Date 01 Maret 2021

No. QUO/RBK/346-III-2021

TO
KEMENTRIAN
SEKRETARIAT NEGARA REPIBLIK INDONESIA
ISTANA KEPRESIDENAN
CIPANAS CIANJUR

DESCRIPTION QTY/UNIT UNIT PRICE SUB TOTAL AMMOUNT

A. PREPARATION OF WORK 1,500,000


Site survey 1.0 lot 500,000 500,000
Supporting Tools 1.0 lot 1,000,000 1,000,000

B. SCOPE OF WORK 18,929,500


R1 1/4" x 20 M "HIGHFLEX/setara" 1.0 pcs 5,200,000 5,200,000
R2 3/8" x 1 M "HOSEMAX / setara" 2.0 pcs 286,000 300,000
R2 3/4" x 20 M "HOSEMAX / setara" 1.0 pcs 7,800,000 7,800,000
R2 1/2" x 1M " HOSEMAX / setara" 2.0 pcs 338,000 676,000
Fitting set 3/8" 2.0 set 143,000 286,000
Fitting Set 1/2" 1.0 set 169,000 169,000
Fitting Set 1/4" 2.0 set 130,000 260,000
Fitting set 3/4" 1.0 set 188,500 188,500
Replacement oil hydraulic 3.0 pail 1,250,000 3,750,000
Service pompa Submersible 1.0 lot 300,000 300,000

C. Engineering ,Supervision & Transport


Mandor ( 1 orang) 3.0 hari 170,000 510,000 3,320,000
Tukang ( 2 orang) 2.0 hari 300,000 600,000
Kenek / Pekerja ( 1 orang ) 2.0 hari 105,000 210,000
Tarnsportasi 1.0 lot 2,000,000 2,000,000
TOTAL 23,749,500
PPN 10% 2,374,950
TOTAL PROJECT COST 26,124,450

ARIES SUKMAWAN