October 6 University Course : Survey 2 – CBE 204

Faculty of Engineering Assignment 8 ( volumes )


Department :Construction
Date : 2019
Dr. Nasr Mohammedy Saba
Assignment no (8)

4:
The following data table concerns a part of a roadway, 5.0 meter wide, which is partly in cutting
and partly embankment. The relevant earthworks data are given below. Calculate the following:
(a) the cross–sectional area at each chainage point?
(b) The volume of material excavated from the cutting?
(c) The volume of material in filled to form the embankment?

1
Chainage (m) Depth of Cutting Height of Filling Side slope Gradient
0.00 1.10 --- 1 to 2
10.00 2.50 --- 1 to 2
20.00 0.00 0.00 ---
30.00 --- 1.00 1 to 1
40.00 --- 2.30 1 to 1
5:
A proposed service roadway, 5.5 meter wide, is to be built along a center line XY. The embankment
is to have side slopes of 1 to 2. given the following data, calculate the volume of material required to construct the
embankment:

Chainage (m) 40.00 60.00 80.00 100.00 120.00 140.00


Ground Level (m) 10.00 9.60 9.50 10.40 7.30 10.40
Formation Level (m) 11.00 11.10 11.20 11.30 11.40 11.50
6:
A roadway cutting is to be constructed across an area of undulating ground and cross sections are to be drawn at
points A, B and C. The data tables shown the three cross sections with their respective ground levels and formation
levels, the road is to be 5.00 meters wide. Calculate:

(a) The cross-sectional areas at A, B and C.

(b) The volume of material excavated in constructing the cutting.

Chainage (m) Section Ground Levels (m) Formation Level Side Angle
0.00 A 21.30 21.90 22.80
15.00 B 22.90 23.50 24.50 20.00 45º
30.00 C 23.20 24.60 26.30

7:
A proposed service roadway, 6 meter wide, is to be built along a center line XY. The cut and fill
is to have side slopes of 1 to 2. given the following data, calculate the volume of material required to construct the
embankment:

Chainage (m) 60.00 80.00 100.00 130.00 160.00 190.00


Ground Level (m) 11.00 10.60 8.50 13.40 10.30 9.40
Formation Level (m) 12 11 10 9 8 7

2
8:

9:

A roadway is to be designed on a level terrain. This roadway is 150 meters in length. Four cross sections have
been selected, one at 0 meters, one at 50 meters, one at 100 meters, and one at 150 meters. The cross sections,
respectively, have areas of 40 square meters, 42 square meters, 19 square meters, and 34 square meters. What
is the volume of earthwork needed along this road?

10:
A roadway cutting is to be constructed across an area of undulating ground and cross sections are to be drawn at
points A, B and C. The data tables shown the three cross sections with their respective ground levels and formation
levels, the road is to be 6.00 meters wide. Calculate:

(a) The cross-sectional areas at A, B and C.

(b) The volume of material excavated in constructing the filling

Formation
Chainage (m) Section Ground Levels (m) Ground slope Side Angle
Level
0.00 A 28.90
20.00 B 27.70 30.00 1:11 30º
40.00 C 28.10

11. The areas within the underwater contour lines of a reservoir are as follows:

Calculate the volume of water in the reservoir between 172 m and 182m contours using two different
methods.

Contour (m) 184 182 180 178 176 174 172

Area (m2) 3127 2457 1622 898 228 116 73