DREDGER SSMM
DATE NOV 23TH, 2020
PERIOD 60 MINUTES
4 ENGINE CABIN OK OK
KEEP CLEAN OK OK
AIR BLOWER OK RUNNING
NEED ADDITIONAL 2
AIR CIRCULATION HOT
UNIT BLOWER
5 CONTROL CABIN OK OK
CONTROL PANEL OK RUNNING
DISPLAY / PILOT CONTROL OK OK
NEED ADDITIONAL
AIR CONDITIONING OFF
FREON R32
NEED A/C SHOULD BE
AIR CIRCULATION HOT
ON
NEED ADDITIONAL
NOISY NOISY
DOOR GASKET
6 CUTTER SECTION OK OK
LAY UP/DOWN OK OK
CUTTER SECTION ROTATION OK OK
NEED REPLACE BECOME
TOWING SLING BREAK SLING DIA 32 LONG 300
METRE
SUCTION OK OK
RESULT
1 PRE TEST #1, 60 MINUTES RUNNING WELL WITH THE NORMAL PERFOMS IN 60-70% SOLID
MATERIALS.
2 ALL ENGINE RUNNING WELL.
3 WATER PRESSURE IN GOOD PERFOMS
4 LONG OVER ALL OF OUTLET PIPE ARE 100 METRES
5 TOWING SLING WERE BROKEN, NEED REPLACE MORE BIG THEN DIAMETRE 32, WITH 300
METRES LONG.
6 ENGINE CABIN IS TOO HOT, NEED ADDITIONAL AIR BLOWER TO AVOID OVERHEAD ENGINE
7 URGENT NEEDED ROPR SIER 6, WITH TOTAL 3 ROLLS
8 100 PIECES OF SACKLE SHOULD BE AVAILAVLE, TO MAKE SAFETY TUG AND AVOID THE DENT OF
UNITS.