DAILY PRODUCTION

DATE 20-Dec
PIT PIT CSW
SHIFT Night Shift
CONTRACTOR PT. HILLCON

Loader EXSN36022 PT. HILLCON


Hauler ADT 04.05.11
Loader : EXSN36022 MATERIAL ADT 60 TON TONAGE ADT 40 TON TONAGE GIGA FVZ TONAGE TOTAL RITASE TOTAL TONAGE
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase 17Loader : EXSN36022 SAPROLITE 22 924 16 576 0 0 38 1500
16
17 16 3 0 7 0 0 43 WASTE 88 2383.92 16 372.8 0 0 104 2756.72
LIMONITE 2 84 3 108 0 0 5 192
Start Loading 20:17 Wit BOULDER 0 0 0 0 0 0 0 0
7
Stop Loading 5:49 Wit TOP SOIL 0 0 7 163.1 0 0 7 163.1
3 BIOMASS 0 0 0 0 0 0 0 0
0 0 0 QUARRY 0 0 0 0 0 0 0 0
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY Total Ritase 112 3391.92 42 1219.9 0 0 154 4611.82

Remaks :
Loader EXSN50012 Loader : EXSN50012 Shift Change 07:00 - 07:30
Hauler ADT 01.02.12 Meal & Rest 12:00 - 13:00
SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY 88
Loader : EXSN50012
Total Ritase Shift Change 18:30 - 19:00
21 88 2 0 0 0 0 111

Start Loading 20:17 Wit


Stop Loading 5:49 Wit 21
2 0 0 0 0

SAPROLITE WASTE LIMONITE BOULDER TOP SOIL BIOMASS QUARRY