Hi, I'm Saul and I'll talk about the project

facilities.

Hydraulic installation
A hydraulic installation is a set of pipes and connections of different
diameters and different materials COOPËR PVC TUBO PLUS; To feed and
distribute water within the construction, this installation will supply water to
all the points and places of the architectural work that requires it, so that this
liquid reaches all the wet areas of this installation in adequate quantity and
pressure of furniture and equipment. WATER CENTER, bathtub, washbasin
to fulfill the executive project we need
Blueprints
cuts

specification of material PIPE VALVe furniture and equipment to be


used.
Calculation memory
descriptive memory
detail drawing
isometric
Drawing of the hydraulic instalation
Rainwater harvesting plant

treatment system. in this case

The potable water supply enters through boulevard de las Naciones street
until it reaches the cistern located to the northwest of the complex and in the
closest part of said street, whose capacity is one hundred seven
thousand five hundred thirty-five liters (107,535) than 107 CUBIC
meter , being double the capacity of the elevated tank.

Once that amount of water has been reserved saved, the next step is to fill
the elevated tank by means of a pumping system up to a height of 20 meters
to achieve the adequate column of water to reach the furthest hydraulic
installation.
With the previous system, the force of gravity and the water column
obtained are used to fill the entire pipeline that is distributed under the main
horizontal corridor to later be distributed respectively to each of the spaces,
thus avoiding pumping equipment or some kind of energy.

For pipe and valve installations the following recommendations shall be


followed:
Avoid contact with another installation, especially the drainage one. It is
recommended that the general supply pipe have at least one meter
separation from the drainage lines residual water; in addition, they will
have to be placed in easily accessible areas for maintenance.
The hot and cold water pipes must be 20 centimeter apart; the hot water are
always placed on the left side and consequently the cold water It Installs
on the right side.
It is recommended that all the furniture have a stopcock so that, in the
future, if there is a leak or the cabinet needs to be changed, the general
installation stopcock does not have to be closed, but only the stopcock. of
the furniture in question.
At the end of the installation, a pressure test is carried out to check if there
are no leaks or if there is adequate pressure, to confirm this, the airtightness
tests that are established in the aforementioned standard are carried out.
Additionally, the project has a wastewater treatment plant with a treated
water cistern with a capacity of fifty-one thousand three hundred
ninety-four 51,394 liters, distributed by a hydropneumatic tank for
irrigation of the green areas of the general hospital. shrubbery TREES

sanitary installation
The sanitary facilities will be proposed based on the architecture project,
coordinated with all the specialists involved in the integral design of the
building.

The interior sanitary facilities correspond to the sanitary solution of all


environments, such as the hygienic services and the annex services according
to the equipment.
The outdoor facilities correspond to the wastewater evacuation system to
the city's public collector and the solution of the rainwater drainage systems.
coupled with the catchment system.

The feasibility for the evacuation of wastewater from the building will be
through a connection to the existing public collector. 16Ø INCHES
The quality of the materials will comply with the corresponding standards.

Fire protection system


The hospital is also equipped with a fire fighting system supplied by the same
Potable water cistern with an independent pumping system. apart from the
one you already have
The purpose of the fire protection installation is to reduce to acceptable
limits the risk that the users of the building suffer damages derived from a
fire of accidental origin, as a consequence of the characteristics of the
project, construction, use and maintenance.
Likewise, the projected installation aims to signal the start of a fire as soon as
possible, in order to allow the start-up of the appropriate means for fighting
fire in its initial phase.

A careful execution of the facilities will be required that is to say high


end, as well as an adequate quality of all the materials that make up the
supply.
Fire sprinklers will be installed in critical areas
There will be smoke sensors in the places indicated in the corresponding
plans.
Stairs and elevators that serve fire sectors will be delimited by construction
elements whose resistance to fire will be, at least, that required for
separating elements of fire sectors.

Electrical installation
The electrical supply will be made with the hospital's existing electrical
networks.
The distribution of the circuits in general will be through trays and / or pipes
that come out of the distribution boards and make a distribution of the
circuits through side outlets that reach the junction boxes attached to the
ceiling by means of pipes. From these attached boxes, all the circuits
downstream of these are derived, until reaching the different lighting exits
and electrical outlets
The electrical supply includes from the low voltage output from the electrical
rooms of the first one at a voltage level of 380, 60 hz, to a common bus and
from this to the existing general boards and located in the electrical board
rooms.
The type of lighting contemplated in the project responds to the specific
needs of each premises, such as the planned furnishings and the type of
activity to be carried out, We will use brands like Calux. - A
distribution of properly distributed luminaires has been considered in order
to achieve the basic lighting considerations in normal, emergency and
evacuation situations

Installation of gas
The design was made adhering to the guidelines established in the official
Mexican standard

The gas distribution system will be made through a system of pipes that will
be installed visible and painted with yellow enamel. Pass valves will be placed
at each exit to the furniture for better control and maintenance of the
installation.
The pipes, both horizontal and vertical, can be connected at right angles to
each other.

to finish this part


Project review
The contractor must study all the plans corresponding to the work (including
those of other specialties) to verify the conditions of the work and determine
possible interferences or the need for modifications.

that's all of my part, I let it continue