You are on page 1of 16

TCE.

12185E-PJ-PM- TATA CONSULTING ENGINEERS LIMITED


MQIR-1 Date: 31-10-21

MONTHLY QUALITY INSPECTION REPORT SHEET 1 of 16


MUNICIPAL MARKET COMPLEX, BADA DANDA

ODISHA BRIDGE & CONSTRUCTION CORPORATION LIMITED

TATA CONSULTING ENGINEERS LIMITED

(PgMC FOR DEVELOPMENT OF VARIOUS PROJECTS IN PURI)

MONTHLY QUALITY REPORT

OCTOBER-2021
1. Introduction:

This report contains the tests witnessed and conducted by TCE in Municipal
Market, Bada Danda Project.

2. Municipal Market Complex, Bada Danda:

2.1 Cube Compressive Strength (7 days):

Validity
Avg of of indv
7 days set of result
Date of Date of strengt 3cube check Remark
I.D. Mark of Cube
Casting Testing h results, for s
N/mm2, N/mm2 varianc
, e of
15%
          Cl. 15.4  
24.45 -2.9
26-Sep- 3rd floor column (C-02,C-
19-Sep-21
21
14,C-26,C-40,C-51,C-67,C-72, 26.23 25.19 4.1 OK
C-71)
24.89 -1.2
3rd floor column (C-66,C- 24.00 -2.4
27-Sep- 92,C-107,C-119,C-130,C-139,C-
20-Sep-21
21 120, C-115,C-108,C-73, C-52,C-
25.34 24.60 3.0 OK
41,C-35, C-01) 24.45 -0.6
3rd floor column (C-02,C- 24.45 -1.8
28-Sep- 03,C-04, C-42,C-53,C-74,C-36,
21-Sep-21
21
25.78 24.89 3.6 OK
C-116,C-121,C-131 C-146,C-
81,C-84, C-95) 24.45 -1.8
3rd floor column (C-83,C- 24.00 -0.6
29-Sep- 91,C-96, C-109,C-147,C-132,C-
22-Sep-21 11, C-15,C-16,C-27 C-28,C- 24.89 24.15 3.1 OK
21 43,C-08, C-122,C-43,C-08, C-
122,C-123,C-124) 23.56 -2.4
3rd floor column (C-54,C- 23.12 -3.1
30-Sep- 44,C-27, C-17,C-07,C-09,C-76,
23-Sep-21
21
24.45 23.86 2.5 OK
C-85,C-84,C-97,C-110,C-125,C-
133, C-129,C-114,C-111) 24.00 0.6
3rd floor column (C-99,C- 24.45 -1.8
24-Sep-21 01-Oct-21 100,C-112, C-134,C-89,C-93,C- 27.11 24.89 OK
102, C-117,C-63,C-69,C-18,C- 8.9
10,C-45, C-55,C-77) 23.11 -7.2
3rd floor column (C-138,C- 24.00 0.6
144,C-135, C-136,C-126,C-
25-Sep-21 02-Oct-21 118,C-90, C-94,C-101,C-87,C- 23.11 23.85 -3.1 OK
78,C-56,C-69, C-75,C-12,C-
19,C-30) 24.45 2.5
3rd floor column (C-127,C- 25.78 -1.7
27-Sep-21 04-Oct-21 128,C-129, C-113,C-155,C- 27.56 26.23 OK
103,C-104, C-86,C-46,C-31,C- 5.1
20,C-70,C-47, C-22) 25.34 -3.4
3rd floor column (C-21,C- 26.67 5.3
28-Sep-21 05-Oct-21 25.34 OK
57,C-32, C-23,C-37,C-61,C-68, 24.45 -3.5
Validity
Avg of of indv
7 days set of result
Date of Date of strengt 3cube check Remark
I.D. Mark of Cube
Casting Testing h results, for s
N/mm2, N/mm2 varianc
, e of
15%
          Cl. 15.4  
C-105,C-106,C-88,C-156) 24.89 -1.8
3rd floor column (C-33,C- 23.56 -2.5
29-Sep-21 06-Oct-21 49,C-58, C-79,C-80,C-62,C- 24.45 24.15 1.2 OK
65,C-48,C-38)
24.45 1.2
24.45 3.1
3rd Floor Staircase (North
02-Oct-21 09-Oct-21 23.11 23.71 -2.5 OK
side & South Side)
23.56 -0.6

2.2 Cube Compressive Strength (28 Days):

Validity of
28 days
Avg of set of indv result
Date of I.D. Mark of Cube / strengt
Casting
Date of Testing 3cube results, check for
members h
N/mm2, Xi variance of
N/mm2,
15%

40 -8.3
19-Sep- 3rd floor column (C-02,C-
17-Oct-21 14,C-26,C-40,C-51,C-67,C-72, C- 38.66 39.26 -4.9
21 71)
39.12 0.8
3rd floor column (C-66,C- 35.56 13.0
20-Sep- 92,C-107,C-119,C-130,C-139,C-
18-Oct-21 34.67 35.41 4.2
21 120, C-115,C-108,C-73, C-52,C-
41,C-35, C-01) 36 10.5
3rd floor column (C-02,C- 37.78 -3.4
21-Sep- 03,C-04, C-42,C-53,C-74,C-36, C-
19-Oct-21 38.22 38.67 4.6
21 116,C-121,C-131 C-146,C-81,C-
84, C-95) 40 -2.3
3rd floor column (C-83,C- 38.22 4.2
22-Sep- 91,C-96, C-109,C-147,C-132,C-
20-Oct-21 11, C-15,C-16,C-27 C-28,C-43,C- 39.12 38.37 0.7
21 08, C-122,C-43,C-08, C-122,C-
123,C-124) 37.78 1.9
3rd floor column (C-54,C- 39.11 -6.6
23-Sep- 44,C-27, C-17,C-07,C-09,C-76, C-
21-Oct-21 38.66 38.07 -8.9
21 85,C-84,C-97,C-110,C-125,C-133,
C-129,C-114,C-111) 36.44 -5.4
3rd floor column (C-99,C- 38.66 -2.3
24-Sep- 100,C-112, C-134,C-89,C-93,C-
22-Oct-21 38.22 38.66 -1.1
21 102, C-117,C-63,C-69,C-18,C-
10,C-45, C-55,C-77) 39.11 3.5
Validity of
28 days
Avg of set of indv result
Date of I.D. Mark of Cube / strengt
Casting
Date of Testing 3cube results, check for
members h
N/mm2, Xi variance of
N/mm2,
15%

3rd floor column (C-138,C- 36 4.5


25-Sep- 144,C-135, C-136,C-126,C-118,C-
23-Oct-21 38.22 36.59 6.9
21 90, C-94,C-101,C-87,C-78,C-
56,C-69, C-75,C-12,C-19,C-30) 35.55 3.3
3rd floor column (C-127,C- 38.22 5.6
27-Sep- 128,C-129, C-113,C-155,C-103,C-
25-Oct-21 36 37.04 4.4
21 104, C-86,C-46,C-31,C-20,C-
70,C-47, C-22) 36.89 -1.6
3rd floor column (C-54,C- 36.44 7.4
28-Sep- 44,C-27, C-17,C-07,C-09,C-76, C-
26-Oct-21 35.55 36.00 6.2
21 85,C-84,C-97,C-110,C-125,C-133,
C-129,C-114,C-111) 36 8.6
29-Sep- 3rd floor column (C-33,C- 35.55 -0.4
27-Oct-21 49,C-58, C-79,C-80,C-62,C-65,C- 36.15
21 48,C-38) 36.89 5.7
36 -1.7
36 5.3
02-Oct- 3rd Floor Staircase (North
30-Oct-21 37.33 36.29 -0.8
21 side & South Side)
35.55 1.6

2.3 Sieve Analysis of Graded Coarse Aggregates:

Limi
t as
Date per
Aggregat Contracto Sourc Sample Passing (10 & 20
of IS Remarks
e r e Test
mm)
383-
201
6
4.7
40
20 10 5
        m    
mm mm m
m
m
        % % % %    
06
10 & 20 M/S ABCPL Tapan Octobe 10 91.2 39.1 1.4 100, Satisfactor
Limi
t as
Date per
Aggregat Contracto Sourc Sample Passing (10 & 20
of IS Remarks
e r e Test
mm)
383-
201
6
4.7
40
20 10 5
        m    
mm mm m
m
m
        % % % %    
90-
100,
MM g r 2021 0 4 1 5 25- y
55,
0-10
100,
90-
10 & 20 Tapan 25 10 0.7 100, Satisfactor
M/S ABCPL Octobe 96.5 33.5
MM g r 2021 0 8 25- y
55,
0-10
100,
90-
10 & 20 Tapan 25 10 98.1 46.7 0.1 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 3 8 3 25- y
55,
0-10
100,
90-
10 & 20 Tapan 25 10 95.8 0.5 100, Satisfactor
M/S ABCPL Octobe 42.6
MM g r 2021 0 8 6 25- y
55,
0-10
100,
90-
10 & 20 Tapan 26 10 51.0 0.2 100, Satisfactor
M/S ABCPL Octobe 97.8
MM g r 2021 0 6 6 25- y
55,
0-10
100,
90-
10 & 20 Tapan 26 10 98.6 0.3 100, Satisfactor
M/S ABCPL Octobe 32.2
MM g r 2021 0 4 3 25- y
55,
0-10
M/S ABCPL 26
10 & 20 Tapan Octobe
10 98.0 31.6 0.1 100, Satisfactor
MM g r 2021 0 2 5 90- y
100,
25-
Limi
t as
Date per
Aggregat Contracto Sourc Sample Passing (10 & 20
of IS Remarks
e r e Test
mm)
383-
201
6
4.7
40
20 10 5
        m    
mm mm m
m
m
        % % % %    
55,
0-10
100,
90-
10 & 20 Tapan 27 10 98.2 44.8 0.5 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 3 6 9 25- y
55,
0-10
100,
90-
10 & 20 Tapan 27 10 0.2 100, Satisfactor
M/S ABCPL Octobe 97.3 38.9
MM g r 2021 0 8 25- y
55,
0-10
100,
90-
10 & 20 Tapan 27 10 41.2 0.1 100, Satisfactor
M/S ABCPL Octobe 99
MM g r 2021 0 3 1 25- y
55,
0-10
100,
90-
10 & 20 Tapan 28 10 50.2 0.3 100, Satisfactor
M/S ABCPL Octobe 98.6
MM g r 2021 0 3 3 25- y
55,
0-10
100,
90-
10 & 20 Tapan 28 10 97.5 36.4 0.4 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 5 5 5 25- y
55,
0-10
100,
90-
10 & 20 Tapan 28 10 98.2 49.5 0.1 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 2 5 9 25- y
55,
0-10
10 & 20 M/S ABCPL Tapan 28 10 97.6 35.2 0.2 100, Satisfactor
Limi
t as
Date per
Aggregat Contracto Sourc Sample Passing (10 & 20
of IS Remarks
e r e Test
mm)
383-
201
6
4.7
40
20 10 5
        m    
mm mm m
m
m
        % % % %    
90-
100,
Octobe
MM g r 2021 0 6 5 3 25- y
55,
0-10
100,
90-
10 & 20 Tapan 28 10 98.3 37.5 0.1 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 6 9 7 25- y
55,
0-10
100,
90-
10 & 20 Tapan 28 10 98.4 30.4 0.2 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 4 6 8 25- y
55,
0-10
100,
90-
11 & 20 Tapan 28 10 45.1 0.1 100, Satisfactor
M/S ABCPL Octobe 97.2
MM g r 2021 0 3 8 25- y
55,
0-11
100,
90-
12 & 20 Tapan 28 10 97.6 35.7 0.1 100, Satisfactor
M/S ABCPL Octobe
MM g r 2021 0 6 4 7 25- y
55,
0-12

2.4 Sieve Analysis and Fineness Modulus of Fine Aggregates:


Dat
Aggre Contra Sourc F. Rema
e of Sample Passing Zone
gate ctor e Test M. rks

4.7 2.3 1.1 0.


10 0.6 0.3 Zo Zo Zo
5 6 8 15
        m m m ne ne ne  
m m m m
m m m I II III
m m m m
        % % % %                
06
M/S Cutt Octo 10 94. 88. 80. 64. 33. 1. 2.
Sand ber       ok
ABCPL ack 0 77 19 12 54 65 62 37
2021
25
M/S Cutt Octo 10 96. 91. 78. 70. 25. 0. 2.
Sand ber       ok
ABCPL ack 0 8 56 9 15 6 05 37
2021
25
M/S Cutt Octo 10 98. 90. 81. 70. 25. 0. 2.
Sand ber       ok
ABCPL ack 0 31 16 44 97 96 55 33
2021
25
M/S Cutt Octo 10 98. 90. 79. 70. 21. 0. 2.
Sand ber       ok
ABCPL ack 0 72 28 17 3 99 76 39
2021
26
M/S Cutt Octo 10 98. 91. 80. 69. 20. 0. 2.
Sand ber       ok
ABCPL ack 0 05 85 79 33 72 69 39
2021
26
M/S Cutt Octo 10 97. 90. 79. 72. 16. 0. 2.
Sand ber       ok
ABCPL ack 0 89 49 64 99 82 66 42
2021
26
M/S Cutt Octo 10 98. 90. 80. 70. 20. 0. 2.
Sand ber       ok
ABCPL ack 0 41 17 73 05 97 77 39
2021
27
M/S Cutt Octo 10 98. 89. 80. 71. 20. 0. 2.
Sand ber       ok
ABCPL ack 0 77 31 12 84 05 32 4
2021
27
M/S Cutt Octo 10 98. 91. 80. 70. 21. 0. 2.
Sand ber       ok
ABCPL ack 0 49 1 37 22 94 62 37
2021
27
M/S Cutt Octo 10 98. 91. 81. 75. 19. 0. 2.
Sand ber       ok
ABCPL ack 0 6 44 76 83 44 52 32
2021
28
M/S Cutt Octo 10 98. 86. 80. 65. 23. 1. 2.
Sand ber       ok
ABCPL ack 0 19 4 4 9 5 8 44
2021
28
M/S Cutt Octo 10 98. 93. 80. 71. 20. 0. 2.
Sand ber       ok
ABCPL ack 0 2 04 13 46 99 66 36
2021
28
M/S Cutt Octo 10 98. 92. 80. 76. 15. 0. 2.
Sand ber       ok
ABCPL ack 0 73 33 46 82 77 46 35
2021
28 1
M/S Cutt Octo 98. 91. 84. 71. 27. 0. 2.
Sand
ABCPL ber 0 39 25 17 44 13 47 27
      ok
ack 2021 0
28 1
M/S Cutt Octo 98. 90. 80. 73. 25. 0. 2.
Sand
ABCPL ber 0 17 76 3 21 44 42 32
      ok
ack 2021 0
Sand M/S 28 97. 90. 85. 68. 27. 0. 2.   ok
Cutt Octo
1    
ABCPL ack ber 0 46 02 44 7 49 36 31
Dat
Aggre Contra Sourc F. Rema
e of Sample Passing Zone
gate ctor e Test M. rks

4.7 2.3 1.1 0.


10 0.6 0.3 Zo Zo Zo
5 6 8 15
        m m m ne ne ne  
m m m m
m m m I II III
m m m m
        % % % %                
2021 0
28 1
M/S Cutt Octo 98. 98. 91. 79. 65. 20 0.
Sand
ABCPL ber 0 3 3 47 16 44 .2 55
      ok
ack 2021 0
28 1
M/S Cutt Octo 98. 89. 81. 65. 25. 0. 2.
Sand
ABCPL ber 0 7 66 57 8 79 21 38
      ok
ack 2021 0

Sl. Silt
Aggregat Contracto
No Source Date of Test Content Remarks
e r
. (%)
Limit Silt = 3%
1 Sand M/S NCC CUTTACK 06 October 2021 3.2
max by mass
2 Sand M/S ABCPL CUTTACK 25 October 2021 2.83 Ok
3 Sand M/S ABCPL CUTTACK 26 October 2021 3.12 Ok
4 Sand M/S ABCPL CUTTACK 28 October 2021 2.83 Ok
5 Sand M/S ABCPL CUTTACK 28 October 2021 3.1 Ok
6 Sand M/S ABCPL CUTTACK 28 October 2021 3.075 Ok

2.5 Slump Test:

Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
120 100-150
125 100-150
120 100-150
110 100-150
130 100-150
1 14 September 2021 3rd Floor SLAB
120 100-150
110 100-150
130 100-150
120 100-150
120 100-150
Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
110 100-150
120 100-150
120 100-150
110 100-150
120 100-150
125 100-150
120 100-150
125 100-150
130 100-150
125 100-150
120 100-150
125 100-150
130 100-150
125 100-150
120 100-150
130 100-150
120 100-150
130 100-150
125 100-150
130 100-150
125 100-150
120 100-150
120 100-150
130 100-150
125 100-150
120 100-150
100 100-150
110 100-150
110 100-150
120 100-150
110 100-150
125 100-150
125 100-150
130 100-150
130 100-150
125 100-150
125 100-150
120 100-150
2 15 September 2021 3rd Floor SLAB
110 100-150
120 100-150
110 100-150
110 100-150
110 100-150
110 100-150
115 100-150
110 100-150
120 100-150
120 100-150
125 100-150
120 100-150
115 100-150
125 100-150
Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
120 100-150
115 100-150
115 100-150
120 100-150
125 100-150
130 100-150
130 100-150
125 100-150
130 100-150
130 100-150
120 100-150
3 16 September 2021 3rd Floor SLAB
110 100-150
110 100-150
125 100-150
120 100-150
125 100-150
110 100-150
110 100-150
120 100-150
4 19 September 2021 3rd Floor COLUMN
130 100-150
110 100-150
130 100-150
130 100-150
130 100-150
120 100-150
120 100-150
120 100-150
110 100-150
110 100-150
5 20 September 2021 3rd Floor COLUMN
120 100-150
120 100-150
130 100-150
130 100-150
125 100-150
110 100-150
120 100-150
130 100-150
130 100-150
120 100-150
120 100-150
110 100-150
110 100-150
120 100-150
6 21 September 2021 3rd Floor COLUMN
120 100-150
130 100-150
130 100-150
120 100-150
110 100-150
110 100-150
110 100-150
120 100-150
7 22 September 2021 3rd Floor COLUMN
130 100-150
Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
130 100-150
130 100-150
120 100-150
110 100-150
120 100-150
130 100-150
120 100-150
130 100-150
120 100-150
110 100-150
110 100-150
120 100-150
120 100-150
130 100-150
130 100-150
130 100-150
130 100-150
130 100-150
120 100-150
120 100-150
110 100-150
130 100-150
110 100-150
8 23 September 2021 3rd Floor COLUMN
110 100-150
120 100-150
125 100-150
125 100-150
110 100-150
125 100-150
120 100-150
120 100-150
135 100-150
130 100-150
130 100-150
110 100-150
120 100-150
130 100-150
130 100-150
130 100-150
9 24 September 2021 3rd Floor COLUMN 130 100-150
130 100-150
130 100-150
120 100-150
120 100-150
110 100-150
110 100-150
120 100-150
110 100-150
130 100-150
125 100-150
10 25 September 2021 3rd Floor COLUMN
130 100-150
120 100-150
Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
120 100-150
130 100-150
125 100-150
120 100-150
130 100-150
120 100-150
120 100-150
120 100-150
130 100-150
130 100-150
130 100-150
130 100-150
120 100-150
120 100-150
110 100-150
120 100-150
130 100-150
12 27 September 2021 3rd Floor Column 110 100-150
110 100-150
120 100-150
130 100-150
110 100-150
130 100-150
120 100-150
120 100-150
130 100-150
130 100-150
130 100-150
120 100-150
130 100-150
13 28 September 2021 3rd Floor Column
120 100-150
120 100-150
120 100-150
130 100-150
120 100-150
120 100-150
110 100-150
130 100-150
110 100-150
110 100-150
14 29 September 2021 3rd Floor Column
120 100-150
130 100-150
130 100-150
120 100-150
130 100-150
120 100-150
110 100-150
110 100-150
3rd Floor Staircase
15 2 October 2021 110 100-150
(North side & South Side)
120 100-150
120 100-150
110 100-150
Sl Slumps
Date of casting Member ID Limits (mm)
No. (mm)
130 100-150
130 100-150
130 100-150
120 100-150
110 100-150
110 100-150
130 100-150
120 100-150
130 100-150

3. Request for Inspections:

Status
Site Contracto Type of Date of
Member ID (Satisfactory/Unsatisfa
Name r Inspection Inspection
ctory)
3RD floor C-138,
R/F
MM, C-144, C-135, C-
Bada M/S 136, C-126, C-118, SHUTTERING
C-90, C-94, C-101, 25-Sep-21 Satisfactory
Dand ABCPL C-87, C-78, C-56,
a C-69, C-75, C-12, CONCRETE
C-19, C-30
3RD floor C-127,
MM, C-129, C-113, C-
R/F
Bada M/S 155, C-103, C-104, SHUTTERING
C-86, C-46, C-31, 27-Sep-21 Satisfactory
Dand ABCPL
C-20, C-70, C-47, CONCRETE
a C-22
MM, 3RD floor C-21, C- R/F
57, C-32, C-33, C-
Bada M/S SHUTTERING
33, C-61, C686, C- 28-Sep-21 Satisfactory
Dand ABCPL 105, C-106, C-88,
a C-156, CONCRETE
MM, 3RD floor C-33, C- R/F
Bada M/S 49, C-58, C-79, C-
SHUTTERING
80, C-62, C65, C- 29-Sep-21 Satisfactory
Dand ABCPL
48, C-38 CONCRETE
a
MM, R/F
3RD floor STAIR
Bada M/S SHUTTERING
CASE (NORTH & 02-Oct-21 Satisfactory
Dand ABCPL SOUTH)
a CONCRETE
MM, ALLIGNMENT
2ND FLOOR
Bada M/S
TOILET BRICK 06-Oct-21 Satisfactory
Dand ABCPL WORK PLUMB
a
MM, M/S 2ND FLOOR ALLIGNMENT 09-Oct-21 Satisfactory
Status
Site Contracto Type of Date of
Member ID (Satisfactory/Unsatisfa
Name r Inspection Inspection
ctory)
Bada
HENTS TOILET
Dand ABCPL PLUMB
BRICK WORK
a
MM, R/F
TERRACE
Bada M/S SHUTTERING
FLOOR SLAB 29-Oct-21 Satisfactory
Dand ABCPL PART-1
a CONCRETE
MM, R/F
TERRACE
Bada M/S SHUTTERING
FLOOR SLAB 30-Oct-21 Satisfactory
Dand ABCPL PART-2
a CONCRETE

4. Pour Cards:

Date of grade
Site Concret Status
Contract Inspection Membe of
Nam e Qty (Open/Close
or / r ID concret
e (Cum) d)
Checking e
3RD
floor C-
138, C-
144, C-
135, C-
MM, 136, C-
126, C-
Bada M/S
25-Sep-21 118, C- 8.5 M30 Closed
Dand ABCPL 90, C-94,
a C-101, C-
87, C-78,
C-56, C-
69, C-75,
C-12, C-
19, C-30
3RD
floor C-
127, C-
129, C-
MM, 113, C-
155, C-
Bada M/S
27-Sep-21 103, C- 7.8 M30 Closed
Dand ABCPL 104, C-
a 86, C-46,
C-31, C-
20, C-70,
C-47, C-
22
MM, M/S 28-Sep-21 3RD 6 M30 Closed
Bada ABCPL floor C-
21, C-57,
Dand C-32, C-
a 33, C-33,
C-61,
C686, C-
Date of grade
Site Concret Status
Contract Inspection Membe of
Nam e Qty (Open/Close
or / r ID concret
e (Cum) d)
Checking e
105, C-
106, C-
88, C-
156,
3RD
floor C-
MM, 33, C-49,
Bada M/S C-58, C-
29-Sep-21 79, C-80,
5.2 M30 Closed
Dand ABCPL
a C-62,
C65, C-
48, C-38
3RD
MM, floor
STAIR
Bada M/S
02-Oct-21 CASE 7 M30 Closed
Dand ABCPL (NORTH
a &
SOUTH)
MM, TERRACE
Bada M/S FLOOR
29-Oct-21 SLAB
350 M30 Closed
Dand ABCPL
a PART-1

MM, TERRACE
Bada M/S FLOOR
30-Oct-21 SLAB
360 M30 Closed
Dand ABCPL
a PART-2

QUALITY INDEX:

Quality Index Oct 21 - MM, Bada Danda

0 1 2 3 4 5 Items Avg. Site Quality Index


Adherence to Code / Specs
5 4.00

4.06
4

3
Avg Quality Index
2
Supervision Method Statements
1 3.25
4.50
0

Adherence to Code /
Specs
4.00

Documents / Checklists Workmanship 4.09


4.46

Method Statements 3.25


Avg Quality Index

Workmanship 4.09

Documents / Checklists 4.46

Supervision 4.50