You are on page 1of 90

For me, it has been 20 fantastic years and a journey I will never forget.

I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.
Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.
I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊
For me, it has been 20 fantastic years and a journey I will never forget. I joined
NEG Micon in 2001 and was a part of the merger with Vestas Wind System back in
2003. The first real challenge was upgrading the 81 turbines at Horn Reef 1 in
Esbjerg, an Offshore-project where I met so many new people and colleagues in the
wind business, people that I still collaborate with and have a connection to. My
career then shifted to the 2MW platform for 8 years and then to the biggest wind
turbine ever made in 2013, the V164-8MW. Lastly, I was leading the Technology
department as CTO from start to the end, which I’ll look back to with proudness for
years to come.
I want to thank all my friends and colleagues in Vestas and MHI Vestas Offshore for
letting me be a part of, and joining me, on this journey – Thanks. I also want to
say thank you some special people in MHI Vestas Offshore, Vestas and in NEG Micon –
pioneers in Wind which don’t need further introduction.
I leave MHI Vestas Offshore and Vestas Wind Systems with friends, lots of good
memories, and lessons learned from the many good colleagues. I’m confident that
Vestas will become one of the leaders in offshore wind and I will together with my
old team be looking forward to seeing the BlueMarlin prototype spinning next year.

I will be starting my new journey as Senior Vice President and Head of Engineering
at Macquarie’s Green Investment Group from February 1st, 2022. A start that I am
really looking forward to, to meet new people and learn how to develop wind parks.

Looking forward to meeting you all again and get back to offshore wind – I really
missed it 😊

You might also like