WORK COMPLETION
11-Nov-19
12-Nov-19
13-Nov-19
14-Nov-19
16-Nov-19
17-Nov-19
18-Nov-19
19-Nov-19
20-Nov-19
21-Nov-19
23-Nov-19
24-Nov-19
25-Nov-19
26-Nov-19
27-Nov-19
28-Nov-19
30-Nov-19
10-Dec-19
11-Dec-19
12-Dec-19
13-Dec-19
14-Dec-19
15-Dec-19
16-Dec-19
17-Dec-19
18-Dec-19
19-Dec-19
20-Dec-19
21-Dec-19
22-Dec-19
23-Dec-19
24-Dec-19
25-Dec-19
26-Dec-19
27-Dec-19
28-Dec-19
29-Dec-19
30-Dec-19
31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
2-Dec-19
3-Dec-19
4-Dec-19
5-Dec-19
7-Dec-19
8-Dec-19
9-Dec-19
START DATE FINISH DATE DURATION
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED
1 Steel Structure Approval for MV switchgear Engr. Ahmed 100% Under Review
ENGINEERING ISSUE
1 Wall Elevation for Electrical, ELV, BMS & Novec Coordination Drawing Mr. Hafeez 100% 20/Nov/19 22/Nov/19
2 BMS Shop Drawing Engr. Saud -S1 UNDER REVIEW * Under Consultant approval
LIGHTING SYSTEM
5 Testing for wires & Light Fixtures Eng. Aijaz 100% 21/Nov/19 21/Nov/19 1
MV CONTAINMENT
1 Installation of Cable Ladder with Earth Braid Engr. Aijaz 100% Lug Bal. ✓ 14/Nov/19 18/Nov/19 5 Earth braid (Jumper) is Pending
6 MV cable Identification tag Mr. Syed 0% 12/15/2019 MIR Under Review 20/Dec/19 21/Dec/19 2
CABLE HV TESTING
IR Value Checks
HV Test
IR Value Checks
HV Test
Torque checks
EARTHING
1 Installation of GI conduit for detector and Remote indicator Engr. Ibrahim 100% 14/Nov/19 17/Nov/19 3
SECURITY SYSTEM
2 Cabling for Electric motorised lock,Magnetic Lock Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3
4 Installation of DDC panel which is related to MV switchgear Room Engr. Ibrahim 0% X 10/Dec/19 12/Dec/19 3
NOVEC SYSTEM
1 Installation of Electrical Conduit with Novec Panel 100% ✓ 11/Nov/19 14/Nov/19 4 * After the Completion of Final Fitout work approval
WORK COMPLETION
11-Nov-19
12-Nov-19
13-Nov-19
14-Nov-19
16-Nov-19
17-Nov-19
18-Nov-19
19-Nov-19
20-Nov-19
21-Nov-19
23-Nov-19
24-Nov-19
25-Nov-19
26-Nov-19
27-Nov-19
28-Nov-19
30-Nov-19
10-Dec-19
11-Dec-19
12-Dec-19
13-Dec-19
14-Dec-19
15-Dec-19
16-Dec-19
17-Dec-19
18-Dec-19
19-Dec-19
20-Dec-19
21-Dec-19
22-Dec-19
23-Dec-19
24-Dec-19
25-Dec-19
26-Dec-19
27-Dec-19
28-Dec-19
29-Dec-19
30-Dec-19
31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
2-Dec-19
3-Dec-19
4-Dec-19
5-Dec-19
7-Dec-19
8-Dec-19
9-Dec-19
START DATE FINISH DATE DURATION
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED
HVAC SYSTEM
1 Installation of FCU for MV switchgear room - Located in LGF corridor 0% 5/Dec/19 8/Dec/19
FIRE SEALANT
1 Installation of containment for control battery system Engr.Aijaz 0% 16/Nov/19 19/Dec/19 2 Installed Temporary
2 Installation of Control Battery system charger Qassim 0% 3/Dec/19 3/Dec/19 1 Temporarary Battery Installed
3 Installation of Battery rack Qassim 0% 3/Dec/19 3/Dec/19 1 Battery Rack Not Available for Temporery Battery
4 125 v DC Power cable for control battery system Engr. Aijaz 0% 3/Dec/19 3/Dec/19 1 Done Temporary
5 3-Phase Auxillary power for Control battery system Engr.Aijaz 0% 3/Dec/19 3/Dec/19 1 Done using Temporary Cable
6 Pre commissioning for Control battery system Engr.Aijaz 0% 4/Dec/19 4/Dec/19 1 Temporarary Battery Installed
MV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 76% 5/Dec/19 23/Dec/19 14
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 10/Dec/19 10/Dec/19 1
IR test
Winding Resistance
Polarity
Ratio test
IR test
CB contact Resistance
Locks Interlock Checks 0% Shall be done once Key Cylinders installed in Up-Stream CB & Down -Stream CB
Wiring to be done & Logic function to be checked (Logic Discrimination Relay setting not
Logic discrimination 0%
given in relay setting file)
7 KWH Meter 3rd Party Calibration Certificate through schneider Schneider 100% 18/Dec/19 18/Dec/19 1
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 19/Dec/19 22/Dec/19 2
59 (Overvoltage)
9 Primary Injection Schneider 100% 23/Dec/19 23/Dec/19 1
10 17.5 KVA 80% of Hi Pot Test Schneider 0% 29/Dec/19 29/Dec/19 1 Test Shall be done before Energization
11 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0% After power cable termination completed
Mr.Laurence
12 SUTTON - 3rd Party Confirmation 0% 4/Dec/19 12/Dec/19 7
/George
JLL INSPECTION
1 Calibration certificate of Utility meters With 3rd Party Joint Inspection Mr.Ashraf 0% 10/Dec/19 11/Dec/19 2
2 Approved Material Submittal of Each type of Utility Meters should be Submitted Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1
3 Approved IR for Cable ladders, Switchgear,Test reports Mr. Udhaya 60% last Date: 16-12-2019
WORK COMPLETION
11-Nov-19
12-Nov-19
13-Nov-19
14-Nov-19
16-Nov-19
17-Nov-19
18-Nov-19
19-Nov-19
20-Nov-19
21-Nov-19
23-Nov-19
24-Nov-19
25-Nov-19
26-Nov-19
27-Nov-19
28-Nov-19
30-Nov-19
10-Dec-19
11-Dec-19
12-Dec-19
13-Dec-19
14-Dec-19
15-Dec-19
16-Dec-19
17-Dec-19
18-Dec-19
19-Dec-19
20-Dec-19
21-Dec-19
22-Dec-19
23-Dec-19
24-Dec-19
25-Dec-19
26-Dec-19
27-Dec-19
28-Dec-19
29-Dec-19
30-Dec-19
31-Dec-19
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
2-Dec-19
3-Dec-19
4-Dec-19
5-Dec-19
7-Dec-19
8-Dec-19
9-Dec-19
START DATE FINISH DATE DURATION
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED
2 Temporary power supply change over to MV incoming Switchgear - Spare Breaker Activity Actually Done
Activity Plan
Notes:
1. Once the above information are readily available, the building contractor shall prepare 3 stes and submit it to their respective site supervision consultant for approval.
LGF DATA CENTER PART - MV INCOMING SWITCHGEAR ROOM FOR UTILITY CONNECTION READINESS (25/12/2019)
MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19
WORK COMPLETION
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS
11-Nov-19
12-Nov-19
13-Nov-19
14-Nov-19
16-Nov-19
17-Nov-19
18-Nov-19
19-Nov-19
20-Nov-19
21-Nov-19
23-Nov-19
24-Nov-19
25-Nov-19
26-Nov-19
27-Nov-19
28-Nov-19
30-Nov-19
10-Dec-19
11-Dec-19
12-Dec-19
13-Dec-19
14-Dec-19
15-Dec-19
16-Dec-19
17-Dec-19
18-Dec-19
19-Dec-19
20-Dec-19
21-Dec-19
22-Dec-19
23-Dec-19
24-Dec-19
25-Dec-19
26-Dec-19
27-Dec-19
28-Dec-19
29-Dec-19
30-Dec-19
31-Dec-19
2-Dec-19
3-Dec-19
4-Dec-19
5-Dec-19
7-Dec-19
8-Dec-19
9-Dec-19
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED
1 Steel Structure Approval for MV switchgear Engr. Ahmed 100% Under Review
ENGINEERING ISSUE
1 Wall Elevation for Electrical, ELV, BMS & Novec Coordination Drawing Mr. Hafeez 100% 20/Nov/19 22/Nov/19
2 BMS Shop Drawing Engr. Saud -S1 UNDER REVIEW * Under Consultant approval
LIGHTING SYSTEM
5 Testing for wires & Light Fixtures Eng. Aijaz 100% 21/Nov/19 21/Nov/19 1
MV CONTAINMENT
1 Installation of Cable Ladder with Earth Braid Engr. Aijaz 100% Lug Bal. ✓ 14/Nov/19 18/Nov/19 5 Earth braid (Jumper) is Pending
6 MV cable Identification tag Mr. Syed 0% 12/15/2019 MIR Under Review 20/Dec/19 21/Dec/19 2
EARTHING
1 Installation of GI conduit for detector and Remote indicator Engr. Ibrahim 100% 14/Nov/19 17/Nov/19 3
SECURITY SYSTEM
2 Cabling for Electric motorised lock,Magnetic Lock Engr. Ibrahim 0% 17/Dec/19 20/Dec/19 3
4 Installation of DDC panel which is related to MV switchgear Room Engr. Ibrahim 0% X 10/Dec/19 12/Dec/19 3
NOVEC SYSTEM
1 Installation of Electrical Conduit with Novec Panel 100% ✓ 11/Nov/19 14/Nov/19 4 * After the Completion of Final Fitout work approval
HVAC SYSTEM
1 Installation of FCU for MV switchgear room - Located in LGF corridor 0% 5/Dec/19 8/Dec/19
FIRE SEALANT
1 Installation of containment for control battery system Engr.Aijaz 0% 16/Nov/19 19/Dec/19 2 Installed Temporary
2 Installation of Control Battery system charger Qassim 0% 3/Dec/19 3/Dec/19 1 Temporarary Battery Installed
MATERIAL AVAILABILITY WORK APPROVED STATUS Nov-19 Jan-19
WORK COMPLETION
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS
11-Nov-19
12-Nov-19
13-Nov-19
14-Nov-19
16-Nov-19
17-Nov-19
18-Nov-19
19-Nov-19
20-Nov-19
21-Nov-19
23-Nov-19
24-Nov-19
25-Nov-19
26-Nov-19
27-Nov-19
28-Nov-19
30-Nov-19
10-Dec-19
11-Dec-19
12-Dec-19
13-Dec-19
14-Dec-19
15-Dec-19
16-Dec-19
17-Dec-19
18-Dec-19
19-Dec-19
20-Dec-19
21-Dec-19
22-Dec-19
23-Dec-19
24-Dec-19
25-Dec-19
26-Dec-19
27-Dec-19
28-Dec-19
29-Dec-19
30-Dec-19
31-Dec-19
2-Dec-19
3-Dec-19
4-Dec-19
5-Dec-19
7-Dec-19
8-Dec-19
9-Dec-19
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
IN ( % ) YET TO BE
AVAILABLE APPROVED UNDER REVIEW
DELIVERED
3 Installation of Battery rack Qassim 0% 3/Dec/19 3/Dec/19 1 Battery Rack Not Available for Temporery Battery
4 125 v DC Power cable for control battery system Engr. Aijaz 0% 3/Dec/19 3/Dec/19 1 Done Temporary
5 3-Phase Auxillary power for Control battery system Engr.Aijaz 0% 3/Dec/19 3/Dec/19 1 Done using Temporary Cable
6 Pre commissioning for Control battery system Engr.Aijaz 0% 4/Dec/19 4/Dec/19 1 Temporarary Battery Installed
MV SWITCHGEAR
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 18/Dec/19 18/Dec/19 1
IR test
Winding Resistance
Polarity
Ratio test
IR test
CB contact Resistance
7 KWH Meter 3rd Party Calibration Certificate through schneider Schneider 100% 25/Dec/19 25/Dec/19 1
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 26/Dec/19 29/Dec/19 2
27 (Undervoltage)
59 (Overvoltage)
10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization
11 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0% After power cable termination completed
Mr.Laurence
12 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
1 Calibration certificate of Utility meters With 3rd Party Joint Inspection Mr.Ashraf 0% 10/Dec/19 11/Dec/19 2
2 Approved Material Submittal of Each type of Utility Meters should be Submitted Mr.Ashraf 0% 11/Dec/19 11/Dec/19 1
3 Approved IR for Cable ladders, Switchgear,Test reports Mr. Udhaya 50% last Date: 16-12-2019
2 Temporary power supply change over to MV incoming Switchgear - Spare Breaker Activity Plan
Notes:
1. Once the above information are readily available, the building contractor shall prepare 3 stes and submit it to their respective site supervision consultant for approval.
B2 - MVDB-S1-B SWITCHGEAR READINESS (STATUS AS ON 12/01/2020)
Jan-20
WORK COMPLETION
10-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
ENGINEERING ISSUE
LIGHTING SYSTEM
MV CONTAINMENT
IR Value Checks
HV Test
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
MV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 79% 5/Jan/20 9/Jan/20 5
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 6/Jan/20 6/Jan/20 1
IR test
Winding Resistance
Polarity
Ratio test
IR test
CB contact Resistance
Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 0%
Truck
Logic discrimination 100% Logic Discrimination Relay setting not given in relay setting file
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 8/Jan/20 8/Jan/20 1
64(REF)
27 (Undervoltage)
59 (Overvoltage)
9 Primary Injection Schneider 100% 9/Jan/20 9/Jan/20 1
10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization
11 Stability Checks Schneider 0% Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )
12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
WORK COMPLETION
10-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
19-Jan-20
20-Jan-20
21-Jan-20
22-Jan-20
23-Jan-20
24-Jan-20
25-Jan-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE START DATE FINISH DATE DURATION REMARKS
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
ENGINEERING ISSUE
LIGHTING SYSTEM
MV CONTAINMENT
IR Value Checks
HV Test
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
MV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 79% 8/Jan/20 15/Jan/20 5
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 9/Jan/20 9/Jan/20
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test
CB contact Resistance
Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 10%
Truck
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 100% 14/Jan/20 14/Jan/20
64(REF)
27 (Undervoltage)
59 (Overvoltage)
9 Primary Injection Schneider 100% 15/Jan/20 15/Jan/20
10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization
11 Stability Checks Schneider 0%
Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )
12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Jan-20
11-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
START DATE FINISH DATE DURATION
ENGINEERING ISSUE
LIGHTING SYSTEM
MV CONTAINMENT
IR Value Checks
HV Test
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
2 Installation of Control Battery system charger 0% Installed Temporarary(Permenent solution to be made for cable entry to the Battery charger panel)
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
MV SWITCHGEAR
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 0%
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test
CB contact Resistance
Functional Test 0%
Shall be done once Key Cylinders installed in Up-Stream CB, Transformer,LV system & Earthing
Locks Interlock Checks 0%
Truck
Logic discrimination 0% Logic Discrimination Relay setting not given in relay setting file
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 0%
51N (Earth Fault) Logic Discrimination protection to be enabled & functional test to be done (Logic
Discrimination Relay setting not given in relay setting file )
64(REF)
27 (Undervoltage)
59 (Overvoltage)
9 Primary Injection Schneider 0%
10 17.5 KVA 80% of Hi Pot Test Schneider 0% Test Shall be done before Energization
11 Stability Checks Schneider 0% Test shall be done based on readiness of Transformer,LV System (after completion of Pre-
REF Stability Checks Comm. Works, Busway Installation ,Control & CT cable Termination )
12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Jan-20
11-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
19-Jan-20
20-Jan-20
21-Jan-20
22-Jan-20
23-Jan-20
24-Jan-20
25-Jan-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
START DATE FINISH DATE DURATION
ENGINEERING ISSUE
LIGHTING SYSTEM
MV CONTAINMENT
IR Value Checks
HV Test
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
MV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 63% 14/Jan/20 30/Jan/20 14 Site Access issue (Scaffolding not removed )
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 19/Jan/20 19/Jan/20 1
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test 30%
Functional Test 0%
WORK COMPLETION
10-Jan-20
11-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
19-Jan-20
20-Jan-20
21-Jan-20
22-Jan-20
23-Jan-20
24-Jan-20
25-Jan-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
START DATE FINISH DATE DURATION
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
Logic discrimination 0%
current checks
Voltage checks
MW
MVAR
8 Relay Protection testing for MV Switchgear Schneider 85% 28/Jan/20 29/Jan/20
64(REF)
27 (Undervoltage)
59 (Overvoltage)
9 Primary Injection Schneider 0% 30/Jan/20 30/Jan/20
12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
10-Jan-20
11-Jan-20
11-Jan-20
12-Jan-20
13-Jan-20
14-Jan-20
15-Jan-20
16-Jan-20
17-Jan-20
18-Jan-20
19-Jan-20
20-Jan-20
21-Jan-20
22-Jan-20
23-Jan-20
24-Jan-20
25-Jan-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
START DATE FINISH DATE DURATION
1-Jan-20
2-Jan-20
3-Jan-20
4-Jan-20
5-Jan-20
6-Jan-20
7-Jan-20
8-Jan-20
9-Jan-20
IN ( % )
ENGINEERING ISSUE
LIGHTING SYSTEM
MV CONTAINMENT
IR Value Checks
HV Test
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
MV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 64% 20/Jan/20 11/Feb/20 17
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 23/Jan/20 26/Jan/20 2
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test 30%
6 Functional Test Schneider 80% 30/Jan/20 3/Feb/20 3 NEED TO TO FUNCTIONAL CHECK INTERLOCK CABLES
Functional Test 0%
Logic discrimination 0%
MW 20%
MVAR 20%
64(REF)
27 (Undervoltage)
59 (Overvoltage)
9 Primary Injection Schneider 0% 10/Feb/20 11/Feb/20 2
12 Surge Arrester installation ,SWGR Panel Final Cleaning & Boxup Schneider 0%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
ENGINEERING ISSUE
LIGHTING SYSTEM
LV CONTAINMENT
CABLE TESTING 13
IR Value Checks
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
LV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 92% Site Access issue (Scaffolding not removed )
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 1
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test 20%
6 Functional Test Schneider 80% NEED TO DO FINAL FUNCTIONAL CHECK WITH INTERLOCK CABLES
Functional Test 0%
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
Logic discrimination 0%
20%
MW
MVAR 20%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
ENGINEERING ISSUE
LIGHTING SYSTEM
LV CONTAINMENT
CABLE TESTING 13
IR Value Checks
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
LV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 92% Site Access issue (Scaffolding not removed )
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100% 1
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test
CB contact Resistance
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
26-Jan-20
27-Jan-20
28-Jan-20
29-Jan-20
30-Jan-20
31-Jan-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
Logic discrimination 0%
20%
MW
MVAR 20%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
10-Mar-20
11-Mar-20
12-Mar-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
7-Mar-20
8-Mar-20
9-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
ENGINEERING ISSUE
LIGHTING SYSTEM
LV CONTAINMENT
CABLE TESTING 13
IR Value Checks
IR Value Checks
HV Test
3 Cable Termination 0%
Torque checks
EARTHING
4 Testing of Earthing 0%
SECURITY SYSTEM
NOVEC SYSTEM
HVAC SYSTEM
FIRE SEALANT
4 125 v DC Power cable for control battery system 0% Done using Temporary Cable
5 3-Phase Auxillary power for Control battery system 0% Done using Temporary Cable
6 Pre commissioning for Control battery system 0% Partly Done(Battery Charger Energized by Vender)
LV SWITCHGEAR
Pre commissioning for Circuit breaker- Incoming /Outgoing Schneider 20% Site Access issue (Scaffolding not removed )
IR test
Winding Resistance
Polarity
Excitation test
Ratio
2 Testing of VT Schneider 100%
IR test
Winding Resistance
Polarity
Ratio test
AC/ DC Energization
IR test
CB contact Resistance
Functional Test 0%
WORK COMPLETION
10-Feb-20
11-Feb-20
12-Feb-20
13-Feb-20
14-Feb-20
15-Feb-20
16-Feb-20
17-Feb-20
18-Feb-20
19-Feb-20
20-Feb-20
21-Feb-20
22-Feb-20
23-Feb-20
24-Feb-20
25-Feb-20
26-Feb-20
27-Feb-20
28-Feb-20
29-Feb-20
10-Mar-20
11-Mar-20
12-Mar-20
S.NO ACTIVITY DESCRIPTION PERSON INCHARGE REMARKS
1-Feb-20
2-Feb-20
3-Feb-20
4-Feb-20
5-Feb-20
6-Feb-20
7-Feb-20
8-Feb-20
9-Feb-20
1-Mar-20
2-Mar-20
3-Mar-20
4-Mar-20
5-Mar-20
6-Mar-20
7-Mar-20
8-Mar-20
9-Mar-20
IN ( % )
START DATE FINISH DATE DURATION
Logic discrimination 0%
20%
MW
MVAR 20%
13 Documentation Schneider 0%
Red Markup
Mr.Laurence
14 SUTTON - 3rd Party Confirmation 0%
/George
JLL INSPECTION