Operation Qualification (OQ) testing is performed to verify that the instrument or instrument modules
operate as intended.
Confidential Information. It is not allowed the total or partial reproduction of this document without prior authorization.
Print date: 31-oct-2012 Page 2 of 7
1/6
Reference: REGD-0007337
Version: 6.0; Most-Recent; Effective; CURRENT
Status: Effective Purpose: Uncontrolled Copy
Class: Control del Diseño Effective date: 29-oct-2012
Title: SM DG57-DG517. Operation qualification.
First of all, ensure that the mains switch, which is located in the back side of the instrument, is
turned off. Then plug the mains cable, supplied with the instrument, to the DG-57/ DG-517 first
and to the mains later.
DANGER!
Electromagnetic compatibility and electrical safety tests have
been performed using the cord supplied by the
manufacturer. Using cables different to the one supplied may
degrade the performances of the instrument concerning
electromagnetic compatibility and safety.
NOTE:
If the instrument has been stored under different
environmental conditions than the operation conditions, wait
for at least 1 hour under the operation conditions before
turning the instrument on.
Before turning the instrument on, check that the empty waste bottle is connected and both wash
solution bottles are filled with expected solutions and connected. Check also that the card waste
container is placed correctly.
Department:
Department:
Confidential Information. It is not allowed the total or partial reproduction of this document without prior authorization.
Print date: 31-oct-2012 Page 3 of 7
2/6
Reference: REGD-0007337
Version: 6.0; Most-Recent; Effective; CURRENT
Status: Effective Purpose: Uncontrolled Copy
Class: Control del Diseño Effective date: 29-oct-2012
Title: SM DG57-DG517. Operation qualification.
1 Connect:
DG-57 / DG-517.
Computer.
Computer Model:
Serial Number:
2 Check computer:
Operating System installed:
Operating system
Version:
Software. Versión.
WADiana C.
Diana R.
Diana O
Diana Server.
WADDiagnostic.
Matrox Model:
Visio DLL version:
Confidential Information. It is not allowed the total or partial reproduction of this document without prior authorization.
Print date: 31-oct-2012 Page 4 of 7
3/6
Reference: REGD-0007337
Version: 6.0; Most-Recent; Effective; CURRENT
Status: Effective Purpose: Uncontrolled Copy
Class: Control del Diseño Effective date: 29-oct-2012
Title: SM DG57-DG517. Operation qualification.
4 WADDiagnostic.
Check that holes in the dispensed card film are centered in Y axis and
shifted about 1mm to the left part of the instrument in X axis.
6 Temperature.
(REGD-0000799 Checking the adjust of the incubator module)
6.2 37ºC:
Confidential Information. It is not allowed the total or partial reproduction of this document without prior authorization.
Print date: 31-oct-2012 Page 5 of 7
4/6
Reference: REGD-0007337
Version: 6.0; Most-Recent; Effective; CURRENT
Status: Effective Purpose: Uncontrolled Copy
Class: Control del Diseño Effective date: 29-oct-2012
Title: SM DG57-DG517. Operation qualification.
6.3 24ºC:
User / Operator run a real batch to check overall performance execution (i.e.: ABO-
Rh profile). For negative results, check that the size of the button is homogeneous
between wells.
Comments:
Confidential Information. It is not allowed the total or partial reproduction of this document without prior authorization.
Print date: 31-oct-2012 Page 6 of 7
5/6
Reference: REGD-0007337
Version: 6.0; Most-Recent; Effective; CURRENT
Status: Effective Purpose: Uncontrolled Copy
Class: Control del Diseño Effective date: 29-oct-2012
Title: SM DG57-DG517. Operation qualification.