Professional Documents
Culture Documents
October 2015
Contact
Click:
E-mail:
planningandregenerationenquiries@birmingham.gov.uk
Web:
birmingham.gov.uk/snowhillmasterplan
Call:
Telephone:
(0121) 303 3988
Visit:
Office:
1 Lancaster Circus
Birmingham
B4 7DJ
Post:
PO Box 28
Birmingham
B1 1TU
Plans contained within this document are based upon Ordnance Survey
material with the permission of Ordnance Survey on behalf of the
Controller of Her Majesty’s Stationery Office.
Foreword 3
Introduction 4
The vision 8
Connectivity 12
Development 20
Delivery 28
The Snow Hill district is home to some of the City’s most valuable assets.
It includes the Colmore Business District which supports over 35,000
employees and is a vital part of the economic success of the City; Snow Hill
Station which acts as a principle transport hub used by several thousand
people a day, and fabulous examples of the City’s grand Victorian legacy
with key institutional buildings lining Steelhouse Lane.
This Masterplan has been produced to enhance the area’s assets and drive
growth and regeneration activity, setting out a vision and key development
principles for the district, shared with the Colmore Business District and
major landowners. The redevelopment of Snow Hill Station, to create a
world class transport hub akin to New Street Station; the transformation of
the streets and spaces in the district creating an outstanding environment
with £9.9m already committed to schemes; and the creation of St Mary’s
Place, are just some of the major interventions set out in this Masterplan
which will drive growth and create new focus and activity. Through this
Masterplan it is envisaged that an additional 200,000sq.m of new office
floor space, 4,000 new residential units and 10,000 jobs will be created.
The growth and revitalisation of the Status of the document The location
Snow Hill district is central to the The Snow Hill Masterplan has
City’s ongoing economic success been developed jointly with the The Snow Hill district forms a part
and future growth prospects. Colmore Business District and of Birmingham’s City Centre Core,
other key stakeholders in the area. taking in the northern section of the
The area is a major hub for the It has also been informed by the Core between the civic hub in the
business, professional and financial Snow Hill Interchange Plan (SHIP), west, the Learning Quarter in the
services sector. It is home to undertaken on behalf of Centro, east, the Jewellery Quarter in the
over 500 companies including Colmore Business District and north and Corporation Street and
major international businesses Birmingham City Council, which St Phillip’s Churchyard in the south.
which together occupy a total sets out a programme of projects
of 500,000sq.m of office space to be delivered over a 15 year Snow Hill is a district of contrasts.
and employ over 35,000 people. timeframe to improve interchange, Within a short walk the character
The Masterplan builds on this connectivity and economic shifts from the grand Victorian
key strength plus the many other performance around Snow Hill streets around Colmore Row,
significant assets in the area. Station. to the high rise commercial
hub immediately to the east of
The transport proposals within the Snow Hill Station and further
The role of the Masterplan Masterplan sit in the context of east the cluster of fine High
The Snow Hill Masterplan sets Birmingham Connected, which is Victorian institutional buildings on
out an approach to maximise Birmingham’s long term strategy for Steelhouse Lane. The outer edge
the development of the Snow its transport system. Its vision is to of the district is dominated by the
Hill district and transform its reinvent the system to meet current heavily trafficked A38 Queensway.
environmental quality and overall and future mobility challenges, and
offer. Covering a 20 year period, to facilitate strong and sustainable Within the Masterplan boundary
this Masterplan builds upon the economic growth. Measures there are a number of distinct
vision and broad principles set include challenging the car culture, areas:
out in the Big City Plan, providing significant investment in walking
a framework for the future and cycling, new mass transit routes Historic Colmore
development and transformation of such as Metro and Sprint - bus A grid of legible and well enclosed
the area. The Masterplan sets out based rapid transit - and a radical streets containing a mix of historic
the following: approach to the transformation of and contemporary commercial
the A38. buildings and supporting uses.
•A
vision for the area including
a series of Big Moves to bring The Masterplan will be a non-
about major transformation. statutory planning document High-Rise Commercial
prepared in the context of the Part of the City’s central business
•A
radical approach to improving principles and proposals of the district, this area is dominated by
connectivity covering public Birmingham Development Plan: modern glass, steel, and concrete
transport, public realm and the statutory planning document office buildings on large plots
walking and cycling. that provides the planning policy clustered around Colmore Circus
framework and overarching and Snow Hill Queensway. This area
•P
rinciples for redevelopment, has been the focus for recent and
strategy for the whole of the City.
incorporating a clear urban ongoing commercial development
design framework; proposals for The Masterplan will help inform including the One and Two Snowhill
how the historic environment can future decisions on development developments and complementary
be utilised and opportunities for and investment in infrastructure. retail uses.
major investment including the
area’s Enterprise Zone sites.
•A
strategy for delivery.
Aston
University
ds y
C ha wa
s
St een
Q u
St Pauls
Square
ne
La
se
hou
e el
t
St
ee
tr
sS
rle
ha
Snow Hill
tC
Station
ea
Gr
Millennium
Point
w
Ro
t e
re
e
or
St
lm St Phillips
Co
ion
Square
at
or
rp
Co
Paradise
Circus
New Str
eet
Moor Street
Station
n
NORTH
New Street
Bullring
NOT TO SCALE
Station
KEY
Masterplan boundary Listed Buildings within
Masterplan boundary
Conservation Areas
Locally Listed Buildings within
Canal Masterplan boundary
Gun Quarter
Learning
ds y
ha wa
Quarter
C s
St een
Q u
Jewellery
Quarter Victorian
Institutions
High Rise
Commercial ne
La
t
se
ee
u
tr
lho
sS
ee
St
rle
ha
tC
Snow Hill
ea
Station
Gr
Historic
Colmore
w
Ro
et
e
tre
or
lm
nS
Co
tio
Curzon
ra
HS2
por
Co
Retail Core
Civic Core
New Str
eet
New Street
Station
n
NORTH
NOT TO SCALE
Expanded Office Core With the arrival of HS2 the Snow and safe environment, creating
At the heart of the Snow Hill district Hill district will see its attractiveness a legible network of streets and
new landmark developments will as a key location for business, spaces which connect into the
extend the City’s central business professional and financial services wider City Centre to bring life and
district, providing a sustainable grow significantly. It will have a activity. Enhanced streetscapes will
supply of high-quality office key role as a hub for HS2 related support opportunities to integrate
space complemented by a mix businesses kickstarted by the sustainable travel modes into
of uses creating 24/7 activity, and decision to locate the HS2 the area and improve facilities
supporting strong business and construction headquarters to the for walking, cycling and public
residential growth across the area. Enhanced routes to the HS2 transport.
Masterplan area. terminus will be delivered including
further extension of the Midland Great Charles Street Boulevard
Snow Hill Station Metro and improved pedestrian The Queensway (A38) will be
Snow Hill Station will be routes. reconfigured to restore sustainable
transformed, creating an attractive connectivity to this part of the
high-quality public transport East-West Connection City Centre, freeing up land for
interchange at the heart of the A grand pedestrian and cycle development and supporting
district. The improvement of the route will be created, running the introduction of an enhanced
station will unlock development from east to west via Colmore integrated transport system.
opportunities and facilitate the Row to Steelhouse Lane. This will Connections will be restored to the
provision of new routes through tie together the different parts Jewellery Quarter, facilitating the
and around the station. The of the district which make up the extension of the central business
approach will be modelled on Masterplan area, reconnecting district and creating opportunities
the highly successful Birmingham the Steelhouse Lane area and the for major redevelopments. There
Gateway project which is City Centre Core into the Learning will be two phases of localised
transforming Birmingham New Quarter. intervention; in the short-
Street Station. medium term these will provide
Public realm interventions immediate benefits while the
St Mary’s Place Public realm interventions major infrastructural changes are
In the Steelhouse Lane area the throughout the area will provide a developed and brought forward
reconfiguration of major institutions consistently high quality, inclusive over the longer term.
will unlock new sites with significant
redevelopment potential to
create a new sustainable urban
neighbourhood; St Mary’s Place.
New uses and activity will be
introduced, including innovative
and exciting opportunities to
reuse the area’s valuable historic
buildings. These new uses will feed
into, and be supported by, the
nearby Learning Quarter.
North/South Connectivity
Significant improvements to north/
south connectivity will be made,
enhancing pedestrian routes
through the district to the Jewellery
Quarter, New Street Station and the
Retail Core. Old and new around Steelhouse Lane
d
var
ul e
o St Mary’s
et B
Stre Place
s
arle
h
Expanded
tC
Office Core
ea
Gr
n
ti o
N
ew n ec
St Con
re Snow Hill t
et Station es
-C
ol Redevelopment st-W
m
or Ea
e HS
2C
-J
ew
on
n
el
ec
tiv
le
ity
ry
Qu
ar
te
rC
on
nec
tivity
n
NORTH
NOT TO SCALE
Improved connectivity, the The arrival of HS2 to the City Medium/longer term:
enhancement of walking, cycling Centre in 2026 will create a step
•R
econfigure Snow Hill Station,
and public transport, and the change in accessibility and further
enhancing passenger experience
creation of a consistent, high enhance the area’s attractiveness
and creating new pedestrian
quality public realm, will be central for investment and business. With
routes.
to the transformation of the area improved connections to the HS2
and the realisation of its huge terminus, the Snow Hill district will
potential for sustainable growth. become one of the best connected •D
evelop efficient new integrated
business locations in the country. transport links with New Street
Station and Birmingham Curzon
Principles to enhance local, regional and
Key projects to transform national connectivity.
The Masterplan seeks to deliver connectivity
radical enhancements to the
pedestrian environment. Improved Short term: •C
reate new public thoroughfares
routes will give priority to • £9.9m has already been secured through the heart of the district,
pedestrians and cyclists, linking from the Local Growth Fund, enhancing both east-west and
together a series of landmark Enterprise Zone and Colmore north-south connections.
public spaces which will provide Business District to implement
amenity space and form attractive key proposals which will be •T
ransform the public realm to
settings for new development. brought forward over the period provide a world-class visitor and
2015-2020. These works will user experience.
Public transport provision will tie in with major public realm
be greatly improved with the enhancements across the City •R
adically reconfigure the
enhancement of the Metro, the Centre brought forward under Queensway, creating new links
introduction of the Sprint - bus the Enterprise Zone City Centre with adjacent Quarters.
rapid transit system - and the Public Realm Improvement
rationalisation of bus routes and Programme.
stopping facilities. Interchange
between public transport modes
will be enhanced and new
connections provided between
the City’s transport hubs at New
Street Station, Moor Street and
the HS2 terminus at Birmingham
Curzon. These improvements
will reduce traffic congestion and
Carbon Dioxide emissions as well
as delivering improvements in air
quality.
s
had ay
St Censw
e
Qu
ne
La
se
ou
t
ee
h
Snow Hill el
tr
e
St
sS
Station
rle
ha
tC
ea
Gr
w
Ro
e t
e
re
or
St
lm
Co
ion
at
or
rp
Co
Birmingham Curzon
HS2 Station
New Str
eet
Moor Street
Station
New Street
Station
n
NORTH
NOT TO SCALE
KEY
Masterplan boundary Improved walking routes
M Metro route/station Pedestrian crossing zones
Intergrated transport zone Canal
PLAN 4 Movement
Wider connectivity
Enhanced routes will connect the
Snow Hill district to major transport
hubs at New Street Station and
Birmingham Curzon and establish
closer links with the Jewellery
Quarter, the Retail Core and the
Learning Quarter.
ne
La
se
ou
rd
h
va
el
le
e
St
ou
tB
Snow Hill
ee
Station
tr
sS
Ch
rle
ur
ch
ha
tC
St
N Pr
ea
re
ew io
Gr
ha ry
t
ll Q
St ue
re en
e swa
t y
Row
t
e
e
or
re
lm
St
Co
ion
at
or
rp
Co
New Str
eet
New Street
Station
n
NORTH
NOT TO SCALE
KEY
Masterplan boundary
Public spaces
Main routes
Canal
•T
he reconfiguration and
optimisation of bus routes to
improve journey times and reduce
congestion.
*
*
*
n
NORTH
NOT TO SCALE
KEY
Masterplan boundary Re-used buildings M Metro route/station
New development Tall buildings cluster zone Canal
Active frontage
* Key City landmarks
ds y
C ha wa
s
St een
Q u
Expanded
Office Core St Mary’s
Place
ne
La
Ludgate Hill se
hou
el
t
Snow Hill e
ee
St
tr
Station
sS
rle
ha
tC
ea
Gr
Historic
Colmore
w
Ro
t
e
e
re
or
St
lm
Co
ion
at
or
rp
Co
New Str
eet
n
NORTH
NOT TO SCALE
Funding for public realm • Proposals for the redevelopment • Public transport enhancements
enhancements will be identified of Snow Hill Station will be including initial Sprint routes and
from a variety of sources including developed in collaboration further extension of the Metro to
BID resources, Enterprise Zone between the City Council, Curzon HS2 and Five Ways.
funding, Community Infrastructure Network Rail, Ballymore and
Levy and CGF. This will sit Centro. £125k has been secured • Reconfiguration of the A38
alongside an existing £9.9m fund and feasibility and development Queensway to create a boulevard
for public realm improvements, work is in progress. featuring new public spaces
consisting of Local Growth Fund, and opening up major new
Enterprise Zone funding and • Enhancement of Queensway development opportunities.
contributions from the Colmore crossings including Great Charles HS2 enters service and the
Business District, which has been Street Footbridge, Newhall Street connections between new
allocated for the implementation of crossing and Livery Street subway. terminus and Snow Hill district are
the SHIP Delivery Plan. The future in place.
maintenance of spaces will be fully • Completion of major
considered including the role of developments including Post and
developers or the BID. Mail, Ludgate Hill, Three Snowhill,
Lumina and 103 Colmore Row
The Masterplan proposals will developments.
be delivered on a phased basis.
An indication of the anticipated • Opening of HS2 engineering
timescale is as follows: headquarters.