Abstract:
2
Power line communication (PLC) system and their critical components are
presents an interesting and economical given. The measurement results are
solution for Automatic Meter Reading given.
(AMR). If an AMR system via PLC is This paper describes detector
set in a power delivery system, a system for illegal electricity usage using
detection system for illegal electricity the power lines based on the research
usage may be easily added in the work-taking place at the Central Power
existing PLC network. In the detection Research Institute (CPRI), Bangalore.
system, the second digitally energy The target of this study is to discover
meter chip is used and the value of new and possible solutions for this
energy is stored. The recorded energy is problem.
compared with the value at the main Index Terms: — Automatic meter
kilo Watt-hour meter. In the case of the reading (AMR), detector, illegal
difference between two recorded energy electricity usage, power line
data, an error signal is generated and communication, power line
transmitted via PLC network. communications (PLC) modem.
The detector and control system
is proposed. The architecture of the
1. Introduction
India, the largest democracy with an particularly electricity, is a key input for
estimated population of about 1.04 billion, is accelerating economic growth.
on a road to rapid growth in economy. Energy,
3
The theft of electricity is a criminal is a very important application in these
offence and power utilities are losing billions possibilities due to every user connected each
of rupees in this account. If an Automatic other via modems, using power lines. AMR is
Meter Reading system via Power line a technique to facilitate remote readings of
Communication is set in a power delivery energy consumption.
system, a detection system for illegal The following sections will describe
electricity usage is possible. the proposed detection and control system for
Power line communications (PLC) has illegal electricity usage using the power lines.
many new service possibilities on the data The scheme is based on the research work-
transferring via power lines without use of taking place at “Central Power Research Unit
extra cables. Automatic Meter Reading (AMR) (CPRI), Bangalore ”.
4
The AMR system starts at the meter. The three main components of AMR system
Some means of translating readings from are,
rotating meter dials, or cyclometer style meter
dials, into digital form is necessary in order to 1. Meter interface module: with power supply,
send digital metering data from the customer meter sensors, controlling electronics and a
site to a central point. In most cases, the meter communication interface that allows data to be
that is used in an AMR system is the same transmitted from this remote device to a
ordinary meter used for manual reading but the central location.
difference with conventional energy meter is
the addition of some device to generate pulses 2. Communications systems: used for the
relating to the amount of consumption transmission, or telemetry, of data and control
monitored, or generates an electronic, digital send signals between the meter interface units
code that translates to the actual reading on the and the central office.
meter dials. One such technique using optical
sensor is shown in Figure 1. 3. Central office systems equipment: including
modems, receivers, data concentrators,
controllers, host upload links, and host
computer.
5
transferring via power lines without use of of tree systems, connection points for adjacent
extra cables. AMR is a very important systems are provided in order that paths/loads
application in these possibilities due to every may be switched when necessary for
user connected each other via power lines. In operation. Additionally, in terms of
this power network, every user connected to distribution line types, there are underground
each other via modems with data originating cables and overhead power distribution lines.
from the remote meter or central station. Where transformers are concerned, they can be
divided into pole-mounted transformers, pad-
Electrical power systems vary in mounted transformers and indoor
configuration from country to country transformers.
depending on the state of the respective power
sources and loads. The practice of using High-speed PLC applications of the
medium-voltage (11-to-33kV) and low-voltage future include Automatic Meter Reading
(100-to-400V) power distribution lines as (AMR), power system fault detection, power
high-speed PLC communication means and theft detection, leakage current detection, and
optical networks as backbone networks is the measurement/control/energy-management
commonplace. of electrical power equipment for electrical
power companies, as well as home security,
Under normal service conditions, they the remote- monitoring/control of electrical
can be broadly divided into open-loop household appliances, online games, home
systems, each with a single opening, and tree networks, and billing.
systems with radial arranged lines. In the case
6
3. Detection and Control System
The proposed control system
[1] for the detection of illegal
electricity usage is shown in Fig.3.
PLC signaling is only valid over the
low voltage VAC power lines. The
system should be applied to every
low-voltage distribution network.
The system given in Fig. 3 belongs
only one distribution transformer
network and should be repeated for
every distribution network. Although
the proposed system can be used
uniquely, it is better to use it with
automatic meter reading system. If
the AMR system will be used in any
network, the host PLC unit and a PLC
modem for every subscriber should
be contained in this system. In Fig. 3,
the host PLC unit and other PLC
modems are named PLC1A, PLCNA
and are used for AMR. These units
provide communication with each Figure 4: Illegal detector system for one
subscriber.
other and send the recorded data in
kilowatt-hour meters to the PLC unit. PLC signaling must be in CENELEC
In order to detect illegal usage of standards. In Europe, CENELEC has formed
electrical energy, a PLC modem and the standard EN-50 065-1, in which the
an energy meter chip for every frequency bands, signaling levels, and
subscriber are added to an existing procedures are specified. 3–95 kHz are
restricted for use by electricity suppliers, and
AMR system. As given in Fig. 3,
95–148.5 kHz are restricted to consumer use.
PLC1B, PLCNB and energy meter
The recorded data in kilowatt-hour
chips belong to the detector.
meters for every subscriber are sent to host
The detector PLC s and energy
meters must be placed at the
connection point between PLC modem via PLC modems, which
distribution main lines and is placed in subscriber’s locations. On the
subscriber’s line. Since this other hand, energy meter chips are located at
connection point is usually in the air the connection points and read the energy in
or at underground, it is not suitable kilowatt-hours and also send the data to host
for anyone to access, such that its PLC unit. This proposed detector system has
control is easy. The main procedure two recorded energy data in host PLC unit,
of the proposed system can be one, which comes from the AMR-PLC, and
summarized as follows. the other, which comes from the PLC modem
7
at the connection points. These two recorded combined and sent to the central control unit.
energy data are compared in the host PLC; if If it is requested, a contactor may be included
there is any difference between two readings, to the system at subscriber locations to turn off
an error signal is generated. This means that the energy automatically, as in the case of
there is an illegal usage in the network. After illegal usage.
that, the subscriber address and error signal are
3.1 Simulation
8
the digital form directly using the 25 per subscriber. It is very
port of the meter. Therefore, there is economical and is a reliable solution
no need for an optical reflector when it is compared with the
system in digital meters. The results economic loss caused by illegal
of the tests show that this system usage [1].
may solve this problem economically
because the budget of the proposed
system is approximately U.S. $ 20–
9
4) The host PLC modems and its 7) The proposed equipment is the
controller must include two only one distributed in the power
addresses per every user: one is the network. So this system should be
AMR and the other for the energy repeated for all distribution power
meter. These two addresses must be networks. All host units in each
selected sequentially. distribution transformer may be
5) Operating software must be connected to only one main center
designed for the information of station via phone lines, fiber-optic
every subscriber in every sub power cable, or RF links.
network: subscriber identification
number, billing address, etc.
6) The system has two values of the Results and the variations of the
energy consumption for every user, measurements are shown in Figs. 6–
so if there is a difference between 7 [2]. The relations between
them, an error signal is generated frequency, length, and bit-error
for the illegal user. probability are given in these figures
[1].
Research work has been taking
place in the CPRI, Bangalore for the
remote metering and detection of
power theft and will soon be helpful
to electricity boards in India.
5. Conclusion
The proposed detector system to determine of electricity might be detected. Once this
illegal electricity usage via power line proposed detection systems are tried in real
communications is examined in the laboratory power lines, the distribution losses in India can
conditions. Results proved that if AMR and be reduced effectively.
detector system are used together illegal usage
10