LGF TOWER PART - MV INCOMING SWITCHGEAR ROOM FOR UTILITY CONNECTION READINESS (STATUS AS ON 23/12/2019)

MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19

WORK COMPLETION

11-Nov-19

12-Nov-19

13-Nov-19

14-Nov-19

16-Nov-19

17-Nov-19

18-Nov-19

19-Nov-19

20-Nov-19

21-Nov-19

23-Nov-19

24-Nov-19

25-Nov-19

26-Nov-19

27-Nov-19

28-Nov-19

30-Nov-19

10-Dec-19

11-Dec-19

12-Dec-19

13-Dec-19

14-Dec-19

15-Dec-19

16-Dec-19

17-Dec-19

18-Dec-19

19-Dec-19

20-Dec-19

21-Dec-19

22-Dec-19

23-Dec-19

24-Dec-19

25-Dec-19

26-Dec-19

27-Dec-19

28-Dec-19

29-Dec-19

30-Dec-19

31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

2-Dec-19

3-Dec-19

4-Dec-19

5-Dec-19

7-Dec-19

8-Dec-19

9-Dec-19
START DATE FINISH DATE DURATION

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED

ARCHITECTURAL / FIT OUT WORKS

1 Steel Structure Approval for MV switchgear Engr. Ahmed 100% Under Review

2 Wall Finishing Engr. Ahmed 100% 30/Nov/19 2/Dec/19 3

3 Painting on floor Engr. Ahmed 100% 24/Nov/19 30/Nov/19 6

4 Raised Floor Installation Engr. Ahmed 0% 26/Dec/19 2/Jan/20 7

* 2 Nos of Front Door Delivery on 02-Dec-2019


5 Door Installation Engr. Ahmed 0% 17/Dec/19 20/Dec/19 3 * 4 Nos of Back side door delivery on 15-Dec-2019

ENGINEERING ISSUE

1 Wall Elevation for Electrical, ELV, BMS & Novec Coordination Drawing Mr. Hafeez 100% 20/Nov/19 22/Nov/19

2 BMS Shop Drawing Engr. Saud -S1 UNDER REVIEW * Under Consultant approval

3 Rasied Floor Drawing Mr.Alvin 100% 10/Nov/19 10/Nov/19

4 Fire Alarm Drawing Engr.Shabir S1 UNDER REVIEW * Under Consultant approval

5 Hand Over Document ( Last Part ) Mr.Ashraf 12/Dec/19 20/Dec/19

LIGHTING SYSTEM

1 Installation of GI Conduits Eng. Aijaz 100% ✓ 18/Nov/19 19/Nov/19 2

2 Wire pulling of lighting fixtures Eng. Aijaz 100% ✓ 19/Nov/19 19/Nov/19 1

4 Light fixtures installation Eng. Aijaz 100% 20/Nov/19 20/Nov/19 1

5 Testing for wires & Light Fixtures Eng. Aijaz 100% 21/Nov/19 21/Nov/19 1

POWER - WIRING DEVICES

1 Installation of GI Conduit Eng. Aijaz 100% 20/Nov/19 23/Nov/19 3

2 Wire pulling of Power Eng. Aijaz 100% 24/Nov/19 24/Nov/19 1

3 Back box of Wiring devices/Lighting Switches Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

4 Wiring Devices for Power Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

5 Wiring devices for Lighting switches Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

6 Testing for wires Eng. Aijaz 100% 4/Dec/19 4/Dec/19 1

MV CONTAINMENT

1 Installation of Cable Ladder with Earth Braid Engr. Aijaz 100% Lug Bal. ✓ 14/Nov/19 18/Nov/19 5 Earth braid (Jumper) is Pending

2 MV cable pulling Mr. Syed 100% ✓ 11/Nov/19 20/Nov/19 9

4 Cable Cleat for MV cable Mr. Syed 0% 12/10/2019 12/Dec/19 15/Dec/19 3

5 Cable Tie for MV cable Mr. Syed 0% 12/10/2019 12/Dec/19 15/Dec/19 3

6 MV cable Identification tag Mr. Syed 0% 12/15/2019 MIR Under Review 20/Dec/19 21/Dec/19 2

7 IR testing for MV cable Mr. Syed 0% 12/Dec/19 13/Dec/19 2

8 Termination kit for MV cable Mr. Syed 0% 12/7/2019 20/Dec/19 30/Dec/19


1 No of Submittal submitted Date : 26-11-2019
9 Certified HT Jointer for MV cable termination Mr. Syed 0% MIR Under Review 12/Dec/19 26/Dec/19 13 1 No of submittal will be submit on 30-11-2019

CABLE HV TESTING

1 Outer Sheath Test 0% 12/Dec/19 26/Dec/19 13

IR Value Checks

HV Test

2 Main Conductor test 0% 12/Dec/19 26/Dec/19 13

IR Value Checks

HV Test

3 Cable Termination 0% 30/Dec/19 31/Dec/19 2

Torque checks

EARTHING

1 Installation of Earth Bar Engr. Aijaz 100%

2 Cable Pulling for Earthing Engr. Aijaz 100% 2/Dec/19 3/Dec/19 2

3 Both End termination Engr. Aijaz 100% X 2/Dec/19 3/Dec/19 2

4 Testing of Earthing Engr. Aijaz 0% 2/Dec/19 3/Dec/19 2

FIRE ALARM SYSTEM

1 Installation of GI conduit for detector and Remote indicator Engr. Ibrahim 100% 14/Nov/19 17/Nov/19 3

2 Smoke detector installation Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

3 Remote indicator installation Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

4 Control module Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

5 Interface module Engr. Ibrahim 0% ✓ 16/Dec/19 16/Dec/19 1

6 Monitor Module for Novec Engr. Ibrahim 0% ✓ 17/Dec/19 18/Dec/19 2

SECURITY SYSTEM

1 Installation of GI conduit Engr. Ibrahim 90% 17/Dec/19 20/Dec/19 3

2 Cabling for Electric motorised lock,Magnetic Lock Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3

3 Door Contact Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

4 Door Module Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

5 Break Glass Unit Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3

6 Card Reader Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

BUILDING MANAGEMENT SYSTEM

1 Installation of 110mm Tray Engr. Ibrahim 100% 17/Nov/19 20/Nov/19 3

2 Installation of Flexible conduit Engr. Ibrahim 0% 5/Dec/19 8/Dec/19 3

3 Cabling for BMS points Engr. Ibrahim 0% ✓ 9/Dec/19 10/Dec/19 1

4 Installation of DDC panel which is related to MV switchgear Room Engr. Ibrahim 0% X 10/Dec/19 12/Dec/19 3

NOVEC SYSTEM

1 Installation of Electrical Conduit with Novec Panel 100% ✓ 11/Nov/19 14/Nov/19 4 * After the Completion of Final Fitout work approval

2 Installation of Gi Pipe with Fittings 60% 7/Dec/19 10/Dec/19 2

3 Cabling for the Control devices 100% ✓ 12/Dec/19 12/Dec/19 2

4 Kidde Aegis ECP panel 100% ✓ 12/Dec/19 12/Dec/19 1

5 Conventional Photoelectric smoke detector with Detector base 0% ✓ 12/Dec/19 12/Dec/19 1

6 Conventional Thermal Detector with Detector base 0% ✓ 12/Dec/19 12/Dec/19 1

7 Backbox + Suppression Abort Station 0% ✓ 14/Dec/19 14/Dec/19 1

8 6" Alarm Bell 0% ✓ 14/Dec/19 14/Dec/19 1

9 Horn Strobe, Red 12/24 VDC 0% ✓ 15/Dec/19 15/Dec/19 1


MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19

WORK COMPLETION

11-Nov-19

12-Nov-19

13-Nov-19

14-Nov-19

16-Nov-19

17-Nov-19

18-Nov-19

19-Nov-19

20-Nov-19

21-Nov-19

23-Nov-19

24-Nov-19

25-Nov-19

26-Nov-19

27-Nov-19

28-Nov-19

30-Nov-19

10-Dec-19

11-Dec-19

12-Dec-19

13-Dec-19

14-Dec-19

15-Dec-19

16-Dec-19

17-Dec-19

18-Dec-19

19-Dec-19

20-Dec-19

21-Dec-19

22-Dec-19

23-Dec-19

24-Dec-19

25-Dec-19

26-Dec-19

27-Dec-19

28-Dec-19

29-Dec-19

30-Dec-19

31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

2-Dec-19

3-Dec-19

4-Dec-19

5-Dec-19

7-Dec-19

8-Dec-19

9-Dec-19
START DATE FINISH DATE DURATION

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED

10 Manual Release station + Indoor surface back box 0% ✓ 15/Dec/19 15/Dec/19 1

11 Supression key maintenance switch + Back box 0% ✓ 15/Dec/19 15/Dec/19 1

12 Novec 1230 Cylinder with complete set 0% ✓ 26/Dec/19 30/Dec/19 4

13 Room integrity test for Novec 0% 30/Dec/19 30/Dec/19 1

HVAC SYSTEM

1 Installation of FCU for MV switchgear room - Located in LGF corridor 0% 5/Dec/19 8/Dec/19

2 Installation of Ducting 0% 8/Dec/19 13/Dec/19

3 Installation of MSFD 0% 3/8/2019 10/Mar/20 15/Mar/20

4 Installation of MSFD power supply 0% 18/Dec/19 22/Dec/19

5 Bell Mouth for the ducting 0% 15/Mar/20 18/Mar/20

6 Functional test for MSFD 0% 19/Mar/20 20/Mar/20

FIRE SEALANT

1 Fire stopping material for Electrical system 10/Dec/19 11/Dec/19 2

2 Fire Stopping material for Mechanical system 17/Dec/19 18/Dec/19 2

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system Engr.Aijaz 0% 16/Nov/19 19/Dec/19 2 Installed Temporary
2 Installation of Control Battery system charger Qassim 0% 3/Dec/19 3/Dec/19 1 Temporarary Battery Installed

3 Installation of Battery rack Qassim 0% 3/Dec/19 3/Dec/19 1 Battery Rack Not Available for Temporery Battery

4 125 v DC Power cable for control battery system Engr. Aijaz 0% 3/Dec/19 3/Dec/19 1 Done Temporary

5 3-Phase Auxillary power for Control battery system Engr.Aijaz 0% 3/Dec/19 3/Dec/19 1 Done using Temporary Cable

6 Pre commissioning for Control battery system Engr.Aijaz 0% 4/Dec/19 4/Dec/19 1 Temporarary Battery Installed

MV SWITCHGEAR

1 Installation of MV Switchgear 100% ✓ ✓


2 Torque Tightness of the MV switchgear Busbar 100% ✓ ✓
3 Control wiring based on As manufactured drawings 100% ✓ WIR should be Submitted

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 76% 5/Dec/19 23/Dec/19 14

1 Testing of CT Schneider 100% 8/Dec/19 9/Dec/19 2

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 10/Dec/19 10/Dec/19 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 100%


Energized by Temporary source & Temporary Cable
AC/ DC Energization

4 Testing of Incoming/Outgoing Breaker Schneider 100% 11/Dec/19 12/Dec/19 2

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 100% 15/Dec/19 15/Dec/19 1

Contact Resistance Measurement

6 Functional Test Schneider 33% 16/Dec/19 17/Dec/19 2

Functional Test 100%

Locks Interlock Checks 0% Shall be done once Key Cylinders installed in Up-Stream CB & Down -Stream CB

Wiring to be done & Logic function to be checked (Logic Discrimination Relay setting not
Logic discrimination 0%
given in relay setting file)

7 KWH Meter 3rd Party Calibration Certificate through schneider Schneider 100% 18/Dec/19 18/Dec/19 1

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 19/Dec/19 22/Dec/19 2

50/51 (Phase Overcurrent)

51N (Earth Fault) Depond up on Availability of Final Relay Setting


27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 100% 23/Dec/19 23/Dec/19 1

10 17.5 KVA 80% of Hi Pot Test Schneider 0% 29/Dec/19 29/Dec/19 1 Test Shall be done before Energization

11 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0% After power cable termination completed

Mr.Laurence
12 SUTTON - 3rd Party Confirmation 0% 4/Dec/19 12/Dec/19 7
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0% 15/Dec/19 15/Dec/19

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0% 3/Dec/19 4/Dec/19 2

2 Establish the LOTO activities Mr.Udhaya 0% 15/Dec/19 15/Dec/19 1

SEC DOCUMENTATION PROCESS

1 Calibration certificate of Utility meters With 3rd Party Joint Inspection Mr.Ashraf 0% 10/Dec/19 11/Dec/19 2

2 Approved Material Submittal of Each type of Utility Meters should be Submitted Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1

3 Approved IR for Cable ladders, Switchgear,Test reports Mr. Udhaya 60% last Date: 16-12-2019

4 SEC Approval Including Relay Settings Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1

5 SEC Approval for Energization Mr.Harry 0% 30/Dec/19 7/Jan/19 8

TEMPORARY POWER SUPPLY


1 Parcel 1.04 cable reroute will be adjusted with JLL according to Tadawul change over schedule
MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19

WORK COMPLETION

11-Nov-19

12-Nov-19

13-Nov-19

14-Nov-19

16-Nov-19

17-Nov-19

18-Nov-19

19-Nov-19

20-Nov-19

21-Nov-19

23-Nov-19

24-Nov-19

25-Nov-19

26-Nov-19

27-Nov-19

28-Nov-19

30-Nov-19

10-Dec-19

11-Dec-19

12-Dec-19

13-Dec-19

14-Dec-19

15-Dec-19

16-Dec-19

17-Dec-19

18-Dec-19

19-Dec-19

20-Dec-19

21-Dec-19

22-Dec-19

23-Dec-19

24-Dec-19

25-Dec-19

26-Dec-19

27-Dec-19

28-Dec-19

29-Dec-19

30-Dec-19

31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

2-Dec-19

3-Dec-19

4-Dec-19

5-Dec-19

7-Dec-19

8-Dec-19

9-Dec-19
START DATE FINISH DATE DURATION

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED

2 Temporary power supply change over to MV incoming Switchgear - Spare Breaker Activity Actually Done

Activity Plan
Notes:

1. Once the above information are readily available, the building contractor shall prepare 3 stes and submit it to their respective site supervision consultant for approval.
LGF DATA CENTER PART - MV INCOMING SWITCHGEAR ROOM FOR UTILITY CONNECTION READINESS (25/12/2019)
MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19

WORK COMPLETION
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS

11-Nov-19

12-Nov-19

13-Nov-19

14-Nov-19

16-Nov-19

17-Nov-19

18-Nov-19

19-Nov-19

20-Nov-19

21-Nov-19

23-Nov-19

24-Nov-19

25-Nov-19

26-Nov-19

27-Nov-19

28-Nov-19

30-Nov-19

10-Dec-19

11-Dec-19

12-Dec-19

13-Dec-19

14-Dec-19

15-Dec-19

16-Dec-19

17-Dec-19

18-Dec-19

19-Dec-19

20-Dec-19

21-Dec-19

22-Dec-19

23-Dec-19

24-Dec-19

25-Dec-19

26-Dec-19

27-Dec-19

28-Dec-19

29-Dec-19

30-Dec-19

31-Dec-19
2-Dec-19

3-Dec-19

4-Dec-19

5-Dec-19

7-Dec-19

8-Dec-19

9-Dec-19

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED

ARCHITECTURAL / FIT OUT WORKS

1 Steel Structure Approval for MV switchgear Engr. Ahmed 100% Under Review

2 Wall Finishing Engr. Ahmed 100% 30/Nov/19 2/Dec/19 3

3 Dust Proof Painting on floor Engr. Ahmed 100% 4/Dec/19 5/Dec/19 2

4 Raised Floor Installation Engr. Ahmed 0% 12/3/2019 26/Dec/19 2/Jan/20 7

* 2 Nos of Front Door Delivery on 02-Dec-2019


5 Door Installation Engr. Ahmed 0% 17/Dec/19 20/Dec/19 3
* 4 Nos of Back side door delivery on 15-Dec-2019

ENGINEERING ISSUE

1 Wall Elevation for Electrical, ELV, BMS & Novec Coordination Drawing Mr. Hafeez 100% 20/Nov/19 22/Nov/19

2 BMS Shop Drawing Engr. Saud -S1 UNDER REVIEW * Under Consultant approval

3 Rasied Floor Drawing Mr.Alvin 100% 10/Nov/19 10/Nov/19

4 Fire Alarm Drawing Engr.Shabir S1 UNDER REVIEW * Under Consultant approval

5 Hand Over Document ( Last Part ) Mr.Ashraf 12/Dec/19 20/Dec/19

LIGHTING SYSTEM

1 Installation of GI Conduits Eng. Aijaz 100% ✓ 18/Nov/19 19/Nov/19 2

2 Wire pulling of lighting fixtures Eng. Aijaz 100% ✓ 19/Nov/19 19/Nov/19 1

4 Light fixtures installation Eng. Aijaz 100% 20/Nov/19 20/Nov/19 1

5 Testing for wires & Light Fixtures Eng. Aijaz 100% 21/Nov/19 21/Nov/19 1

POWER - WIRING DEVICES

1 Installation of GI Conduit Eng. Aijaz 100% 20/Nov/19 23/Nov/19 3

2 Wire pulling of Power Eng. Aijaz 100% 24/Nov/19 24/Nov/19 1

3 Back box of Wiring devices/Lighting Switches Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

4 Wiring Devices for Power Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

5 Wiring devices for Lighting switches Eng. Aijaz 0% 11/Dec/19 12/Dec/19 2

6 Testing for wires Eng. Aijaz 100% 4/Dec/19 4/Dec/19 1

MV CONTAINMENT

1 Installation of Cable Ladder with Earth Braid Engr. Aijaz 100% Lug Bal. ✓ 14/Nov/19 18/Nov/19 5 Earth braid (Jumper) is Pending

2 MV cable pulling Mr. Syed 100% ✓ 11/Nov/19 20/Nov/19 9

4 Cable Cleat for MV cable Mr. Syed 0% 12/10/2019 12/Dec/19 15/Dec/19 3

5 Cable Tie for MV cable Mr. Syed 0% 12/10/2019 12/Dec/19 15/Dec/19 3

6 MV cable Identification tag Mr. Syed 0% 12/15/2019 MIR Under Review 20/Dec/19 21/Dec/19 2

7 IR testing for MV cable Mr. Syed 0% 12/Dec/19 13/Dec/19 2

8 Termination kit for MV cable Mr. Syed 0% 12/7/2019 20/Dec/19 30/Dec/19


1 No of Submittal submitted Date : 26-11-2019
9 Certified HT Jointer for MV cable termination Mr. Syed 0% MIR Under Review 1 No of submittal will be submit on 30-11-2019

EARTHING

1 Installation of Earth Bar Engr. Aijaz 100% 2/Dec/19 3/Dec/19 2

2 Cable Pulling for Earthing Engr. Aijaz 50% 2/Dec/19 3/Dec/19 2

3 Both End termination Engr. Aijaz 0% 2/Dec/19 3/Dec/19 2

4 Testing of Earthing Engr. Aijaz 0% 2/Dec/19 3/Dec/19 2

FIRE ALARM SYSTEM

1 Installation of GI conduit for detector and Remote indicator Engr. Ibrahim 100% 14/Nov/19 17/Nov/19 3

2 Smoke detector installation Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

3 Remote indicator installation Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

4 Control module Engr. Ibrahim 0% ✓ 15/Dec/19 15/Dec/19 1

5 Interface module Engr. Ibrahim 0% ✓ 16/Dec/19 16/Dec/19 1

6 Monitor Module for Novec Engr. Ibrahim 0% ✓ 17/Dec/19 18/Dec/19 2

SECURITY SYSTEM

1 Installation of GI conduit Engr. Ibrahim 90% 17/Dec/19 20/Dec/19 3

2 Cabling for Electric motorised lock,Magnetic Lock Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3

3 Door Contact Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

4 Door Module Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

5 Break Glass Unit Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3

6 Card Reader Engr. Ibrahim 0% ✓ 17/Dec/19 20/Dec/19 3

BUILDING MANAGEMENT SYSTEM

1 Installation of 110mm Tray Engr. Ibrahim 100% 17/Nov/19 20/Nov/19 3

2 Installation of Flexible conduit Engr. Ibrahim 0% 5/Dec/19 8/Dec/19 3

3 Cabling for BMS points Engr. Ibrahim 0% ✓ 9/Dec/19 10/Dec/19 1

4 Installation of DDC panel which is related to MV switchgear Room Engr. Ibrahim 0% X 10/Dec/19 12/Dec/19 3

NOVEC SYSTEM

1 Installation of Electrical Conduit with Novec Panel 100% ✓ 11/Nov/19 14/Nov/19 4 * After the Completion of Final Fitout work approval

2 Installation of Gi Pipe with Fittings 60% 5/Dec/19 7/Dec/19 2

3 Cabling for the Control devices 100% ✓ 2/Dec/19 3/Dec/19 2

4 Kidde Aegis ECP panel 100% ✓ 3/Dec/19 3/Dec/19 1

5 Conventional Photoelectric smoke detector with Detector base 0% ✓ 3/Dec/19 3/Dec/19 1

6 Conventional Thermal Detector with Detector base 0% ✓ 3/Dec/19 3/Dec/19 1

7 Backbox + Suppression Abort Station 0% ✓ 4/Dec/19 4/Dec/19 1

8 6" Alarm Bell 0% ✓ 4/Dec/19 4/Dec/19 1

9 Horn Strobe, Red 12/24 VDC 0% ✓ 5/Dec/19 5/Dec/19 1

10 Manual Release station + Indoor surface back box 0% ✓ 5/Dec/19 5/Dec/19 1

11 Supression key maintenance switch + Back box 0% ✓ 5/Dec/19 5/Dec/19 1

12 Novec 1230 Cylinder with complete set 0% ✓ 26/Dec/19 30/Dec/19 4

13 Room integrity test for Novec 0% 15/Dec/19 17/Dec/19 3

HVAC SYSTEM

1 Installation of FCU for MV switchgear room - Located in LGF corridor 0% 5/Dec/19 8/Dec/19

2 Installation of Ducting 0% 8/Dec/19 13/Dec/19

3 Installation of MSFD 0% 3/8/2019 10/Mar/20 15/Mar/20

4 Installation of MSFD power supply 0% 18/Dec/19 22/Dec/19

5 Bell Mouth for the ducting 0% 15/Mar/20 18/Mar/20

6 Functional test for MSFD 0% 19/Mar/20 20/Mar/20

FIRE SEALANT

1 Fire stopping material for Electrical system 0% 10/Dec/19 11/Dec/19 2

2 Fire Stopping material for Mechanical system 0% 17/Dec/19 18/Dec/19 2

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system Engr.Aijaz 0% 16/Nov/19 19/Dec/19 2 Installed Temporary
2 Installation of Control Battery system charger Qassim 0% 3/Dec/19 3/Dec/19 1 Temporarary Battery Installed
MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19

WORK COMPLETION
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS

11-Nov-19

12-Nov-19

13-Nov-19

14-Nov-19

16-Nov-19

17-Nov-19

18-Nov-19

19-Nov-19

20-Nov-19

21-Nov-19

23-Nov-19

24-Nov-19

25-Nov-19

26-Nov-19

27-Nov-19

28-Nov-19

30-Nov-19

10-Dec-19

11-Dec-19

12-Dec-19

13-Dec-19

14-Dec-19

15-Dec-19

16-Dec-19

17-Dec-19

18-Dec-19

19-Dec-19

20-Dec-19

21-Dec-19

22-Dec-19

23-Dec-19

24-Dec-19

25-Dec-19

26-Dec-19

27-Dec-19

28-Dec-19

29-Dec-19

30-Dec-19

31-Dec-19
2-Dec-19

3-Dec-19

4-Dec-19

5-Dec-19

7-Dec-19

8-Dec-19

9-Dec-19

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED

3 Installation of Battery rack Qassim 0% 3/Dec/19 3/Dec/19 1 Battery Rack Not Available for Temporery Battery

4 125 v DC Power cable for control battery system Engr. Aijaz 0% 3/Dec/19 3/Dec/19 1 Done Temporary
5 3-Phase Auxillary power for Control battery system Engr.Aijaz 0% 3/Dec/19 3/Dec/19 1 Done using Temporary Cable

6 Pre commissioning for Control battery system Engr.Aijaz 0% 4/Dec/19 4/Dec/19 1 Temporarary Battery Installed

MV SWITCHGEAR

1 Installation of MV Switchgear 100% ✓ ✓


2 Torque Tightness of the MV switchgear Busbar 100% ✓ ✓
3 Control wiring based on As manufactured drawings 100% ✓
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 76% 15/Dec/19 30/Dec/19 13

1 Testing of CT Schneider 100% 16/Dec/19 17/Dec/19 2

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 18/Dec/19 18/Dec/19 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 100%


Energized by Temporary source & Temporary Cable
AC/ DC Energization

4 Testing of Incoming/Outgoing Breaker Schneider 100% 19/Dec/19 22/Dec/19 2

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 100% 22/Dec/19 22/Dec/19 1

Contact Resistance Measurement

6 Functional Test Schneider 33% 23/Dec/19 24/Dec/19 2

Functional Test 100%

Shall be done once Key Cylinders installed in Up-Stream CB & Down


Locks Interlock Checks 0%
-Stream CB

Wiring to be done & Logic function to be checked (Logic Discrimination


Logic discrimination 0%
Relay setting not given in relay setting file)

7 KWH Meter 3rd Party Calibration Certificate through schneider Schneider 100% 25/Dec/19 25/Dec/19 1

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 26/Dec/19 29/Dec/19 2

50/51 (Phase Overcurrent)

51N (Earth Fault)

27 (Undervoltage)

59 (Overvoltage)

9 Primary Injection Schneider 100% 30/Dec/19 30/Dec/19 1

10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization

11 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0% After power cable termination completed

Mr.Laurence
12 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0% 15/Dec/19 15/Dec/19

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0% 3/Dec/19 4/Dec/19 2

2 Establish the LOTO activities Mr.Udhaya 0% 15/Dec/19 15/Dec/19 1

SEC DOCUMENTATION PROCESS

1 Calibration certificate of Utility meters With 3rd Party Joint Inspection Mr.Ashraf 0% 10/Dec/19 11/Dec/19 2

2 Approved Material Submittal of Each type of Utility Meters should be Submitted Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1

3 Approved IR for Cable ladders, Switchgear,Test reports Mr. Udhaya 50% last Date: 16-12-2019

4 SEC Approval Including Relay Settings Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1

5 SEC Approval for Energization Mr.Harry 0% 30/Dec/19 7/Jan/19 8

TEMPORARY POWER SUPPLY


1 Parcel 1.04 cable reroute will be adjusted with JLL according to Tadawul change over schedule Activity Actually Done

2 Temporary power supply change over to MV incoming Switchgear - Spare Breaker Activity Plan

Notes:

1. Once the above information are readily available, the building contractor shall prepare 3 stes and submit it to their respective site supervision consultant for approval.
B2 - MVDB-S1-B SWITCHGEAR READINESS (STATUS AS ON 12/01/2020)
Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

MV CONTAINMENT

CABLE HV TESTING 12/Dec/19 26/Dec/19 13

1 Outer Sheath Test 0%

IR Value Checks

HV Test

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable

5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

MV SWITCHGEAR

1 Installation of MV Switchgear 100%

2 Torque Tightness of the MV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 100%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 79% 5/Jan/20 9/Jan/20 5

1 Testing of CT Schneider 100% 6/Jan/20 6/Jan/20 1

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 6/Jan/20 6/Jan/20 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 100% 7/Jan/20 7/Jan/20 1


Energized by Temporary source & Temporary Cable
AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 7/Jan/20 7/Jan/20 1

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 100% 7/Jan/20 7/Jan/20 1

Contact Resistance Measurement

6 Functional Test Schneider 67% 7/Jan/20 7/Jan/20 1

Functional Test 100%

Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 0%
Truck

Logic discrimination 100% Logic Discrimination Relay setting not given in relay setting file

7 Power Meter Test Schneider 100% 8/Jan/20 8/Jan/20 1

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 8/Jan/20 8/Jan/20 1

50/51 (Phase Overcurrent)

51N (Earth Fault)

64(REF)

27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 100% 9/Jan/20 9/Jan/20 1

10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization

11 Stability Checks Schneider 0% Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )

12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%


Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


L22 - MVDB-S2-A SWITCHGEAR READINESS (STATUS AS ON 19/01/2020)
Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20

19-Jan-20

20-Jan-20

21-Jan-20

22-Jan-20

23-Jan-20

24-Jan-20

25-Jan-20

26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

MV CONTAINMENT

CABLE HV TESTING 12/Dec/19 26/Dec/19 13

1 Outer Sheath Test 0%

IR Value Checks

HV Test

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

MV SWITCHGEAR

1 Installation of MV Switchgear 100%

2 Torque Tightness of the MV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 100%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 79% 8/Jan/20 15/Jan/20 5

1 Testing of CT Schneider 100% 9/Jan/20 9/Jan/20

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 9/Jan/20 9/Jan/20

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 100% 12/Jan/20 12/Jan/20

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 12/Jan/20 12/Jan/20

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 100% 13/Jan/20 13/Jan/20

Contact Resistance Measurement

6 Functional Test Schneider 70% 13/Jan/20 13/Jan/20

Functional Test 100%

Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 10%
Truck

Logic discrimination 100%

7 Power Meter Test Schneider 100% 14/Jan/20 14/Jan/20

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 14/Jan/20 14/Jan/20

50/51 (Phase Overcurrent)

51N (Earth Fault)

64(REF)

27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 100% 15/Jan/20 15/Jan/20

10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization
11 Stability Checks Schneider 0%
Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )

12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


L22 - MVDB-S2-B SWITCHGEAR READINESS (STATUS AS ON 09/01/2020)
Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )
START DATE FINISH DATE DURATION

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

MV CONTAINMENT

CABLE HV TESTING 12/Dec/19 26/Dec/19 13

1 Outer Sheath Test 0%

IR Value Checks

HV Test

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable

5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

MV SWITCHGEAR

1 Installation of MV Switchgear 100%

2 Torque Tightness of the MV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 100%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 0%


1 Testing of CT Schneider 0%

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 0%

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 0%

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 0%

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 0%

Contact Resistance Measurement

6 Functional Test Schneider 0%

Functional Test 0%

Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 0%
Truck

Logic discrimination 0% Logic Discrimination Relay setting not given in relay setting file

7 Power Meter Test Schneider 0%

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 0%

50/51 (Phase Overcurrent)

51N (Earth Fault) Logic Discrimination protection to be enabled & functional test to be done (Logic
Discrimination Relay setting not given in relay setting file )
64(REF)

27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 0%

10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization

11 Stability Checks Schneider 0% Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )

12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


L6 - MD-A SWITCHGEAR READINESS (STATUS AS ON 06/02/2020)
Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20

19-Jan-20

20-Jan-20

21-Jan-20

22-Jan-20

23-Jan-20

24-Jan-20

25-Jan-20

26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20
1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )
START DATE FINISH DATE DURATION

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

MV CONTAINMENT

CABLE HV TESTING 12/Dec/19 26/Dec/19 13

1 Outer Sheath Test 0%

IR Value Checks

HV Test

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Not Installed

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

MV SWITCHGEAR

1 Installation of MV Switchgear 100%

2 Torque Tightness of the MV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 100%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 63% 14/Jan/20 30/Jan/20 14 Site Access issue (Scaffolding not removed )

1 Testing of CT Schneider 100% 15/Jan/20 16/Jan/20 2

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 19/Jan/20 19/Jan/20 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 40% 19/Jan/20 19/Jan/20 1

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 20/Jan/20 21/Jan/20 2

IR test 30%

CB contact Resistance 35%

Coil Resistance & operation 35%

5 Bus Bar Test 100% 22/Jan/20 22/Jan/20 1

Contact Resistance Measurement

6 Functional Test Schneider 70% 23/Jan/20 26/Jan/20

Functional Test 0%

Locks Interlock Checks 0%


Jan-20

WORK COMPLETION

10-Jan-20

11-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20

19-Jan-20

20-Jan-20

21-Jan-20

22-Jan-20

23-Jan-20

24-Jan-20

25-Jan-20

26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20
START DATE FINISH DATE DURATION

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )

Logic discrimination 0%

7 Power Meter Test Schneider 100% 27/Jan/20 27/Jan/20

current checks

Voltage checks

MW

MVAR
8 Relay Protection testing for MV Switchgear Schneider 85% 28/Jan/20 29/Jan/20

50/51 (Phase Overcurrent)

51N (Earth Fault)

64(REF)

27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 0% 30/Jan/20 30/Jan/20

10 17.5 KVA 80% of Hi Pot Test Schneider 0%

11 Stability Checks Schneider 0%

REF Stability Checks

12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


L6 - MD-B SWITCHGEAR READINESS (STATUS AS ON 06/02/2020)
Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20
10-Jan-20

11-Jan-20

11-Jan-20

12-Jan-20

13-Jan-20

14-Jan-20

15-Jan-20

16-Jan-20

17-Jan-20

18-Jan-20

19-Jan-20

20-Jan-20

21-Jan-20

22-Jan-20

23-Jan-20

24-Jan-20

25-Jan-20

26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20
START DATE FINISH DATE DURATION

1-Jan-20

2-Jan-20

3-Jan-20

4-Jan-20

5-Jan-20

6-Jan-20

7-Jan-20

8-Jan-20

9-Jan-20
IN ( % )

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

MV CONTAINMENT

CABLE HV TESTING 12/Dec/19 26/Dec/19 13

1 Outer Sheath Test 0%

IR Value Checks

HV Test

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Not Installed

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

MV SWITCHGEAR

1 Installation of MV Switchgear 100%

2 Torque Tightness of the MV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 100%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 64% 20/Jan/20 11/Feb/20 17

1 Testing of CT Schneider 100% 21/Jan/20 22/Jan/20 2

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 23/Jan/20 26/Jan/20 2

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 100% 27/Jan/20 27/Jan/20 1

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 27/Jan/20 28/Jan/20 2

IR test 30%

CB contact Resistance 35%

Coil Resistance & operation 30%

5 Bus Bar Test 100% 29/Jan/20 29/Jan/20 1

Contact Resistance Measurement

6 Functional Test Schneider 80% 30/Jan/20 3/Feb/20 3 NEED TO TO FUNCTIONAL CHECK INTERLOCK CABLES

Functional Test 0%

Locks Interlock Checks 0%

Logic discrimination 0%

7 Power Meter Test Schneider 100% 4/Feb/20 5/Feb/20 2

current checks 30%

Voltage checks 30%

MW 20%

MVAR 20%

8 Relay Protection testing for MV Switchgear Schneider 25% 6/Feb/20 9/Feb/20 2

50/51 (Phase Overcurrent)

51N (Earth Fault)

64(REF)

27 (Undervoltage)

59 (Overvoltage)
9 Primary Injection Schneider 0% 10/Feb/20 11/Feb/20 2

10 17.5 KVA 80% of Hi Pot Test Schneider 0%

11 Stability Checks Schneider 0%

REF Stability Checks

12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


M2T2A LV SWITCHGEAR READINESS (STATUS AS ON 06/02/2020)
Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20
26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

LV CONTAINMENT

CABLE TESTING 13

1 Outer Sheath Test 0%

IR Value Checks

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar

2 Cable Pulling for Earthing

3 Both End termination

4 Testing of Earthing

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Not Installed

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

LV SWITCHGEAR

1 Installation of LV Switchgear 100%

2 Torque Tightness of the LV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 70%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 92% Site Access issue (Scaffolding not removed )

1 Testing of CT Schneider 100%

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 50% 1

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 1

IR test 20%

CB contact Resistance 40%

Coil Resistance & operation 40%

5 Bus Bar Test 100% 1

Contact Resistance Measurement

6 Functional Test Schneider 80% NEED TO DO FINAL FUNCTIONAL CHECK WITH INTERLOCK CABLES

Functional Test 0%

Locks Interlock Checks 0%


Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20
26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

Logic discrimination 0%

7 Power Meter Test Schneider 100%

current checks 20%

Voltage checks 20%

20%
MW

MVAR 20%

8 Relay Protection testing for LV Switchgear Schneider 80%

50/51 (Phase Overcurrent)

51N (Earth Fault)


9 Primary Injection Schneider 100%

10 BUSBAR CRM Test Schneider 100%

11 Micrologic Relay Checks Schneider 100%

12 SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for LV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


M2T1A LV SWITCHGEAR READINESS (STATUS AS ON 06/02/2020)
Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20
26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

LV CONTAINMENT

CABLE TESTING 13

1 Outer Sheath Test 0%

IR Value Checks

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 100%

2 Cable Pulling for Earthing 100%

3 Both End termination 100%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Not Installed

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

LV SWITCHGEAR

1 Installation of LV Switchgear 100%

2 Torque Tightness of the LV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 70%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 92% Site Access issue (Scaffolding not removed )

1 Testing of CT Schneider 100%

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100% 1

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 50% 1

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 100% 1

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 100% 1

Contact Resistance Measurement

6 Functional Test Schneider 80%

Functional Test 0% NEED TO DO FINAL FUNCTIONAL CHECK WITH INTERLOCK CABLES

Locks Interlock Checks 0%


Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20
26-Jan-20

27-Jan-20

28-Jan-20

29-Jan-20

30-Jan-20

31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

Logic discrimination 0%

7 Power Meter Test Schneider 100%

current checks 20%

Voltage checks 20%

20%
MW

MVAR 20%

8 Relay Protection testing for LV Switchgear Schneider 80%

50/51 (Phase Overcurrent)

51N (Earth Fault)


9 Primary Injection Schneider 100%

10 BUSBAR CRM Test Schneider 100%

11 Micrologic Relay Checks Schneider 100%

12 SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%


S22-AE LV SWITCHGEAR READINESS (STATUS AS ON 06/02/2020)
Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20

10-Mar-20

11-Mar-20

12-Mar-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20

7-Mar-20

8-Mar-20

9-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

ARCHITECTURAL / FIT OUT WORKS

ENGINEERING ISSUE

LIGHTING SYSTEM

POWER - WIRING DEVICES

LV CONTAINMENT

CABLE TESTING 13

1 Outer Sheath Test 0%

IR Value Checks

2 Main Conductor test 0%

IR Value Checks

HV Test

3 Cable Termination 0%

Torque checks

EARTHING

1 Installation of Earth Bar 0%

2 Cable Pulling for Earthing 0%

3 Both End termination 0%

4 Testing of Earthing 0%

FIRE ALARM SYSTEM

SECURITY SYSTEM

BUILDING MANAGEMENT SYSTEM

NOVEC SYSTEM

HVAC SYSTEM

FIRE SEALANT

CONTROL BATTERY SYSTEM

1 Installation of containment for control battery system 0%

2 Installation of Control Battery system charger 0% Not Installed

3 Installation of Battery rack 0% Not Installed

4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable

6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)

LV SWITCHGEAR

1 Installation of LV Switchgear 100%

2 Torque Tightness of the LV switchgear Busbar 100%

3 Control wiring based on As manufactured drawings 0%

Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 20% Site Access issue (Scaffolding not removed )

1 Testing of CT Schneider 100%

IR test

Winding Resistance

Polarity

Excitation test

Ratio
2 Testing of VT Schneider 100%

IR test
Winding Resistance

Polarity

Ratio test

3 Bus Wiring Checks Schneider 0%

AC/ DC Energization

4 Testing of Incoming / Outgoing Breaker Schneider 20%

IR test

CB contact Resistance

Coil Resistance & operation

5 Bus Bar Test 0%

Contact Resistance Measurement

6 Functional Test Schneider 0%

Functional Test 0%

Locks Interlock Checks 0%


Jan-20

WORK COMPLETION

10-Feb-20

11-Feb-20

12-Feb-20

13-Feb-20

14-Feb-20

15-Feb-20

16-Feb-20

17-Feb-20

18-Feb-20

19-Feb-20

20-Feb-20

21-Feb-20

22-Feb-20

23-Feb-20

24-Feb-20

25-Feb-20

26-Feb-20

27-Feb-20

28-Feb-20

29-Feb-20

10-Mar-20

11-Mar-20

12-Mar-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS

1-Feb-20

2-Feb-20

3-Feb-20

4-Feb-20

5-Feb-20

6-Feb-20

7-Feb-20

8-Feb-20

9-Feb-20

1-Mar-20

2-Mar-20

3-Mar-20

4-Mar-20

5-Mar-20

6-Mar-20

7-Mar-20

8-Mar-20

9-Mar-20
IN ( % )
START DATE FINISH DATE DURATION

Logic discrimination 0%

7 Power Meter Test Schneider 0%

current checks 20%

Voltage checks 20%

20%
MW

MVAR 20%

8 Relay Protection testing for LV Switchgear Schneider 0%

50/51 (Phase Overcurrent)

51N (Earth Fault)


9 Primary Injection Schneider 0%

10 BUSBAR CRM Test Schneider 0%

11 Micrologic Relay Checks Schneider 0%

12 SWGR Panel Final Cleaning & Boxup Schneider 0%

13 Documentation Schneider 0%

Site Test Report

Red Markup

Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George

JLL INSPECTION

1 Room Initial Inspection Mr.Rashad 0%

LOTO & 3rd PARTY INSPECTION

1 Signages for MV switchgear Mr.Udhaya 0%

2 Establish the LOTO activities Mr.Udhaya 0%