DATE SWGR LEVEL CT CBCT VT BREAKER POWER

NAME METER

03.01.2020 MD-A L-6 FINISHED FINISHED FINISHED FINISHED FINISHED

03.01.2020 MD-B L-6 FINISHED FINISHED FINISHED FINISHED FINISHED

03.01.2020 M2T2A L22 FINISHED n/a FINISHED FINISHED FINISHED

03.01.2020 M2T1A L22 FINISHED n/a FINISHED FINISHED FINISHED


FUNCTIONAL
FUNCTIONAL
RELAY/Microl PRIMARY BUS WIRING CHECK OF CHECK INTERLOCK BUSBAR
ogic relay INJECTION B/W PANELS with TESTING
INDIVIDUAL
control cables

FINISHED FINISHED ONGOING FINISHED

ONGOING FINISHED FINISHED FINISHED

FINISHED FINISHED Finished FINISHED/MCCB FINISHED


NOT TESTED

FINISHED/MCCB
FINISHED FINISHED Finished FINISHED
NOT TESTED