DPR

L0 Tps L/8 Tpe 2L/8 3L/8 4L/8


Section Distance, mm 0 2170 3225 3670 6450 9675 12900
INNER GIRDER

Section Property for Girder


Area m2 1.06 0.87 0.87 0.68 0.68 0.68 0.68
Ixx m4 0.23 0.21 0.21 0.19 0.19 0.19 0.19
ycg_TOP m 0.78 0.78 0.78 0.78 0.78 0.78 0.78
ycg_BOT m 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Depth m 1.60 1.60 1.60 1.60 1.60 1.60 1.60
Section Property of Composite Section
Area m2 1.61 1.42 1.42 1.24 1.24 1.24 1.24
Ixx m4 0.53 0.49 0.49 0.46 0.46 0.46 0.46
ycg_deck top m 0.70 0.66 0.66 0.62 0.62 0.62 0.62
ycg_TOP gir m 0.48 0.44 0.44 0.40 0.40 0.40 0.40
ycg_BOT m 1.12 1.16 1.16 1.20 1.20 1.20 1.20
DEPTH m 1.82 1.82 1.82 1.82 1.82 1.82 1.82

PRESTRESSING SUPRIOR CASE


Stage-1:- Prestressing forces after fric and slip Losses:- Considering 10% Higher forces for suprior case
Total H (kN) 8041.16 8092.19 8121.16 8133.29 8207.78 8263.55 8288.91
V (kN) -472.59 -420.16 -376.35 -357.77 -240.37 -101.06 6.08
ycg (M) 0.70 0.57 0.52 0.50 0.40 0.33 0.31

Stresses due to Prestressing [Mpa]


[4.3]= 8041.16/0.23x(0.7-0.82)x(1.6-0.82)/1000+8041.16/1.06/1000 Girdet top 4.30 2.0 0.4 1.4 -2.0 -4.3 -4.9
[7.62]= 8041.16/1.06/1000 Section cg 7.62 9.3 9.4 12.0 12.1 12.2 12.2
[8.13]= 8041.16/0.23x(0.7-0.82)x(0.7-0.82)/1000+8041.16/1.06/1000 Cable cg 8.13 12 13 16 20 23 23
[11.09]= 8041.16/0.23x(0.7-0.82)x(0-0.82)/1000+8041.16/1.06/1000 Girder bottom 11.09 17 19 23 27 29 30

SA INFRA PRESTRESSING SUPRIOR CASE FOR INNER GIRDER


DPR

L0 Tps L/8 Tpe 2L/8 3L/8 4L/8


Section Distance, mm 0 2170 3225 3670 6450 9675 12900
INNER GIRDER

BM due to Girder Selfweight [kN-m] -4.28 485.17 690.66 770.96 1187.04 1484.87 1584.15
[-0.01]= -4.28/0.23*0.78/1000 Stress at Girder Top -0.01 1.80 2.56 3.15 4.85 6.06 6.47
[0.002]= -4.28/0.23*(0.7-0.82)/1000 Stress at Cable cg 0.0023 -0.56 -0.97 -1.28 -2.61 -3.80 -4.19
[0.02]= 4.28/0.23x0.82/1000 Stress at Girder Bottom 0.02 -1.88 -2.68 -3.30 -5.08 -6.35 -6.78
Combined Stresses immediately After Stressing, [Mpa]
[4.29]=4.3+-0.01 Stress at Girder Top 4.29 3.8 3.0 4.6 2.8 1.7 1.6
[8.14]=8.13+0 Stress at Cable cg 8.14 11.1 11.8 15.0 17.1 18.7 19.1
[11.11]=11.09+0.02 Stress at Girder Bottom 11.11 15.1 16.1 19.8 21.8 23.1 23.4

Elastic Shortaining Losses, stresses [Mpa], Force [kN]


stress at cg of cables 8.14 11.07 11.80 15.00 17.09 18.74 19.14
conc strain at cable cg 2.40E-04 3.26E-04 3.48E-04 4.42E-04 5.04E-04 5.52E-04 5.64E-04
stress loss in cables 23.38 31.82 33.90 43.12 49.12 53.85 55.00
Total Force Loss 131.66 179.23 190.93 242.82 276.61 303.26 309.76
% Loss 1.64 2.21 2.35 2.99 3.37 3.67 3.74

Stage-1, Cable Force after Elastic Shortaining Losses


H (kN) 7910 7913 7930 7890 7931 7960 7979
V (kN) -465 -411 -367 -347 -232 -97 6
ycg (kN) 0.697 0.574 0.521 0.501 0.398 0.329 0.312
Stress due to Pre-stress after Elastic Shortaining, Mpa
Stresses top 4.23 1.95 0.42 1.40 -1.93 -4.17 -4.73
section cg 7.49 9.13 9.15 11.64 11.70 11.74 11.77
Cable cg 8.00 11.38 12.47 15.80 19.04 21.71 22.46
bottom 10.91 16.65 18.30 22.36 25.98 28.41 29.06

SA INFRA PRESTRESSING SUPRIOR CASE FOR INNER GIRDER