Jan-June 2019
A. Big Loader
538 491 91% MERAH
PC 2000
770 722 94%
6015B
700 558 80%
HD 465 81 61 76%
PLANT
1 Physical Availability 87 % 81 % 93,1 % MERAH
6 Claim Warrantee
90 % 78 % 86,7 % MERAH
Acceptance
KPI Project Site (3) _Ytd June 2019
No KPI Target 2019 Ach Ytd Juni % Ach Colour Indicator Note
Ytd Ach
7 RM Cost 46.72 % 33.2 % 140% HIJAU
11 Program Component
80 % 10 % 12,5 % MERAH
Replacement
12 Plant People Development 32 jam 33,8 Jam 105,6 % HIJAU
HRGA
1 GA Services 95% 92% 97% MERAH
SERIOUS INJURY FREQUENCY RATE SERIOUS INJURY SEVERITY RATE / MINOR INJURY FREQUENCY RATE /
FATALITY / ENVIRONMENTAL INCIDENT FREQUENCY RATE /
HSE INDEX / RATA - RATA KECELAKAAN YANG RATA-RATA HARI HILANG AKIBAT CIDERA RATA-RATA KECELAKAAN AKIBAT CIDERA
DEPT MENINGGAL RATA - RATA KECELAKAAN LINGKUNGAN
TERMASUK CIDERA BERAT BERAT RINGAN
BULAN INI BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX
OPR 0.8 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
ENG 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
PLT 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
LOG 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
HRGA 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
FAC 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
HSE 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
MD 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
IT 1.0 0 0 0 0 0 0.14 0.00 0.00 6.00 0.00 0.00 0.30 0.00 0.00 0.90
PROJECT 0.8 0 0 0 0 0.00 0.14 0.00 0.0 6.00 0.00 0.00 0.30 0.00 0.00 0.90
BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX BULAN INI TAHUN INI LIMIT MAX
OPR 49 45 125 0.03% 0.26% 0.50% 0 0 0 32.33 46.95 20.00 $ 5,512.11 $ 111,576.54 $ 6,539.39
ENG 20 20 125 0.00% 0.14% 0.50% 0 0 0 0.00 0.00 20.00 $ - $ - $ 166.82
PLT 89 62 125 0.11% 0.64% 0.50% 0 0 0 0.00 142.96 20.00 $ - $ 24,504.19 $ 600.56
LOG 0 0 125 0.07% 0.07% 0.50% 0 0 0 0.00 24.38 20.00 $ - $ 52,766.62 $ 233.55
HRGA 0 0 125 0.00% 0.00% 0.50% 0 0 0 0.00 0.00 20.00 $ - $ - $ 533.83
FAC 0 0 125 0.00% 0.00% 0.50% 0 0 0 #DIV/0! #DIV/0! 20.00 $ - $ - $ -
HSE 0 0 125 0.00% 0.00% 0.50% 0 0 0 0.00 0.00 20.00 $ - $ - $ 100.09
MD 0 0 125 0.00% 0.00% 0.50% 0 0 0 0.00 0.00 20.00 $ - $ - $ 33.36
IT 0 0 125 0.00% 0.00% 0.50% 0 0 0 #DIV/0! #DIV/0! 20.00 $ - $ - $ -
PROJECT 46 37 125 0.05% 0.29% 0.50% 0 0 0 17.74 42.41 20.00 $ 5,512.11 $ 188,847.35 $ 8,207.60
1. HSE Index_Ytd June 2019
.
NILAI
NILAI MAKS % % % % % % % %
NO JUDUL ELEMEN AKTUAL
1 P LANNING AND ORGANIZING / 2420 1504 42.00% 41.67% 77.00% 67.74% 47.33% 79.35% 70.85% 71.67%
PERENCANAAN DAN ORGANISASI
2 A CCOUNTABILITY, COMMUNICATION AND TRAINING / 2635 1874 81.79% 67.67% 75.00% 76.99% 52.57% 78.75% 70.57% 76.77%
AKUNTABILITAS, KOMUNIKASI DAN PELATIHAN
5 A NNUAL MANAGEMENT REVIEW & CONTINUOUS IMPROVEMENT / 360 184 20.00% 20.00% 80.00% 60.00% 30.00% 77.50% 52.50% 60.00%
TINJAUAN MANAJEMEN TAHUNAN
TOTAL NILAI 11750 8272 59.83% 54.49% 68.95% 79.43% 58.09% 78.85% 75.68% 77.02%
1,900
1,800
5,000 9,346
1,699
1,500 1,450 60%
4,000 40%
2,028
1,300
1,300
1,741
1,000 40%
1,616
1,564
3,000
1,286
1,110
20%
500 20% 2,000
1,000 0%
- 0% YTD
Jan Feb Mar Apr May Jun
Plan MTD Actual MTD
Plan Actual Ach Ach
70%
140 95%
90% 800 70%
87% 140 60%
120
125 126 125
80% 700 756
120 120 50%
70% 600
100 67% 67%
63%
60% 500 40%
80
50% 400
30%
60 118.78 41% 40%
108 300
93 30% 528 20%
40 76 81 200
20% 10%
51 100
20
10%
- 0%
- 0% YTD
Jan Feb Mar Apr May Jun
Plan MTD Actual MTD
Plan Actual Ach Ach
100% 100%
80% 80%
60% 60%
95% 96% 86% 96%
40% 86% 86% 40%
20% 20%
0% 0%
May Jun YTD
0% 0%
Jan Feb Mar Apr May Jun YTD
60% 60%
50% 50%
40% 40%
10% 10%
0% 0%
Jan Feb Mar Apr May Jun YTD
60% 50%
50%
40%
40%
30%
30% 62% 55% 53%
52% 49% 55% 55% 55% 57% 58% 54% 58%
46% 50% 20%
20%
10% 10%
0% 0%
Jan Feb Mar Apr May Jun YTD
0% 0%
Jan Feb Mar Apr May Jun YTD
0% 0%
May Jun YTD
Plan Actual Plan MTD Actual MTD
4. Utilization of Availability _Ytd June 2019
UA PC 1250 Year to Date
70% 70%
60% 60%
50% 50%
40% 40%
10% 10%
0% 0%
Jan Feb Mar Apr May Jun YTD
60% 60%
50% 50%
40% 40%
0% 0%
Jan Feb Mar Apr May Jun YTD
60% 60%
50% 50%
40% 40%
30% 59% 56% 55% 56% 62% 60% 60% 60% 65% 59% 30% 57% 59%
50% 53%
20% 20%
10% 10%
0% 0%
Jan Feb Mar Apr May Jun YTD
Plan Actual Plan MTD Actual MTD
60% 60%
50% 50%
40% 40%
10% 10%
0% 0%
May Jun YTD
Plan Actual Plan MTD Actual MTD
4. Utilization of Availability _Ytd June 2019
UA HD 465 Year to Date
70% 60%
60% 50%
50%
40%
40%
30%
30% 56%
55% 56% 59% 59% 58%
49% 44% 20%
20% 40% 42% 40% 36%
28% 24% 10%
10%
0% 0%
Jan Feb Mar Apr May Jun YTD
500 500
400 400
300 300
544 540 540 534 541 534 501 534 499 538 491
476 491
200 441 200
100 100
0 0
Jan Feb Mar Apr May Jun YTD
500 500
400 400
300 300
485 485 485 446 485 476 485 468 485 485 439
200 421 394 430 200
100 100
0 0
Jan Feb Mar Apr May Jun YTD
300 300
250 250
200 200
150
330 330 330 330 330 330 150 330
264
238 230
100 207 100 208
165 145
50 50
0 0
Jan Feb Mar Apr May Jun YTD
0.80
100%
0.60 1.18 1.12 1.22 1.16 1.14 1.13 1.11 1.20 1.00
1.10 1.06 1.07 1.06
0.40
0.20
0.80
0.00
Jan Feb Mar Apr May Jun
Plan Actual Ach
0.60
1.13 1.13
Deviasi Fuel
15%
10% 0.40
10% 7% 7%
5%
0.20
0%
Jan Feb Mar Apr May Jun
-5%
146%
142% 140%
5000 5000.00
120% 120%
5236 5376
4550 60% 4228.
2000 2000.00 17
3876 3565.
3437 17
2894 40%
1000 1000.00
20%
2.50
Distance MGA 2019 140% 2.50
Year to Date 120%
102%
120%
115% 100%
2.00 2.00
110%
105%
100% 100%
95% 80%
90%
1.50 1.50
80%
60%
2.30
1.00
2.10
2.20
2.10
2.00
60% 2.15 2.1
1.00
1.90 0
40%
40%
0.50 0.50
20%
20%
16
120%
117%
14
17 64%
8 60%
6
11 40%
4
7 7 7
6
20%
2
7 7 7 7 15 7
0 0%
Jan Feb Mar Apr May Jun
9000
2.5%
2.4%
2000 8000
2.0% 2.0%
7000
1.5%
1500 6000
1.1%
1.0% 1.0% 5000
9244 9342
1000 2028 4000
0.5%
1741
1612 1564 3000
1286 0.0%
500 1110
-0.2% 2000
-0.5%
-0.7% 1000
0 -1.0% 0
Jan Feb Mar Apr May Jun YTD
Truck Count Joint Survey Ach Truck Count Joint Survey
Jul-19
Monthly Plan 2,000,000 Day 64,516
Week 451,613 Shift 32,258
PICA Project Site_Ytd June 2019
(OPR-ENG)
Plant
1. Physical Availability (1)_Ytd June 2019
Equipment Category A
Comment :
Pencapaian PA masih dibawah
targe yaitu 82%.
Comment :
Pencapaian PA masih dibawah
target yaitu 79%.
Comment :
Pencapaian PA masih dibawah
target yaitu 79%.
Lambatnya Proses Administrasi dan Perbaikan pada Body repair MERCY ACTROSS 4843AK unit Incident
Sering Terjadinya kekosongan Stock part VHS Pada lining Brake, Spring & part-part Undercarriage
2
3 Proses Fabrikasi Unit Drilling DM45 Track Frame & Kualitas Repair Jack Shoe Team Welder
Lifetime Component Rendah untuk model unit EC480D, Part number tidak sesua / Component Salah Supply, available Stock
4 Component & Undercarriage yang jauh di Singapura sehingga down time waiting part tinggi
Proses Warranty Main Pum & Servo Pump Unit EX75103VV, available Stock yang jauh di Singapura sehingga down time waiting
part tinggi
Unavailable Stock Engine Assy (Nwe/Reman)
5
Unit HD465-7 tidak adanya Rotable pada Component Turbo charge , Pump brake, deman Valve & Repair Kit Hoist
6 Rendahnya daya Supply UT untuk Component-komponent tersebut
PC1250-8R Over Down time pada saat penarikan unit Sechedule dikarenakan kondisi aktual dilapangan saat pengerjaan
7
8 EX50104DS Re-Seal Fornt Seal Dumper, Waiting Part Engine Mounting, Feed back Vendor Lambat & daya Supply Rendah
9 Proses Warranty Engine BD37101KM, Waiting Engine & Mounting Cabin
Kesalahan Part number saat Order Bracket & Bearing Kink Pin GD705 hingga Stock available tidak ada di indonesia membuat
10 Waiting part Tinggi
11 Not available Stock Part Bushing Artic & cyrcle GD825-2A sehingga waiting part tinggi
Proses pencarian Part Number (Part Book tidak lengkap, Model Engine yang berbeda-beda), supply Part Gasket Oil pan Unit SAKAI
12 Lama, Fan Radiator Salah Fisik / Salah Supply (Proses return Part)
1. Physical Availability Review_Ytd June 2019
Corrective Action/CA
NO Action PIC Due Date Open/Closed
1 EX48105VV Replace Final Drive RH, Under Carrige (Sprocket, Recoil Eldi SB / Nurul M 20/07/2019 Open
Spring, Trck Roller, Carrir Roller & Link
2 EX50104DS Re-Seal Fornt Seal Dumper Dwi Chusaini 01/04/2019 Closed
3 EX50104DS Repair/Install Tack Link Eko P / Dwi C 20/06/2019 Closed
4 DA40125VV Replace Transmission Reman Tata Gemi Eldi SB / Nurul M 16/01/2019 Closed
5 DA40126VV Replace Air Compressor Eldi SB / Nurul M 16/01/2019 Closed
DM45103AC rack Frame RH Crack, Replace Track Roller, Replace PTO & CS Eko P/ A. Luthfi 01/02/2019 Closed
6 Pump
7 DA40125VV Replace Brake Sensor Eldi SB / Nurul M 08/02/2019 Closed
8 DA40126VV Replace Accumulator brake Ade L / Herri 01/03/2019 Closed
9 HD46102KM Replace Pump Brake Eldi SB / Nurul M 08/02/2019 Closed
10 HD46105KM Replace Turbo L/R Eldi SB / Nurul M 09/03/2019 Closed
11 HD46119KM Replace Pump Brake Eldi SB / Nurul M 01/04/2019 Closed
12 HD46108KM Replace Deman valve Eldi SB / Nurul M 20/04/2019 Closed
13 HD46119KM Replace Radiator & Intercooler Incident Eldi SB / Nurul M 01/04/2019 Open
EX12105KM Rekondisi Attachment (Repair hige join cyr arm, repair A. Jalil 20/02/2019 Closed
14 bucket
15 EX12107KM Replace Track link RH A. Jalil 26/02/2019 Closed
16 EX12110KM Replace Track Prame RH A. Jalil 23/05/2019 Closed
17 EX12107KM PCR Engine A. Jalil 31/05/2019 Closed
18 EX12101KM Pe-bushing Pin Joint Arm A. Jalil 25/06/2019 Closed
19 BD37101KM Replace Core Radiator Eldi SB / Nurul M 30/05/2019 Closed
20 BD37101KM Replace Engine Reman Eldi SB / Nurul M 20/01/2019 Closed
21 BD37101KM Replace Mounting Cabin Eldi SB / Nurul M 01/02/2019 Closed
22 GD70103KM Replace Bracket & Re-Bearing Kink Pin (Revisi Pn) Dwi Chusaini 06/02/2019 Closed
23 GD82101KM Replace Bushing Ade L / Herri 22/01/2019 Closed
24 WA50101KM Replace Fuel Eldi SB / Nurul M 26/02/2019 Closed
25 VR51108KM Re-Gasket Oil Pan & Dwi Chusaini 01/02/2019 Closed
26 EX75103VV Replace main Pump A. Jalil 20/01/2019 Closed
27 EX75103VV Overhoul Engine A. Jalil 01/08/2019 Open
2. MTBF (1)_Ytd June 2019
Equipment Category A
Root Cause
1 Trouble Electrical System Work Lamp, Rotary Lamp, Wairing Harness, Wipper & Sensor
2 Masih Tingginya Frekuensi Trouble Engine Low power dikarenakan Fuel System(fuel Kotor) dan Trouble Pada Fuel Pump
Undercarriage tertinggi pada unit Mercy (Spring, Bolt Lever, bogi, Torque rod , Stabilizer) dikarenakan jalan huling yang tidak Bagus, Untuk Unit Track pada trouble Track Kendor kerna track
3
adjuster bocor
4 Frekuensi breakdown tyre tinggi disebabkan selain jalan Hauling & pit yang jelek dipengaruhi juga dengan masih rendahnya Inspeksi tyre & Cleaning Undercarriage
5 Tingginya frekuensi breakdown pada Bucket, Cyrcle Motor Greader dan tail gate unit Mercy
Corrective Action/CA
Open/Closed
NO Action PIC Due Date
Menjalankan Program Kawasima saat Unit Service, Standarisa installasi harness dan bertahap mengganti
1 Spv Pant 25 juli 2019 Open
Work lamp dengan Led
2 Flashing Fuel tank per 2000 Hm, mengganti Fuel Cap yang Rusak/hilang Spv Pant 20 Juli 2019 Open
3 Meningkatkan Program Inspeksi & Cleaning under cariage Spv Pant 20 Juli 2019 Open
4 Meningkatkan Program Inspeksi tyre & Cleaning under cariage Spv Pant 20 Juli 2019 Open
5 Meningkatkan kwalitas Inspecsi pada daily inspeksi dan inspeksi saat unit service Spv Pant 20 Juli 2019 Open
3. MTTR & BS Ratio_Ytd June 2019
MTTR Equipment Category A MTTR Equipment Category B
Downtime Status
BS Ratio Equipment
CODE 1 2 3 4 5 6 YTD
D00 (On Progress) 6.788,23 6.804,07 5.638,02 6.392,62 7.707,32 23.015,53 56.345,78
D01 (Unit Movement) 8,12 11,22 32,58 0,00 48,00 0,00 99,92
D02 (Respon Time) 0,00 529,65 236,90 229,37 89,78 1.214,50 2.300,20
D03 (Wait Bays) 0,00 0,00 0,00 0,00 20,00 0,00 20,00
D04 (Wait Part) 6.268,37 6.105,90 6.408,00 2.885,25 2.547,13 9.753,93 33.968,58
D05 (Wait Comex) 0,00 0,00 0,00 0,00 0,00 0,00 0,00
D06 (Wait Internal Labour) 739,23 551,45 412,87 93,62 365,70 4,48 2.167,35
D07 (Wait External Labour) 96,00 262,20 0,00 67,88 0,00 0,00 426,08
D08 (Wait Tools & Support) 25,35 70,85 30,00 21,00 32,00 791,42 970,62
D09 (Outsite Repair) 0,00 29,18 27,42 0,00 512,88 0,00 569,48
D10 (Weather) 182,85 78,18 330,07 832,70 176,92 386,82 1.987,53
D11 (Civil Strike) 0,00 0,00 0,00 0,00 0,00 0,00 0,00
TOTAL 14.108,15 14.442,70 13.115,85 10.522,43 11.499,73 35.166,68 98.855,55
CODE 1 2 3 4 5 6 YTD
D00 (On Progress) 48% 47% 43% 61% 67% 65% 57%
D01 (Unit Movement) 44% 42% 49% 27% 22% 28% 34%
D02 (Respon Time) 0% 4% 2% 2% 1% 3% 2%
D03 (Wait Bays) 5% 4% 3% 1% 3% 0% 2%
D04 (Wait Part) 1% 1% 3% 8% 2% 1% 2%
D05 (Wait Comex) 0% 0% 0% 0% 0% 2% 1%
3. MTTR & BS Ratio Review_Ytd June 2019
Problem Identification /PI
1 Populasi Unit Dengan Berbagai macam Model & Merek
2 Lamanya / Bertambahnya down time Pekerjaan kerena terbatasnya Manpower
3 Lamanya / Bertambahnya down time Pekerjaan kerena terbatasnya Tools Support
4 Lamanya / Bertambahnya down time Pekerjaan kerena tidak adanya Shop manual (Unit Non Komatsu)
Root Cause
1 Banyaknya Model dan Merk unit yang berbeda sehingga mechanic belum pamilier atas job trouble yang terjadi pada unit
2 Rasio Jumlah Manpower dengan Populasi unit
3 Masih kurangnya ketersediaan Special Tools Support Untuk Repair & Maintenance Unit dengan kondisi 2 pit yang berjauhan (Bambang & CTM)
4 Belum lengkapnya panduan untuk Repair & Maintenance Unit hinga mechanic meraba-raba dalam proses Repair
Corrective Action/CA
Open/Closed
NO Action PIC Due Date
4 Pengadaan Panduaan untuk Perbaikan unit (Shop manual, operation manual) MDV 15 Agst 2019 Countinue
4. Oil Consumption (1)_Ytd June 2019
Comment :
Achievement O.C masih belum memenuhi
target :
Top Up : 8% , Plan 5%
Schedule : 68% , Plan 85%
Repaired : 24% , Plan 10%.
Isu :
1. Flow meter oil dan pompa lube skid
REPORT OIL CONSUMPTION ALL OIL TYPE
pit stop bambang tidak balance
Oil Usage Month
Site YTD 2. Pencatatan log sheet oil masih belum
Type Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nov Des
Repaired
akurat
5745 6002 5594 3948 7116 4311 32716
MGA Schedule
16966 16253 17020 15455 15560 12244 93498
Top Up
1638 1785 2325 1170 2252 1938 11108
2000
1500
O.C (Liter)
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Repaired 549 608 715 1061 1170 664 1014 1272 1254 1351 1313 573 651 953 1593 829 46 323 1193 912 1130 1260 496 422 506 1240
Schedule 69 254 157 56 193 126 411 212 503 321 288 847 712 180 258 232 364 1006 338 467 271 449 25 187 267 179
Top Up 24 212 171 79 159 124 111 151 418 296 199 186 346 96 242 88 8 177 253 221 276 114 391 151 197 90
Grand Total 642 1074 1043 1196 1522 914 1536 1635 2175 1968 1800 1606 1709 1229 2093 1149 418 1506 1784 1600 1677 1823 912 760 970 1509
4. Oil Consumption (2)_Ytd June 2019
Top Up Oil Type
TOP UP OIL (LITER)
SITE EQUIPMENT Problem Outstanding Job
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YTD
Main Pum Hydraulic Leak, Oil Engine Close
EX12101KM 16 49 64 64 96 7 296
Low, Hose cylinder arm leak
Pump Auto lube mulfunction, Reseal Pump Autolube MO: 000342950
EX12105KM - - 118 165 13 213 509
Hose Arm Leak Replace Hose Arm MO: 1000345766
EX12107KM 72 - 63 12 42 - 189 Hose Hidrolik Main Pump Leak Close
Hose Cylinder Arm Leak, Seal PPC Joy Replace Hose Cylinder Arm MO :
EX12110KM 2 13 30 41 295 16 397 Stick Leak 1000346145
MGA Reseal PPC Joy Stick
EX12117KM - 18 27 19 39 51 154 Hose Hidrolik leak Program Hose Care
EPC Fan Pump Solenoid Leak and Reoring and replace EPC solenoid Fan
EX21102KM - 1 3 - 135 11 150
Mulfunction Pump MO: 1000337608
EX21R01KM 10 29 38 42 45 17 181 Hose cylinder Arm Leak Close (MO: 1000308078)
EX75103VV 14 86 83 29 29 91 332
EX12R01KM - - - - 10 - 10 Hose travel leak Close (MO: 1000339162)
EX60102CT - - - - 65 52 117
2 Flow meter dan pompa oil di Lube Skid Pit Stop Bambang tidak balance
4 Problem kebocoran oli masih tinggi dari bebrapa componen (Cylinder hydraulic, hydraulic pump, control valve dan Hose Care)
Root Cause
1 Bocor diantara celah tangki sehingga sulit untuk diidentifikasi kebocorannya
2 Spesifikasi Pressure Flow meter tidak sesuai dengan spesifikasi pressure oil pump sehinggga totalisator tidak balance dengan pengeluaran
3 Flow meter diindikasi sudah mengalami keruskan pada inner part nya
4 Kondisi oring, seal dan hose mengalami fatigue materia dan bebrapa case mengalami premature failure
5 Kondisi Flow meter di lube truck ada yang sudah mengalami kebocoran dari sealing nya
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
1 Repaire Oil Tank by Fabrikasi Eko Prasetyo 16 Juli 2019 Open
2 Melakukan penggantian pump hidrolik, waiting pump OSR ALLmakes MDV 20 Juli 2019 Open
3 Melakukan repair atau penggantian flow meter FOG 20 Juli 2019 Open
Membuat schedule reoring dan resealing, serta membuat CWR untuk case Hose Care
4 MDV 25 Juli 2019 Open
yang premature failure
5 Melakukan reinspeksi dan konsisten untuk sounding oil setiap hari FOG , MDV 18 Juni 2019 Open
5. Basic Maintenance (1)_Ytd June 2019
MONTH Values Greasing ACH Isu MONTH Values Inspeksi ACH Isu
01 'PLAN 2151 01 'PLAN 410
100,5% - 132,9% -
'ACT 2161 'ACT 545
02 'PLAN 1964 02 'PLAN 364
103,4% - 120,6% -
'ACT 2031 'ACT 439
03 'PLAN 2292 Breakdown LT40111MB 03 'PLAN 403
99,7% 129,8% -
'ACT 2286 Grease Pump Mulfungtion
'ACT 523
04 'PLAN 2208 Breakdown LT40106MB Air 04 'PLAN 390
99,3% 129,0% -
'ACT 2193 Compressor mulfungtion
'ACT 503
05 'PLAN 2255 Breakdown LT40106MB
05 'PLAN 403
99,8% Hydraulic motor leak 115,9% -
'ACT 2250 mulfungtion 'ACT 467
06 'PLAN 1739 06 'PLAN 325
101,6% - 109,2% -
'ACT 1767 'ACT 355
Total 'PLAN 12609 Total 'PLAN 2295
100,6% 123,4%
Total 'ACT 12688 Total 'ACT 2832
5. Basic Maintenance (2)_Ytd June 2019
Washing
500 464
430
400
300 218 214 243
Number
Root Cause
1
Unit Lube Truck LT106M dan LT111 Mengalami Breakdown Workequipment sehingga tidak dapat digunakan untuk
proses greasing
Ketersediaan washing truck hanya ada 1 unit untuk back up service unit Big Digger, Drill dan A2B Pit CTM (rata-rata 5
2 unit service per shift). sehingga ketika Washing Truck breakdown maka unit yang service dilapangan tidak dilakukan
pencucian.
3
4
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
Menggunakan grease pump portable untuk unit
1 Al Arifin 20 Juni 2019 Close
support
Menarik unit support A2B untuk dilakukan Daily Schedule
2 Spv A2B Continue
greasing di area lube skid Pit Stop Greasing
Mengajukan penambahan unit Washing truck
3 untuk back up Pit Bambang dan untuk rotable Spt Plant Continue Open
Washing truck ketika salah satu breakdown
4
6. Claim Warranty Acceptance Level_Ytd June 2019
40
30
20 13
10
0
CWR Accept CWR Open
List Outstanding Claim
Life tIme
SITE COM CWR DATE Vendor UNIT CODE MODEL Component Problem
(Hrs)
MGA HPU HPU/MGA/CWR-PLT/MGA/III/2019 7-Mar-19 PT UNITED TRACTORS BD15111KM D155A-6 TRANSMISSION 4594 Inner Part Transmisi Worn out
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 26-Apr-19 PT UNITED TRACTORS EX21102KM PC2000-8 Hose A 3960 Hose A Menggelembung
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 11-May-19 PT UNITED TRACTORS EX12101KM PC1250-8R Hose Cylinder Bucket 3434 Hose Crack dan Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 19-May-19 PT UNITED TRACTORS EX12101KM PC1250-8R Hose Cylinder Bucket 3544 Hose Crack dan Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 19-May-19 PT UNITED TRACTORS EX12101KM PC1250-8R ARM CYLINDER PC1250-8 1190 Cylinder Arm Internal leakage
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 19-May-19 IPPS EX75103VV EC750D FINAL DRIVE 10976 Final Drive abnormal noise
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 29-May-19 PT UNITED TRACTORS EX12105KM PC1250-8R Hose Discharge Main Pump 3510 Hose Discharge Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 29-May-19 PT UNITED TRACTORS EX12105KM PC1250-8R Hose A 3510 Hose A Crack
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 31-May-19 PT UNITED TRACTORS EX12110KM PC1250-8R Hose Cylinder Bucket LH 5023 Hose Cylinder Bucket Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 10-Jun-19 PT UNITED TRACTORS HD78157KM HD 785-7 Gaseket Cyl Head 11521 Gasket cylinder head LH Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 12-Jun-19 PT UNITED TRACTORS EX12107KM PC1250-8R Hose A 5915 Hose A Leak
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 24-Jun-19 PT UNITED TRACTORS EX21102KM PC2000-8 Hose Swing Motor Rear 4860 Hose Crack
MGA HPU HPU/MGA/CWR-PLT/MGA/V/2019 24-Jun-19 PT MHB HD78135KM HD 785-7 Cylinder Hoist LH 628,4 Line oil end rod cylinder Leak
6. Claim Warranty Acceptance Level Review_ Ytd June 2019
Problem Identification /PI
1 Outstanding CWR Hose Care masih tinggi (8 CWR Open dari 17 CWR yang di Kirim).
2
3
4
5
Root Cause
1
Response dan Feed Back UT terhadap CWR Hose Care Lama (Lebih dari 2 minggu untuk setiap proses
CWR)
2
3
4
5
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
Mengevaluasi MOU untuk sistem dan proses CWR antara
Every Monthly Meeting
1 HPU dan UT untuk mempercepat Follow Up dan Feed Back MDV Open
With Vendor
CWR.
2
3
4
5
7. RM Cost_Ytd June 2019
Root Cause
1 Over RM Cost Bulan Juni 2019 dikarenakan Plan revenue tidak tercapai
Plan Revenue $ 3.597.533 => Plan RM Cost $ 1.807.984 => 50,3%
Actual Revenue $ 2.810.578 => Actual RM $ 1. 536.987 => 54,7%
Site Item 1-Machine Down 2-Imminent 3-Backlog 4-Schedule COL Grand Total
Root Cause
1 Adanya part partial Suply dr Vendor
2 Adanya PO yang berbeda vendor dalam 1 PR, sehingga bisa terjadi vendor 1 suply, vendor yg lain belum suply
3 Adanya kurang detailnya pengorderan spare part backlog
4
5
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
1 Untuk part backlog, HPU baru terima jila status full LOG 01 Agst 2019 Open
2 Usulan untuk 1 PR jadi 1 PO ke vendor LOG 01 Agst 2019 Open
3 Training OJI detail inspection dari instruktur langsung ke unit Instruktur 25 jul 2019 Open
4 Estimasi part diinformasikan ke PLT secara regulerry LOG 01 Agst 2019 Open
5 Verifikasi orderan backlog wajib ttd Pengawas dan SPT plus TI Plant 20 Juli 2019 Open
9. OSR Riview_Ytd June 2019
OSR MONTH Grand
Type Problem
Status 1 2 3 4 5 6 Total
ISR CLOSE 4 16 2 12 8 42
OPEN 1 3 1 3 8 Wait PO
OSR CLOSE 1 6 6 6 3 4 26
OPEN 2 8 0 10 On Progress di Vendor
Grand
Total 1 11 25 10 24 15 86
Root Cause
1 Tidak ada PIC yang menjadi tanggung jawab untuk memfollow up OSR
2 Komunikasi untuk penggantian vendor, perlu diinfokan ke site, agar detail job tidak salah
3 PIC Comex belum maksimal
4
6
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
1 Adanya PIC LOG yang follow up Quoatation ke Vendor LOG 01 Agst 2019 Open
2 Mencari Alternatif pengiriman lain LOG 01 Agst 2019 Open
3 PIC OSR diplot dan diknsisten follow up LOG 01 Agst 2019 Open
4 Komunikasi penggantian Vendor PRC 20 Juli 2019 OPen
5 Ditunjuk PIC Comex PLT 15 Juli 2019 Close
10. ECM_Ytd June 2019
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
NO ITEM ECM Condition YTD
Plan Actual Ach Plan Actual Ach Plan Actual Ach Plan Actual Ach Plan Actual Ach Plan Actual Ach
SOS Follow Up ( Plan vs Actual ) 50 46 92% 47 13 28% 38 5 49% 61 11 69% 142 16 89% 66 31 47% 62%
1 C 48 44 92% 35 1 3% 33 3 9% 46 1 2% 129 5 4% 16 9 56% 28%
SOS Follow up
X 2 2 100% 12 12 100% 5 2 40% 15 10 67% 13 11 85% 50 22 44% 73%
Magnetic Plug ( Plan vs Actual ) 15 8 53% 35 4 11% 147 3 2% 64 64 100% 89 89 100% 67 60 90% 59%
2 Mag plug Follow C 2 1 50% 0 0 0 0 0 0 0 0 0 0 0 0 2 2 100% 25%
Up X 2 2 100% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 17%
Filter Cut ( Plan vs Actual ) 23 22 96% 39 42 108% 39 42 108% 0 0 0% 41 41 100% 26 19 73% 81%
3 C 0 0 0 0 0 0 0 0 0 0 0 0% 0 0 0 2 2 100% 17%
Filter Cut Follow up
X 0 0 0 0 0 0 0 0 0 0 0 0% 0 0 0 0 0 0% 0%
VHMS ( Plan vs Actual ) 21 21 100% 37 31 84% 37 31 84% 0 0 0% 0 0 0 32 28 88% 59%
4
VHMS Follow up Critical 20 13 65% 10 9 90% 11 10 91% 0 0 0% 0 0 0 0 0 0% 41%
5 PPM ( Plan vs Actual ) 6 3 50% 2 4 200% 2 4 200% 2 4 200% 0 0 0 6 3 50% 117%
Note :
Yang highlight warna merah achievement dibawah 90%
Problem Identification /PI
1 Achievement Follow Up SOS rata-rata dibawah 90%
2 Fasilitas untuk cutting filter belum cukup
3 Mekanik belum berkompeten untuk melakukan PPM dan Tune Up Mesin
4
Root Cause
1 Hasil interpretasi sample melebihi waktu interval service, sehingga waktu untuk Follow up[ kurang akurat
2 Tidak adanya ragum khusus untuk fiilter cutting sehingga kesulitan dalam proses pemotongan filter
3 Belum adanya training khusus untuk PPM dan Tune Up Mesin
4
Corrective Action/CA
Open/
No Action PIC Due Date
Closed
Memprioritaskan pengiriman sample oil engine dan hasil interpretasi
1 MDV, Logistik Setiap Hari Senin dan Rabu Open
oil engine untuk di follow up
2 Membuat ragum khusus untuk filter cutting MDV, Fabrikasi 31 Juli 2019 Open
3 Membuat schedule training khusus untuk PPM dan Tune Up Mesin PPD 24 Juni – 24 Juli 2019 Continue
4
11. Tyre Life_Ytd June 2019
27,00R49 MGA
12,000
10,000
8,000
Comment :
6,000
Pencapaian Tyre Life masih
4,000 dibawah target, masih 45%
2,000 (5470 Jam).
0
Jan Feb Mar Apr May Jun
1.20 1.20
1.00 1.00
0.80 0.80
0.60 0.60
0.40 0.40
0.20 0.20
0.00 0.00
Jan Feb Mar Apr Mei Jun Jan Feb Mar Apr Mei Jun
ITO All 1.16 1.42 1.02 1.10 1.40 0.89 ITO LIB 0.77 1.17 0.73 0.82 1.23 0.57
Target 1.5 1.5 1.5 1.5 1.5 1.5 Target 1.5 1.5 1.5 1.5 1.5 1.5
1. STOCK AMOUNT
1.1. Profile Inventory (exlude solar) :
Stock Amount All Exclude Solar No Pareto Problem
25,000 01. Stock amount inventory tertinggi pada Bulan Mei 2019 yang disebabkan karena
maksimalisasi stock LIB untuk back up libur hari raya Idul Fitri 2019,
20,000 replenishment new item untuk unit baru dan kedatangan aksesoris new stone
crusher.
15,000
02. Pada bulan Mei 19 terdapat GR Stock Consumable dan Part service unit exclude
10,000 Komatsu dan Mercy untuk periode Juni – Juli 2019, antisipasi stock saat hari
raya idul fitri 2019.
5,000
03. Stock Amount Inventory Rank D,E dan F ( Inc. Dead stock ) masih sangat tinggi
0 yaitu Average di angka 6,7 M / Bulan, 37,64% dari total amount inventory.
Jan Feb Mar Apr Mei Jun
Stock Amount 15,342 19,493 14,823 16,584 22,664 17,993
Stock Amount LIB (Rank A,B,C) Stock Amount LIB (Rank D,E,F)
16,000 8,000
14,000 7,000
12,000 6,000
10,000 5,000
8,000 4,000
6,000 3,000
4,000 2,000
2,000 1,000
0 0
Jan Feb Mar Apr Mei Jun Jan Feb Mar Apr Mei Jun
Stock Amount 7,175 10,629 7,826 8,558 13,474 8,314 Stock Amount 7,061 7,471 5,917 6,855 6,429 6,465
1. STOCK AMOUNT
1.2. Profile Inventory New Part Number ( N T) :
Stock Amount LIB (Rank N,T)
3,500
3,000
2,500
2,000
1,500
1,000
500
0
Jan Feb Mar Apr Mei Jun
Stock Amount 1,106 1,392 1,081 1,171 2,760 3,215
No Pareto Problem
01. Stock Amount Inventory Rank N ( New Material ) pada bulan Mei 2019 sebesar Rp 2.383.570.813, hal ini dikarenakan Part-part LIB maupun CIB untuk
unit Baru (1 unit EX6015 dan 5 unit CAT777), penggantian pin boom foot PC 2000 dan kedatangan aksesoris new stone crusher.
02. Stock Amount Inventory Rank N ( New Material ) pada bulan Juni 2019 sebesar Rp 2.844.326.078, hal ini disebabkan supply new part dengan amount
tinggi khususnya Link PC 2000, Grease Pump PC 1250, replenishment spring dan hollow dengan new part number (New Branch) untuk DT Mercy.
1. STOCK AMOUNT
1.3. Dead Stock :
DEAD STOCK MGA
12%
10%
8%
6%
4%
2% 2% 2% 2% 2% 2% 2%
0%
Jan Feb Mar Apr Mei Jun
Percentage 10% 7% 11% 10% 7% 8%
Target 2% 2% 2% 2% 2% 2%
No Pareto Problem
01. Stock amount Dead stock dari Jan-19 sd Jun-19 Over melebihi limit target 2%, secara amount tertinggi di bulan April sebesar 1.68 M dan mengalami
penurunan di Juni menjadi 1.43 M.
02. Beberapa item parts DS yang amountnya tinggi adalah item2 part eks return unit dan miss plan replenishment pada awal tahun 2018.
03. Redistribusi Project belum efective dan maksimal menurunkan problem Over Dead Stock ini, apalagi untuk item DS yang amountnya tinggi dan rank
material nya DEF secara nasional HPU/HPMU yang tidak memungkinkan dilakukan Redistribusi.
1. STOCK AMOUNT
1.4. Allocated :
Allocated MGA (value x1jt)
2,500
2,000
1,500
1,000
500
0
Jan Feb Mar Apr Mei Jun
Value 1,312 1,716 523 2,045 2,059 2,263
2. Part allocate dengan priority Machine Down sebagai penyumbang amount tertinggi selama bulan Mei 2019 (1,2M) dan Juni 2019 (700 jt).
3. Partial supply by MO untuk priority Imminent dan Backlog masih ada dikarenakan allocate part dari stock logistik dan 1 dokumen PR yang diterbitkan menjadi
beberapa PO karena ketersediaan part dari vendor.
1. STOCK AMOUNT
03. Stock amount Dead stock Part Rank F dan Material Item Part Dengan Rank F ( Dead Listing All item Part Rank F DS LOG 5-Mei-19 Closed
dari Jan-19 sd Jun-19 Movementnya 0 ( Tidak ada Stock ) dikeluarkan dari dan dilokasikan terpisah
melebihi limit target 2% Pergerakan ) selama > 1 Tahun Inventory Active dengan inventory Active
yaitu sebesar 9%
Site lain belum ada kebutuhan Active Check Rank Material As Sharing data parts Rank F ( LOG 15-Jan-19 Continue
part-part rank F ( Dead Stock ) data Part Rank F ( Dead Stock ) Dead Stock ) ke All Site
dari site KMO KMO di plant All Site
Belum dilakukan centralisasi Sharing data ke MM HO untuk Follow Up ke MM HO terkait LOG/ 31-Aug-19 Open
Part Slow Moving dan Dead advise penyelesaian part Dead Project Centralisasi part Slow MM
stock di Warehouse Central Stock Moving dan Dead Stock HO
1. STOCK AMOUNT
No. Problem Identification Corrective Action PIC Due Date Status
04. Stock Amount Part Allocated Tingginya part allocate dengan Follow Up ke team plant Good Issue Part sesuai LOG 6-Jul-19 Continue
Allocated terbesar adalah di status by MO adalah full yang untuk Eksekusi Part dengan komitmen plan ekseskusi
bulan April, Mei dan Juni 2019 belum tereksekusi, average status full By Opt MO saat saat Weekly Meeting
(Apr 2019 = 2,04M; Mei 2019 = selama 3 bulan = 81% dari total Weekly Meeting Backlog. Backlog.
2,06M; Juni 2019 = 2,26M) amount part allocate (Apr 2019
= 1,9M; Mei 2019 = 1,67M; Juni
2019 = 1,55M)
Part allocate dengan priority Follow Up ke team plant Penyampaian informasi LOG 6-Jul-19 Continue
Machine Down sebagai untuk Eksekusi Part untuk kedatangan part untuk
penyumbang amount tertinggi kebutuhan Machine Down. unit down saat daily
selama bulan Mei 2019 (1,2M) DMBD, via Radio dan WA
dan Juni 2019 (700 jt). Grup saat part tsb tiba.
Partial supply by MO status Mencari alternative Dilakukan review LOG 31-Jul-19 Open
Backlog dan Imminent masih beberapa Vendor lain As performa vendor Mercy,
ada dikarenakan allocate part Brand unit terutama vendor terkait kemampuan supply
dari stock logistik dan 1 Mercy yang Available Stock full dalam 1 PO.
dokumen PR yang diterbitkan
menjadi beberapa PO karena
ketersediaan part dari vendor.
3. AVAILABILTY
No Pareto Problem
1. Availability Part All item dari Jan sd Juni-19 masih jauh di bawah target 85% yaitu Average di angka 77%.
2. Availability Stock VHS ALUN di bawah target 90% yaitu Average 76%, sehingga proses pemenuhannya melebihi Requirement date untuk proses
MO Unit Down yaitu lebih dari 1 days.
3. Kebutuhan item2 part unit Breakdown Exclude item LIB/CIB sehingga pemenuhannya (Proses GI) melebihi requirement date yang di plannkan
saat pembuatan Request Order.
3. AVAILABILTY
Stock LIB dan CIB tidak Review stock LIB/CIB Identifikasi part-part LIB/CIB LOG 31-Aug-19 Open
mengakomodir dan dibandingkan yang sudah tidak efective
kebutuhan unit Down dengan history GI part untuk diback up berdasarkan
as trending kerusakan Rank Material
unit
2. Part Availability VHS ALUN di Part LIB/CIB tidak Follow up ketersediaan - PST bersama stock Alun tiap LOG 01-Jun-19 Closed
bawah target 90% yaitu Available di VHS ALUN part VHS bersamaan Minggu dan ikut ambil bagian
Average 76%. dengan pengiriman untuk monitoring serta speed
Daily Report Stock up refill stock VHS Alun.
taking VHS ALUN
Performance Availability Maksimalisasi vendor Pengajuan item-item LIB yang LOG 31-Juli-19 Open
ketersediaan Part VHS VHS DUI untuk back up tidak available di VHS Alun
ALUN sangat kurang part yang tidak available untuk dilakukan pemenuhan
di VHS ALUN. oleh vendor VHS DUI .
3. AVAILABILTY
3. Kebutuhan item2 part unit Part tidak tersedia di site Koordinasi dengan plant Membuat weekly report dan Log 01-Aug-19 Continue
Breakdown Exclude item ketika unit Breakdown untuk maksimalisasi review saat weekly meeting
LIB/CIB ( Di luar Part Consg program Backlog. backlog.
dan VHS )
Stock LIB dan CIB tidak Review stock LIB/CIB Identifikasi part-part LIB/CIB LOG 31-Aug-19 Open
mengakomodir dan dibandingkan yang sudah tidak efective
kebutuhan unit Down dengan history GI part untuk diback up berdasarkan
as trending kerusakan Rank Material
unit
Proses Release PR dan Koordinasi dengan MM Percepatan proses Release PR LOG 31-Jul-19 Continue
PO > 1 days untuk HO agar dilakukan to PO sesuai LT yang telah
kebutuhan unit Down Peninjauan kembali ditentukan dan speed up
untuk Req Date unit supply parts as Req Unit
Down ketika part yang Down.
dibutuhkan di luar Rank
ABC dan tidak Available
di site
3. DISCREPANCY
0.80%
0.50%
0.70%
0.40% 0.60%
0.50%
0.30%
0.40%
0.20% 0.30%
0.00% 0.00%
Jan Feb Mar Apr Mei Jun Jan Feb Mar Apr Mei Jun
Discrepancy 0.10% 0.11% 0.49% 0.01% 0.10% 0.15% Discrepancy 0.04% 0.10% 0.11% 0.04% 0.79% 0.10%
Target 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% Target 0.15% 0.15% 0.15% 0.15% 0.15% 0.15%
4. DISCREPANCY FUEL
No Problem Identification Corrective Action PIC Responsible Person Due Date Status
karena faktor life time tank fuel truck, TERA standar dari BMG, PR Team FOG
Hendarsyah, Budi H. 30-Okt-19 OPEN
sehingga perlu data update tera di 1100042148, waiting PO. HO
Deviasi fuel selama bulan Maret 2019 sebanyak -6,756 Liter (-0,38%)
No Problem Identification Corrective Action PIC Responsible Person Due Date Status
Dilakukan penggantian
Flowmeter yang ada di Lubecar (
Flowmeter yang baru serta
Counter dan Totalisator ) tidak
dilakukan pengecekan kembali Team FOG & Plant T. Prasetyo 2-Jun-19 OPEN
Deviasi Oil Selama Bulan Mei 2019 Sebanyak -628 Liter (0,79%)
94.0%
94.0% 93.41%
92.8% 92.8%
92.0%
90.6%
90.0%
88.7%
88.0%
86.0%
84.0%
82.0%
Januari Februari Maret April Mei Juni
PLAN
Actual Achievement
2. Voluntary Turnover Rate_Ytd June 2019
Voluntary Turn Over Ratio
3.00% 2.62%
2.47%
2.50%
2.00%
1.60%
1.50%
0.87%
1.00% 0.72% 0.80%
0.63%
0.50% 0.29%
0.16% 0.13%
0.16% 0.16%
0.00%
Januari Februari Maret April Mei Juni
PIC
No Issues Activity Plan Semester II Output PIC HO Due Date
Site
1 Hauling road condition - Follow up kecepatan - - perijinan (IPK) Imen MGM Juli 2019
quarry Imen Udin S Juli 2019
- Progress kecepatan crusher baru Mirza Didik JI Juli 2019
- Penambahan jumlah pengawas road
maintenance (2 foreman)
2 Hauling Coal Problem Optimalisasi Fleet Sites Haryadi Progress
(HSE, UA & PTY)
3 Maintenance Pembangunan workshop di CTM Imen Udin S End 2019
MM / LOGISTIC
4 Pembangunan Warehouse Renovasi warehouse sekarang Imen Udin S, Semester 2
Utama Sulis - 2019
5 Perluasan Area Gudang RAB belum - lokasi saat ini tidak mencukupi Imen Agustus
Oli.
6 Terra Tangki All Fuel Truck dan PR dan PO sudah, menunggu pelaksaan (waiting Ardi Hendarsyah Semester 2
Lube Truck. skedul dari BMGK) 2019
7 Percepatan mereadykan PO Sudah, supply spare part dan rencana Ardi Yoga, Semester 2
FT40110MB (incident fire case) dikerjakan sendiri atau vendor belum ada Hendarsyah 2019
untuk rotable rekondisi All Fuel kejelasan
Truck.
8 1.Tindak lanjut ke UT HO untuk :
- Alokasi 1 COP di site (untuk
Penyampaian ke HO sudah tapi belum putus Ardi Azam Semester 2
reduce LT transaksi).
2019
- - Pengatapan area VHS UT
site MGA.
Activity Plan Semester II & Need Supports
Target : HSE Index: 1, Produksi: OB: 2 jt/bln, Coal: 170 rb/bln, 8 fleet OB running
No Issues Activity Plan Semester II Output PIC Site PIC HO Due Date
9 Review dan tindak VHS dari Alun performanya menurun (supply Ardi Azam Agustus
lanjut performance undercarriage, average availability hanya di angka 2019
vendor VHS Alun. 82% dari target 90%)
PLANT
Penambahan 1 x water Permintaan penambahan (belum terealisasi), saat ini Joan Baharudin Agustus 2019
10 hanya ada 1 unit
Truck High Pressure
Permintaan penambahan (belum terealisasi), saat ini Joan Baharudin Agustus 2019
Penambahan 1 x Lube hanya ada 2 unit lube truck untuk 2 pit (semester 2
11
Truck akan ada 3 pit dan pit ctm sudah sudah tik tercover
dengan 1 unit lube truk)
ET Tool & Charging Tool Suspensi Cat 777, Tool Joan Baharudin Agustus 2019
12 Penambahan Tool Plant Remove Install Bushing (UC) DT Mercy, Beat Breaker
& Impact Wrench (tyre)
Penambahan part VHS DT Ardi Azam Agustus 2019
13 Point no 10
Mercy
Rotable control valve (1-2- Follow up raker supertintendent 2019 (belum Joan Baharudin Agustus 2019
14 terealisasi)
3) untuk unit PC 1250
HCMGA
Untuk menambah 1 unit dutro sampah dan yang satu Mirza Kevin Agustus 2019
Penambahan 1x Dutro TS
15 tambahan untuk alokasi distribusi air minum ke
(mutasi PDU sesuai email)
tambang (sesuai email)
16 Replace 4 x pompa ebara Saat ini yang ada sudah mulai rusak (aus) dan usia Mirza Kevin Agustus 2019
65 x 50 FS kebutuhan wtp pompa sudah dari kontraktor sebelumnya'
reff PO 86_04609
Activity Plan Semester II & Need Supports
Target : HSE Index: 1, Produksi: OB: 2 jt/bln, Coal: 170 rb/bln, 8 fleet OB running
No Issues Activity Plan Semester II Output PIC Site PIC HO Due Date
Penambahan MP FM GA (replace Hari Mulyanto -> mutasi KDA) Monitoring Mirza Kevin 31 agustus 2019
untuk penguatan implementasi Mess Management implementasi GA
Services di Mess
berjalan
Implementasi GA Services < 95%
20
Penambahan 1x Dutro TS untuk back up pengangkutan sampah Pengelolaan Mirza Kevin 31 agustus 2019
all area, aktual kondisi dutro on site saat ini sering b/d & sampah
bergantian dengan pengangkutan air minum -> reff email pak domestik lebih
Anang & pak Kevin optimal
Replace 1x pompa sungai dengan kapasitas minimal sama, Supply air ke Mirza Kevin 31 agustus 2019
aktual kondisi housing pompa sudah aus & mesin sering b/d -> WTP tdk
reff PR 1100057365 terkendala
Activity Plan Semester II & Need Supports
Target : HSE Index: 1, Produksi: OB: 2 jt/bln, Coal: 170 rb/bln, 8 fleet OB running
PIC
No Issues Activity Plan Semester II Output PIC HO Due Date
Site
HSE
Menunggu kepastian mutasui asset dari PDU Avan / Ade K Agustus 2019
21 Peralatan ERT Tonang
Followup kedatangan
Orderan saat ini di hold, menunggu kepastian mutasi Avan / Ade K Agustus 2019
asset dari PDU Tonang
22 Pemenuhan Alkes
Followup kedatangan
Informasinya akan diurus secara online oleh HCMGA Avan / Ade K, Kevin Agustus 2019
HO, hal ini terkait persyaratan-persyaratan yang tidak Tonang
dapat diakomodir oleh site
23 SIO dan SLO Genset
Support perizinan paralel komunikasi dengan ESDM
palangkaraya
Perijinan tidak sesuai dengan channel yang Avan / Taufiq Agustus 2019
digunakan (case : ISR expired baru diurus sehingga Tonang
24 Review perpanjangan ISR keluar ISR baru dengan channel yang berbeda)
No Issues Activity Plan Semester II Output PIC Site PIC HO Due Date
ENG
Untuk QC (2 pit saat ini dan 3 pit di semester 2 2019), Imen Udin Agustus 2019
27 Penambahan LV
rencanan LV dari PDU
Traineeng software Untuk scheduling pembuatan sekuen Imen Agus Set Agustus 2019
28
scheduling
Untuk welding HDPE baru diameter 14 inchi untuk Imen Udin Agustus 2019
29 Mesin las HDPE 14 inch
pompa sellwood ctm
Imen Udin Agustus 2019
30 Penambahan alat TS Laser Saat ini TS yang bisa laser sering rusak