Ghanpur
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
Ac Gts Ac Gts Ac Gts Ac Gts Ac Gts
1 Main Canal 0.687 Chagal Ghanpur Jangaon SDC/JCR/GLIP 17 21 17 21.00 17 21 0
2 Main Canal 2.744 Chagal Ghanpur Jangaon SDC/JCR/GLIP 69 23 69 23.00 69 23 0
3 Main Canal 0.687 Chagal Ghanpur Jangaon A1/973/309 15 8 15 8.25 15 8 0
Vishwanathagude
4 Main Canal 1.721 Ghanpur Jangaon SDC/JCR/GLIP 45 25 45 25.00 45 25 0
m
5 Main Canal 0.904 Thanedalpally Ghanpur Jangaon SDC/JCR/GLIP 57 7 57 7.00 57 7 0
6 Main Canal 2.898 kusrsapally Ghanpur Jangaon SDC/JCR/GLIP 115 9 115 9.00 115 9 0
7 Main Canal 5.931 ippagudem Ghanpur Jangaon SDC/JCR/GLIP 175 19 175 19.00 175 19 0
8 Main Canal 6.858 kanchana pally Ghanpur Jangaon SDC/JCR/GLIP 153 1 153 1.00 153 1 0
9 Main Canal 2.269 bhanojpet Ghanpur Jangaon SDC/JCR/GLIP 45 14 45 14.00 45 14 0
10 Main Canal 6.012 Narayanpuram Ghanpur Jangaon SDC/JCR/GLIP 121 5 121 5.00 121 5 0
11 Main Canal 0.356 Nidigonda Ghanpur Jangaon SDC/JCR/GLIP 13 27 13 27.00 13 27 0
Neilutla &
12 Main Canal 0.401 Ghanpur Jangaon SDC/JCR/GLIP 13 9 13 9.00 13 9 0
Kundaram
Vishwanathapura
m, tanedapally, Ghanpur &
13 1L 8.875 Jangaon A/283/08 76 36 76 36.00 76 36 0
teegaram & Zafferghad
Zafferghad
Vishwanathapura
14 1L-1L 2.940 m, Shivunipally, & Ghanpur jangaon A1/871/09 20 18.25 20 18.25 20 18.25
Namiligonda
Vishwanathapura
15 2L-1L 1.650 m, tanedapally, & Ghanpur jangaon B1/607/2009 11 16 11 16.00 11 16
Namiligonda
Thimmampet,
16 3L-1L 6.500 Ghanpur & jangaon SDT-III/291/12 40 18.5 40 18.50 40 18.50
tanedapally, & Zaffargadh
Namiligonda
17 1R-2L 1.925 Samudrala & Ghanpur jangaon B/08/09 19 8 19 8.00 19 8 0
Ippagudem
18 2L-2L 0.360 Samudrala & Ghanpur jangaon SDT-I/213/12 31 6 31 6.00 31 6
Suraram
19 1L-2L-2L 2.300 Samudrala Ghanpur jangaon B/241/10 17 9 17 9.00 17 9
20 1R-1L-2L-2L 0.950 Samudrala Ghanpur jangaon B/127/13 6 19.5 6 19.50 6 19.50
21 2L-2L-2L 0.985 Samudrala Ghanpur jangaon B2/128/13 8 14 8 14.00 8 14 0
22 3L-2L-2L 0.900 Samudrala Ghanpur jangaon B2/646/12 7 37 7 37.00 7 37
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
23 4R-2L-2L 0.475 Samudrala Ghanpur jangaon B1/125/13 3.00 33.00 3 33.00 3 33 0
24 5L-2L-2L 2.800 Samudrala Ghanpur jangaon B1/126/13 17 6 17 6.00 17 6
25 5L-2L-2L 2.800 Samudrala Ghanpur jangaon 1 1 0 0 1 1
Thimmampet&
26 4L-1L 1.295 Ghanpur & jangaon SDT-IV/277/2012 18 4.75 18 4.75 18 4.75
Theegaram Zaffargadh
27 1L-3L-1L 1.075 Namiligonda Ghanpur jangaon B1/271/12 8 15.5 8 15.50 8 15.50
28 2R-3L-1L 1.125 Namiligonda Ghanpur jangaon B1/271/12 5 22 5 22.00 5 22.00
29 1R-2R-3L-1L 0.550 Namiligonda & Ghanpur jangaon B1/271/12 3 16.5 3 16.50 3 16.50 0
Thigaram
30 3L-3L-1L 0.750 Namiligonda Ghanpur jangaon B1/271/12 5 33 5 33.00 5 33.00
31 4L-3L-1L 1.100 Namiligonda & Ghanpur & jangaon B1/271/12 7 1 7 1.00 7 1.00
Thimmampet Zafferghad
32 1L-1L-1L Namiligonda & Ghanpur jangaon SDT-
0.525 Shivunipally IV/279/2012 3 27 3 27.00 3 27.00
0 - - -
- - 31.05.2017
0 - - 30.04.2017
0.00 11.5 - - 31.05.2017
. 31.07.2017
31.07.2017
0.25 11.50
0.50 23.00
1.00 39 - - 30.04.2017
0.00 27.5 - - 30.04.2017
2.00 0 - - 30.04.2017
4 95
6 15
0.00 0 - - -
Balance LA stage Remarks /
probable date of
PN PD Award acquisition
0.00 4 - - 30.04.2017
0.00 0 - - -
2.00 13 - - 31.05.2017
5.00 22.5 - - 31.05.2017
0.00 0 - - -
0.00 0 - - -
0.00 23 - - 31.05.2017
0.00 9 - - 31.05.2017
4.00 39 - - 31.05.2017
0.00 2 - - 31.05.2017
0.00 2.5 - - 31.05.2017
0.00 7 - - 31.05.2017
0.00 9.5 - - 31.05.2017
4.00 4.75 - - 31.05.2017
0.00 8 - - 31.05.2017
0.00 16 - - 31.05.2017
6.00 33 - - 31.05.2017
0.00 0 - - -
0.00 0 - - -
5.00 9 - - 31.05.2017
309.00
77.00 224.00
ABSTRACT
Status of Land acquisition on RFMC of R.S.Ghanpur
Extent in Acres
Acquired
Remarks /
Name of the Length in SDC File total probable
Sl no. Village Mandal District requisitio Balance SDR PN PD Award
canal Km No. as per act GO 123 Total date of
ned acquisition
10.15 1/2
Distributory
1
System
162.54 TOTAL : 2096 1367 351 1718 378 69 309 pn TO BE
ISSUED
Canal wise Ayacut Particulars and status of IP creation of RFMC of RS Ghanpur Reservoir
24 1R - 5L - 2L - 2L of 1.093 11 0 11 1 1 6 2 1
RFMC
25 3L of RFMC 6.000 33 33 0
26 4LA 4.175 21 0 21 1 2 2 2 1 7 5 1
27 1L - 4LA of RFMC 0.900 7 0 7 2 2 2 1
Balance Type of Structures for Balance nos only
total
Sl No. Name of the canal Length in Total no. of Completed Designs to be CRs / Inlets /
Structures approved DLRBs SLRBs UTs SPs Aquiducts Drops OTs DPs Tes
Kms submitted approved Escape SWF
28 5L of RFMC 8.750 50 34 16 1 5 5 5 10 1
29 2R - 5L of RFMC 1.800 13 12 1 1 1
30 1R - 2R - 5L of RFMC 1.910 7 0 7 1 1 1 3 1
31 3R - 5L of RFMC 1.650 13 0 13 1 6 5 1
32 4R - 5L of RFMC 1.450 13 0 13 1 1 8 2 1
33 5L - 5L of RFMC 0.725 8 0 8 5 2 1
34 6R - 5L of RFMC 2.700 21 0 21 1 1 11 7 1
35 6L of RFMC 9.000 61 55 6 1 1 1 3
36 1R - 6L of RFMC 4.500 28 28 0 1 3
37 1L - 1R - 6L of RFMC 1.450 11 11 0 1
38 2L - 6L of RFMC 2.617 11 1 10 1 5 3 1
39 3R - 6L of RFMC 1.125 8 8 1 4 2 1
40 4R - 6L of RFMC 4.324 30 30 1 2 2 14 10 1
41 7L of RFMC 5.500 35 28 7 1 4 1 1
42 1R - 7L of RFMC 1.750 12 12 1 1 5 4 1
43 8L of RFMC 3.800 25 14 11 4 1 5 1
44 1L - 8L of RFMC 5.300 35 35 3 1 17 1 12 1
45 1R - 1L - 8L of RFMC 1.100 10 10 6 3 1
46 9L of RFMC 11.600 86 2 84 4 1 4 41 4 30
47 1L - 9L of RFMC 0.568 5 5 2 2 1
48 2L - 9L of RFMC 1.300 9 9 1 1 4 2 1
49 3L - 9L of RFMC 2.025 17 17 2 10 4 1
50 4L - 9L of RFMC 1.100 9 9 1 4 3 1
51 10L of RFMC 9.125 59 59 2 3 1 1 28 3 20 1
52 1L - 10L of RFMC 1.800 15 15 10 4 1
53 2R - 10L of RFMC 1.000 7 7 4 2 1
54 3R - 10L of RFMC 2.000 12 12 7 4 1
Total Nos. 192.740 1158 637 0 521 0 22 24 4 20 2 243 0 15 174 33 1
ABSTRACT
Status of Canal wise CM & CD works of RFMC of RS Ghanpur Reservoir
RFMC
2 Distributory 162.540 1103 584 0 519 0 22 24 4 20 2 243 0 14 174 33 0
System
Balance reach
Km. 4.750 to Km. 5.000
1 6L of RFMC 9.000 0.295 DLRC with Drains L/S & R/S Progresss
2 0.500 OT of 1R Completed
3 0.740 UT Completed
4 0.747 SLRC with Drains L/S & R/S Completed
5 0.900 OT OF 2L Completed
6 1.550 DP1 R/S Completed
7 1.550 0.50 M Drop Completed
8 1.550 DP2 L/S In progress
9 1.700 0.50 M Drop Completed
10 1.900 0.50 M Drop Completed
11 1.900 DP3 R/S Completed
12 1.900 DP4 L/S Completed
13 2.202 SLRC Completed
14 2.275 DP5 R/S Completed
15 2.500 DP6 L/S Completed
16 2.600 0.50 M Drop Completed
17 2.900 0.50 M Drop Completed
18 3.025 DP7 R/S Completed
19 3.025 DP8 L/S Completed
20 3.150 DP9 L/S Completed
21 3.300 DP10 L/S Completed
22 3.600 0.50 M Drop Completed
23 3.600 OT of 3R Completed
24 3.850 1.50 M Drop Completed
25 4.075 1.0 M Drop Not tackled
26 4.250 DP11 R/S Not tackled
27 4.250 DP12 L/S Completed
28 4.437 SLRC Completed
29 4.600 1.50 M Drop Completed
30 4.600 OT of 4R Completed
31 4.750 2.0 M Drop Completed
32 4.900 1.50 M Drop Completed
33 4.998 DLRC with Drains Completed
34 5.075 0.50 M Drop Completed
35 5.075 DP13 R/S Completed
36 5.075 DP14 L/S Completed
37 5.350 0.50 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
38 5.525 DP15 L/S Completed
39 5.900 DP16R/S Completed
40 5.900 DP17 L/S Completed
41 6.050 0.50 M Drop Completed
42 6.200 DP18 L/S Completed
43 6.200 DP19 R/S Completed
44 6.850 2.0 M Drop Completed
45 6.850 DP20 L/S Completed
46 6.850 DP21R/S Completed
47 7.025 2.0 M Drop Completed
48 7.200 DP22 L/S Completed
49 7.430 2.0 M Drop cum SLRC Completed
50 7.430 DP23 R/S Completed
51 7.650 1.50 M Drop Completed
52 6L of RFMC 7.697 2.0 M Drop cum S.P Completed
53 7.855 0.50 M Drop cum S.P Completed
54 8.051 SLRC with Drains Completed
55 8.225 DP24 R/S Completed
56 8.225 DP25 L/S In progress
57 8.440 0.50 M Drop cum S.P In progress
58 8.625 1.50 M Drop Completed
59 8.750 2.0 M Drop In progress
60 8.750 DP26 R/S Completed
61 9.000 Tail Cluster ( DP27 ) Completed
1 2 3 4 5 6 7
10L
h
1.800Km / 248 Ac
9L
1.0Km / 318 Ac 4L 3L 1L
h
2.00Km / 453 Ac 2L 1.0Km / 342 Ac
1.50Km / 287 Ac
8L
Km.1.100/210 Ac 1R
h
5.300Km / 1132 Ac 1L 1.80Km / 277 Ac
1R
5.525 km / 1241 5Ac Km.22.800
7L
SCHEMATIC DIAGRAM OF R.F.M.C OF R.S.GHANPUR RESERVOIR
h
4.500 / 961 Ac 1R Km.21.450 to Km. 21.650
4.342Km / 583 Ac 4R 1.125Km / 173 Ac 1L 1.45
3R 1.50 / 261 Ac
6L
Km.4.500
h
STATUS OF EWE WORK & LINNING
2L 2.617Km / 233 Ac
Progress
15.000
20.000
1.000
1.45 / 265 Ac 3R 1R 1.918/158/ Ac
-
4R
Balance
5L
77.158
1.000
1.000
0.500
519
2
0.725Km / 174 Ac
Chennur Tank
STATUS OF WORK
Completed
24016 Ac Km.12.625
25,165 Ac
30.200
85.382
12.225
5.350
584
53
4L
h
4LA 1L 0.90
162.540
31.200
13.225
h
5.850
Total
1103
55
158Ac
6.00km / 917 Ac Km.7.800
Distributories - CM&CD
3L
h
0.95 / 188 Ac
1R
199 Ac 4R 2.10
LINING
Forest Land
Bottleneck
Km 1.500
1R
INDEX
1.193 / 241 Ac
Km.4.750
2L
L.A paid Work not Tackled
3.600Kms / 2490 Ac
1L
Work in Progress
Work Completed
0.550Kms/156 Ac
Km.1.950
5L 1R 1L 136Ac 0.525Kms
1.125Kms/348 Ac
Km.0.250 2R 2L 1L 215Ac
Km.0.950 / 282 Ac 4L Km.2.520 1.650Kms/261Ac 1L
Km.3.375
4L 1.100Kms / 235 Ac
Km 1.250
Km.2.800 / 418Ac
* Railway Crossing Km 0.782
3L
10L
h
1.800Km / 248 Ac
9L
1.0Km / 318 Ac 4L 3L 1L
h
2.00Km / 453 Ac 2L 1.0Km / 342 Ac
1.50Km / 287 Ac
8L
Km.1.100/210 Ac 1R
h
5.300Km / 1132 Ac 1L 1.80Km / 277 Ac km.23.700
SCHEMATIC DIAGRAM OF R.F.M.C OF R.S.GHANPUR RESERVOIR
1R
5.525 km / 1241 5Ac Km.22.800
7L
h
4.500 / 961 Ac 1R Km.21.450 to Km. 21.650
4.342Km / 583 Ac 4R 1.125Km / 173 Ac 1L 1.45
3R 1.50 / 261 Ac
6L
Km.4.500
h
2L 2.617Km / 233 Ac
1.65 / 550 Ac 2R
STATUS OF LAND ACQUISITION
4R
5L
5L
h
0.725Km / 174 Ac
Chennur Tank
24016 Ac Km.12.625
4L
25,165 Ac
2039
1728
###
311
4.175Km / 617Ac Km.9.850
0
4LA 1L 0.90
h
158Ac
STATUS OF LA
6.00km / 917 Ac Km.7.800
LA Not Submitted
1.925 / 395 Ac
1R
PN Submitted
Balance
9.68km / 4451Ac. 5.100 3.05 Km.6.150
2L
0.95 / 188 Ac
1R
199 Ac 4R 2.10
Km 1.500
1R
1.193 / 241 Ac
INDEX
Km. 8.875
2L
Bottle necks/Disputes
3.600Kms / 2490 Ac
1L
Not Submitted
11.500Kms / 6152 Ac
Not Acquired
0.550Kms/156 Ac
Km.1.950
5L 1R 1L 136Ac 0.525Kms
1.125Kms/348 Ac
Forest
Km.0.250 2R 2L 1L 215Ac
Km.0.950 / 282 Ac 4L Km.2.520 1.650Kms/261Ac 1L
Km.3.375
4L 1.100Kms / 235 Ac
Km 1.250
Km.2.800 / 418Ac
* Railway Crossing Km 0.782
3L
OIR
7.975 Kms / 2735Ac RFMC
ERV
RES
R
R.S
GHA
NPU
R
RES
ERV
OIR
Canal wise Ayacut Particulars and status of IP creation
Name of the
canal/ Balance LA Other bottle necks
total length Completed I.P.Conte IP Budget
I.P.Uitlize Balance I.P.Target Main/Distributory (Balance structures)
Sl no Tunnel/Pipipe Length mplated created d (Ac.) I.P.Target for 2017 Requirement
(Km) I.P. (Ac.) for 2018 On Main canal
line/Pump (Km) (Ac.) (Ac.) (in Crores)
house /Distributory
May July June Aug
RFMC of RS
1 Ghanpur
31.775 30.775 - - 2 -
30444
2 Distributories 162.54 85.382 (28806) 9292 0 19514 19514 - 38.03 76-00 235-00 35 306