3 S02/6C
BK
10.3.2014
22
+LVD-PGA3 S02/6D
BK
5
5
23
-XDA 5 S02/6D
BK
Title
6
6
Alternator 4
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.07
Page
Pages 42
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
77 PCS
17
-XDX 233 M07/6B
BK
+PLG-QAB3-XB 19 Q11/6D
340 BK
3
3
+PLG-QAB3-XB 9 Q11/7D
TERMINAL UT 4 3044102
341
BK
+PLG-QAB3-XB 42 Q11/7D
342
BK
+PLG-QAB3-XB 32 Q11/8D
343
BK
Project name
+LVR-XE 30 Q10/2D
351
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 29 Q10/3D
352
BK
4
4
+LVR-XE 20 Q10/4D
353
BK
Date
+LVR-XE 19 Q10/4D
354
BK
13.8kV SWITCHGEAR
-FCM2.1 14 Q10/5D
BK
Approved BRAUN
-FCM2.1 13 Q10/6D
356
BK
10.3.2014
-FCM14.1 14 Q10/6D
357
BK
5
5
-FCM11.4 13 Q10/7D
358
BK
Title
+PLG-QAB3-XB 15 Q11/2D
371
BK
+PLG-QAB3-XB 5 Q11/2D
372
BK
+PLG-QAB3-XB 38 Q11/3D
373
BK
+PLG-QAB3-XB 28 Q11/3D
374
BK
6
6
Alternator 4
-KFA11 14 Q11/4D
375
BK
-KFA12 14 Q11/4D
376
BK
ABB s.r.o., PPMV Brno
-KFA11 13 Q11/5D
377
BK
+LVD-SFS1 12 Q11/5D
378
BK
+LVD-SFS1 11 Q11/6D
379
BK
Doc. No.
Order No.
7
7
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
1000032473
+LVR-XE 13 X02/3B
403
BK
1VL8458359
+LVR-XE 14 X02/3E
404
BK
+ LV
+LVR-XE 15 X02/4B
405
BK
8
8
+LVR-XE 16 X02/4E
406
BK
= 00BBA01.07
Page
Pages
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
42
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVR-XE 23 X02/6B
409
BK
Name
21.5.2014 ABRLE
+LVR-XE 24 X02/6E
410
BK
Based on
+LVR-XE 25 X02/7B
411
BK
412
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 22 X03/1B
421
BK
+LCB-BGC2 23 X03/1E
422
BK
77 PCS
+LCB-BGC2 24 X03/1B
423
BK
424
BK
X03/2B
425
3
3
X03/2E
TERMINAL UT 4 3044102
426
X03/2B
427
X03/2E
428
Project name
X03/3B
429
Prepared HORNAK
Checked HAVELKA
X03/3E
430
4
4
+PLG-QAB3-XB 24 X03/4B
431
BK
Date
+PLG-QAB3-XB 34 X03/4E
432
BK
13.8kV SWITCHGEAR
+PLG-QAB3-XB 26 X03/4B
BK
Approved BRAUN
+PLG-QAB3-XB 36 X03/4E
434
BK
10.3.2014
+PLG-QAB3-XB 27 X03/5B
435
BK
5
5
+PLG-QAB3-XB 37 X03/5E
436
BK
Title
+PLG-QAB3-XB 6 X03/5B
437
BK
+PLG-QAB3-XB 16 X03/5E
438
BK
+PLG-QAB3-XB 55 X03/6B
439
BK
+PLG-QAB3-XB 56 X03/6E
440
BK
6
6
Alternator 4
+PLG-QAB3-XB 7 X03/6B
441
BK
+PLG-QAB3-XB 17 X03/6E
442
BK
ABB s.r.o., PPMV Brno
+PLG-QAB3-XB 8 X03/7B
443
BK
+PLG-QAB3-XB 18 X03/7E
444
BK
+PLG-QAB3-XB 3 X03/8B
445
BK
Doc. No.
Order No.
7
7
+PLG-QAB3-XB 13 X03/8E
446
BK
-FCM3.1 13 X04/1B
501
BK
1000032473
-FCM3.1 14 X04/1E
502
BK
1VL8458359
-FCM4.1 13 X04/1B
503
BK
+ LV
-FCM4.1 14 X04/1E
504
BK
8
8
-FCM11.1 13 X04/2B
505
BK
= 00BBA01.07
Page
Pages
-FCM11.1 14 X04/2E
506
BK
X04/2B
507
42
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/3B
X04/2E
X04/3E
DEVICE
PIN
DESIGNATION
B B
DEVICE
POTENTIAL/
COLOR
czpebdz 25.6.2014
C C
508 509 510
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/3C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/4C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/5C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Alternator 4
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.07
Page
Pages 42
X10
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S12/1D
S12/1D
S12/1D
S12/2D
S10/6D
S10/6D
S10/7D
S10/7D
S10/7D
S10/6C
DEVICE
1015
1017
PIN
dn
da
n
2
a
a
DESIGNATION
B B
DEVICE
+TOP1-RAA1
+VT-BAT1
+VT-BAT2
+VT-BAT3
+VT-BAT3
+VT-BAT1
+VT-BAT3
-FCM11.4
-FCM11.4
-FCM11.4
-FCM14.1
-XDV
-XG
-XG
POTENTIAL/
COLOR
czpebdz 25.6.2014
GNYE
GNYE
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 8 9 10 11 31 32 33 38 39 40
TERMINALS
-XDV
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
COLOR
-FCM11.1
-FCM11.1
-FCM11.1
-XDV
-FCM14.1
DESIGNATION
DEVICE
E E
1
11
1
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
59 PCS
14 +LVD-SFC1 +PLG-QAB3-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB3-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB3-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB3-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB3-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB3-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
17 -XDC M07/5A
233
BK
6
6
Alternator 4
BK BK
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB3-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458359
-KFA11 33 M07/6C
242
BK
+ LV
BK BK
8
8
BK BK
= 00BBA01.07
Page
Pages
BK BK;BK
BK BK
42
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
14 -XDI2 M07/8F
254
BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LVD-SFT1 13 M09/7A
303
BK
M09/8A
304
59 PCS
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
M09/7F
313
3
3
M09/8F
TERMINAL UT 4 3044102
314
BK BK
BK BK
Project name
51 +PLG-QAB3-XB +LVD-PFX3 G M09/4D
318
BK
Prepared HORNAK
BK
Checked HAVELKA
234 -XDX +PLG-QAB3-XB 29 Q02/3D
321
BK BK
4
4
+LCB-BGC2 28 Q02/4D
322
BK
Date
39 +PLG-QAB3-XB -XDI2 13 Q02/3E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q02/4E
BK
Approved BRAUN
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB3-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
6
6
Alternator 4
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.07
Page
Pages 42
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE2-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE2-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE2-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE2-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE2-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE2-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE2-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE2-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE2-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE2-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE2-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE2-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE2-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE2-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE2-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE2-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE2-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE2-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE2-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE2-RLE3 BK
+LV-XDX 243 +LVM07/6D
BK
XE32
32
H +ES-QCE2-RLE3 BK
+LV-XDX 252 +LVM07/6E
BK
6
6
Alternator 4
7
7
1000032473
1VL8458359
+ LV
8
8
= 00BBA01.07
Page
Pages 42
X14
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.07+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 2 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 5 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
BB ES OPEN
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.07
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 4 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458359 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
-QAB3
VD4/P 17.12.32 P150
17.5 kV
M 1250 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P2
SGB12 -BCT4,-BCT5,-BCT6
C TPU 50.23 C
700/1/1 A at 40°C
Core 2: 5P20, 15 VA VALID FOR PANELS:
Core 1: 0.5Fs5, 10 VA
3 P1 POS. DESIGN. NAME
-BAT1,-BAT2,-BAT3 9 00BBA01.09 Alternator 5
TJC5
13.8/√3//0.11/√3//0.11/3 kV
ISSUED BY:
0.5, 15 VA
-FA11
3P, 50 VA
-FA21
-FA31
MWD16 -QCE2
D EK6 D
Earthing balls
4x d=25mm
-BCN1
KOLA 06 D2
Under cubicle
(accessory)
60/1 A
E G cl. 3 1,2 VA E
-BCN2
KOLA 06 D2
(accessory)
60/1 A
cl. 3 1,2 VA
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XDI1 2 -XDI1 2
-XDI1 3 -XDI1 3
-XDI1 4 -XDI1 4
-XDI1 5 -XDI1 5
-XDI1 6 -XDI1 6
-XDI1 7 -XDI1 7
B B
-XDI1 8 -XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/5C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB3
-BS1
-MS
CON+ M SIG+
M06/1A M09/1A
CON- SIG-
E M06/1F -XB 35 M09/1F
E
M01/1D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q02/4D
M07/7C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/3C
Q11/6C
Q11/7C
X03/4C
X03/4C
X03/6C
X03/8C
X03/5C
X03/7C
X03/5C
X03/6C
+PLG
-QAB3
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/4D
X03/4D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/3D
X03/6D
X03/8D
X03/5D
M06/6E
M07/2E
M07/4E
X03/7D
Q02/4E
M09/3B
M09/3B
Q11/6D
Q11/7D
M09/4B
M09/4B
M07/7C
M07/7C
X03/5D
M06/3C
X03/6D
D D
+LCB 20 22 24 26 28
Q02/5D
M07/6C
Q03/3C
X03/1C
X03/1C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE2
EK6
M07/6D
M09/2B
Q10/4C
X02/2C
X02/3C
X02/4C
B B
G 40 42 44 46 48
-RLE3 -BGE2
H 41 43 45 47 49
M09/1B
Q10/2C
X02/5C
X02/6C
X02/7C
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
-RLE3 EARTHING SWITCH BLOCKING COIL
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/5C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 Q01/2D 11 B
5-6 12 14
7-8
-KFA2
MAN CONTORL
MAN CONTORL
9 - 10 Q01/3D 11
ALTERNATOR CB
-XDX 217
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL ALTERNATOR CB
-KFA3 M01/8B ON COMMAND -XDX 218
OPEN/TRIP LOOP
Q01/4D 11 05BAC01GS003-YB01
+PLG -XB 57 05BAC01GS003-YB32
12 14
-QAB3
-KFA4
czpebdz 25.6.2014
-KFA9
Q02/6D 11
13
-XDX 215 -XDX 216 -KFA10
D Q02/7D 14 D
13
+LVD
-SFC1
14
MP1-11C
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
-XDC 17
+LVD-SFS1
M06/2A 6
MAN CONTORL
MAN CONTORL
B B
SYSTEM
SYSTEM
ALTERNATOR CB
13 TRIPPING COIL EARTHING
+LVD OFF COMMAND SWITCH RELEASE
-SFO1 05BAC01GS003-YB02 05BAC01GS008-YB15
XDX:321
14 Q02/5C
KTC4-9004
M01/7B
-XDC 12 +PLG -XB 52
-XDC 18
czpebdz 25.6.2014
-QAB3
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C -XDX 241 -XDX 242 24 24 C
26 33 -XB 53 54
+LCB
-KFA11 M01/7D M01/7D
-BGC2 M07/7E
27 34
-XDX 239 -XDX 240 M01/2F
ISSUED BY:
XE31
M06/5E 21
1K2
4K7
22K
5K6
U -BB2
M07/6D
14 5
BY500-1000 +ES-QCE2
5A 22 G
1000V
E F G H M02/4B -RLE3 -XDX1
-MO1
2 -XB 33 H M07/3D Q02/5C
M01/5D XDI2:16
XE32
-XB 30 6
M01/5D
A1 A1
+LVR-XE 32 -KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/4C 13 14 Q11/4C
23 24 Q03/3C 23 24
33 34 M07/6C 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
XE17 -QAB3
B B
+ES-QCE2 13 21 13 13
26 46
-BB3 -BB3 -BT2 -BT1
-BGE3 -BGE2
M02/6C M02/6B 14 22 14 14
27 47
XE28
XE18
-XB 22 21 50 51
M01/6D M01/6D M01/7D M01/7D
+LVR-XE 28 +LVR-XE 18
czpebdz 25.6.2014
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE CUBICLE
-XDI2 1 -XDI2 1
A A
-XDI2 2 -XDI2 2
-XDI2 3 -XDI2 3
-XDI2 4 -XDI2 4
-XDI2 5 -XDI2 5
-XDI2 6 -XDI2 6
-XDI2 7 -XDI2 7
-XDI2 8 -XDI2 8
B -XDI2 9 -XDI2 9
B
-XDI2 10 -XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14 14
11 M06/2B 11 M06/2B 11 M06/2B 11 M06/2C 11 M06/2C
12 12 12 12 12
24 24 24 24 24
21 21 21 21 21
E 22 22 22 22 22 E
34 34 34 34 34
31 31 31 31 31
32 32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CUBICLE CUBICLE
-XDI2 11 -XDI2 11
A A
-XDI2 12 -XDI2 12
-XDI2 13 -XDI2 13
-XDI2 14 -XDI2 14
-XDI2 15 -XDI2 15
-XDI2 16 -XDI2 16
-XDI2 17 -XDI2 17
-XDI2 18 -XDI2 18
B -XDI2 19 -XDI2 19
B
-XDI2 20 -XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C XDI2:16 M07/8E
C
XDX:321 M07/8B
ISSUED BY:
D M01/5B D
+PLG -XB 29
-QAB3
-KFA6 -KFA7 -KFA9
700-HA33Z1-3 A1 700-HA33Z1-3 A1 41 33 28 700-HA33Z1-3 A1 A1
-BB2 +LCB -KFA10
DC110V DC110V DC110V
-BGC2 KC6-40E
A2 A2 A2 A2
42 -BT2 34 29 110-125VDC
M01/2F
14 14 -XB 39 14
11 M06/2C 11 M06/2C M01/5D 11 M06/1D 13 14 M06/5D
12 12 12
23 24
24 24 24
21 21 21 33 34
E 22 22
-XDX 323 -XDX 324 22 43 44 E
34 34 34
31 31 31
32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS =NEXT
CUBICLE CIRCUIT BREAKER IN TEST POSITION CUBICLE
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 -XDI2 21 22 A
-XDI2 23 24 -XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/7E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 13 C
-FCM11.4
XE29
XE19
S12/1C 14
+ES-QCE2
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14 13
-FCM14.1
XE30
XE20
ISSUED BY:
S10/6D 14
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
STATION
CB CLOSED CB OPEN CB IN TEST CB IN SERVIS TRANSFORMER CB CLOSED CB CLOSED
POSITION POSITION CB REMOTE
COMMAND MODE
05BAC01GS003-XB01 05BAC01GS003-XB02 05BAC01GS003-XB41 05BAC01GS003-XB40 05BAC01GS003-XB43 05BAC01GS003-XB01 05BAC01GS003-XB01
B B
czpebdz 25.6.2014
15 38 19 42
M01/3D M01/3D M01/6D M01/6D
D D
-XDC 371 372 373 374 375 376 377 378 379 340 341 342 343
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+CT
P2 P2 P2
2S2
B TPU 50.23 -BCT4 B
700/1A 2S1
Core 2: 5P20, 15VA
-XDA 11
4 BK
-XDA 14
czpebdz 25.6.2014
4 BK
2S2
-BCT5
C 2S1 C
MAN
-XDA 13
4 BK CONTROL
SYSTEM
(CCP)
-XDA 16
4 BK
ISSUED BY:
2S2
-BCT6
2S1
D D
-XDA 15
4 BK
-XE
-XDA 17
1002 2,5 GNYE
E E
PROTECTION
CT´s MV PANEL
05BAC01CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
+LVD
-PGA1
-XDA 2 -XDA 18
4 BK 4 BK A
1S2 FB96-1
B TPU 50.23 -BCT4 700/1A B
700/1A 1S1 0-700/1400A
Core 1: 0.5Fs5, 10VA
-XDA 1 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 4 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S2 FB96-1
-BCT5 700/1A
C 1S1 0-700/1400A C
MAN
-XDA 3 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 6 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S2 FB96-1
-BCT6 700/1A
1S1 0-700/1400A
D D
-XDA 5 -XDA 23
4 BK 4 BK CURRENT
MEASURING MV
-XE PANEL
-XDA 7
1001 2,5 GNYE
05BAC01CE003A/B/C
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P1 P1 P1
L1 L2 L3 N
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
+CAB-BCN1
D KOLA 06 D260/1 A P2 S2 D
cl. 3 1,2 VA
S1
+CAB-BCN2
E KOLA 06 D2 S2 E
60/1 A
cl. 3 1,2 VA
GROUND FAULT
CURRENT
05BAC01CE021
05BAU01CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L2 L3
© Copyright 2012 ABB. All rights reserved.
A A
+VT A PE A PE A PE
N N N
2,5BK
2,5 BK 2,5 BK
2,5 BK
B B
czpebdz 25.6.2014
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
2,5BK
C C
-XDV 31
2,5BK
+TOP1-RAA1
1 2
2,5 BK
TR318 27R 500W
ISSUED BY:
1 13 21
-FCM14.1
S201-Z4 2 14 22
D D
Q10/6D
2,5BK
2,5BK
4GNYE
4GNYE
-XDV 1 2 3 4 5 6 -XDV 32 33 38 39 40
2,5BK
2,5BK
2,5BK
2,5BK
-XG
-XG
L1
E S12/4B L2
E
S12/4B L3
S12/4B
N
S12/2D 05BAC01CE011D
MAN CONTROL SYSTEM
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING Y/yd DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
S10/3E L1
S10/3E L2
S10/3E L3
B B
2,5 BK
2,5 BK
2,5 BK
SFS
1 3 5 13 21 1 3 5 13 21 0
czpebdz 25.6.2014
L1 - L2
-FCM11.4 -FCM11.1
S203-Z2
2 4 6
14 22 S203-Z1
2 4 6
14 22 L2 - L3
Q10/6C
X04/2C
C L3 - L1 C
FS1410760
CONTACTS 0 L1 - L2 L2 - L3 L3 - L1
1-2
2,5BK
2,5BK
2,5BK
3-4
S10/3E 5-6
N 7-8
2,5BK
2,5BK
2,5BK
ISSUED BY:
+LVD-SFV1
-XDV 8 9 10 11 L1 L3 L2 T0-2-8004/E
D D
1 3 5 7
2 4 6 8
05BAC01CE011A/B/C
2,5BK
2,5BK
E MAN CONTROL SYSTEM E
+LVD-PGV1
17 18
V
FB96-1
13800/110V
0-18kV
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VOLTAGE METERING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S12
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.09+LV-00BBA01.09@PLD
=00BBA01.09+LV =00BBA01.09
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA3
-KFA4
-KFA5
-KFA6
-KFA7
-KFA9
-KFA3 PANEL 3 OFF
-FCM11.1
-FCM11.4
-KFA4 PANEL 4 OFF
-FCM2.1
-FCM3.1
-FCM4.1
-XDX1
+LVR-XE
-KFA5 PANEL 5 OFF
czpebdz 25.6.2014
-FCM14.1
-KFA6 PANEL 6 OFF
-KFA10 BB ES OPEN
-XDX
-KFA11 CB IN TEST POSITION
-XDI1 -XDI2
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.09+LVD-00BBA01.09@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.09+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
+TOP1
-PFX1 E/S OPEN / CLOSED
-RAA1
-PFX2 CB OPEN / CLOSED
-PGA1 L1
00BBA01.09
B -PGA2 L2 B
-PGA3 L3
-PGV1 VOLTMETER
-PGA1 -PGA2 -PGA3
-SFC1 CB CLOSE
-SFO1 CB OPEN
czpebdz 25.6.2014
705 mm
-SFS1 LOCAL - REMOTE SWITCH
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
E E
A A
B B
czpebdz 25.6.2014
XE13
XE15
XE21
XE23
XE25
C C
+ES-QCE2
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT SPARE SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445
B B
czpebdz 25.6.2014
1 34
-XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13 13
-FCM3.1 -FCM4.1 -FCM11.1
G01/4C 14 G01/6C 14 S12/4C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
19 -XDA BK
+CT-BCT4 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
+LVD-PGA1 BK
+CT-BCT4 1S2 S02/4B
BK
Based on
3
21 -XDA BK
+CT-BCT5 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
23 -XDA BK
+CT-BCT6 1S1 S02/4D
BK
6
+LVD-PGA3 BK
+CT-BCT6 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4D
GNYE
12
+CT-BCT4 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/6B
BK
Date
19
-XDA 1 S02/6B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/6C
Approved BRAUN
21
-XDA 3 S02/6C
BK
10.3.2014
22
+LVD-PGA3 S02/6D
BK
5
5
23
-XDA 5 S02/6D
BK
Title
6
6
Alternator 5
7
7
1000032473
1VL8458360
+ LV
8
8
= 00BBA01.09
Page
Pages 42
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
77 PCS
17
-XDX 233 M07/6B
BK
+PLG-QAB3-XB 19 Q11/6D
340 BK
3
3
+PLG-QAB3-XB 9 Q11/7D
TERMINAL UT 4 3044102
341
BK
+PLG-QAB3-XB 42 Q11/7D
342
BK
+PLG-QAB3-XB 32 Q11/8D
343
BK
Project name
+LVR-XE 30 Q10/2D
351
Prepared HORNAK
BK
Checked HAVELKA
+LVR-XE 29 Q10/3D
352
BK
4
4
+LVR-XE 20 Q10/4D
353
BK
Date
+LVR-XE 19 Q10/4D
354
BK
13.8kV SWITCHGEAR
-FCM2.1 14 Q10/5D
BK
Approved BRAUN
-FCM2.1 13 Q10/6D
356
BK
10.3.2014
-FCM14.1 14 Q10/6D
357
BK
5
5
-FCM11.4 13 Q10/7D
358
BK
Title
+PLG-QAB3-XB 15 Q11/2D
371
BK
+PLG-QAB3-XB 5 Q11/2D
372
BK
+PLG-QAB3-XB 38 Q11/3D
373
BK
+PLG-QAB3-XB 28 Q11/3D
374
BK
6
6
Alternator 5
-KFA11 14 Q11/4D
375
BK
-KFA12 14 Q11/4D
376
BK
ABB s.r.o., PPMV Brno
-KFA11 13 Q11/5D
377
BK
+LVD-SFS1 12 Q11/5D
378
BK
+LVD-SFS1 11 Q11/6D
379
BK
Doc. No.
Order No.
7
7
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
1000032473
+LVR-XE 13 X02/3B
403
BK
1VL8458360
+LVR-XE 14 X02/3E
404
BK
+ LV
+LVR-XE 15 X02/4B
405
BK
8
8
+LVR-XE 16 X02/4E
406
BK
= 00BBA01.09
Page
Pages
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
42
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LVR-XE 23 X02/6B
409
BK
Name
21.5.2014 ABRLE
+LVR-XE 24 X02/6E
410
BK
Based on
+LVR-XE 25 X02/7B
411
BK
412
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LCB-BGC2 22 X03/1B
421
BK
+LCB-BGC2 23 X03/1E
422
BK
77 PCS
+LCB-BGC2 24 X03/1B
423
BK
424
BK
X03/2B
425
3
3
X03/2E
TERMINAL UT 4 3044102
426
X03/2B
427
X03/2E
428
Project name
X03/3B
429
Prepared HORNAK
Checked HAVELKA
X03/3E
430
4
4
+PLG-QAB3-XB 24 X03/4B
431
BK
Date
+PLG-QAB3-XB 34 X03/4E
432
BK
13.8kV SWITCHGEAR
+PLG-QAB3-XB 26 X03/4B
BK
Approved BRAUN
+PLG-QAB3-XB 36 X03/4E
434
BK
10.3.2014
+PLG-QAB3-XB 27 X03/5B
435
BK
5
5
+PLG-QAB3-XB 37 X03/5E
436
BK
Title
+PLG-QAB3-XB 6 X03/5B
437
BK
+PLG-QAB3-XB 16 X03/5E
438
BK
+PLG-QAB3-XB 55 X03/6B
439
BK
+PLG-QAB3-XB 56 X03/6E
440
BK
6
6
Alternator 5
+PLG-QAB3-XB 7 X03/6B
441
BK
+PLG-QAB3-XB 17 X03/6E
442
BK
ABB s.r.o., PPMV Brno
+PLG-QAB3-XB 8 X03/7B
443
BK
+PLG-QAB3-XB 18 X03/7E
444
BK
+PLG-QAB3-XB 3 X03/8B
445
BK
Doc. No.
Order No.
7
7
+PLG-QAB3-XB 13 X03/8E
446
BK
-FCM3.1 13 X04/1B
501
BK
1000032473
-FCM3.1 14 X04/1E
502
BK
1VL8458360
-FCM4.1 13 X04/1B
503
BK
+ LV
-FCM4.1 14 X04/1E
504
BK
8
8
-FCM11.1 13 X04/2B
505
BK
= 00BBA01.09
Page
Pages
-FCM11.1 14 X04/2E
506
BK
X04/2B
507
42
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
X04/3B
X04/2E
X04/3E
DEVICE
PIN
DESIGNATION
B B
DEVICE
POTENTIAL/
COLOR
czpebdz 25.6.2014
C C
508 509 510
TERMINALS
-XDC
ISSUED BY:
D D
POTENTIAL/
COLOR
DESIGNATION
DEVICE
E E
DEVICE
PIN
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
BK;BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1;1
2;2
3;3
4;4
5;5
6;6
7;7
8;8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1;1 =ANEXT-XDI2 BK;BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2;2 =ANEXT-XDI2 BK;BK
-KFA1 A2 Q01/2C
BK
Based on
3
3;3 =ANEXT-XDI2 BK;BK
-KFA2 A1 Q01/3C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5;5 =ANEXT-XDI2 BK;BK
-KFA3 A1 Q01/4C
BK
6
6;6 =ANEXT-XDI2 BK;BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7;7 =ANEXT-XDI2 BK;BK
-KFA4 A1 Q01/5C
BK
9
9;9 =ANEXT-XDI2 BK;BK
-KFA5 A1 Q01/6C
BK
3
3
10
Project name
13
Prepared HORNAK
BK
Checked HAVELKA
14
4
4
15
Date
16
13.8kV SWITCHGEAR
17
Approved BRAUN
18
10.3.2014
19
5
5
20
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
=KNEXT-XDI2 21 Q03/3B
BK
23
328 -XDX BK
=KPREV-XDI2 24 Q03/3B
BK
24
330 -XDX BK
=KNEXT-XDI2 23 Q03/4B
BK
6
6
Alternator 5
7
7
1000032473
1VL8458360
+ LV
8
8
= 00BBA01.09
Page
Pages 42
X10
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S10/3D
S12/1D
S12/1D
S12/1D
S12/2D
S10/6D
S10/6D
S10/7D
S10/7D
S10/7D
S10/6C
DEVICE
1015
1017
PIN
dn
da
n
2
a
a
DESIGNATION
B B
DEVICE
+TOP1-RAA1
+VT-BAT1
+VT-BAT2
+VT-BAT3
+VT-BAT3
+VT-BAT1
+VT-BAT3
-FCM11.4
-FCM11.4
-FCM11.4
-FCM14.1
-XDV
-XG
-XG
POTENTIAL/
COLOR
czpebdz 25.6.2014
GNYE
GNYE
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
C C
1 2 3 4 5 6 8 9 10 11 31 32 33 38 39 40
TERMINALS
-XDV
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
COLOR
-FCM11.1
-FCM11.1
-FCM11.1
-XDV
-FCM14.1
DESIGNATION
DEVICE
E E
1
11
1
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
201
BK BK
Name
21.5.2014 ABRLE
M06/4A
202
Based on
-XDX 217 M06/5A
203
BK
204
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
M06/7A
205
231 -XDX M06/8A
206
BK
59 PCS
14 +LVD-SFC1 +PLG-QAB3-XB 4 M06/2D
207
BK BK
208
BK
3
3
-XDX1 3 M06/5D
TERMINAL UT 4 3044102
211
BK
BK BK
BK BK
Project name
+PLG-QAB3-XB 57 M06/3B
214
Prepared HORNAK
BK
Checked HAVELKA
11 -KFA9 +LVD-SFC1 13 M06/2D
215
BK BK
4
4
58 +PLG-QAB3-XB M06/3D
216
BK
Date
-XDX 203 M06/5B
217
BK
13.8kV SWITCHGEAR
-KFA10 13 M06/5B
BK
Approved BRAUN
14 +PLG-QAB3-XB -FCM2.1 2 M06/2F
221
BK BK
10.3.2014
46 +PLG-QAB3-XB -XDX1 4 M06/5F
222
BK BK
5
5
44 +PLG-QAB3-XB M06/6F
223
BK
Title
-XDX 251 M06/8F
224
BK
BK BK
+LVD-SFS1 7 M07/3A
232
BK
17 -XDC M07/5A
233
BK
6
6
Alternator 5
BK BK
BK BK
ABB s.r.o., PPMV Brno
12 -XDC M07/3C
236
BK
M07/3C
237
-RAR1 B M07/5C
238
BK
Doc. No.
Order No.
7
7
BK BK
+PLG-QAB3-XB 23 M07/4C
240
BK
1000032473
BK BK
1VL8458360
-KFA11 33 M07/6C
242
BK
+ LV
BK BK
8
8
BK BK
= 00BBA01.09
Page
Pages
BK BK;BK
BK BK
42
X12
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
253
BK BK
Name
21.5.2014 ABRLE
16 -XDI2 M07/8F
254
BK
Based on
17;4 +LVR-XE +LVR-XE 27 M09/1A
301
BK;BK BK
302
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
+LVD-SFT1 13 M09/7A
303
BK
M09/8A
304
59 PCS
- +LVD-PFX1 -FCM4.1 2 M09/2F
311
BK BK
312
BK BK
M09/7F
313
3
3
M09/8F
TERMINAL UT 4 3044102
314
BK BK
BK BK
Project name
51 +PLG-QAB3-XB +LVD-PFX3 G M09/4D
318
BK
Prepared HORNAK
BK
Checked HAVELKA
234 -XDX +PLG-QAB3-XB 29 Q02/4D
321
BK BK
4
4
+LCB-BGC2 28 Q02/5D
322
BK
Date
39 +PLG-QAB3-XB -XDI2 15 Q02/4E
323
BK BK
13.8kV SWITCHGEAR
29 +LCB-BGC2 Q02/5E
BK
Approved BRAUN
23 -XDI2 -KFA11 23 Q03/3C
328
BK BK
10.3.2014
+LCB-BGC2 20 Q03/3C
329
BK
5
5
BK BK
Title
+LCB-BGC2 21 Q03/3D
BK
21 +PLG-QAB3-XB BK
+LVD-PFX2 G M09/3D
BK
331 3316
6
6
Alternator 5
7
7
1000032473
1VL8458360
+ LV
8
8
= 00BBA01.09
Page
Pages 42
X13
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
+LVR-XE
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
XE11
11
40 +ES-QCE2-BGE2 BK
+LV-XDC 401 +LVX02/2C
BK
Name
21.5.2014 ABRLE
XE12
12
41 +ES-QCE2-BGE2 BK
+LV-XDC 402 +LVX02/2D
BK
Based on
XE13
13
42 +ES-QCE2-BGE2 BK
+LV-XDC 403 +LVX02/3C
BK
14
43 +ES-QCE2-BGE2 +LV-XDC 404 +LVX02/3D
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
XE15
15
44 +ES-QCE2-BGE2 BK
+LV-XDC 405 +LVX02/4C
BK
XE16
16
45 +ES-QCE2-BGE2 BK
+LV-XDC 406 +LVX02/4D
BK
22 PCS
XE17
17
46 +ES-QCE2-BGE2 BK
+LV-XDX 301 +LVM09/2B
BK
18
47 +ES-QCE2-BGE2 BK
+LVD-PFX1 G +LVM09/2C
BK
XE19
19
48 +ES-QCE2-BGE2 BK
+LV-XDC 354 +LVQ10/4C
BK
3
3
XE20
20
49 +ES-QCE2-BGE2 BK
+LV-XDC 353 +LVQ10/4D
BK
XE21
20 +ES-QCE2-BGE3 BK
+LV-XDC 407 +LVX02/5C
BK
XE22
22
21 +ES-QCE2-BGE3 BK
+LV-XDC 408 +LVX02/5D
BK
Project name
XE23
23
22 +ES-QCE2-BGE3 BK
+LV-XDC 409 +LVX02/6C
Prepared HORNAK
BK
Checked HAVELKA
XE24
24
23 +ES-QCE2-BGE3 BK
+LV-XDC 410 +LVX02/6D
BK
4
4
XE25
25
24 +ES-QCE2-BGE3 BK
+LV-XDC 411 +LVX02/7C
BK
Date
XE26
26
25 +ES-QCE2-BGE3 BK
+LV-XDC 412 +LVX02/7D
BK
13.8kV SWITCHGEAR
XE27
27
XE28
Approved BRAUN
28
27 +ES-QCE2-BGE3 BK
+LVD-PFX1 R +LVM09/1C
BK
10.3.2014
XE29
29
28 +ES-QCE2-BGE3 BK
+LV-XDC 352 +LVQ10/2C
BK
5
5
XE30
30
29 +ES-QCE2-BGE3 BK
+LV-XDC 351 +LVQ10/2D
BK
Title
XE31
31
G +ES-QCE2-RLE3 BK
+LV-XDX 243 +LVM07/6D
BK
XE32
32
H +ES-QCE2-RLE3 BK
+LV-XDX 252 +LVM07/6E
BK
6
6
Alternator 5
7
7
1000032473
1VL8458360
+ LV
8
8
= 00BBA01.09
Page
Pages 42
X14
Lang. English
F
E
B
C
A
D
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X15
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X16
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
-SFS1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
=00BBA01.09+LVD SWITCH T0-3-8222/E T0-3-8222/E
LOCAL - REMOTE SWITCH
LAMP TEST
-SFV1 Sensor, switch, and pushbutton - Switch / pushbutton - Selectors switches EATON
ISSUED BY:
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X17
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
VT - Y WINDING
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X18
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 2 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X19
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
PANEL 5 OFF
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X20
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART LIST
© Copyright 2013 ABB. All rights reserved.
BB ES OPEN
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.09
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Alternator 5 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PART LIST DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X21
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458360 Pages 42
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B 00BBA01 B
-QAB1
VD4/P 17.06.32 P150
17.5 kV
M 630 A
31.5 kA
czpebdz 25.6.2014
-PFV1
CPI VI-3P P1
SGB12 -BCT1,-BCT2,-BCT3
C 150/1/1 A at 40°C C
Core 2: 5P20, 10 VA
Core 1: 0.5Fs5, 10 VA VALID FOR PANELS:
3 P2 POS. DESIGN. NAME
10 00BBA01.10 Station Transformer 2
Earthing balls
ISSUED BY:
-FA11 4x d=25mm
-FA21
-FA31
MWD16 -QCE1
D EK6 D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SINGLE LINE SCHEME DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TYPICAL INFORMATIONS DCC Code &EFA Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
© Copyright 2013 ABB. All rights reserved.
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name SHEET INDEX DCC Code Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page A03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o., PPMV Brno 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS SPRING
CUBICLE REDUNDANT CONTROL CHARGER
SIGNAL CIRCUIT
© Copyright 2012 ABB. All rights reserved.
A A
-XDI1 2
-XDI1 3
-XDI1 4
-XDI1 5
-XDI1 6
-XDI1 7
B B
-XDI1 8
-XDI1 1 2 3 4 5 6 7 8
czpebdz 25.6.2014
C 3 1 13 21 3 1 13 21 3 1 13 21 C
-FCM2.1 -FCM3.1 -FCM4.1
S202-C2 4 2 14 22 S202-K1 4 2 14 22 S202-C1 4 2 14 22
6kA 6kA 6kA
Q10/6C
X04/1C
X04/1C
ISSUED BY:
D D
M01/1B
+PLG -XB 25
-QAB1
-BS1
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name DC SUPPLY CIRCUITS DC 110 V DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page G01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-XG
1011
1012
M07/2D
M07/2D
M07/4D
Q02/5D
M07/5C
M06/3C
M09/3B
G01/4D
M06/5E
M06/2E
M06/6E
Q11/2C
Q11/4C
X03/3C
X03/3C
X03/7C
X03/8C
X03/4C
X03/7C
X03/4C
X03/5C
X03/6C
X03/5C
+PLG
-QAB1
-XB 24 26 25 45 4 5 28 7 3 27 43 31 41 23 8 6 29 11 9 32 1 40 52 57 55
-BB11
CB CHARGED
CB DISCHARGED
CB CLOSED
B 2 B
CB OPEN
-BS2
-BS1
4 2 1
-BT2
0 I
3 1 13 23 33 53
-BB1
-BB2
-BB3
-MS
13 31 53 43 13 21 31 53 41 13 21 41 31 14 24 34 54
M P
-BT1
14 32 54 44 14 22 32 54 42 14 22 42 32
czpebdz 25.6.2014
POSITION
SERVICE
13 23 33 53
-BB4
4 14 24 34 54
C E C
POSITION
A 1
-RL2 -MC -MU -MO1
TEST
-XB 34 36 35 46 14 15 38 17 13 37 44 30 33 18 39 22 21 19 42 50 51 53 54 16 58 56
ISSUED BY:
X03/3D
X03/3D
G01/4E
M06/5E
M06/2E
Q11/2D
Q11/4D
X03/7D
X03/8D
X03/4D
M06/6E
M07/2E
M07/4E
X03/7D
Q02/5E
M09/3C
M09/3C
X03/5D
X03/6D
M09/4C
M09/4C
M07/5C
M07/6C
X03/4D
M06/3C
X03/5D
D D
+LCB 20 22 24 26 28
Q03/3C
Q02/6E
X03/1C
X03/1C
X03/2C
-BGC2
21 23 25 27 29
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name VD4 INTERNAL WIRING DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A A
+ES-QCE1
EK6
M09/2B
Q10/4C
X02/2D
X02/3D
X02/4D
B B
40 42 44 46 48
-BGE2
41 43 45 47 49
M09/1B
Q10/3C
X02/5D
X02/6D
X02/7D
20 22 24 26 28
czpebdz 25.6.2014
-BGE3
21 23 25 27 29
+CAB
C C
D D
DESIGNATION DESCRIPTION
-BGE3 EARTHING SWITCH OPEN AND CRANK NOT INSERTED
-BGE2 EARTHING SWITCH CLOSED
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name EARTHING SWITCH TYPE EK6 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CON+ CON+
A A
G01/2E -XDX 201 202 203 204 205 206 M07/1A
2 4
+LVD-SFS1
SFS1 T0-3-8222/E 1 3
LOCAL REMOTE 4 3 M06/4A
5 6 M07/2B
7 8 M07/3A
FS943
9 10 -XDX 213 -XDX 214
CONTACTS LOC. REM. 11 12 Q11/7C
12 14
1-2
-KFA1 -XDC 1 -XDC 7
B 3-4 B
Q01/2D 11
5-6 12 14
7-8
-KFA2
MAN CONTORL
MAN CONTORL
9 - 10 Q01/3D 11
STATION TFR CB
-XDX 217
STATION TFR CB
11 - 12
SYSTEM
SYSTEM
12 14
CLOSING COIL OPEN/TRIP LOOP
-KFA3 ON COMMAND -XDX 218 00BHT02GS103-YB32
Q01/4D 11 00BHT02GS103-YB01
12 14
M01/8B
-KFA4
czpebdz 25.6.2014
+PLG -XB 57
Q01/5D 11 -QAB1 -XDC 2 -XDC 8
12 14
-KFA5 53
-BT2
C Q01/6D 11 C
12 14 54
-KFA6
Q02/2D 11
12 14
-XB 58
M01/8D
-KFA7
Q02/3D 11
12 14 13
ISSUED BY:
-KFA8 -KFA10
Q02/4D 11 Q02/7D 14
-XDX 207 -XDX 208 -XDX 210 -XDX 211 -XDX 212
4
-XB 14 -XB 46 -XB 44
M01/3D M01/2D M01/4D
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CONTROL CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M06
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CON+
M06/8A -XDX 231 232 233 234
7
+LVD-SFS1
M06/2A 8
-XDC 11
5
+LVD-SFS1
M06/2A 6
MAN CONTORL
B STATION TFR CB
B
SYSTEM
TRIPPING COIL
13 OFF COMMAND
+LVD
00BHT02GS103-YB02 XDX:321
-SFO1
14 Q02/5C
MCBH-20
M01/7B
-XDC 12 +PLG -XB 52
czpebdz 25.6.2014
-QAB1
23 23
-BT2 -BT1
-XDX 235 -XDX 236 -XDX 237 -XDX 238
C 24 24 C
-XB 53 54
M01/7D M01/7D
M01/5B M01/5B
+PLG -XB 31 41 M01/5B
-QAB1 1 +PLG -XB 23 -RAR1 D C B A
D -BB2
13
-QAB1 D
-XDX1
14 M06/5E 21
1K2
4K7
22K
5K6
U -BB2
X01/8E
BY500-1000
5A 22
-MO1 1000V
E F G H
2 -XB 33 Q02/5C
-XB 30 M01/5D XDI2:18
M01/5D
A1 A1
-KFA11 -KFA12
KC6-40E KC6-40E
E 110-125VDC A2 110-125VDC A2 E
13 14 Q11/5C 13 14 Q11/5C
23 24 Q03/2C 23 24
33 34 33 34
43 44 43 44
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name TRIPPING CIRCUITS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page M07
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ES OPEN AND ES CLOSED CB OPEN CB CLOSED CB IN TEST CB IN SERVICE LAMP TEST
CRANK NOT POSITION
INSERTED
© Copyright 2012 ABB. All rights reserved.
A A
SIG+
G01/6E -XDX 301 302 303 304
+LVR-XE 27 +LVR-XE 17
XE27
XE17
B M01/6B B
+ES-QCE1 +PLG -XB 11
26 46
-BGE3 -BGE2 -QAB1
M02/6C M02/6B
27 47 13 21 13 13
-BB3 -BB3 -BT2 -BT1
XE28
XE18
14 22 14 14
+LVR-XE 28 +LVR-XE 18
-XB
czpebdz 25.6.2014
22 21 50 51
M01/6D M01/6D M01/7D M01/7D
C C
63 53 43 33 23 +LVD 13
+LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 +LVD-SFT1 -SFT1
MCB-10
-XDX 315 3316 317 318 M09/7D M09/7D M09/7D M09/7D M09/7D
ISSUED BY:
64 54 44 34 24 LAMP TEST 14
23 24 M09/7D
33 34 M09/6D
43 44 M09/6D
53 54 M09/5D
D 63 64 M09/5D D
E E
- - -
CUBICLE
-XDI2 1
A A
-XDI2 2
-XDI2 3
-XDI2 4
-XDI2 5
-XDI2 6
-XDI2 7
-XDI2 8
B -XDI2 9
B
-XDI2 10
-XDI2 1 2 3 4 5 6 7 8 9 10
czpebdz 25.6.2014
C C
ISSUED BY:
D D
14 14 14 14 14
11 M06/2B 11 M06/2B 11 M06/2B 11 M06/2C 11 M06/2C
12 12 12 12 12
24 24 24 24 24
21 21 21 21 21
22 22 22 22 22
E 34 34 34 34 34
E
31 31 31 31 31
32 32 32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS BB ES OPEN
© Copyright 2012 ABB. All rights reserved.
CUBICLE
-XDI2 11
A A
-XDI2 12
-XDI2 13
-XDI2 14
-XDI2 15
-XDI2 16
-XDI2 17
-XDI2 18
B -XDI2 19
B
-XDI2 20
-XDI2 11 12 13 14 15 16 17 18 19 20
czpebdz 25.6.2014
C XDI2:18 M07/7E
C
XDX:321 M07/7B
ISSUED BY:
D D
M01/5B
+PLG -XB 29
-KFA6 -KFA7 -KFA8
700-HA33Z1-3 A1 700-HA33Z1-3 A1 700-HA33Z1-3 A1 -QAB1 A1
DC110V DC110V DC110V -KFA10
41 33 28 KC6-40E
A2 A2 A2 -BB2 A2
+LCB 110-125VDC
42 -BT2 34 -BGC2
29
M01/2F
14 14 14
11 M06/2C 11 M06/2C 11 M06/1D 13 14 M06/5D
12 12 12 -XB 39
23 24
24 24 24 M01/5D
21 21 21 33 34
E 22 22 22 43 44 E
34 34 34 -XDX 323 -XDX 324
31 31 31
32 32 32
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=PREVIOUS
CUBICLE CIRCUIT BREAKER IN TEST POSITION
© Copyright 2012 ABB. All rights reserved.
A -XDI2 21 22 A
-XDI2 23 24
B B
C C
20
23 +LCB
-KFA11 -BGC2
M07/5E 24 21
M01/1F
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name XDI2 SIGNALS DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C +LVR-XE 29 +LVR-XE 19 C
XE29
XE19
+ES-QCE1
28 48 13
-BGE3 -BGE2
M02/6C M02/6B -FCM2.1
29 49 G01/2C 14
XE30
XE20
ISSUED BY:
+LVR-XE 30 +LVR-XE 20
D D
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q10
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
00BHT02GS103-XB43
B B
czpebdz 25.6.2014
C C
M01/3B M01/3B
+PLG -XB 5 +PLG -XB 28
-QAB1 -QAB1
13 13 11
13 31
-BB1 -BB1 -KFA11 -KFA12 +LVD-SFS1
M07/5E 14 M07/6E 14 M06/2A 12
14 32
ISSUED BY:
-XB 15 -XB 38
M01/3D M01/3D
D D
-XDC 371 372 373 374 375 376 377 378 379
=
E + E
MAN
CONTROL
SYSTEM
(CCP)
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MAN CONTROL SYSTEM DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page Q11
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 17
+CT 1002 2,5 GNYE
P1 P1 P1
2S1
B TPU 50.23., IP=150A -BCT1 B
150/1A 2S2
Core 2: 5P20, 10VA
-XDA 12
4 BK
-XDA 13
czpebdz 25.6.2014
4 BK
2S1
-BCT2
C 2S2 C
MAN
-XDA 14
4 BK CONTROL
SYSTEM
(CCP)
-XDA 15
4 BK
ISSUED BY:
2S1
-BCT3
2S2
D D
-XDA 16
4 BK
E E
PROTECTION
CT´s MV PANEL
00BHT02CE001A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
L1 L2 L3
A = A
+
-XE
-XDA 7
+CT 1001 2,5 GNYE DO NOT REMOVE THESE JUMPERS
UNTIL EXTERNAL DEVICES IN MAN CONTROL SYSTEM ARE SECURELY CONNECTED
+LVD
-PGA1
-XDA 1 -XDA 18
4 BK 4 BK A
1S1 FB96-1
B TPU 50.23 -BCT1 150/1A B
150/1A 1S2 0-150/300A
Core 1: 0.5Fs5, 10VA
-XDA 2 -XDA 19
4 BK 4 BK
+LVD
-PGA2
-XDA 3 -XDA 20
A
czpebdz 25.6.2014
4 BK 4 BK
1S1 FB96-1
-BCT2 150/1A
C 1S2 0-150/300A C
MAN
-XDA 4 -XDA 21
4 BK 4 BK CONTROL
+LVD
SYSTEM
-PGA3 (CCP)
-XDA 5 -XDA 22
4 BK 4 BK A
ISSUED BY:
1S1 FB96-1
-BCT3 150/1A
1S2 0-150/300A
D D
-XDA 6 -XDA 23
4 BK 4 BK
+CAB -BAD1
Ck
-BAD2
Ck
6 SR
-BAD3
Ck 21
-XG
E E
+LVD
-PFV1 GND L3 GND L2 GND L1 GND
CPI VI-3P 10-52KV 8201
P2 P2 P2
L1 L2 L3 N
CURRENT
MEASURING MV
PANEL
00BHT02CE003A/B/C
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CURRENT TRANSFORMER CORE 1 DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A = A
+
L1 L2 L3
B B
+CAB
czpebdz 25.6.2014
C C
MAN
CONTROL
SYSTEM
(CCP)
ISSUED BY:
P1 S1
-BCN1
D KOLA 06 D2 P2 S2 D
Under cubicle (accessory)
60/1 A
cl. 3 1,2 VA, VA
E E
GROUND FAULT
CURRENT
00BHT02CE021
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name GFCT DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page S09
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.10+LV-00BBA01.10@PLD
=00BBA01.10+LV =00BBA01.10
© Copyright 2012 ABB. All rights reserved.
-KFA10
-KFA11
-KFA12
-KFA1
-KFA2
-KFA3
-KFA4
-KFA5
-KFA6
-KFA7
-KFA8
-KFA6 PANEL 6 OFF
-RAR1 -KFA7 PANEL 7 OFF
-FCM2.1
-FCM3.1
-FCM4.1
+LVR-XE
-XDX1
-KFA8 PANEL 9 OFF
czpebdz 25.6.2014
-KFA10 BB ES OPEN
-XDX -XDA
-XDC
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name PANEL LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page V01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=00BBA01.10+LVD-00BBA01.10@DLD
© Copyright 2012 ABB. All rights reserved.
=00BBA01.10+LVD
A A
DEVICE TAG TEXT
-PFV1 VOLTAGE INDICATOR
-PGA1 L1
00BBA01.10
B -PGA2 L2 B
-PGA3 L3
-SFC1 CB CLOSE
-PGA1 -PGA2 -PGA3
-SFO1 CB OPEN
705 mm
-SFT1 LAMP TEST
C -PFX3
C
-PFV1
-PFX1
-SFS1 -SFT1
ISSUED BY:
D D
650 mm
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name LV COMP. DOOR LAYOUT 650x705 DCC Code &ELU Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page W01
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A +LVD A
-WE
PE1 PE2 PE3 PE4 PE5
5
B B
+LVR
201 202 203 204 205
-WE1
czpebdz 25.6.2014
C C
ISSUED BY:
D D
5
E E
-XDX1
M07/3D
A A
B B
czpebdz 25.6.2014
C C
XE13
XE15
XE21
XE23
XE25
+ES-QCE1
40 42 44 20 22 24
-BGE2 -BGE2 -BGE2 -BGE3 -BGE3 -BGE3
M02/5B M02/5B M02/5B M02/5C M02/5C M02/5C
ISSUED BY:
41 43 45 21 23 25
XE12
XE14
XE16
XE22
XE24
XE26
D +LVR-XE 12 +LVR-XE 14 +LVR-XE 16 +LVR-XE 22 +LVR-XE 24 +LVR-XE 26 D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name ES SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X02
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
PLUG OUT PLUG OUT PLUG OUT SPARE SPARE CB SPRING CB SPRING CB MECHANICAL CB CLOSED AND CB IN SERVICE CB CLOSED CB CLOSED CB CLOSED CB OPEN CB CLOSED
CHARGED DISCHARGED FAILURE IN SERVICE POSITION
POSITION
-XDC 421 423 425 427 429 431 433 435 437 439 441 443 445 447 449
B B
czpebdz 25.6.2014
M01/1B M01/1B M01/4B M01/5B M01/8B M01/6B M01/6B M01/3B M01/5B M01/3B
C +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG +PLG C
-XB 24 -XB 26 -XB 27 -XB 6 -XB 55 -XB 9 -XB 32 -XB 7 -XB 8 -XB 3
-QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1 -QAB1
2 53
-BB11 -BB2
4 2 53 41 31 53 31 43
-BS2 -BS2 -BT1 -BB3 -BB3 -BB1 -BB2 -BB1
22 24 26 1 54
+LCB +LCB +LCB 4 33
3 1 -BB4 -BT1 54 42 32 54 32 44
-BGC2 -BGC2 -BGC2
23 25 27
M01/1F M01/2F M01/2F
1 34
-XB -XB -XB -XB -XB -XB -XB -XB
ISSUED BY:
34 36 56 19 42 17 18 13
M01/1D M01/1D -XB 37 -XB 16 M01/8D M01/6D M01/6D M01/3D M01/5D M01/3D
M01/4D M01/8D
D D
E E
-XDC 422 424 426 428 430 432 434 436 438 440 442 444 446 448 450
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name CB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X03
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
czpebdz 25.6.2014
C C
13 13
-FCM3.1 -FCM4.1
G01/4C 14 G01/6C 14
ISSUED BY:
D D
E E
F F
Based on Prepared HORNAK Date 10.3.2014 Title Order No. = 00BBA01.10
C 17.04.2014 HORNAK Customer Checked HAVELKA Approved BRAUN Station Transformer 2 1000032473 + LV
D 21.5.2014 ABRLE MAN Diesel & Turbo SE Project name MCB SPARE CONTACTS DCC Code &EFS Lang. English
F 9.6.2014 ABRLE Contract No. 5302272 UCIC, Saudi Arabia Doc. No. Page X04
Rev. Code Date Name 13.8kV SWITCHGEAR ABB s.r.o. 1VL8458361 Pages 37
1 2 3 4 5 6 7 8
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDA
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-PGA1 BK
+CT-BCT1 1S1 S02/4B
BK
Name
21.5.2014 ABRLE
2
19 -XDA BK
+CT-BCT1 1S2 S02/4B
BK
Based on
3
+LVD-PGA2 BK
+CT-BCT2 1S1 S02/4C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
+LVD-PGA3 BK
+CT-BCT3 1S1 S02/4D
BK
6
23 -XDA BK
+CT-BCT3 1S2 S02/4D
BK
20 PCS
7
-XE 1001 S02/4A
GNYE
12
+CT-BCT1 2S2 S01/4B
BK
3
3
13
Project name
16
Prepared HORNAK
BK
Checked HAVELKA
17
4
4
18
+LVD-PGA1 S02/5B
BK
Date
19
-XDA 2 S02/5B
BK
13.8kV SWITCHGEAR
20
+LVD-PGA2 S02/5C
Approved BRAUN
21
-XDA 4 S02/5C
BK
10.3.2014
22
+LVD-PGA3 S02/5D
BK
5
5
23
-XDA 6 S02/5D
BK
Title
6
6
Station Transformer 2
7
7
1000032473
1VL8458361
+ LV
8
8
= 00BBA01.10
Page
Pages 37
X05
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
+LVD-SFS1 3 M06/4B
BK
Name
21.5.2014 ABRLE
2
-XDX 208 M06/4C
BK
Based on
7
-XDX 204 M06/6B
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
11
+LVD-SFS1 8 M07/3B
BK
12
-XDX 236 M07/3C
BK
71 PCS
+LVR-XE 30 Q10/3D
351
BK
352
BK
+LVR-XE 20 Q10/4D
353 BK
3
3
+LVR-XE 19 Q10/5D
TERMINAL UT 4 3044102
354
BK
-FCM2.1 14 Q10/6D
355
BK
-FCM2.1 13 Q10/7D
356
BK
Project name
+PLG-QAB1-XB 15 Q11/2D
371
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB1-XB 5 Q11/3D
372
BK
4
4
+PLG-QAB1-XB 38 Q11/4D
373
BK
Date
+PLG-QAB1-XB 28 Q11/4D
374
BK
13.8kV SWITCHGEAR
-KFA11 14 Q11/5D
BK
Approved BRAUN
-KFA12 14 Q11/5D
376
BK
10.3.2014
-KFA11 13 Q11/6D
377
BK
5
5
+LVD-SFS1 12 Q11/7D
378
BK
Title
+LVD-SFS1 11 Q11/7D
379
BK
+LVR-XE 11 X02/2B
401
BK
+LVR-XE 12 X02/2E
402
BK
+LVR-XE 13 X02/3B
403
BK
6
6
+LVR-XE 14 X02/3E
404
BK
Station Transformer 2
+LVR-XE 15 X02/4B
405
BK
ABB s.r.o., PPMV Brno
+LVR-XE 16 X02/4E
406
BK
+LVR-XE 21 X02/5B
407
BK
+LVR-XE 22 X02/5E
408
BK
Doc. No.
Order No.
7
7
+LVR-XE 23 X02/6B
409
BK
+LVR-XE 24 X02/6E
410
BK
1000032473
+LVR-XE 25 X02/7B
411
BK
1VL8458361
+LVR-XE 26 X02/7E
412
BK
+ LV
+LCB-BGC2 22 X03/1B
421
BK
8
8
+LCB-BGC2 23 X03/1E
422
BK
= 00BBA01.10
Page
Pages
+LCB-BGC2 24 X03/1B
423
BK
+LCB-BGC2 25 X03/1E
424
BK
37
X06
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDC
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
+LCB-BGC2 26 X03/2B
425
BK
Name
21.5.2014 ABRLE
+LCB-BGC2 27 X03/2E
426
BK
Based on
X03/2B
427
428
2
2
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
X03/2B
429
X03/2E
430
71 PCS
+PLG-QAB1-XB 24 X03/3B
431
BK
432
BK
+PLG-QAB1-XB 26 X03/3B
433 BK
3
3
+PLG-QAB1-XB 36 X03/3E
TERMINAL UT 4 3044102
434
BK
+PLG-QAB1-XB 27 X03/4B
435
BK
+PLG-QAB1-XB 37 X03/4E
436
BK
Project name
+PLG-QAB1-XB 6 X03/4B
437
Prepared HORNAK
BK
Checked HAVELKA
+PLG-QAB1-XB 16 X03/4E
438
BK
4
4
+PLG-QAB1-XB 55 X03/5B
439
BK
Date
+PLG-QAB1-XB 56 X03/5E
440
BK
13.8kV SWITCHGEAR
+PLG-QAB1-XB 9 X03/5B
BK
Approved BRAUN
+PLG-QAB1-XB 19 X03/5E
442
BK
10.3.2014
+PLG-QAB1-XB 32 X03/6B
443
BK
5
5
+PLG-QAB1-XB 42 X03/6E
444
BK
Title
+PLG-QAB1-XB 7 X03/7B
445
BK
+PLG-QAB1-XB 17 X03/7E
446
BK
+PLG-QAB1-XB 8 X03/7B
447
BK
+PLG-QAB1-XB 18 X03/7E
448
BK
6
6
+PLG-QAB1-XB 3 X03/8B
449
BK
Station Transformer 2
+PLG-QAB1-XB 13 X03/8E
450
BK
ABB s.r.o., PPMV Brno
-FCM3.1 13 X04/1B
501
BK
-FCM3.1 14 X04/1E
502
BK
-FCM4.1 13 X04/1B
503
BK
Doc. No.
Order No.
7
7
-FCM4.1 14 X04/1E
504
BK
X04/2B
505
1000032473
X04/2E
506
1VL8458361
X04/2B
507
+ LV
X04/2E
508
8
8
= 00BBA01.10
Page
Pages 37
X07
Lang. English
F
E
B
C
A
D
© Copyright 2013 ABB. All rights reserved. 1 2 3 4 5 6 7 8
PAGE
A A
G01/1C
G01/2C
G01/7C
G01/7C
G01/7C
G01/7C
G01/8C
G01/8C
DEVICE
PIN
1
DESIGNATION
B B
DEVICE
-FCM2.1
-FCM2.1
POTENTIAL/
COLOR
czpebdz 25.6.2014
BK
BK
C C
1 2 3 4 5 6 7 8
TERMINALS
-XDI1
ISSUED BY:
D D
POTENTIAL/
BK
BK
BK
BK
BK
BK
BK
BK
COLOR
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
=KPREV-XDI1
DESIGNATION
DEVICE
E E
1
8
DEVICE
PIN
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDI2
1
1
Date
DEVICE DEVICE
PIN DESIGNATION COLOR COLOR DESIGNATION PIN PAGE
1
1 =KPREV-XDI2 BK
-KFA1 A1 Q01/2C
BK
Name
21.5.2014 ABRLE
2
2 =KPREV-XDI2 BK
-KFA1 A2 Q01/3C
BK
Based on
3
3 =KPREV-XDI2 BK
-KFA2 A1 Q01/3C
BK
2
2
BK
TERMINAL TYPE:
TOTAL TERMINALS COUNT:
5
5 =KPREV-XDI2 BK
-KFA3 A1 Q01/4C
BK
6
6 =KPREV-XDI2 BK
-KFA3 A2 Q01/4C
BK
24 PCS
7
7 =KPREV-XDI2 BK
-KFA4 A1 Q01/5C
BK
9
9 =KPREV-XDI2 BK
-KFA5 A1 Q01/6C
BK
3
3
10
10 =KPREV-XDI2 BK
-KFA5 A2 Q01/6C
BK
11
11 =KPREV-XDI2 BK
-KFA6 A1 Q02/2C
BK
12
Project name
13
13 =KPREV-XDI2 BK
-KFA7 A1 Q02/3C
Prepared HORNAK
BK
Checked HAVELKA
14
14 =KPREV-XDI2 BK
-KFA7 A2 Q02/3C
BK
4
4
15
15 =KPREV-XDI2 BK
-KFA8 A1 Q02/4C
BK
Date
16
16 =KPREV-XDI2 BK
-KFA8 A2 Q02/4C
BK
13.8kV SWITCHGEAR
17
Approved BRAUN
18
18 =KPREV-XDI2 BK
-XDX 254 Q02/5C
BK
10.3.2014
19
19 =KPREV-XDI2 BK
-KFA10 A1 Q02/7C
BK
5
5
20
20 =KPREV-XDI2 BK
-KFA10 A2 Q02/7C
BK
Title
21
=KPREV-XDI2 22 Q03/2B
BK
22
328 -XDX BK
Q03/2B
23
330 -XDX BK
=KPREV-XDI2 24 Q03/4B
BK
24
329 -XDX BK
Q03/3B
6
6
Station Transformer 2
7
7
1000032473
1VL8458361
+ LV
8
8
= 00BBA01.10
Page
Pages 37
X09
Lang. English
F
E
B
C
A
D
F
E
B
C
A
D
ISSUED BY: czpebdz 25.6.2014 © Copyright 2013 ABB. All rights reserved.
F
C
D
TERMINALS
Rev. Code
-XDX
1
1
Date
DEVICE DEVICE