TABLE 5

Plant-wise Installed Capacity (MW) as on 30th June


Type of
Power Station Plant Location 2016 2017 2018* 2019* 2020*
Power Station
A1: Hydel (WAPDA)
Major Hydropower Units
Tarbela Tarbela, KPK Reservoir 3,478 3,478 3,948 3,478 3,478
Tarbela 4th Ext. Tarbela, KPK Reservoir - - - 1,410 1,410
Ghazi Barotha Ghazi Barotha, Punjab Run of River 1,450 1,450 1,450 1,450 1,450
Mangla Mangla, AJ&K Reservoir 1,000 1,000 1,000 1,000 1,000
Warsak Warsak, KPK Run of River 243 243 243 243 243
Chashma Chashma, Punjab Run of River 184 184 184 184 184
Khan Khwar Shangla, KPK Reservoir 72 72 72 72 72
Allai Khwar Battagram, KPK Reservoir 121 121 121 121 121
Jinnah Hydel Mianwali, Punjab Run of River 96 96 96 96 96
Duber Khwar Kohistan, KPK Reservoir 130 130 130 130 130
Neelum Jhelum Muzaffarabad, AJ&K Run of River - - 969 969 969
Golen Gol Chitral, KPK Run of River - - - 108 108
Small Hydropower Units
Dargai Dargai, KPK Run of Canal 20 20 20 20 20
Rasul Rasul, Punjab Run of Canal 22 22 22 22 22
Shadiwal Shadiwal, Punjab Run of Canal 14 14 14 14 14
Chichoki Mallian Chichoki Mallian, Punjab Run of Canal 13 13 13 13 13
Nandipur Nandipur, Punjab Run of Canal 14 14 14 14 14
Kurram Garhi Kurram Garhi, KPK Run of Canal 4 4 4 4 4
Renala Renala, Punjab Run of Canal 1 1 1 1 1
Chitral Chitral, KPK Run of Canal 1 1 1 1 1
Gomal Zam South Waziristan, KPK Reservoir 17 17 17 17 17
Malakand/Jabban Malakand, KPK Run of River 22 22 22 22 22
Total Hydel (WAPDA) 6,902 6,902 8,341 9,389 9,389
A2: Hydel (IPPs)
Jagran (AJ&K) Jagran, AJ&K Hydro 30 30 30 30 30
Malakand-III (PEDO) Malakand, KPK Run of River/Canal 81 81 84 84 84
Pehur (PEDO) Swabi, KPK Canal Fall/Run of River 18 18 18 18 18
Laraib Energy (AJ&K) Jhelum River, AJ&K Hydro 84 84 84 84 84
Garam Chashma Chitral, KPK Hydro 1 1 1 1 1
Marala Hydro (PPDCL) Sialkot, Punjab Canal Fall/Run of River - - 8 8 8
Patrind Hydro (AJ&K) Muzaffarabad, AJ&K Run of River - - 147 147 147
Gulpur Hydro Gulpur, Kotli, AJK Run of River - - - - 100
Total Hydel (IPPs) 214 214 372 372 472
Total Hydel (A1+A2) 7,116 7,116 8,713 9,761 9,861
B1: Thermal (GENCOs: CPPA-G System)
TPS Jamshoro Jamshoro, Sindh STs 880 880 880 880 880
GTPS Kotri Kotri, Sindh GTs+CCPP 144 144 144 144 0
TPS Guddu (Units 1-4) Guddu, Sindh STs 640 640 640 640 0
TPS Guddu (Units 5-10) Guddu, Sindh GTs+CCPPs 600 600 600 600 600
TPS Guddu (Units 11-13) Guddu, Sindh GTs+OCPPs 415 415 415 415 415
TPS Guddu (Units 14-16) Guddu, Sindh GTs+ST+CCPPs 747 747 747 747 747
TPS Quetta Quetta, Balochistan GT 28 28 0 0 28
TPS Muzaffargarh Muzaffargarh, Punjab STs 1,350 1,350 1,350 1,350 1,350
SPS Faisalabad Faisalabad, Punjab STs 132 132 0** 0 0
GTPS Faisalabad Faisalabad, Punjab GTs+CCPPs 244 244 144** 144** 144**
TPS Nandipur Gujranwala, Punjab GTs+CCPPs 567 567 567 567 567
FBC Lakhra Lakhra, Sindh STs 150 150 150 150 150
Total Thermal (GENCOs: CPPA-G System) 5,897 5,897 5,637 5,637 4,881

85
Type of
Power Station Plant Location 2016 2017 2018* 2019* 2020*
Power Station
B2: Thermal (IPPs: CPPA-G System)
Lal Pir Power Mehmood Kot, Punjab ST 362 362 362 362 362
Pak Gen. Power Mehmood Kot, Punjab ST 365 365 365 365 365
Altern Energy Fateh Jang, Punjab GEs 31 31 31 31 31
Fauji Kabirwala Kabirwala, Punjab GTs+CCPP 157 157 170 170 170
Habibullah Coastal Quetta, Balochistan GTs+CCPP 140 140 155 155 155
Hub Power Hub, Balochistan STs 1,292 1,292 1,292 1,292 1,292
Japan Power Raiwind, Punjab DE 135 135 120 120 120
KAPCO Kot Addu, Punjab GTs+CCPPs 1,600 1,600 1,600 1,600 1,600
Kohinoor Energy Raiwind, Punjab DEs+ST 131 131 131 131 131
Rousch Power Sidhnai, Punjab GTs+ST 450 450 450 450 450
Saba Power Farooqabad, Punjab ST 134 134 136 136 136
Southern Electric Raiwind, Punjab DEs 136 136 117 117 117
TNB Liberty Power Daharki, Sindh GTs+CCPP 235 235 235 235 235
Uch Power Murad Jamali, Balochistan GTs+ST 586 586 586 586 586
Attock Gen. Attock Morgah, Punjab DGs+ST 165 165 165 165 165
Atlas Power Sheikhupura, Punjab REs+ST 219 219 224 224 224
Engro Power Gen. Qadirpur Qadirpur, Sindh GT+ST 217 217 227 227 227
Saif Power Sahiwal, Punjab GTs+ST 210 210 225 225 225
Orient Power Balloki, Punjab GTs+ST 225 225 225 225 225
Nishat Power Qasur, Punjab REs+ST 200 200 202 202 202
Nishat Chunian Qasur, Punjab DEs+ST 200 200 202 202 202
Sapphire Electric Muridke, Punjab GTs+ST 235 235 235 235 235
Halmore Power Bhikki, Punjab GTs+ST 225 225 225 225 225
Narowal Energy Narowal, Punjab DEs+ST 214 214 214 214 214
Liberty Power Tech. Faisalabad, Punjab DEs+ST 202 202 202 202 202
Foundation Power Daharki, Sindh GT+ST 185 185 179 179 179
Davis Energen. Jhang, Punjab GEs 11 14 12 12 12
Uch-II Power Murad Jamali, Balochistan GTs+ST 381 381 404 404 404
Huaneng Shandong Ruyi Sahiwal, Punjab STs - 660 1,320 1,320 1,320
QATPL (Bhikki) Bhikki, Punjab GT/HRSG/ST 0 832 1,231 1,231 1,231
NPPMCL (HBS) HBS, Punjab GT/HRSG/ST 0 428 1,277 1,277 1,277
NPPMCL (Balloki) Balloki, Punjab GT/HRSG/ST 0 0 1,276 1,276 1,276
Port Qasim Electric Port Qasim, Sindh ST+CB - - 1,320 1,320 1,320
Reshma Power Raiwind, Punjab RE - - 97 97 97
Gulf Powergen Gujranwala, Punjab RE - - 84 84 84
China Power Hub Lasbella, Balochistan ST+CB - - - 1,320 1,320
Engro Powergen Thar Tharparkar, Sindh ST+CB - - - 330 660
Total Thermal (IPPs: CPPA-G System) 8,643 10,566 15,297 16,946 17,276
Total Thermal in CPPA-G system (B1+B2) 14,540 16,463 20,934 22,583 22,157
C: Nuclear
CHASNUPP-I Chashma, Punjab STs 300 325 325 325 325
CHASNUPP-II Chashma, Punjab STs 315 340 325 325 325
CHASNUPP-III Chashma, Punjab STs - 340 340 340 340
CHASNUPP-IV Chashma, Punjab STs - - 340 340 340
KANUPP Karachi, Sindh STs 137 137 137 137 137
Total Nuclear (C) 752 1,142 1,467 1,467 1,467
D: Renewable Energy (CPPA-G System)
D1: Wind Power Projects
Zorlu Enerji Pakistan Thatta, Sindh WTs 56 56 56 56 56
FFC Energy Thatta, Sindh WTs 50 50 50 50 50
Three Gorges First Wind Farm Thatta, Sindh WTs 50 50 60 60 60
Foundation Wind Energy-I Thatta, Sindh WTs 50 50 50 50 50
Foundation Wind Energy-II Thatta, Sindh WTs 50 50 50 50 50
Sapphire Wind Thatta, Sindh WTs 50 50 53 53 53
Yunus Energy Thatta, Sindh WTs - 50 50 50 50
Metro Power Company Thatta, Sindh WTs - 50 50 50 50

86
Type of
Power Station Plant Location 2016 2017 2018* 2019* 2020*
Power Station
Gul Ahmad Wind Thatta, Sindh WTs - 50 50 50 50
Master Wind Energy Thatta, Sindh WTs - 50 50 50 50
Tenaga Generasi Thatta, Sindh WTs - 50 50 50 50
HydroChina Dawood Thatta, Sindh WTs - 50 50 50 50
Sachal Energy Thatta, Sindh WTs - 50 50 50 50
UEP Wind Power Thatta, Sindh WTs - 99 99 99 99
Artistic Wind Power Thatta, Sindh WTs - 30 50 50 50
Act Wind Thatta, Sindh WTs - - 30 30 30
Hawa Energy Thatta, Sindh WTs - - 50 50 50
Jhimpir Power Thatta, Sindh WTs - - 50 50 50
Three Gorges Second Wind Farm Thatta, Sindh WTs - - 50 50 50
Three Gorges Third Wind Farm Thatta, Sindh WTs - - 50 50 50
Tricon Boston Consulting-A Thatta, Sindh WTs - - - 50 50
Tricon Boston Consulting-B Thatta, Sindh WTs - - - 50 50
Tricon Boston Consulting-C Thatta, Sindh WTs - - - 50 50
Zephyr Power Thatta, Sindh WTs - - - 50 50
Total Wind Power Projects 306 785 1,048 1,248 1,248
D2: Solar Power Projects
Quaid-e-Azam Solar Park Bahawalpur, Punjab Solar 100 100 100 100 100
Appolo Solar Development Bahawalpur, Punjab Solar 100 100 100 100 100
Best Green Energy Bahawalpur, Punjab Solar 100 100 100 100 100
Crest Energy Bahawalpur, Punjab Solar 100 100 100 100 100
AJ Power Khushab, Punjab Solar - - 12 12 12
Harappa Solar Sahiwal, Punjab Solar - - 18 18 18
Total Solar Power Projects 400 400 430 430 430
D3: Bagasse/Biomass Power Projects
Jamal Din Wali-II Rahim Yar Khan, Punjab Bagasse/Biomass 26 26 26 26 26
Jamal Din Wali-III Rahim Yar Khan, Punjab Bagasse/Biomass 27 27 27 27 27
RYK Mills Rahim Yar Khan, Punjab Bagasse 30 30 30 40 40
Chiniot Power Chiniot, Punjab Bagasse 63 63 63 63 63
Fatima Energy Muzaffargarh, Punjab Biomass/Coal - 119 120 120 120
Hamza Sugar Mills Rahim Yar Khan, Punjab Bagasse/Biomass - 15 15 15 15
The Thal Industries Layyah, Punjab Bagasse - - 20 20 20
Almoiz Industries Mianwali, Punjab Bagasse - - - 36 36
Chanar Energy Faisalabad, Punjab Bagasse/Biomass - - - 22 22
Total Bagasse/Biomass Power Projects 146 280 301 369 369
Total Renewable Energy (D1+D2+D3) (CPPA-G system) (D) 852 1,465 1,779 2,047 2,047
E1: Thermal (KE Own)
Bin Qasim TPS-I Karachi, Sindh STs 840 840 1,260‡ 1,260 1,260
Bin Qasim TPS-II Karachi, Sindh GTs 572 572 572 572 572
Korangi Town GTPS-II Karachi, Sindh GTs 107 107 107 107 107
Site GTPS-II Karachi, Sindh GTs 107 107 107 107 107
Korangi CCPP Karachi, Sindh GTs 248 248 248 248 248
Total Thermal (KE Own) 1,874 1,874 2,294 2,294 2,294
E2: Thermal (IPPs connected with KE System)
Gul Ahmed Karachi, Sindh DE+ST 128 128 136 136 136
Tapal Energy Karachi, Sindh DE+ST 124 124 126 126 126
SNPCL-I Jamshoro, Sindh GEs+STs - - 52 52 52
SNPCL-II Jamshoro, Sindh GEs+STs - - 52 52 52
Total Thermal (IPPs connected with KE System) 252 252 366 366 366

87
Type of
Power Station Plant Location 2016 2017 2018* 2019* 2020*
Power Station
E3: Thermal (Others connected with KE System)
Intl. Steel Limited Karachi, Sindh GEs+DGs 19 19 19 19 19
Intl. Ind. Limited Karachi, Sindh GEs+ST 4 4 4 4 4
FFBL Power Karachi, Sindh CFB+STs - 52 52 52 52
Total Thermal (Others connected with KE System) 35 87 87 87 87
Total Thermal KE (E1+E2+E3) 2,161 2,213 2,747 2,747 2,747
E4: Renewable Energy (KE System)
Oursun Pakistan Gharo, Thatta Solar - - - 50 50
Gharo Solar Thatta, Sindh Solar - - - - 50
Total RE (KE System) 0 0 0 50 100
Total KE (KE own and others connected with KE System) 2,161 2,213 2,747 2,797 2,847
F: SPPs/CPPs/N-CPPs: CPPA-G System [Contract Capacity (MW)‡‡]
Total SPPs/CPPs/N-CPPs: CPPA-G System (F) 312.5 339.7 339.7 339.7
Grand Total (A+B+C+D+E+F) 25,421 28,712 35,979 38,995 38,719
* Installed Capacity as per valid Generation Licence. ** Licence not available, partial energy procured during July-2017 to Feb.-2018.
‡ As per latest modification of KE Licence, Unit 3&4 are now part of KE's generation fleet. ‡‡ Contract Capacity as per Tariff Determination.

Source: WAPDA/GENCOs/IPPs/KE/CPPA-G

TABLE 6
Installed Capacity by Systems and by Sectors (MW)
As on 30th June 2016 2017 2018 2019 2020
BY SYSTEM
Total Installed Capacity: CPPA-G System 23,123 26,362 33,095 36,061 35,735
% Share (Installed Capacity: CPPA-G System) 90.96 91.82 91.98 92.48 92.29
Total Installed Capacity: KE System 2,298 2,350 2,884 2,934 2,984
% Share (Installed Capacity: KE System) 9.04 8.18 8.02 7.52 7.71
BY SECTOR
Total Installed Capacity in Public Sector 13,651 15,301 19,329 20,377 19,621
% Share (Installed Capacity in Public Sector) 53.70 53.29 53.72 52.26 50.68
Total Installed Capacity in Private Sector 11,770 13,411 16,650 18,618 19,098
% Share (Installed Capacity in Private Sector) 46.30 46.71 46.28 47.74 49.32
Total Installed Capacity in the Country 25,421 28,712 35,979 38,995 38,719
Note: See tables 4 and 5 for breakup details.
Source: WAPDA/GENCOs/IPPs/KE/CPPA-G

Figure 6A: Share of Installed Generation Capacity Figure 6B: Share of Installed Generation Capacity by Sector (%)
by System (%)
60.00
90.00
80.00 50.00
70.00
60.00 40.00

50.00
30.00
40.00
30.00 20.00
20.00
10.00
10.00
0.00 0.00
2016 2017 2016 2017
2018 2019 2018 2019
2020 2020
% Share (Installed Capacity: CPPA-G System) % Share (Installed Capacity in Public Sector)
% Share (Installed Capacity: KE System) % Share (Installed Capacity in Private Sector)