General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
Wafer Biscuit plant
1 WF-1 CO2 5 KG Near Pannels @ Entrance old RMS 24/Mar/21 10/May/21 ok ok ok ok ok ok
2 WF-2 DCP 6 KG Wafer Biscuit Store @ Entrance 31/Mar/21 10/May/21 ok ok ok ok ok ok
4 WF-3 CO2 5 KG Wafer Oven @ North wall 31/Mar/21 10/May/21 ok ok ok ok ok ok
5 WF-4 CO2 5 KG Wafer Oven @ South wall 31/Mar/21 10/May/21 ok ok ok ok ok ok
5 WF-5 CO2 5 KG Wafer Store Mazzanain Floor 24/Mar/21 5/Apr/21 ok ok ok ok ok ok
6 WF-6 DCP 6 KG Wafer Store Mazzanain Floor 24/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
7 WF-7 DCP 6 KG Wafer Store Near Clerk desk 24/Mar/21 10/May/21 ok ok ok ok ok ok
8 WF-8 DCP 6 KG Wafer Store Near Clerk desk 24/Mar/21 20/Sep/21 ok ok ok ok ok ok
9 WF-9 CO2 3 KG West wall center Near Control panel 24/Mar/21 5/Apr/21 ok ok ok ok ok ok
10 WF-10 CO2 5 KG Wafer Store Near Clerk desk 24/Mar/21 20/Sep/21 ok ok ok ok ok ok

Jelly Department
11 J-1 CO2 5 KG Heat exchanger (Near Hand wash) 4/Mar/21 2/Nov/21 ok ok ok ok ok ok
12 J-2 CO2 5 KG Heat exchanger 4/Mar/21 2/Nov/21 ok ok ok ok ok ok
13 J-3 DCP 6 KG Daily Packing Material Store 4/Mar/21 25/Jul/21 ok ok ok ok ok ok
14 J-4 CO2 5 KG Mogal Line Jelly (Near electrical panel) 4/Mar/21 5/Apr/21 ok ok ok ok ok ok
15 J-5 CO2 5 KG Mogal Line Jelly (Mid pole) 4/Mar/21 2/Nov/21 ok ok ok ok ok ok
16 J-6 DCP 50 KG South Wall near Electrical panel 4/Mar/21 5/Apr/21 ok ok ok ok ok ok
17 J-7 CO2 3 KG Curring Area Jelly (North Wall Side) 4/Mar/21 5/Apr/21 ok ok ok ok ok ok
18 J-8 CO2 3 KG Curring Area Jelly (Pole#.2) 4/Mar/21 20/Dec/21 ok ok ok ok ok ok
19 J-9 CO2 3 KG Curring Area Jelly (Pole#.4) 4/Mar/21 20/Dec/21 ok ok ok ok ok ok
20 J-10 CO2 5 KG Curring Area Jelly (pole#.6) 4/Mar/21 5/Apr/21 ok ok ok ok ok ok
21 J-11 CO2 5 KG Jelly Kitchen Area. 4/Mar/21 5/Apr/21 ok ok ok ok ok ok
22 J-12 CO2 5 KG Jelly CFA Area. 4/Mar/21 20/Oct/21 ok ok ok ok ok ok
23 J-13 CO2 5 KG Jelly Holding Area 1st Floor (Near E.P) 4/Mar/21 1/Jul/21 ok ok ok ok ok ok
24 J-14 DCP 6 KG Jelly Oiling & Sanding Area 4/Mar/21 1/Feb/22 ok ok ok ok ok Replaced
25 J-15 CO2 3 KG Jelly Twistoo Hall 4/Mar/21 20/Dec/21 ok ok ok ok ok ok
26 J-16 CO2 5 KG Jelly Ishida Hall 4/Mar/21 10/May/21 ok ok ok ok ok ok
27 J-17 CO2 5 KG Jelly Right Éclair Packing Hall 4/Mar/21 10/Oct/21 ok ok ok ok ok ok
28 J-18 CO2 5 KG Jelly Tray packing hall (Near hand W) 4/Mar/21 1/Dec/21 ok ok ok ok ok ok
29 J-19 CO2 3 KG Jelly Tray packing hall 4/Mar/21 15/Sep/21 ok ok ok ok ok ok
30 J-20 CO2 5KG Jelly packing day Store Area. 4/Mar/21 10/May/21 ok ok ok ok ok ok
Éclair
31 E-1 CO2 5 KG Éclair Kitchen Near sugar Hop (South Wall) 7/Mar/21 25-Feb-22 ok ok ok ok ok ok
32 E-2 CO2 5 KG Éclair Plant west wall 7/Mar/21 20/Sep/21 ok ok ok ok ok ok
33 E-3 CO2 3 KG Éclair wrapping area North wall 7/Mar/21 10-Nov-21 ok ok ok ok ok ok
34 E-4 CO2 5 KG Éclair wrapping area West wall 7/Mar/21 10-Oct-21 ok ok ok ok ok ok
35 E-5 CO2 5 KG Éclair Mixing Mazzanine floor. 7/Mar/21 10-Oct-21 ok ok ok ok ok ok
36 E-6 CO2 5 KG Éclair packing hall North wall Pole#.3 7/Mar/21 10-May-21 ok ok ok ok ok ok
37 E-7 CO2 5 KG Éclair packing hall South wall 7/Mar/21 5/Apr/21 ok ok ok ok ok ok
38 E-8 DCP 6 KG Éclair packing hall near H.wash pole. 7/Mar/21 20-Dec-21 ok ok ok ok ok ok
Marsh Mellow & Toffix
39 MM-1 CO2 5 KG Near Éclair Hand Wash 5/Mar/21 20-Dec-21 ok ok ok ok ok ok
40 MM-2 CO2 5 KG Marsh Mellow Kitchen Platform 5/Mar/21 5/Apr/21 ok ok ok ok ok ok
41 MM-3 CO2 5 KG Marsh Mellow plant (near kitchen door) 5/Mar/21 5/May/21 ok ok ok ok ok ok
42 MM-4 CO2 5 KG Marsh Mellow plant (near Jelly door) 5/Mar/21 20/Sep/21 ok ok ok ok ok ok
Pan Coating - 1st Floor
43 PC-1 CO2 3 KG Pan Coating Hall - 1 (1st Floor) 7/Mar/21 2/Nov/21 ok ok ok ok ok ok
44 PC-2 CO2 3 KG Pan Coating Kitchen (1st F) 7/Mar/21 20/Dec/21 ok ok ok ok ok ok
45 PC-3 CO2 5 KG Pan Coating Hall - 2 (1st Floor) 7/Mar/21 10-Oct-21 ok ok ok ok ok ok
46 PC-4 CO2 3 KG Pan Coating Hall - 2 Bunty 7/Mar/21 10-Oct-21 ok ok ok ok ok ok
Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________
Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
Biscuit Mixing Line - 1 & 2. 2nd Floor
47 B-1 CO2 5 KG Near Biscuit Mixing lift 11/Mar/21 20/Sep/21 ok ok ok ok ok ok
48 B-2 CO2 5 KG Biscuit Mixing South Wall cold Room 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
49 B-3 CO2 3 KG Biscuit Cutting middle pole#.3 11/Mar/21 5/Feb/22 ok ok ok ok ok ok
50 B-4 DCP 50 KG Biscuit Cutting west wall 11/Mar/21 2/Nov/21 ok ok ok ok ok ok
51 B-5 DCP 6 KG Biscuit oven line - 1 & 2 pole#.1 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
52 B-6 DCP 6 KG Biscuit oven line - 1 & 2 pole#.3 11/Mar/21 10/Oct/21 ok ok ok ok ok ok
53 B-7 DCP 6 KG Biscuit oven line - 1 & 2 pole#.5 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
54 B-8 DCP 6 KG Biscuit oven line - 1 & 2 pole#.7 11/Mar/21 25/Jul/21 ok ok ok ok ok ok
55 B-9 DCP 50 KG Biscuit oven line - 1 & 2 West wall. 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
56 B-10 CO2 5 KG Biscuit oven line - 2 Panels North wall 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
57 B-11 CO2 5 KG Biscuit oven line - 1 Panels South wall 11/Mar/21 10/Oct/21 ok ok ok ok ok ok
58 B-12 DCP 6 KG Biscuit Packing line 1 South Wall Pole#.2 11/Mar/21 25/Jul/21 ok ok ok ok ok ok
59 B-13 DCP 6 KG Biscuit Packing line 1 South wall Pole#.4 11/Mar/21 5/Feb/22 ok ok ok ok ok Replaced
60 B-14 CO2 3 KG Biscuit Packing line 1 South Wall pole#6 11/Mar/21 1/Feb/22 ok ok ok ok ok ok
61 B-15 CO2 3 KG Biscuit Packing line 1&2 Middle Pole#.1 11/Mar/21 20/Dec/21 ok ok ok ok ok ok
62 B-16 DCP 6 KG Biscuit Packing line 1&2 Middle Pole#.3 11/Mar/21 10/May/21 ok ok ok ok ok ok
63 B-17 CO2 5 KG Biscuit Packing line 1&2 Middle Pole#.5 11/Mar/21 10/Oct/21 ok ok ok ok ok ok
64 B-18 CO2 5 KG Biscuit Packing West Wall Biscuit Conveyor 11/Mar/21 5/Apr/21 ok ok ok ok ok ok
65 B-19 CO2 3 KG Biscuit Packing North Wall 11/Mar/21 5/Feb/22 ok ok ok ok ok Replaced
66 B-20 DCP 6 KG Biscuit Packing North Wall near Pannel 11/Mar/21 25/Jul/21 ok ok ok ok ok ok
67 B-21 DCP 50 KG Biscuit New Packing Hall 1st pole 11/Mar/21 1/Feb/22 ok ok ok ok ok ok
Old & New Candy
68 OC-1 DCP 6 KG Packing Area - Front of hand wash 13/Mar/21 5/Apr/21 ok ok ok ok ok ok
69 OC-2 CO2 3 KG Packing Area 13/Mar/21 5/Apr/21 ok ok ok ok ok ok
70 OC-3 CO2 3 KG wrapping Area 13/Mar/21 9/Oct/21 ok ok ok ok ok ok
71 OC-4 CO2 3 KG wrapping Area 13/Mar/21 2/Nov/21 ok ok ok ok ok ok
72 OC-5 CO2 3 KG wrapping Area 13/Mar/21 5/Apr/21 ok ok ok ok ok ok
73 OC-6 CO2 5 KG Old Oven Area 13/Mar/21 10/Oct/21 ok ok ok ok ok ok
74 OC-7 CO2 5 KG Old Kitchen near Clerck desk 13/Mar/21 10/May/21 ok ok ok ok ok ok
75 OC-8 CO2 5 KG Old Kitchen Entrance @ 2nd pole 13/Mar/21 10/May/21 ok ok ok ok ok ok
76 OC-9 CO2 3 KG First pole near Hand wash 13/Mar/21 10/May/21 ok ok ok ok ok ok
77 OC-10 DCP 50 KG 3rd Pole new Kitchen 13/Mar/21 1/Feb/22 ok ok ok ok ok ok
78 OC-11 CO2 3 KG Double Pole Near Cooker 13/Mar/21 20/Sep/21 ok ok ok ok ok ok
79 OC-12 CO2 3 KG Last pole of cooker Area 13/Mar/21 20/Sep/21 ok ok ok ok ok ok
80 OC-13 CO2 3 KG 1st Pole @ New Wrapping Area 13/Mar/21 20/Sep/21 ok ok ok ok ok ok
81 OC-14 CO2 3 KG 2nd Pole New Wrapping Area 13/Mar/21 20/Sep/21 ok ok ok ok ok ok
82 OC-15 CO2 3 KG New Wrapping Area 13/Mar/21 20/Sep/21 ok ok ok ok ok ok
83 OC-16 CO2 3 KG New Wrapping Area 13/Mar/21 10/May/21 ok ok ok ok ok ok
84 OC-17 CO2 3 KG New Packing Area @ North Wall 13/Mar/21 14/May/21 ok ok ok ok ok ok
85 OC-18 DCP 6 KG New Packing Area @ South Wall 13/Mar/21 1/Feb/22 ok ok ok ok ok ok
86 OC-19 CO2 3 KG New Packing Area @ South Wall 13/Mar/21 10/Oct/21 ok ok ok ok ok ok
87 OC-20 CO2 5 KG New Packing Area @ North Wall 13/Mar/21 10/May/21 ok ok ok ok ok ok
88 OC-21 DCP 6 KG New Packing Area @ North Wall 13/Mar/21 20/Sep/20 ok ok ok ok ok ok
89 OC-22 CO2 3 KG New Packing Area @ North Wall 13/Mar/21 10/Oct/21 ok ok ok ok ok ok
90 OC-23 DCP 6 KG New Packing Area @ North Wall 13/Mar/21 20/Dec/21 ok ok ok ok ok ok
91 OC-24 CO2 3 KG New Packing Area @ North Wall 13/Mar/21 10/Aug/21 ok ok ok ok ok ok
Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________
Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
Sifter Area
92 Sf-1 CO2 5 KG Sifter Hall East Wall 24/Mar/21 5/Apr/21 ok ok ok ok ok ok
93 Sf-2 CO2 3 KG Grinding Room 24/Mar/21 20/Mar/22 ok ok ok ok ok New
94 Sf-3 CO2 3 KG Sifter Hall 24/Mar/21 20/Aug/21 ok ok ok ok ok ok
95 Sf-4 DCP 50 KG Sifter Hall @ centre pole 24/Mar/21 20/Mar/22 ok ok ok ok ok New
96 Sf-5 CO2 3 KG Sifter Hall Near Recycling Exit door 24/Mar/21 1/Dec/21 ok ok ok ok ok ok
97 SugC-1 DCP 50 KG Sugar Coating @ Entrance 24/Mar/21 5/Apr/21 ok ok ok ok ok ok
98 SugC-2 CO2 3 KG Sugar Coating @ south Entrance 24/Mar/21 5/Apr/21 ok ok ok ok ok ok
99 SugC-3 CO2 3 KG Sug Recycling Plant 24/Mar/21 5/Apr/21 ok ok ok ok ok ok

Bubble Department.
100 BG-1 CO2 3 KG Bubble Mixing @ Near Mixing Hand Wash 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
101 BG-2 CO2 3 KG Bubble Mixing @ South Wall 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
102 BG-3 CO2 3 KG Bubble Mixing @ Central Pole 14/Mar/21 1/Jul/21 ok ok ok ok ok ok
103 BG-4 CO2 3 KG Chillup Cooling @ South Wall 14/Mar/21 1/Jul/21 ok ok ok ok ok ok
104 BG-5 CO2 5 KG Chillup Cooling @ South Wall 14/Mar/21 10/Oct/21 ok ok ok ok ok ok
105 BG-6 DCP 6 KG Chillup Cooling @ South Wall 14/Mar/21 20/Aug/21 ok ok ok ok ok ok
106 BG-7 CO2 3 KG Chill Up Wrap. @ South Wall 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
107 BG-8 CO2 3 KG Chill Up Wrap. @ South Wall 14/Mar/21 20/Dec/21 ok ok ok ok ok ok
108 BG-9 CO2 3 KG Chill Up Packing. @ South Wall 14/Mar/21 26/Dec/21 ok ok ok ok ok ok
109 BG-10 DCP 6 KG Chill Up Packing. @ South Wall 14/Mar/21 2/Nov/21 ok ok ok ok ok ok
110 BG-11 DCP 6 KG Chill Up Packing @ South Wall 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
111 BG-12 CO2 3 KG Chill Up Near panels @North Wall 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
112 BG-13 CO2 3 KG Chill Up Packing @ South Wall 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
113 BG-14 CO2 3 KG Chill Up @ South Wall 14/Mar/21 20/Dec/21 ok ok ok ok ok ok
114 BG-15 CO2 3 KG Bubble release store 14/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
115 BG-16 CO2 3 KG Boom Cooling @ South Wall 14/Mar/21 20/Aug/21 ok ok ok ok ok ok
116 BG-17 CO2 3 KG Boom Cooling @ Near Panel North Wall 14/Mar/21 1/Jul/21 ok ok ok ok ok ok
117 BG-18 DCP 6 KG Wrapping @ south Wall 14/Mar/21 1/Feb/22 ok ok ok ok ok ok
118 BG-19 CO2 3 KG Wrapping @ south Wall 14/Mar/21 20/Aug/21 ok ok ok ok ok ok
119 BG-20 CO2 3 KG Wrapping @ south Wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
120 BG-21 DCP 6 KG Wrapping @ Packing Store 14/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
121 BG-22 CO2 3 KG Wrapping store @ North Wall 14/Mar/21 1/Jul/21 ok ok ok ok ok ok
122 BG-23 CO2 3 KG Wrapping @ south Wall 14/Mar/21 25/Nov/21 ok ok ok ok ok ok
123 BG-24 CO2 3 KG Packing @ South wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
124 BG-25 DCP 6 KG Packing Material store 14/Mar/21 20/Jun/21 ok ok ok ok ok ok
125 BG-26 DCP 6 KG Packing @ South wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
126 BG-27 CO2 3 KG Packing @ Near panels South wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
127 BG-28 CO2 5 KG Packing @ North wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
128 BG-29 CO2 3 KG Packing @ South wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
129 BG-30 DCP 6 KG Packing @ South wall 14/Mar/21 5/May/21 ok ok ok ok ok ok
130 BG-31 CO2 3 KG Packing @ North wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
131 BG-32 CO2 3 KG Packing @ South wall 14/Mar/21 5/Apr/21 ok ok ok ok ok ok
132 BG-33 CO2 5 KG Grinder area 14/Mar/21 1/Dec/21 ok ok ok ok ok ok
133 BG-34 CO2 5 KG Ball Mil G.F @ Near Control panel 18/Mar/21 10/Dec/21 ok ok ok ok ok ok
134 BG-35 DCP 6 KG Ball Mil G.F @ West Wall 18/Mar/21 1/Feb/22 ok ok ok ok ok ok
135 BG-36 CO2 3 KG Near Lift 11 & 12 Grinder Area 18/Mar/21 20/Mar/22 ok ok ok ok ok ok
Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________
Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
New Biscuit Ground Floor
136 BP-1 CO2 3 KG East Wall near Cutting Exit Door 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
137 BP-2 CO2 3 KG South Pole # 2 mixing area 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
138 BP-3 CO2 3 KG South Pole # 5 mixing area 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
139 BP-4 CO2 3 KG North wall pole # 8 cutting area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
140 BP-5 CO2 3 KG North pole mid line#1, 2 cutting area 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
141 BP-6 CO2 3 KG South wall mid line #1,2 near panel 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
142 BP-7 DCP 50 KG Mid line #1, 2 near PU wall oven area 19-Mar-21 20-Mar-22 ok ok ok ok ok Replaced
143 BP-8 DCP 6 KG Mid line# 1, 2 pole # 1 oven area 19-Mar-21 1-Dec-21 ok ok ok ok ok ok
144 BP-9 DCP 6 KG Mid line# 1, 2 pole # 2 oven area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
145 BP-10 CO2 3 KG South wall near panel 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
146 BP-11 DCP 50 KG Mid line # 2, 3 pole #1 oven area 19-Mar-21 1-Dec-21 ok ok ok ok ok ok
147 BP-12 DCP 6 KG Mid line # 2, 3 pole #2 oven area 19-Mar-21 10-Jan-21 ok ok ok ok ok ok
148 BP-13 DCP 6 KG Mid line # 2, 3 pole #5 oven area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
149 BP-14 AFFF 50 Lit Mid line # 2, 3 pole #7 oven area 19-Mar-21 2-Nov-21 ok ok ok ok ok ok
150 BP-15 DCP 6 KG Mid line # 2, 3 pole #8 oven area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
151 BP-16 DCP 6 KG Mid line # 2, 3 pole #11 oven area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
152 BP-17 DCP 6 KG Mid line # 2, 3 pole #14 oven area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
153 BP-18 CO2 3KG Mid line#3,4 Near Electrical Panel 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
154 BP-19 CO2 3 KG Line # 4 narth wall near panel oven area 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
155 BP-20 DCP 6 KG South wall packing area pole # 1 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
156 BP-21 CO2 3 KG South wall packing area pole # 7 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
157 BP-22 DCP 6 KG South wall packing area pole # 10 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
158 BP-23 DCP 6 KG South wall packing area pole # 13 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
159 BP-24 DCP 6 KG South wall wrapping area near exit door 19-Mar-21 1-Feb-22 ok ok ok ok ok ok

160 BP-25 DCP 6 KG South wall packing area near hand wash 19-Mar-21 20-Mar-22 ok ok ok ok ok Replaced
161 BP-26 DCP 6 KG North wall near packing area exit door 19-Mar-21 20-Mar-22 ok ok ok ok ok Replaced
162 BP-27 DCP 50 KG North wall packing area 19-Mar-21 20-Sep-21 ok ok ok ok ok ok
163 BP-28 CO2 3 KG North wall Pole #1 Packing area 19-Mar-21 20-Dec-21 ok ok ok ok ok ok
164 BP-29 DCP 6 KG Center Pole # 2 Packing area 19-Mar-21 20-Mar-22 ok ok ok ok ok Replaced
165 BP-30 DCP 6 KG Center Pole # 7 Packing area 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
166 BP-31 DCP 50 KG West Entrance door Near Egg Cracker 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
167 BP-32 DCP 6 KG South wall near panel pack. 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
168 BP-33 DCP 6 KG South wall line#3 Creamy mixer 19-Mar-21 5-Feb-22 ok ok ok ok ok ok
169 BP-34 DCP 6 KG Pole #9 near electrical panel 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
170 BP-35 CO2 5 KG South wall 19-Mar-21 10-Oct-21 ok ok ok ok ok ok
171 BP-36 DCP 6 KG North wall near hand wash 19-Mar-21 15-Oct-21 ok ok ok ok ok ok
Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________
Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
NEW CHOCOLATE PLANT
172 COB-1 DCP 50 KG Raw Material storage area 18/Mar/21 1/Feb/22 ok ok ok ok ok ok
173 COB-2 CO2 3 KG Raw Material storage area 18/Mar/21 27/Dec/21 ok ok ok ok ok ok
174 COB-3 DCP 6 KG Raw Material storage area 18/Mar/21 20/Sep/21 ok ok ok ok ok ok
175 COB-4 CO2 3 KG Raw Material storage area 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
176 COB-5 CO2 3 KG 1st Kitchen @ South wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
177 COB-6 CO2 3 KG 1st Kitchen @ South wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
178 COB-7 CO2 3 KG 1st Kitchen @ South wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
179 COB-8 CO2 3 KG 1st Kitchen @ South wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
180 COB-9 CO2 3 KG 1st Kitchen @ Battery Ent. 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
181 COB-10 CO2 5 KG 2nd Kitchen @ central pole 18/Mar/21 20/Dec/21 ok ok ok ok ok ok
182 COB-11 CO2 3 KG 2nd Kitchen @ south wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
183 COB-12 CO2 3 KG Bar line 1 @ south wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
184 COB-13 CO2 3 KG Bar line 1 @ Raw storage 18/Mar/21 13/Feb/22 ok ok ok ok ok ok
185 COB-14 CO2 3 KG Bar line 1 @ south wall 18/Mar/21 13/Feb/22 ok ok ok ok ok ok
186 COB-15 DCP 6 KG Bar line 1 @ Raw storage 18/Mar/21 1/Dec/21 ok ok ok ok ok ok
187 COB-16 CO2 3 KG Bar line 1 @ south wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
188 COB-17 CO2 3 KG Bar line 1 @ south wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
189 COB-18 CO2 3 KG Bar line 1 @ Packing M.St.2nd 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
190 COB-19 CO2 5 KG Barline@North wall near slope 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
191 COB-20 CO2 3 KG South wall hand wash 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
192 COB-21 CO2 3 KG New Chocolate Plant east wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
193 COB-22 CO2 3 KG South wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
194 COB-23 CO2 3 KG south wall 18/Mar/21 1/Feb/22 ok ok ok ok ok ok
195 COB-24 CO2 3 KG west wall 18/Mar/21 20/Dec/21 ok ok ok ok ok ok
196 COB-25 CO2 3 KG 3D Packing Area New Hall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
197 COB-26 CO2 3 KG Packing Hall door slope Barline 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
198 COB-27 CO2 3 KG Packing Area @5th p.North 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
199 COB-28 CO2 3 KG Packing Area @9th p.North 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
200 COB-29 CO2 3 KG Packing Area @13th p.North 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
201 COB-30 CO2 3 KG Bar line 2nd pole @ north wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
202 COB-31 CO2 3 KG Bar line 6th pole @ north wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
203 COB-32 CO2 3 KG Bar line 10th pole @north wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
204 COB-33 CO2 3 KG Bar line 14th pole @north wall 18/Mar/21 5/Feb/22 ok ok ok ok ok ok
205 COB-34 CO2 3 KG New Packing Area Near Entrance Door 18/Mar/21 1/Feb/22 ok ok ok ok ok ok
206 COB-35 CO2 5 KG New Packing Area South Wall 18/Mar/21 20/Dec/21 ok ok ok ok ok ok

New Biscuit Mazzanain Floor


207 BP-37 CO2 3 KG TFT center pole 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
208 BP-38 CO2 3 KG South wall Pole# 1 packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
209 BP-39 CO2 3 KG South wall Pole# 15 packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
210 BP-40 CO2 3 KG South wall Pole# 9 packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
211 BP-41 CO2 3 KG South wall Pole# 14 packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
212 BP-42 CO2 3 KG Near West wall Pole # 18 packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
213 BP-43 DCP 6 KG West wall near exist door 1 21/Mar/21 10-Sep-21 ok ok ok ok ok ok
214 BP-44 CO2 5 KG Center pole # 2 from west wall 21/Mar/21 10-Oct-21 ok ok ok ok ok ok
215 BP-45 CO2 3 KG Center pole # 16 from west wall 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
216 BP-46 CO2 3 KG Center pole # 11 from west wall 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
217 BP-47 CO2 3 KG North wall near hand wash 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
218 BP-48 CO2 3 KG Pole # 6 North wall packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
219 BP-49 CO2 3 KG Pole # 14 North wall packing area 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
220 BP-50 CO2 3 KG North wall near main Electrical Panel 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
221 BP-51 CO2 3 KG Center Pole#1 21/Mar/21 1-Dec-21 ok ok ok ok ok ok
222 BP-52 CO2 3 KG Center Pole #4 21/Mar/21 1-Dec-21 ok ok ok ok ok ok

Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________


Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
PASTA Department.
223 PP-1 CO2 3 KG M.Silos line @ South wall 23/Mar/21 10/Apr/21 ok ok ok ok ok ok
224 PP-2 DCP 6 KG M.Silos line @ South wall 23/Mar/21 20/Dec/21 ok ok ok ok ok ok
225 PP-3 DCP 6 KG M.Silos line @ South wall 23/Mar/21 1/Jul/21 ok ok ok ok ok ok
226 PP-4 CO2 3 KG M.Silos line @ west Q.C Lab wall 23/Mar/21 20/Mar/22 ok ok ok ok ok ok
227 PP-5 CO2 3 KG M.Silos line @ North wall 23/Mar/21 20/Mar/22 ok ok ok ok ok ok
228 PP-6 CO2 3 KG Vacuum Pump room 23/Mar/21 25/Apr/21 ok ok ok ok ok ok
229 PP-7 CO2 3 KG Electrical Control room 23/Mar/21 10/Apr/21 ok ok ok ok ok ok
230 PP-8 DCP 6 KG @ South wall Plant area 23/Mar/21 9/Oct/21 ok ok ok ok ok ok
231 PP-9 CO2 3 KG @ South wall Plant area 23/Mar/21 10/Apr/21 ok ok ok ok ok ok
232 PP-10 DCP 6 KG @ South wall Plant area 23/Mar/21 1/Dec/21 ok ok ok ok ok ok
233 PP-11 CO2 3 KG @ South wall Plant area 23/Mar/21 25/Jul/21 ok ok ok ok ok ok
234 PP-12 CO2 5 KG @ South wall Wrapping area 23/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
235 PP-13 CO2 3 KG @ South wall Wrapping area 23/Mar/21 5/Apr/21 ok ok ok ok ok ok
236 PP-14 CO2 3 KG @ South wall Packing area 23/Mar/21 10/Jul/21 ok ok ok ok ok ok
237 PP-15 CO2 3 KG @ South wall Packing area 23/Mar/21 15/Aug/21 ok ok ok ok ok ok
238 PP-16 CO2 3 KG @ North wall near Packing H.W 23/Mar/21 26/Dec/21 ok ok ok ok ok ok
239 PP-17 CO2 5 KG Die washing room 23/Mar/21 20/Dec/21 ok ok ok ok ok ok
240 PP-18 DCP 50 KG @ Mid of plant 23/Mar/21 9/Oct/21 ok ok ok ok ok ok
241 PP-19 CO2 5 KG @ North wall near DB 23/Mar/21 10/Sep/21 ok ok ok ok ok ok
242 PP-20 DCP 6 KG @ 3rd pole 23/Mar/21 1/Dec/21 ok ok ok ok ok ok
243 PP-21 CO2 5 KG @ PU wall 23/Mar/21 10/Sep/21 ok ok ok ok ok ok
244 PP-22 CO2 3 KG Near pannels @ west H.wash 23/Mar/21 26/Dec/21 ok ok ok ok ok ok
245 NC-23 CO2 3 KG Pasta Packing Hall 23/Mar/21 25/Sep/21 ok ok ok ok ok ok
245 PP-24 CO1 2 KG Pasta workshop Mechanical 23/Mar/21 1/Jul/21 ok ok ok ok ok ok
246 PP-25 CO2 5 KG Pasta Control Room 23/Mar/21 20/Mar/22 ok ok ok ok ok New
New Candy Plant
247 NC-1 CO2 3 KG Hand wash 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
248 NC-2 CO2 3 KG Material storage @ 2nd pole 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
249 NC-3 CO2 3 KG Centre @ 6th pole Near Electrical Panel 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
250 NC-4 CO2 3KG Centre @ 9th pole Toffee Cooling area 25/Mar/21 5/Feb/21 ok ok ok ok ok ok
251 NC-5 DCP 50 KG Near 11th pole Toffee Cooling area 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
252 NC-6 CO2 3KG At Office wall candy plant 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
253 NC-7 CO2 3 KG South wall @ centre 25/Mar/21 26/Dec/21 ok ok ok ok ok ok
254 NC-8 CO2 3 KG South wall Near DB (Near Executive H.W) 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
255 NC-9 DCP 50 KG South wall @ LV'S Door 25/Mar/21 1/Dec/21 ok ok ok ok ok ok
256 NC-10 CO2 3 KG South wall @ LV'S door 25/Mar/21 25/Dec/21 ok ok ok ok ok ok
257 NC-11 DCP 6 KG South Wall Wrapping area 25/Mar/21 1/Jul/21 ok ok ok ok ok ok
258 NC-12 CO2 3 KG South Wall (AHU's Room) 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
259 NC-13 CO2 3 KG South Wall Packing Hall 25/Mar/21 25/Dec/21 ok ok ok ok ok ok
260 NC-14 DCP 6 KG South Wall Packing Hall 25/Mar/21 1/Jul/21 ok ok ok ok ok ok
261 NC-15 CO2 3 KG South Wall Packing Hall 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
262 NC-16 CO2 3 KG West Wall Packing H. Wash) 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
263 NC-17 DCP 6 KG Noth wall Packing Hall 25/Mar/21 25/Jul/21 ok ok ok ok ok ok
264 NC-18 CO2 3 KG Noth wall Packing Hall 25/Mar/21 20/Dec/21 ok ok ok ok ok ok
265 NC-19 CO2 3 KG Noth wall Packing Hall 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
266 NC-20 CO2 5 KG Noth wall Wrapping Area 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
267 NC-21 CO2 3 KG Noth wall Wrapping Area (East Wall) 25/Mar/21 5/Feb/22 ok ok ok ok ok ok
268 NC-22 CO2 3 KG Noth wall Wrapping Area 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
269 NC-23 CO2 3 KG Toffee plant south wall Wrapping Hall 25/Mar/21 25/Apr/21 ok ok ok ok ok ok
270 NC-24 CO2 3 KG Toffee plant south wall Wrapping Hall 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
271 NC-25 CO2 3 KG Toffee plant south wall Wrapping Hall 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
272 NC-26 CO2 3 KG Toffee plant North wall Wrapping Hall 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
273 NC-27 DCP 6 KG Toffee plant south wall Wrapping Hall 25/Mar/21 19/Jul/21 ok ok ok ok ok ok
274 NC-28 CO2 3 KG Toffee plant North wall Wrapping Hall 25/Mar/21 25/Sep/21 ok ok ok ok ok ok
Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________
Forms / Reports
Fire Extinguisher Inspection Doc. Level: V Doc. Version: I
Doc. No: V.MAS-SHE-F10 w.e.f: 25thNovember,2017
General Condition- (OK - NOT OK)
Sr# F.E # Type weight Location/Department I.Date A.R.Date Remarks
Pressure Hose Safety Pin Handle Tag
Ketchup Plant
275 KP-1 CO2 3 KG CIP Room 25/Mar/21 10/May/21 ok ok ok ok ok ok
276 Kp-2 CO2 3 KG Ketchup Mayonnise Hall 25/Mar/21 5/Apr/21 ok ok ok ok ok ok
277 KP-3 CO2 3 KG Ketchup Kitchen 25/Mar/21 10/May/21 ok ok ok ok ok ok
278 KP-4 CO2 3 KG Filling Section Near Exit Door 25/Mar/21 5/Apr/21 ok ok ok ok ok ok
279 KP-5 CO2 3 KG Filling Sextion Near Hand Wash 25/Mar/21 10/May/21 ok ok ok ok ok ok
280 KP-6 CO2 3 KG Wrapping /Packing Hall 25/Mar/21 10/May/21 ok ok ok ok ok ok
281 KP-7 DCP 6 KG Near wraping Emergency exit 25/Mar/21 1/Feb/22 ok ok ok ok ok ok
282 KP-8 DCP 6 KG Near Ketchup kitchen Emergency exit 25/Mar/21 10/May/21 ok ok ok ok ok ok
283 KP-9 DCP 6 KG Outside chemical room 25/Mar/21 10/Oct/21 ok ok ok ok ok ok
284 KP-10 CO2 3 KG Infront of Lift#5 Ketchup Floor 25/Mar/21 15/Aug/21 ok ok ok ok ok ok
285 KP-11 DCP 6 KG Near main Ketchup exit door 25/Mar/21 20/Aug/21 ok ok ok ok ok ok
RMS - BASEMENT
286 RSB-1 CO2 3 KG Near west Stairs - Elec. Pannels 19/Mar/21 10/May/21 ok ok ok ok ok ok
287 RSB-2 CO2 3 KG Pasta Silo Area near lift 19/Mar/21 10/May/21 ok ok ok ok ok ok
288 RSB-3 DCP 6 KG 1st Row at 2nd Pole 19/Mar/21 20/Jun/21 ok ok ok ok ok ok
289 RSB-4 DCP 6 KG 2nd row @ 5th pole 19/Mar/21 20/Jun/21 ok ok ok ok ok ok
290 RSB-5 DCP 6 KG 3rd Row at Pu panel West side 19/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
291 RSB-6 DCP 6 KG 3rd Row @ 2nd pole 19/Mar/21 22/Jun/21 ok ok ok ok ok ok
292 RSB-7 DCP 6 KG 4th Row @ 2nd Pole 19/Mar/21 20/Jun/21 ok ok ok ok ok ok
293 RSB-8 DCP 6 KG 5th Row @ 4th Pole 19/Mar/21 20/Jun/21 ok ok ok ok ok ok
294 RSB-9 DCP 6 KG Near Office West south Lift 19/Mar/21 1/Dec/21 ok ok ok ok ok ok
295 RSB-10 DCP 50 KG Near Office West south. 19/Mar/21 20/Dec/21 ok ok ok ok ok ok
296 RSB-11 CO2 3 KG Near cold room west side 19/Mar/21 1/Feb/22 ok ok ok ok ok Replaced
297 RSB-12 DCP 6 KG 6th Row East 1st Pole 19/Mar/21 20/Aug/21 ok ok ok ok ok ok
298 RSB-13 DCP 6 KG 5th Row East side @ Middle Pole 19/Mar/21 20/Dec/21 ok ok ok ok ok ok
299 RSB-14 DCP 6 KG East side near Rejection Area 19/Mar/21 20/Dec/21 ok ok ok ok ok ok
RMS - Ground Floor
300 RSB-15 CO2 3 KG Ground floor Near 1st Shutter door 20/Mar/21 20/Mar/22 ok ok ok ok ok Replaced
301 RSB-16 DCP 6 KG Near entrance to silos 20/Mar/20 20/Mar/22 ok ok ok ok ok Replaced
302 RSB-17 DCP 6 KG Mid Row of 1st Pole 20/Mar/19 20/Mar/22 ok ok ok ok ok Replaced
303 RSB-18 DCP 50 KG Near west entrance side 20/Mar/18 10/Jul/21 ok ok ok ok ok ok
304 RSB-19 CO2 3 KG 1st Pole - Near lift & Stairs 20/Mar/17 10/Jul/21 ok ok ok ok ok ok
305 RSB-20 CO2 3 KG At entrance LV-ROOM 20/Mar/16 20/Nov/21 ok ok ok ok ok ok
306 RSB-21 DCP 6 KG At PU Wall East side 20/Mar/15 20/Mar/22 ok ok ok ok ok Replaced
307 RSB-22 DCP 6 KG Near Stairs/Oil Storage East side 20/Mar/14 1/Dec/21 ok ok ok ok ok ok
308 RSB-23 DCP 6 KG Mid Row of 4th Pole 20/Mar/13 20/Mar/22 ok ok ok ok ok ok
309 RSB-24 DCP 6 KG At East Wall 20/Mar/12 20/Mar/21 ok ok ok ok ok Replaced
310 RSB-25 DCP 6 KG At front of 2nd shutter Door 20/Mar/11 20/Mar/22 ok ok ok ok ok ok
311 RSB-26 DCP 50 KG At front of Offices 20/Mar/10 20/Dec/21 ok ok ok ok ok ok
312 RSB-27 CO2 3 KG 2nd Shutter Exit 20/Mar/09 20/Mar/22 ok ok ok ok ok ok
RMS-1st Floor
313 RSB-28 DCP 6 KG West side single pole 20/Mar/21 20/Mar/22 ok ok ok ok ok ok
314 RSB-29 CO2 3 KG 1st Floor near west stairs & Lift 20/Mar/21 1/Feb/22 ok ok ok ok ok ok
315 RSB-30 DCP 6 KG South at 4th Pole 20/Mar/21 2/Nov/21 ok ok ok ok ok ok
316 RSB-31 DCP 6 KG Near East stairs single pole 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
317 RSB-32 DCP 6 KG Near East mid row single pole 20/Mar/21 2/Nov/21 ok ok ok ok ok ok
318 RSB-33 DCP 6 KG Mid of cold storage at pole 20/Mar/21 20/Mar/22 ok ok ok ok ok ok
319 RSB-34 Foam 10 Ltrs cold storage south entrance 20/Mar/21 20/Jun/21 ok ok ok ok ok ok
320 RSB-35 DCP 50 KG Mid of RMS near Clerk desk 20/Mar/21 10/Sep/21 ok ok ok ok ok ok
RMS-2nd Floor
321 RSB-36 DCP 6 KG West side single pole 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
322 RSB-37 DCP 50 KG Mid of RMS Near Silos wall 20/Mar/21 2/Apr/21 ok ok ok ok ok ok
323 RSB-38 DCP 6 KG Near East south staris 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
324 RSB-39 DCP 6 KG East mid single pole 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
325 RSB-40 DCP 6 KG Near East North stairs single pole 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
326 RSB-41 DCP 6 KG East stairs north side pole.#04 20/Mar/21 20/Aug/21 ok ok ok ok ok ok
327 RSB-42 CO2 3KG West side Near Office 20/Mar/21 20/Sep/21 ok ok ok ok ok ok
328 RSB-43 CO2 5 KG Near Power Pannels 20/Mar/21 10/Aug/21 ok ok ok ok ok ok
329 RSB-44 DCP 6KG 3rd pole B.Exective Offices 20/Mar/21 1/Feb/22 ok ok ok ok ok ok
330 CWA-1 CO2 3KG Civil Workshop Ground floor 19/Mar/21 20/Sep/21 ok ok ok ok ok ok
331 CWP-2 DCP 6 KG Civil Workshop Ground floor 19/Mar/21 5/Apr/21 ok ok ok ok ok ok

Prepared by HSE officer:___________ Reviewed by HSE Executive:_____________ Verified by Manager:_____________