Professional Documents
Culture Documents
V
C1 W1 C2 W2 C3 C4
SB-GY SB-GY
W.C SB-GY
WLP
0.80X TOILET 7
UP POOJA
TOILET 1.20 1.00X WLP UP
SUNK 8
6 5 4 3 2 1 ROOM TOILET WLP WLP
7
WLP
1.00X 2.00 10 11 12 13 14 15 16 WLP WLP
2.00 0.45 SUNK WLP 2.15X2.00 1.2X2.00 8 6 5 4 3 2 1
9 10 11 12 13 14 15 16
SUNK D2 0.20M LOBBY SUNK
0.20M 1.00X3.15 0.20M 9
D2 C7 LOBBY SB-K
SB-T 1.00X3.15
SB-K
D2 D KITCHEN C7 KITCHEN
C6 1.7X3.15 D2
SB-T D SB-T C6 2.15X3.15SB-F
SB-BL SB-F
SB-F OP
D1 SB-M
D C8
OP C5 SB-M D D SB-M D2 SB-T
C5 SB-M C9 SB-M C8 OP OP
OP SB-M
TV-pt C9
WLP
TOILET V
SB-M
TV-pt TV-pt 1.16X1.96
SB-M SUNK
LIVING AREA
3.40X5.00 0.20M
KITCHEN W2
SO-AQ SB-GY
LIVING AREA 2.10X3.19
SB-M 3.47X3.49
LIVING AREA BALCONY
4.08X3.60 1.21X2.98
SUNK 0.15M
SB-M SB-M WLP
SB-K
SD SD
SD
BEDROOM
3.08X5.00 BALCONY DRY BAL.
3.42X1.41 2.20X1.41
SUNK 0.15M SUNK 0.15M BALCONY
4.13X1.35 SD
WLP
SUNK 0.15M
C10 W1 C11 C12 C13
C10 C11 W1 C12 C13
ELECTRICAL
FIRST FLOOR PLAN ELECTRICAL SECOND &
THIRD FLOOR PLAN