PRE TEST #2

WASHING PLAN SSMM


DATE : NOV 25TH, 2020
PERIOD : 60 MINUTES

NO. SUBJECT CONDITIONSSTATUS REMARKS

1 GENSET ENGINE READY RUNNING


FUEL DISTRIBUTION OK OK
STARTER ENGINE OK OK
AMPERE CHARGES OK RUNNING
BATTERY OK RECHARGEABLE
CIRCUIT BREAKER OK RUNNING
ECU SYSTEM (REGULATOR) OK OK
VOLTAGE OK OK
AMPERE OK OK
CONTROL PANEL OK OK
PILOT CONTROL OK OK

2 ELECTRICAL DISTRIBUTION READY RUNNING


CONTROL PANEL OK OK
PILOT CONTROL OK OK
WIRING INSTALATION OK OK
PUSH BUTTON CONTROL OK OK
CIRCUIT BREAKER OK OK
CONTACTOR OK OK
FUSE OK OK
NEED ADDITIONAL
PANEL HOUSE OK WINDOW N FIXED THE
ROOF

3 MOTOR OK RUNNING
TROMOL SCREEN MOTOR OK 2 SET
MAGNETIC DRUM MOTOR OK 24 SET
BELT CONVEYOR MOTOR OK 2 SET
VIBRATOR SCREEN MOTOR OK 4 UNIT
BUCKET CONVEYOR MOTOR OK 2 SET
MOTOR #1. TRIP /
SHUTDOWN IN
WATER PUMP MOTOR OK
30MINUTES. #2.
SHUTDOWN IN 12 MIN

4 PUMP ENGINE READY RUNNING


FUEL DISTRIBUTION OK OK
SPEED ENGINE OK RUNNING IN MIN 600 RPM. OK
STARTER ENGINE OK OK
AMPERE CHARGES OK RUNNING
BATTERY OK RECHARGEABLE
SPEED ADJUSMENT OK RUNNING
WATER CIRCULATION OK RUNNING
WATER PUMP OK RUNNING
WATER CHARGES MOTOR OK RUNNING
ECU SYSTEM (REGULATOR) OK OK
PRESSURE OK OK

5 WATER DISTRIBUTION OK OK

6 BELT CONVEYOR OK OK

7 TROMOL SCREEN OK OK

8 WATER SUPPLY AT TROMOL SCREEN OK OK. ADJUSMENT

9 MAGNETIC SEPARATOR OK OK

NEED ADJUST SPRAY


10 CONSENTRATE CUTTER OK
CUTTER PIPE

11 WATER BLOWER INSIDE THE MAGNETIC OK OK

12 BUCKET CONVEYOR OK OK

13 VIBRATOR SCREEN OK OK

FOR AWHILE USING THE


14 TAILING CANAL OK
PVC PIPE

15 CONSENTRATE CANAL OK ARRANGED

USING POLYBAG FOR


16 WATER TAILING UNFIXED AWHILE, NEED
ADJUSTMENT
RESULT
1 PRE TEST #2, FIRSTLY 30 MINUTES RUNNING WELL AND AUTOMATICALLY STOPPED THE PUMP
MOTOR #2
2 PRE TEST #2, SECONDLY 12 MINUTES RUNNING WELL AND AUTOMATICALLY STOPPED THE PUMP
MOTOR #1
3 GENSET ENGINE RUNNING WELL
4 ALL MOTOR RUNNING WELL, AUTOMATICALLY STOP (AT CONTACTOR), EVALUATION STILL IN
PROGRESS
5 ALL SECTION RUNNING WELL, WITH NEED SOME ADJUSTMENT AT WATER CUTTER PIPE, TO GET THE
CONSENTRATE DROP AUTOMATICALLY
6 MATERIALS TAILING AND WATER TAILING NEED NEW PLAN TO SET UP
7 ELECTRICAL CONTROL RUNNING WELL
8 URGENT NEEDED 20 PIECES OF STEEL PLATE 5MM TO CUSTOMS THE CONSENTRATE CANAL N TAILING
CANAL
9
CHANGE OVER SWITCH ( COS ) TO SWITCH THE ELCETRICITY SHOULD BE APPLY AS SOON AS POSSIBLE

10 NEED SPARE OF FUSE 10 AMPERE, TOTAL 100 PIECES


11 WATER SUPPLY FROM THE SEA, ARRANGED. WITH MAKE MORE WIDE THE TUNNEL