Memo: 27.21.0000.601.58.088.20.

xyz Date: 02 Dec 2021

Chief Operating Officer


United Anowara Power Ltd.
United Group, United House, United City (North-West Building 1 st Floor), Sector-4, Satarkul, Madani
Avenue, Dhaka-1212.

Subject: Activation & Response Test of Automatic Frequency Control at the Anwara 300 MW HFO
Based Power Plant.

Reference No: 27.21.0000.603.58.039 .29.435; dated: 25 Aug 2021

Dear Sir,

As per the decision of FGMO Committee, we sent you the required settings in accordance with the
guideline of Electricity Grid Code-2019 (vide above mentioned reference) in order to activate FGMO in
your plant. Later on you requested for three weeks time to activate your plant in a meeting with BPDB
and PGCB. The three weeks time has so far been over.

Therefore, we are again requesting you to activate your plant as per the settings/ guidelines sent and do
the needful for a FGMO response test.

Copy:

1. Managing Director, PGCB, Dhaka (B.M. Mizanul Hassan)


2. Addl. Secretary, Development, Power Division Chief Engineer (SO)
3. Executive Director (P&D / O&M), PGCB, Dhaka NLDC Bhaban, PGCB
4. Member (Generation/ P&D), BPDB, Dhaka &
5. Chief Engineer (Private Generation), BPDB, Dhaka
6. CSO to Chairman, BPDB, Dhaka
Member of the FGMO Monitoring
7. Superintending Engineer, LDC, PGCB, Dhaka & Supervisory Committee
8. DS (Generation), (1PDB, Dhaka
9. Executive Engineer, IMD, LDC, PGCB