You are on page 1of 2

RFI Detail

 
Client : Konark Builders Project : Konark Virtue
Structure : Tower 1 Stage : Floor 6
Unit : Flat No. 605
Work Type : Flat Wise Check List : Gypsum Plaster R1
Group : During Work Coverage : ceiling and wall. punning
Drawing No : NA Maker : Tanishka Realty
Representing
RFI No : KNB/KNV/T1/3574-2/3 Raised Date : 19/02/2020 02:44 PM
Status : Pending
     
 Mak  Entere  Ente  Questi  Answ  Rem  Ima  Ima   Chec  Chec  Chec  Ans  Rem  Ima  Ima
er d Date red on er ark ge1 ge2 ker ked ked wer ark ge1 ge2
Time Date Time
 Round (1)
 Sain  19/02/  2:43  Gypsu  Confor                     
ath 2020 PM m mity
Paw plaster
ar applica
tion
done
as per
thiyyas
taken
 Sain  19/02/  2:43  All  Confor                     
ath 2020 PM plasteri mity
Paw ng
ar work
carried
out in
perfect
line,
level,
plumb,
right
angle
at
corners
without
wavine
ss and
hollows
 Sain  19/02/  2:43  All  Confor                     
ath 2020 PM clear mity
Paw openin
ar g
dimens
ions
kept as
per
dwg.
Edges
and
corner
finishe
d
properl
y
 Sain  19/02/  2:43  Plaster  Confor                     
ath 2020 PM cut just mity
Paw above
ar skirting
level
 Sain  19/02/  2:43  Any  Confor                     
ath 2020 PM other mity
Paw observ
ar ation

You might also like