You are on page 1of 3
Dashboard / My cou Started on State ‘completed on Time taken Grade 108 cussion arc 100 ost of contin cone Nai 190 oof ses | MOC Div C(AY 21-221) / Unit —V Introduction to Quality and Quality Tools / Quiz 4 onunit 4 Friday, 26 November 2003, 919 PM Finished Friday, 26 November 2021, 932 PM 13 mine S4 secs 10.00 out of 1.00 (1005) Quality of performance? Select one 2. Quality of performance = quality of design - quality of conformance: b. None ofthe above 6 Quality of performancs quality of design + quality of conformance 4. Quality of performance = quality of design + availabilty The correct answer is: Quality of performanct ‘quality of design + qualty of conformance ‘Ona project, quality should generally be of Select one 2. equal priory with cost, but higher priority than schedule equal protity with cost and schedule «lower privity than cost and schedtle <4, equal potty with schedule, but higher privity than cost The correct answer is: equal priority with cost and schedule ‘According to Deming’s 14 points which ofthe following is the meaning of Cease dependence on inspection to achieve quali’? Select one! 2 Inspection is independent b. Inspection is not good forthe product «Eliminate the need for inspection on a mass basis ¥ 4. Inspection cannot bring quality in product ‘The corect answer is: Eliminate the need for inspection on a mass basis ‘1547 7.2:hnmcnodgushason gta Meszbemert 04 ane Asean vsiiond Cost of quality is 9 concept that includes ae 1000uet Select one 1 a. the cost necessary for ensuring conformance to requirements 7 onl the cost af the quality cont function 6: allresearch and development costs lated to the project 4hte ite yc cost of the projet The core answers the cost necestary for ensuring conformance te requirements asin Qualys» predictable degree of uniformity and dependably ta low cost and suited tothe markt sid by wre1@00ust Select one aa a Ishikawa b. Shingo «.Hatngton 4. Deming The comec answers: Dering cue 6 Quality improvement, Quality education and Quay perfomance rested to warc1@0euot Select oe ae a Appraisal Costs: Prevention Costs 7 «Intra Faure Costs 4. externa fare Costs The corect answer i: Prevention Costs asin? Which ofthe flowing does notbelng to Prevention Coss? oct we 10ouet Select one 8 Matketing research Design quality progress reviews c lostsales w 4. Customer/User perception surveys The correct answer is Lost sales ‘4547 7.2:nmcnogushasen stant eszbenert 0 ane Asean Which ofthe fellowing is nat considered a cast of nonconformance to quality? NatctO0ourot | Select one: ve 2. Bxpediting », Rework © Scrap 1, Process control W” The correct answer is Process control oven Which of the following does not belong to Deming’s 4 points on route te quality? arcio0 estat | Select one: oo 1. Adopt the new philosophy »b, Create constancy of purpose towards improvement of product and services| «-Cease dependence on inspection to achieve quality 4. Star the practice of awarding business on the bass of pice tag The correct answer is: Start the practice of awarding business on the bass of price tag cxeston 10 Quality is defined by the customer is Natcto0oxtot | Select one: A product-based definition of quality b. A user-based definition of quality ¥ An unrealistic definition of quality 6. A manufacturing-based definition of qualty ‘The correct answer is A user-based definition of quality = 4.1 Quality and Quality Tools (POF) Jump to. Cee a eee eee ‘1547 1.2:nmcnodgushasen stant Meszbemet 04

You might also like