You are on page 1of 1

FLOWCHART OF PIPING WORK

SUBCONTRACTOR
PIPING WORK
PREPARE DAILY WELDING
PREPARE NDT
PREPARE WELDING HISTORY SHEET'S
PREPARE TOOL FOR PRESSURE TEST AND ALSO RELATED EQUIPMENT'S
PREPARE CERTIFICATE / CALIBRATION TOOL'S

QUALITY CONTROL
REVIEW DAILY WELDING
NO REVIEW NDT RECORD ( NDE CLEARENCE )
REVIEW CERTIFICATE/CALIBRATION OF TOOL'S OR EQUIPMENT
REVIEW WELDING HISTORY SHEET'S

CONSTRUCTION
CLARIFICATION DAILY WELDING YES
CLOSE PUNCHLIST
NO

FIELD ENGINEERING
SPOOL DRAWING CHECK WITH THE LATEST REVISION
PREPARE TEST PACKAGE OF PIPING YES

PREPARE TEST BLOCK, P&ID


INTERNAL LINE CHECK

QUALITY CONTROL
REVIEW TEST PACKAGE COMPLETE

SUBCONTRACTOR
APPLICATION FOR JOINT INSPECTION NO
PUNCHLIST

NO
SUBCONTRACTOR
APPLICATION FOR PRESSURE TESTING WITNESS
YES

FILE
ACCEPTED DOCUMENT