Status of Land acquisition on RFMC of R.S.

Ghanpur
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
Ac Gts Ac Gts Ac Gts Ac Gts Ac Gts
1 Main Canal 0.687 Chagal Ghanpur Jangaon SDC/JCR/GLIP 17 21 17 21.00 17 21 0
2 Main Canal 2.744 Chagal Ghanpur Jangaon SDC/JCR/GLIP 69 23 69 23.00 69 23 0
3 Main Canal 0.687 Chagal Ghanpur Jangaon A1/973/309 15 8 15 8.25 15 8 0
Vishwanathagude
4 Main Canal 1.721 Ghanpur Jangaon SDC/JCR/GLIP 45 25 45 25.00 45 25 0
m
5 Main Canal 0.904 Thanedalpally Ghanpur Jangaon SDC/JCR/GLIP 57 7 57 7.00 57 7 0
6 Main Canal 2.898 kusrsapally Ghanpur Jangaon SDC/JCR/GLIP 115 9 115 9.00 115 9 0
7 Main Canal 5.931 ippagudem Ghanpur Jangaon SDC/JCR/GLIP 175 19 175 19.00 175 19 0
8 Main Canal 6.858 kanchana pally Ghanpur Jangaon SDC/JCR/GLIP 153 1 153 1.00 153 1 0
9 Main Canal 2.269 bhanojpet Ghanpur Jangaon SDC/JCR/GLIP 45 14 45 14.00 45 14 0
10 Main Canal 6.012 Narayanpuram Ghanpur Jangaon SDC/JCR/GLIP 121 5 121 5.00 121 5 0
11 Main Canal 0.356 Nidigonda Ghanpur Jangaon SDC/JCR/GLIP 13 27 13 27.00 13 27 0
Neilutla &
12 Main Canal 0.401 Ghanpur Jangaon SDC/JCR/GLIP 13 9 13 9.00 13 9 0
Kundaram

Vishwanathapura
m, tanedapally, Ghanpur &
13 1L 8.875 Jangaon A/283/08 76 36 76 36.00 76 36 0
teegaram & Zafferghad
Zafferghad

Vishwanathapura
14 1L-1L 2.940 m, Shivunipally, & Ghanpur jangaon A1/871/09 20 18.25 20 18.25 20 18.25
Namiligonda

Vishwanathapura
15 2L-1L 1.650 m, tanedapally, & Ghanpur jangaon B1/607/2009 11 16 11 16.00 11 16
Namiligonda

Thimmampet,
16 3L-1L 6.500 Ghanpur & jangaon SDT-III/291/12 40 18.5 40 18.50 40 18.50
tanedapally, & Zaffargadh
Namiligonda
17 1R-2L 1.925 Samudrala & Ghanpur jangaon B/08/09 19 8 19 8.00 19 8 0
Ippagudem
18 2L-2L 0.360 Samudrala & Ghanpur jangaon SDT-I/213/12 31 6 31 6.00 31 6
Suraram
19 1L-2L-2L 2.300 Samudrala Ghanpur jangaon B/241/10 17 9 17 9.00 17 9
20 1R-1L-2L-2L 0.950 Samudrala Ghanpur jangaon B/127/13 6 19.5 6 19.50 6 19.50
21 2L-2L-2L 0.985 Samudrala Ghanpur jangaon B2/128/13 8 14 8 14.00 8 14 0
22 3L-2L-2L 0.900 Samudrala Ghanpur jangaon B2/646/12 7 37 7 37.00 7 37
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
23 4R-2L-2L 0.475 Samudrala Ghanpur jangaon B1/125/13 3.00 33.00 3 33.00 3 33 0
24 5L-2L-2L 2.800 Samudrala Ghanpur jangaon B1/126/13 17 6 17 6.00 17 6
25 5L-2L-2L 2.800 Samudrala Ghanpur jangaon 1 1 0 0 1 1
Thimmampet&
26 4L-1L 1.295 Ghanpur & jangaon SDT-IV/277/2012 18 4.75 18 4.75 18 4.75
Theegaram Zaffargadh
27 1L-3L-1L 1.075 Namiligonda Ghanpur jangaon B1/271/12 8 15.5 8 15.50 8 15.50
28 2R-3L-1L 1.125 Namiligonda Ghanpur jangaon B1/271/12 5 22 5 22.00 5 22.00
29 1R-2R-3L-1L 0.550 Namiligonda & Ghanpur jangaon B1/271/12 3 16.5 3 16.50 3 16.50 0
Thigaram
30 3L-3L-1L 0.750 Namiligonda Ghanpur jangaon B1/271/12 5 33 5 33.00 5 33.00
31 4L-3L-1L 1.100 Namiligonda & Ghanpur & jangaon B1/271/12 7 1 7 1.00 7 1.00
Thimmampet Zafferghad
32 1L-1L-1L Namiligonda & Ghanpur jangaon SDT-
0.525 Shivunipally IV/279/2012 3 27 3 27.00 3 27.00

33 2L 9.680 Samudrala R.S.Ghanpur & jangaon B/200/16 0 35 - 0 35 0 35 0


palakurty
34 1R-2R-5L 1.918 Ippagudem R.S.Ghanpur jangaon B/200/16 3 15.5
ippagudem,
35 2L 9.680 Samudrala, Gudur R.S.Ghanpur jangaon A1/281/10 81 8.75 81 8.75 81 8.75
& kurchapally
kucrchapally &
36 3L 6.020 Ghanpur jangaon A1/282/08 42 17 42 17.00 42 17.00 0
samudrala
37 3L kucrchapally & Ghanpur jangaon A1/282/08 1 16.5 1 16.50 1 16.50 0
samudrala
38 5L 8.375 Ippagudem R.S.Ghanpur jangaon B/129/16 7 22.5 6 37.5 6 37.5 0
39 2R-5L 1.81 Ippagudem R.S.Ghanpur jangaon B/115/16 3 19 3 7.5 3 7.5 0 12
40 1L-4LA 0.900 Ippagudem R,S,Ghanpur jangaon - 6 8 6 8 6.00 8.00
41 4LA 4.175 Ippagudem R,S,Ghanpur jangaon - 31 15 31 15 31.00 15.00
1317.00 667.50 1266.00 551.50 0.00 35.00 1266.35 586.50 38.26 35.50 37.00 23.00
1334 27.50 1279.00 31.50 0.00 35.00 1281 26.50 39 22.00 74.00 46.00
42 3L-1L 7.975 Thimmapet Zaffargadh A1/729/13 5 33 - 3 34.0 3 34 1 39
jangaon
43 3L-1L 7.975 Uppugal Zaffargadh A1/729/13 7 25 6 37.5 6 37.5 0 27.5
44 5L-1L 0.950 Theegaram, Zafferghad jangaon A1/874/09 6 7.5 6 7.50 6 7.50
Thimmampet
45 5R-3L-1L 2.800 Thimmapet Zaffargadh jangaon A1/337/16 9 25 - 7 36.5 7 36.5 1 28.5
46 5R-3L-1L 1.625 Thimampet Zafferghad jangaon B1/271/12 9 24 9 24.00 9 24.00
47 5L-2L-2L 2.800 Ghanpur Zaffargadh jangaon 3 1 0 0 3 10 3.00 10.00
48 5L-2L-2L 2.800 Suraram Zaffargadh jangaon 2 22 0 0 2 22 2.00 22.00
49 1R-5L-2L-2L 1.193 Suraram Zaffargadh jangaon A1/594/13 9 26 - 7 26 7 26 2 0
50 163.5 15 31.5 23 134 38 165.5 9 127 5 32
54 3.5 15 31.5 26 14 42 5.5 12 7 5 32
50 5L 8.375 Koduru Raghunathpally jangaon C/119/16 24 35 24 35 24 35 0 0
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
51 5L 8.375 Kanchanpally Raghunathpally jangaon B/129/126 10 17.5 10 13 10 13 0 4
52 5L 8.375 Gabetta Raghunathpally jangaon B/132/16 1 28 1 28 1 28 0 0
53 Gabetta Raghunathpally jangaon B/115/16 9 39 7 26 7 26 2 13
54 1R-2R-5L 1.918 Kanchanpally Raghunathpally jangaon B/200/16 12 10.5 6 28 6 28 5 22.5
55 3R-5L 1.650 Koduru Raghunathpally jangaon C/119/16 2 9 2 9 2 9 0 0
56 3R-5L 1.650 Gabetta Raghunathpally jangaon B/276/13 9.00 3.00 9 3 9.00 3.00 0 0
57 4R-5L 1.450 Koduru Raghunathpally jangaon C/117/16 9 39 9 16 9 16 0 23
58 6R-5L 2.700 Koduru Raghunathpally jangaon C/119/16 18 33.5 18 24.5 18 24.5 0 9
59 6L 9.000 Kanchanpally Raghunathpally jangaon B/132/16 29 19 20 2 20 2 4 39
60 6L 9.000 Kannaipally Raghunathpally jangaon B/777/13 2 29 2 27 2 27 0 2
61 6L 9.000 Gabetta Raghunathpally jangaon B/777/13 9 35 9 33 9 32.5 0 2.5
62 1R-6L 4.500 Kanchanapally Raghunathpally jangaon B/120/16 9 39 9 32 9 32 0 7
63 1R-6L 4.500 Kannaipally Raghunathpally jangaon B/512/14 3 26.5 3 17 3 17 0 9.5
64 1R-6L 4.500 Banajipeta Raghunathpally jangaon B/1513/14 23 2 19 15.25 19 15.25 4 4.75
65 1L-1R-6L 1.500 Kanchanpally Raghunathpally jangaon B/1513/14 12 16 12 8 12 8 0 4
66 Banajipeta Raghunathpally jangaon B/1513/14 0 17 0 1 0 1 0 16
67 2L-6L 2.617 Kanchanpally Raghunathpally jangaon B/509/14 23 36 17 3 17 3 6 33
68 3R-6L 1.125 Kanchanpally Raghunathpally jangaon B/777/13 3 13 3 13 3 13 0 0
69 Kannaipally Raghunathpally jangaon B/777/13 6 25.5 6 25.5 6 25.5 0 0
70 4R-6L 4.342 Kannaipally Raghunathpally jangaon B/199/16 24 22 19 13 19 13 5 9
Banajipeta,
71 7L 5.5 ChitoorR Raghunathpally jangaon A1/701/08 44 38 44 38.00 44 38.00
&Kannaipally
72 1R-7L 1.75 Banajpet Raghunathpally jangaon A/876/08 13.00 20.50 13 20.50 13 20.50 0
Sreemanarayanpu
73 8L 3.8 ram, kundaram & Raghunathpally jangaon A/778/08 12 33.5 12 33.50 12 33.50
kalvalpally
74 8L 3.800 Narayanapuram Raghunathpally jangaon A/778/08 14 38.25 0 0 14 38.25
75 8L 3.800 Kaluvalapally Raghunathpally jangaon B/198/16 0 36.5 0 0 0 36.5 0.00 36.50
76 1L-8L 5.300 Narayanapuram Raghunathpally jangaon B/198/16 12 18 0 0 12 18
77 1L-8L 5.300 Kaluvalapally Raghunathpally jangaon B/198/16 22 12 9 3 9 3 12 22
78 1R-1L-8L 1.100 Narayanapuram Raghunathpally jangaon C/171/16 6 12.5 2 8 2 8 4 4.5
79 1R-1L-8L 1.100 Kaluvalapally Raghunathpally jangaon C/171/16 2 2 0 5 0 5 1 37
80 9L 12.000 Narayanapuram Raghunathpally jangaon B/276/13 6.00 0.00 6 0 6.00 0.00 0 0
368 705.75 69 92 222 388 291 514.75 69 354.5 0.00 36.5
385 25.75 71 12 231 28 303 34.75 77 38.5 0.00 36.5
90 5L 8.375 Kothulabad Palakurthy jangaon C/124/16 16 32 14 36 14 36 1 36
total requisitioned Acquired Balan
Name of the Length in Balance
Sl no. Village Mandal District SDC File No. as per act GO 123 Total SDR
canal Km Ac Gts
91 5L 8.375 Erravennu Palakurthy jangaon B/125/16 3.00 23.00 0 0.00 0 0 3 23
92 3R-5L 1.650 Kothulabad Palakurthy jangaon B/272/13 1 18 1 18 1 18
93 5L-5L 0.725 Erravennu Palakurthy jangaon B/118/16 5 13 3 14.5 3 14.5 1 38.5
25 86 0 0 18 68.5 18 68.5 5 97.5 0
27 6 19 28.5 19 28.5 7 17.5
94 9L 12.000 Chinnamadur Devaruppula jangaon A1/201/16 14 5 0 0 14 5
95 10L 9.400 Chinnamadur Devaruppula jangaon A1/202/16 17 1 14 26.5 14 26.5 2 14.5
31 6 0 0 14 26.5 14 26.5 16 19.5 0
31 6 0 0 14 26.5 14 26.5 16 19.5
96 9L 12.000 Chitur Lingala Ghanpur jangaon A1/201/16 22 31.5 0 0 22 31.5
97 1L-9L 1.000 Kundaram Lingala Ghanpur jangaon A1/179/16 4 20.5 4 20.5 4 20.5 0 0
98 2L-9L 1.500 Chitur Lingala Ghanpur jangaon A1/180/16 8 32.5 0 0 8 32.5
99 3L-9L 2.000 Chitur Lingala Ghanpur jangaon A2/181/16 14 19.5 7 16.5 7 16.5 7 3
100 4L-9L 1.000 Chitur Lingala Ghanpur jangaon A1/182/16 8 13.5 0 0 8 13.5
101 10L 9.400 Kundaram Lingala Ghanpur jangaon A1/202/16 60 7 0 0 60 7
102 2L-10L 1.800 Kundaram Lingala Ghanpur jangaon A1/160/16 12 13.5 0 4 0 4 12 9.5
103 3R-10L 1.000 Kundaram Lingala Ghanpur jangaon A1/429/16 6 4 0 0 6 4 6.00 4.00
104 4R-10L 2.000 Kundaram Lingala Ghanpur jangaon A1/159/16 5 32 0 0 5 32
105 4R-10L 2.000 Nylapogula Lingala Ghanpur jangaon A1/159/16 8 5.5 0 0 8 5.5
106 Main Canal 1.000 Nelltla Lingala Ghanpur jangaon - 15 3 15 3 15.00 3.00
107 Main Canal 1.000 Vadicherla Lingala Ghanpur jangaon - 2 28 2 28 2.00 28.00
164 210.5 0 0 11 41 11 41 153 169.5 23 35
169 10.5 12 1 12 1 157 9.5 23 35
1999.69 79.25 1365.00 75.00 302.00 133.00 1671.01 122.75 308.15 114.00 102.00 149.50

TOTAL 2096 1367 351 1718 378.00 69.00

2094 1373 355 1728 366.00 65.00


tion on RFMC of R.S.Ghanpur
Extent in Acres
Balance LA stage Remarks /
probable date of
PN PD Award acquisition
Ac Gts
Balance LA stage Remarks /
probable date of
PN PD Award acquisition

0 - - -

- - 31.05.2017

0 - - 30.04.2017
0.00 11.5 - - 31.05.2017
. 31.07.2017
31.07.2017
0.25 11.50
0.50 23.00
1.00 39 - - 30.04.2017
0.00 27.5 - - 30.04.2017

1.00 28.5 - - 30.04.2017

2.00 0 - - 30.04.2017
4 95
6 15
0.00 0 - - -
Balance LA stage Remarks /
probable date of
PN PD Award acquisition
0.00 4 - - 30.04.2017
0.00 0 - - -
2.00 13 - - 31.05.2017
5.00 22.5 - - 31.05.2017
0.00 0 - - -
0.00 0 - - -
0.00 23 - - 31.05.2017
0.00 9 - - 31.05.2017
4.00 39 - - 31.05.2017
0.00 2 - - 31.05.2017
0.00 2.5 - - 31.05.2017
0.00 7 - - 31.05.2017
0.00 9.5 - - 31.05.2017
4.00 4.75 - - 31.05.2017
0.00 8 - - 31.05.2017
0.00 16 - - 31.05.2017
6.00 33 - - 31.05.2017
0.00 0 - - -
0.00 0 - - -
5.00 9 - - 31.05.2017

14.00 38.25 - - 30.06.2017


0.00 0 - - -
12.00 18 - - 30.06.2017
12.00 22 - - 30.06.2017
4.00 4.5 - - 30.06.2017
1.00 37 - - 30.06.2017
0.00 0 - - -
69 322
77 2
1.00 36 - - 30.04.2017
Balance LA stage Remarks /
probable date of
PN PD Award acquisition
3.00 23 - - 30.04.2017
0.00 0 - - -
1.00 38.5 - - 31.05.2017
5 97.5 Contd..2..
7 17.5
14.00 5 - - 30.06.2017
2.00 14.5 - - 30.06.2017
16 19.5
16 19.5
22.00 31.5 - - 30.06.2017
0.00 0 - - -
8.00 33 - - 30.06.2017
7.00 3 - - 30.06.2017
8.00 13.5 - - 30.06.2017
60.00 7 - - 30.06.2017
12.00 9.5 - - 30.06.2017
- - - 30.06.2017
5.00 32 - - 30.06.2017
8.00 5.5 - - 30.06.2017
31.07.2017
31.07.2017
130 134.5
133 14.5
239.50 91.50

309.00

77.00 224.00
ABSTRACT
Status of Land acquisition on RFMC of R.S.Ghanpur
Extent in Acres
Acquired

Remarks /
Name of the Length in SDC File total probable
Sl no. Village Mandal District requisitio Balance SDR PN PD Award
canal Km No. as per act GO 123 Total date of
ned acquisition

10.15 1/2
Distributory
1
System
162.54 TOTAL : 2096 1367 351 1718 378 69 309 pn TO BE
ISSUED
Canal wise Ayacut Particulars and status of IP creation of RFMC of RS Ghanpur Reservoir

Completed IP Balance Budject


Sl no Name of the canal Total length length Contempl IP created IP utilized IP IP Target for required in Remarks
ated the year lakhs
2017
Main Canal of
1 Rfmc of Rs 31.775 30.775 643
ghanpur

1 1L 11.850 8.875 1772 1326 - 446 446 11.04


2 1L - 1L 2.940 2.500 511 385 - 126 126 23.17
3 1L - 1L - 1L 0.525 0.525 215 215 - - -
4 2L - 1L 1.652 1.652 261 261 - - -
5 3L - 1L 7.975 6.000 1414 1196 - 218 218 11.93
6 1L - 3L - 1L 1.075 1.075 184 184 - - -
2R - 3L - 1L 1.125 192
7 1.125 192 - - -
8 1R - 2R - 3L - 1L 0.550 0.550 156 156 - - -
9 3L - 3L - 1L 0.750 0.700 136 56 - 80 80 6.00
10 4L - 3L - 1L 1.100 1.100 235 235 - - -
11 5R - 3L - 1L 2.981 0.000 418 0 - 418 418 30.8
12 4L - 1L 2.550 2.550 376 376 - - -
13 5L - 1L 0.950 0.950 282 282 - - -
14 2L 9.680 9.680 1566 1566 - - -
15 1R - 2L 1.925 1.925 395 395 - - -
16 2L - 2L 3.600 3.600 659 659 - - -
1L - 2L - 2L 2.100 220
17 2.100 220 - - -
18 1R - 1L - 2L - 2L 0.950 0.000 188 0 - 188 188 5.61
19 2L - 2L - 2L 0.950 0.950 208 208 - - -
20 3L - 2L - 2L 0.900 0.900 210 210 - - -
21 4R - 2L - 2L 0.475 0.475 199 199 - - -
5L - 2L - 2L 2.800 565
22 0.000 0 - 565 0 25.87
23 1R - 5L - 2L - 2L 1.093 0.000 241 0 - 241 0 11.09
24 3L 6.000 6.000 971 971 - - -
25 4LA 4.175 0.000 459 0 - 459 459 43.09
26 1L - 4LA 0.900 0.000 158 0 - 158 158 10.77
Canal wise Ayacut Particulars and status of IP creation of RFMC of RS Ghanpur Reservoir

Completed IP Balance Budject


Sl no Name of the canal Total length length Contempl IP created IP utilized IP IP Target for required in Remarks
ated the year lakhs
2017
27 5L 8.750 6.000 1444 0 - 1444 1444 75.89
28 2R - 5L 1.800 0.000 560 0 - 560 560 35.85
29 1R - 2R - 5L 1.910 0.000 158 0 - 158 158 15.36
30 3R - 5L 1.650 0.000 550 0 - 550 550 39.23
31 4R - 5L 1.450 0.000 265 0 - 265 265 18.9
32 5L - 5L 0.725 0.000 174 0 - 174 174 12.41
33 6L - 5L 2.700 0.000 570 0 - 570 570 40.66
34 6L 9.000 7.000 2197 0 - 2197 2197 32.12
35 1R - 6L 4.500 4.000 700 0 - 700 700 57.09
36 1L - 1R - 6L 1.450 1.400 261 0 - 261 261 14.27
37 2L - 6L 2.617 2.000 233 0 - 233 233 17.3
38 3R - 6L 1.125 1.000 173 0 - 173 173 12.84
39 4R - 6L 4.824 3.500 583 0 - 583 583 43.29
40 7L 5.500 5.500 964 0 - 964 964 10.4
41 1R - 7L 1.750 1.750 277 0 - 277 277 21.66
42 8L 3.800 0.000 729 0 - 729 729 50.03
43 1L - 8L 5.300 0.000 922 0 - 922 922 6.9
44 1R - 1L - 8L 1.100 0.000 210 0 - 210 210 1.21
45 9L 11.600 0.000 2245 0 - 2245 2245 25.45
46 1L - 9L 0.568 0.000 342 0 - 342 342 15.54
47 2L - 9L 1.800 0.000 287 0 - 287 287 13.04
48 3L - 9L 2.025 0.000 453 0 - 453 453 20.55
49 4L - 9L 1.100 0.000 318 0 - 318 318 14.45
50 10L 9.125 0.000 1251 0 - 1251 1251 122.22
51 1L - 10L 1.800 0.000 248 0 - 248 248 17.34
52 2R - 10L 1.000 0.000 220 0 - 220 220 15.38
53 3R - 10L 2.000 0.000 281 0 - 281 281 19.65
193.715 116.157 28806 9292 0 19514 18708 1591
Status of Canal wise CM & CD works of RFMC of RS Ghanpur Reservoir

Balance Type of Structures for Balance nos only


total
Sl No. Name of the canal Total no. of
Length in Structures Completed Designs to be CRs / Inlets /
Kms approved DLRBs SLRBs UTs SPs Aquiducts Drops OTs DPs Tes
submitted approved Escape SWF

1 Main canal 30.200 55 53 2 1 1


2 1L of RFMC 11.850 73 50 23 1 1 10 10 1
3 1L - 1L of RFMC 2.940 17 15 2 1 1
4 1L - 1L - 1L of RFMC 0.525 3 3 0
5 2L - 1L of RFMC 1.652 9 9 0
6 3L - 1L of RFMC 7.975 58 44 14 1 1 4 7 1
7 1L - 3L - 1L of RFMC 1.075 12 12 0
8 2R - 3L - 1L of RFMC 1.125 9 9 0
1R - 2R - 3L - 1L of
9 0.550 5 5 0
RFMC
10 3L - 3L - 1L of RFMC 0.750 7 6 1 1
11 4L - 3L - 1L of RFMC 1.100 9 9 0
12 5R - 3L - 1L of RFMC 2.675 16 10 6 1 1 3 1
13 4L - 1L of RFMC 2.550 18 18 0
14 5L - 1L of RFMC 0.950 9 9 0
15 2L of RFMC 9.680 64 64 0
16 1R - 2L of RFMC 1.925 16 16 0
17 2L - 2L of RFMC 3.600 28 28 0
18 1L - 2L - 2L of RFMC 2.100 11 11 0
1R - 1L - 2L - 2L of
19 0.950 9 8 1 1
RFMC
20 2L - 2L - 2L of RFMC 0.950 11 11 0
21 3L - 2L - 2L of RFMC 0.900 11 11 0
22 4R - 2L - 2L of RFMC 0.475 7 7 0
23 5L - 2L - 2L of RFMC 2.800 19 11 8 2 3 2 1

24 1R - 5L - 2L - 2L of 1.093 11 0 11 1 1 6 2 1
RFMC
25 3L of RFMC 6.000 33 33 0
26 4LA 4.175 21 0 21 1 2 2 2 1 7 5 1
27 1L - 4LA of RFMC 0.900 7 0 7 2 2 2 1
Balance Type of Structures for Balance nos only
total
Sl No. Name of the canal Length in Total no. of Completed Designs to be CRs / Inlets /
Structures approved DLRBs SLRBs UTs SPs Aquiducts Drops OTs DPs Tes
Kms submitted approved Escape SWF

28 5L of RFMC 8.750 50 34 16 1 5 5 5 10 1
29 2R - 5L of RFMC 1.800 13 12 1 1 1
30 1R - 2R - 5L of RFMC 1.910 7 0 7 1 1 1 3 1
31 3R - 5L of RFMC 1.650 13 0 13 1 6 5 1
32 4R - 5L of RFMC 1.450 13 0 13 1 1 8 2 1
33 5L - 5L of RFMC 0.725 8 0 8 5 2 1
34 6R - 5L of RFMC 2.700 21 0 21 1 1 11 7 1
35 6L of RFMC 9.000 61 55 6 1 1 1 3
36 1R - 6L of RFMC 4.500 28 28 0 1 3
37 1L - 1R - 6L of RFMC 1.450 11 11 0 1
38 2L - 6L of RFMC 2.617 11 1 10 1 5 3 1
39 3R - 6L of RFMC 1.125 8 8 1 4 2 1
40 4R - 6L of RFMC 4.324 30 30 1 2 2 14 10 1
41 7L of RFMC 5.500 35 28 7 1 4 1 1
42 1R - 7L of RFMC 1.750 12 12 1 1 5 4 1
43 8L of RFMC 3.800 25 14 11 4 1 5 1
44 1L - 8L of RFMC 5.300 35 35 3 1 17 1 12 1
45 1R - 1L - 8L of RFMC 1.100 10 10 6 3 1
46 9L of RFMC 11.600 86 2 84 4 1 4 41 4 30
47 1L - 9L of RFMC 0.568 5 5 2 2 1
48 2L - 9L of RFMC 1.300 9 9 1 1 4 2 1
49 3L - 9L of RFMC 2.025 17 17 2 10 4 1
50 4L - 9L of RFMC 1.100 9 9 1 4 3 1
51 10L of RFMC 9.125 59 59 2 3 1 1 28 3 20 1
52 1L - 10L of RFMC 1.800 15 15 10 4 1
53 2R - 10L of RFMC 1.000 7 7 4 2 1
54 3R - 10L of RFMC 2.000 12 12 7 4 1
Total Nos. 192.740 1158 637 0 521 0 22 24 4 20 2 243 0 15 174 33 1
ABSTRACT
Status of Canal wise CM & CD works of RFMC of RS Ghanpur Reservoir

Balance Type of Structures for Balance nos only


total Total no.
Name of the of Complete
Sl No. Length in Designs to be CRs / Inlets /
canal Kms Structure d approved DLRBs SLRBs UTs SPs Aquiducts Drops OTs DPs Tes
s submitted approved Escape SWF

1 Main canal 30.200 55 53 0 2 1 1

RFMC
2 Distributory 162.540 1103 584 0 519 0 22 24 4 20 2 243 0 14 174 33 0
System

Total Nos. 192.740 1158 637 0 521 0 22 24 4 20 2 243 0 15 174 33 1


Canal wise Status of Lining of RFMC of RS Ghanpur Reservoir

total length Length of


Name of the Complted Balance in
Sl No. Lining in Remarks
Canal canal in Km in Km Km
Km

Balance reach
Km. 4.750 to Km. 5.000

Km. 8.000 to Km. 8.500


1 Main canal 31.775 13.225 12.225 1.000
Km. 12.000 to Km. 12.100

Km. 12.500 to Km. 12.650

EWE completed but CC lining is


not completed due to court
2 1L - RFMC 11.500 2.850 2.350 0.500 case on LA dispute (OA No.
1096/13) From Km. 0.500 to
1.000

3 2L - RFMC 9.680 3.000 3.000 0.000


Canal wise List of Structures and its status of RFMC of RS Ghanpur
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms)
Not Tackled)
1 1L of RFMC 8.875 0.250 Super passage Completed
2 0.350 OT of 1L Completed
3 0.465 DLRC Completed
4 0.925 DP1 L/S Completed
5 0.950 Super passage Completed
6 1.145 SLRC Completed
7 1.550 Super passage Completed
8 1.850 OT of 2L Completed
9 1.915 Super passage Completed
10 1.978 DLRC Completed
11 2.100 DP2 L/S Completed
12 2.350 Super passage Completed
13 2.400 SLRC Completed
14 2.775 Super passage Completed
15 2.800 OT of 3L Completed
16 3.060 SLRC CUM S.P Completed
17 3.525 DP3 L/S Completed
18 3.525 DP4 R/S Completed
19 3.525 1.916 M Drop Completed
20 3.625 2.0 M Drop Completed
21 3.700 1.0 M Drop Completed
22 3.800 2.0 M Drop Completed
23 3.950 1.50 M Drop Completed
24 4.125 1.0 M Drop Completed
25 4.267 SLRC Completed
26 4.350 2.0 M Drop Completed
27 4.350 DP5 R/S Completed
28 4.410 1.0 M Drop Completed
29 4.500 Super passage Completed
30 4.870 0.50 M Drop cum SLRC Completed
31 5.284 DLRC Completed
32 5.350 OT of 4L Completed
33 5.530 DP6 L/S Completed
34 5.537 0.50 M Drop Completed
35 5.850 1.0 M Drop Completed
36 5.950 Super passage Completed
37 6.300 2.0 M Drop Completed
38 6.300 DP7 L/S Completed
39 6.300 DP8 R/S Completed
40 6.450 1.50 M Drop Completed
41 6.450 DP9 L/S Completed
42 6.650 DP10 R/S Completed
43 6.865 0.50 M Drop cum SLRC Completed
44 7.300 DP11 R/S Completed
45 7.550 DP12 L/S Completed
46 7.775 U.T Completed
47 8.100 DP13 R/S Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
48 8.175 OT of 5L Completed
49 8.300 DP14 L/S Not tackled
50 8.300 DP15 R/S Completed
51 8.360 U.T Not tackled
52 8.450 DP14A L/S Not tackled
53 8.875 DP16 L/S Not tackled
54 8.875 DP17 R/S Not tackled
55 8.875 1.0 M Drop Not tackled
56 8.925 Super passage Not tackled
57 9.100 DP18 L/S Not tackled
58 9.200 0.50 M Drop cum SLRC Not tackled
59 9.400 DP19 R/S Not tackled
60 9.400 1.0 M Drop Not tackled
61 9.475 1.50 M Drop Not tackled
62 9.625 DP20 R/S Not tackled
63 9.625 1.50 M Drop Not tackled
64 10.025 DP21 R/S Not tackled
65 10.025 1.50 M Drop Not tackled
66 10.450 0.50 M Drop Not tackled
67 10.525 DP18A L/S Not tackled
68 10.525 1.0 M Drop cum SLRc Not tackled
69 10.650 DP22 R/S Not tackled
70 10.850 1.50 M Drop Not tackled
71 10.975 1.50 M Drop Not tackled
72 11.650 SLRC Not tackled
73 11.850 Tail cluster DP23 Not tackled

1 1L - 1L of RFMC 2.94 0.580 S.P cum SLRC Completed


2 0.805 DLRC with Drains Completed
3 1.125 DP1 L/S Completed
4 1.125 DP2 R/S Completed
5 1.725 DP3 R/S Completed
6 1.725 DP4 L/S Completed
7 1.975 OT of 1L-1L-1L Completed
8 2.200 1.0 M Drop Completed
9 2.200 DP5 L/S Completed
10 2.200 DP6 R/S Completed
11 2.300 1.0 M Drop Completed
12 2.300 DP7 R/S Completed
13 2.400 1.50 M Drop Completed
14 2.450 1.0 M Drop Completed
15 2.500 1.0 M Drop Not tackled
16 2.575 1.0 M Drop Completed
17 2.940 Tail Cluster ( DP8 ) Not tackled

1 1L - 1L - 1L of RFMC 0.525 0.100 DP1 L/S Completed


2 0.100 DP2 R/S Completed
3 0.525 Tail Cluster ( DP3 ) Completed
4
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
1 2L - 1L of RFMC 1.65 0.150 Super passage Completed
2 0.240 DLRC Completed
3 0.325 DP1 R/S Completed
4 0.600 Super passage Completed
5 0.650 DP2 L/S Completed
6 1.275 U.T Completed
7 1.425 DP3 R/S Completed
8 1.495 U.T Completed
9 1.650 Tail Cluster ( DP4 & DP5 ) Completed

1 3L - 1L of RFMC 7.975 0.075 DP1 L/S Completed


2 0.280 SLRC Completed
3 0.375 U.T Completed
4 0.450 DP2 R/S Completed
5 0.960 U.T Completed
6 1.090 SLRC Completed
7 1.350 U.T Completed
8 1.425 DP3 L/S Completed
9 1.670 U.T Completed
10 1.875 Super passage Completed
11 1.950 OT of 1L Completed
12 2.150 U.T Completed
13 2.255 SLRC cum S.P Completed
14 2.520 OT of 2R Completed
15 2.525 1.0 M Drop Completed
16 2.650 DP4 L/S Completed
17 2.875 1.0 M Drop cum S.P Completed
18 3.000 2.0 M Drop Completed
19 3.050 1.50 M Drop Completed
20 3.375 OT of 3L Completed
21 3.400 1.50 M Drop Completed
22 3.400 DP5 L/S Completed
23 3.600 Super passage Completed
24 3.666 SLRC Completed
25 3.850 1.50 M Drop Completed
26 3.850 DP6 R/S Completed
27 3.975 1.50 M Drop Completed
28 4.025 OT of 4L Completed
29 4.050 1.50 M Drop Completed
30 4.225 DP7 L/S Completed
31 4.250 2.0 M Drop Completed
32 4.350 0.50 M Drop Completed
33 4.350 DP8 R/S Completed
34 4.875 2.0 M Drop Completed
35 4.875 DP9 R/S Completed
36 5.000 2.0 M Drop Completed
37 5.075 DP9A R/S Completed
38 5.100 2.0 M Drop Completed
39 5.300 0.50 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
40 5.300 DP10 L/S Completed
41 5.300 DP11 R/S Completed
42 5.375 Acquiduct cum SLRc Completed
43 5.500 OT of 5R Completed
44 5.725 0.50 M Drop Completed
45 5.990 DLRC Completed
46 6.050 DP12 L/S Completed
47 6.325 0.50 M Drop Not tackled
48 6.325 DP13 L/S Not tackled
49 6.500 DP14 L/S Not tackled
50 6.500 DP15 R/S Not tackled
51 6.500 1.0 M Drop Not tackled
52 6.600 0.50 M Drop Not tackled
53 7.280 SLRC Not tackled
54 7.500 DP16 R/S Not tackled
55 7.500 DP17 L/S Not tackled
56 7.670 Super passage Not tackled
57 7.825 1.0 M Drop Not tackled
58 7.975 Tail cluster DP18 & DP18A Not tackled

1 1L - 3L - 1L of RFMC 1.075 0.050 2.0 M Drop Completed


2 0.050 DP1 L/S Completed
3 0.050 DP2 R/S Completed
4 0.100 2.0 M Drop Completed
5 0.135 SLRC Completed
6 0.200 2.0 M Drop Completed
7 0.325 2.0 M Drop Completed
8 0.500 2.0 M Drop Completed
9 0.585 SLRC cum S.P Completed
10 0.800 2.0 M Drop Completed
11 0.975 1.0 M Drop Completed
12 1.075 Tail Cluster ( DP3 & DP4 ) Completed

1 2R - 3L - 1L of RFMC 1.125 0.080 Super passage Completed


2 0.250 OT of 1R Completed
3 0.250 0.50 M Drop Completed
4 0.503 U.T Completed
5 0.700 2.0 M Drop Completed
6 0.700 DP1R/S Completed
7 0.825 2.0 M Drop Completed
8 0.890 1.50 M Drop cum S.P Completed
9 1.125 Tail Cluster ( DP2 ) Completed

1 1R - 2R - 3L - 1L of RFMC 0.550 0.125 DP1 L/S Completed


2 0.150 0.50 M Drop Completed
3 0.230 U.T Completed
4 0.485 U.T Completed
5 0.550 Tail Cluster ( DP2 ) Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
1 3L - 3L - 1L of RFMC 0.750 0.025 DP1 L/S Completed
2 0.025 2.0 M Drop Completed
3 0.125 2.0 M Drop Completed
4 0.225 2.0 M Drop Completed
5 0.375 1.0 M Drop Completed
6 0.650 2.0 M Drop Completed
7 0.750 Tail Cluster ( DP1 & DP2 ) Not tackled

1 4L - 3L - 1L of RFMC 1.100 0.075 1.50 M Drop Completed


2 0.075 DP1 L/S Completed
3 0.075 DP2 R/S Completed
4 0.175 2.0 M Drop Completed
5 0.325 2.0 M Drop Completed
6 0.500 1.0 M Drop cum SLRC Completed
7 0.975 1.50 M Drop Completed
8 1.075 SLRC Completed
9 1.100 Tail Cluster ( DP3 ) Completed

1 5R - 3L - 1L of RFMC 2.675 0.525 Super passage Completed


2 0.700 DLRC Completed
3 0.900 DP1 L/S Completed
4 0.900 DP2 R/S Completed
5 0.800 1.0 M Drop Completed
6 1.000 1.0 M Drop Completed
7 1.100 1.0 M Drop Completed
8 1.175 1.0 M Drop Completed
9 1.350 1.0 M Drop Completed
10 1.468 1.0 M Drop cum SLRC Completed
11 1.625 0.50 M Drop Not tackled
12 1.625 DP3 L/S Not tackled
13 1.938 DLRC Not tackled
14 2.450 DP4 R/S Not tackled
15 2.575 DP5 R/S Not tackled
16 2.675 Tail cluster DP6 Not tackled

1 4L - 1L of RFMC 2.550 0.067 DLRC Completed


2 0.725 1.0 M Drop Completed
3 0.725 DP1 L/S Completed
4 0.900 1.0 M Drop Completed
5 0.900 DP2 R/S Completed
6 0.975 1.0 M Drop Completed
7 1.050 1.0 M Drop Completed
8 1.050 DP3 L/S Completed
9 1.100 1.0 M Drop Completed
10 1.175 1.0 M Drop Completed
11 1.275 1.0 M Drop Completed
12 1.402 1.0 M Drop cum DLRC Completed
13 1.500 1.0 M Drop Completed
14 1.600 1.0 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
15 1.600 DP4 R/S Completed
16 1.700 1.0 M Drop Completed
17 2.400 1.0 M Drop Completed
18 2.550 Tail Cluster ( DP5TE ) Completed

1 5L - 1L of RFMC 0.950 0.150 DP1 L/S Completed


2 0.175 1.0 M Drop Completed
3 0.650 1.0 M Drop Completed
4 0.650 DP2 L/S Completed
5 0.725 DP3 L/S Completed
6 0.750 0.50 M Drop Completed
7 0.850 1.0 M Drop Completed
8 0.900 0.50 M Drop Completed
9 0.950 Tail Cluster ( DP4 ) Completed

1 2L of RFMC 9.680 0.300 Super passage Completed


2 0.670 SLRC cum S.P Completed
3 0.990 DP1 R/S Completed
4 1.000 S.P cum SLRC Completed
5 1.172 DLRC Completed
6 1.350 DP2 R/S Completed
7 1.600 I.C Crossing Completed
8 1.675 U.T Completed
9 1.752 I.C Crossing Completed
10 1.775 DP3 R/S Completed
11 2.072 SLRC Completed
12 2.325 U.T Completed
13 2.450 DP4 R/S Completed
14 3.050 OT of 1R Completed
15 3.387 S.P cum SLRC Completed
16 3.600 Super passage Completed
17 3.800 DP5 R/S Completed
18 4.178 Super passage Completed
19 4.250 DP6 R/S Completed
20 4.344 Super passage Completed
21 4.450 DP7 R/S Completed
22 4.590 U.T Completed
23 4.775 DP8 R/S Completed
24 5.100 0.50 M Drop Completed
25 5.100 OT of 2L Completed
26 5.100 DP9 R/S Completed
27 5.231 0.50 M Drop cum S.P Completed
28 5.350 0.50 M Drop cum SLRC Completed
29 5.600 DP10 R/S Completed
30 5.700 1.50 M Drop Completed
31 5.825 0.50 M Drop Completed
32 5.825 DP11 L/S Completed
33 5.900 0.50 M Drop Completed
34 5.950 0.50 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
35 6.000 1.50 M Drop Completed
36 6.000 DP12 R/S Completed
37 6.150 2.0 M Drop Completed
38 6.235 1.00 M Drop cum SLRC Completed
39 6.375 1.50 M Drop Completed
40 6.460 0.50 M Drop cum SLRC Completed
41 6.600 DP13 L/S Completed
42 6.600 DP14 R/S Completed
43 6.700 1.00 M Drop Completed
44 6.875 1.50 M Drop Completed
45 7.000 1.00 M Drop Completed
46 7.225 DP15 L/S Completed
47 7.250 0.50 M Drop Completed
48 7.329 0.50 M Drop cum SLRC Completed
49 8.075 DP16 R/S Completed
50 8.150 SLRC Completed
51 8.300 0.50 M Drop Completed
52 8.300 DP17 L/S Completed
53 8.500 0.50 M Drop Completed
54 8.700 DP18 R/S Completed
55 8.850 DP19 L/S Completed
56 8.850 DP20 R/S Completed
57 9.025 0.50 M Drop Completed
58 9.100 0.50 M Drop Completed
59 9.100 DP21 R/S Completed
60 9.275 0.50 M Drop Completed
61 9.375 DP22 L/S Completed
62 9.450 0.50 M Drop Completed
63 9.550 0.50 M Drop Completed
64 9.680 Tail Cluster ( DP23 ) Completed

1 1R - 2L of RFMC 1.925 0.050 2.0 M Drop Completed


2 0.050 DP1 L/S Completed
3 0.225 2.0 M Drop Completed
4 0.425 2.0 M Drop Completed
5 0.485 SLRC cum S.P Completed
6 0.750 0.50 M Drop Completed
7 0.900 0.50 M Drop Completed
8 0.900 DP2 R/S Completed
9 1.050 0.50 M Drop Completed
10 1.225 0.50 M Drop Completed
11 1.380 0.50 M Drop cum SLRC Completed
12 1.380 DP3 R/S Completed
13 1.380 DP4 L/S Completed
14 1.500 0.50 M Drop Completed
15 1.700 0.50 M Drop Completed
16 1.925 Tail Cluster ( DP5 ) Completed

1 2L - 2L of RFMC 3.600 0.150 OT of 1L-2L-2L Completed


Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
2 0.271 2.0 M Drop cum SLRC Completed
3 0.271 DP1 R/S Completed
4 0.425 0.50 M Drop Completed
5 0.525 0.50 M Drop Completed
6 0.675 0.50 M Drop Completed
7 0.675 DP2 R/S Completed
8 0.675 OT of 2L-2L-2L Completed
9 0.850 1.50 M Drop Completed
10 0.850 OT of 3L-2L-2L Completed
11 1.100 1.50 M Drop Completed
12 1.100 DP3 L/S Completed
13 1.141 SLRC Completed
14 1.250 1.50 M Drop Completed
15 1.600 1.50 M Drop Completed
16 1.600 DP4 L/S Completed
17 1.921 SLRC Completed
18 2.100 OT of 4R-2L-2L Completed
19 2.200 0.50 M Drop Completed
20 2.200 OT of 5L-2L-2L Completed
21 2.200 DP5 R/S Completed
22 2.350 DP6 L/S Completed
23 2.600 1.50 M Drop Completed
24 2.700 1.0 M Drop Completed
25 2.950 DP7 R/S Completed
26 3.050 DP8 R/S Completed
27 3.375 1.50 M Drop Completed
28 3.600 Tail Cluster ( DP9 ) Completed

1 1L - 2L - 2L of RFMC 2.100 0.200 DP1 R/S Completed


2 0.252 UT Completed
3 0.400 DP2 R/S Completed
4 0.973 SLRC Completed
5 1.222 UT Completed
6 1.275 DP3 R/S Completed
7 1.525 UT Completed
8 1.950 OT of 1R of 1L-2L-2L Completed
9 2.100 Tail cluster DP4 R/S Completed

1 1R - 1L - 2L - 2L of RFMC 0.950 0.050 1.50 M Drop Completed


2 0.050 DP1 L/S Completed
3 0.050 DP2 R/S Completed
4 0.175 1.50 M Drop Completed
5 0.275 1.0 M Drop Completed
6 0.400 0.50 M Drop Completed
7 0.650 1.50 M Drop Completed
8 0.800 0.50 M Drop Not tackled
9 0.950 Tail Cluster ( DP3 ) Completed

1 2L - 2L - 2L of RFMC 0.950 0.096 1.50 M Drop cum SLRC Completed


Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
2 0.096 DP1 R/S Completed
3 0.096 DP2 L/S Completed
4 0.200 1.50 M Drop Completed
5 0.375 1.50 M Drop Completed
6 0.500 0.50 M Drop Completed
7 0.559 1.50 M Drop cum SLRC Completed
8 0.650 1.50 M Drop Completed
9 0.700 1.50 M Drop Completed
10 0.850 0.50 M Drop Completed
11 0.950 Tail Cluster ( DP3 ) Completed

1 3L - 2L - 2L of RFMC 0.900 0.025 2.0 M Drop Completed


2 0.025 DP1 L/S Completed
3 0.025 DP2 R/S Completed
4 0.150 2.0 M Drop Completed
5 0.244 SLRC Completed
6 0.300 2.0 M Drop Completed
7 0.450 2.0 M Drop Completed
8 0.575 1.50 M Drop Completed
9 0.700 0.50 M Drop Completed
10 0.775 0.50 M Drop Completed
11 0.900 Tail Cluster ( DP3 ) Completed

1 4R - 2L - 2L of RFMC 0.475 0.025 2.0 M Drop Completed


2 0.025 DP1 R/S Completed
3 0.025 DP2 L/S Completed
4 0.200 0.50 M Drop Completed
5 0.300 0.50 M Drop Completed
6 0.400 0.50 M Drop Completed
7 0.475 Tail Cluster ( DP3 ) Completed

1 5L - 2L - 2L of RFMC 2.800 0.250 DP1 L/S Completed


2 0.475 1.50 M Drop Completed
3 0.475 OT of 1R Completed
4 0.650 2.0 M Drop Completed
5 0.775 2.0 M Drop Completed
6 0.775 DP2 L/S Completed
7 1.025 1.50 M Drop Completed
8 1.250 DP3 R/S Completed
9 1.300 2.0 M Drop Completed
10 1.500 2.0 M Drop Completed
11 1.620 U.T Completed
12 1.673 DLRC Not tackled
13 1.700 DP4 R/S Not tackled
14 1.700 DP5 L/S Not tackled
15 1.825 1.50 M Drop Not tackled
16 2.000 0.50 M Drop Not tackled
17 2.230 0.50 M Drop cum DLRC Not tackled
18 2.300 0.50 M Drop Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
19 2.800 Tail Cluster ( DP6 ) Not tackled

1 1R - 5L - 2L - 2L of RFMC 1.093 0.050 DP1 L/S Not tackled


2 0.050 DP2 R/S Not tackled
3 0.100 SLRC Not tackled
4 0.200 1.50 M Drop Not tackled
5 0.275 1.50 M Drop Not tackled
6 0.350 1.50 M Drop Not tackled
7 0.450 1.50 M Drop Not tackled
8 0.625 1.50 M Drop Not tackled
9 0.820 1.50 M Drop cum DLRC Not tackled
10 0.950 0.50 M Drop Not tackled
11 1.093 Tail Cluster ( DP3 ) Not tackled

1 3L of RFMC 6.000 0.078 DLRC Completed


2 0.325 Super passage Completed
3 0.650 DP1 L/S Completed
4 1.250 0.50 M Drop Completed
5 1.296 U.T Completed
6 1.700 DP2 L/S Completed
7 1.937 S.P cum C.T Completed
8 2.150 DP3 L/S Completed
9 2.195 DLRC Completed
10 2.300 2.0 M Drop Completed
11 2.300 DP4 R/S Completed
12 2.450 0.50 M Drop Completed
13 2.495 DLRC Completed
14 2.525 2.0 M Drop Completed
15 2.825 2.0 M Drop Completed
16 2.925 SLRC Completed
17 3.025 DP5 R/S Completed
18 3.150 1.0 M Drop Completed
19 3.440 DLRC Completed
20 3.525 DP6 L/S Completed
21 3.525 1.0 M Drop Completed
22 3.650 1.0 M Drop Completed
23 4.200 1.0 M Drop Completed
24 4.200 DP7 R/S Completed
25 4.200 DP8L/S Completed
26 4.600 1.0 M Drop Completed
27 4.600 DP9 L/S Completed
28 4.900 1.50 M Drop Completed
29 5.075 DP10 R/S Completed
30 5.155 1.0 M Drop cum DLRC Completed
31 5.475 DP11 L/S Completed
32 5.520 2.0 M Drop cum DLRC Completed
33 6.000 Tail Cluster ( DP12 & DP 13 ) Completed

1 4LA of RFMC 4.175 0.672 SP cum SLRC Not tackled


Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
2 1.200 DP1 L/S Not tackled
3 1.270 Super passage Not tackled
4 1.655 U.T Not tackled
5 1.665 SLRC Not tackled
6 1.725 OT of 1L Not tackled
7 2.060 U.T Not tackled
8 2.425 2.0 M Drop Not tackled
9 2.425 DP2 R/S Not tackled
10 2.425 DP3 L/S Not tackled
11 2.600 2.0 M Drop Not tackled
12 2.776 IC Crossing Not tackled
13 2.990 0.50 M Drop cum SLRC Not tackled
14 2.990 DP4 L/S Not tackled
15 3.300 1.50 M Drop Not tackled
16 3.300 DP5 R/S Not tackled
17 3.500 2.0 M Drop Not tackled
18 3.700 2.0 M Drop Not tackled
19 4.000 1.50 M Drop Not tackled
20 4.090 DLRC Not tackled
21 4.175 Tail Cluster (DP6 TE) Not tackled

1 1L - 4LA of RFMC 0.900 0.050 DP1 L/S Not tackled


2 0.050 DP2 R/S Not tackled
3 0.100 1.50 M Drop Not tackled
4 0.250 1.50 M Drop Not tackled
5 0.403 2.00 M Drop cum SLRC Not tackled
6 0.665 1.50 M Drop cum SLRC Not tackled
7 0.900 Tail Cluster Not tackled

1 5L of RFMC 8.375 0.375 Super passage Completed


2 0.550 OFM Completed
3 0.700 DP1 L/S Completed
4 0.880 Super passage Completed
5 1.445 DLRC Completed
6 1.475 DP2 L/S Completed
7 1.550 OT of 2R Completed
8 1.860 U.T Completed
9 1.950 DP3 L/S Completed
10 2.375 Super passage Completed
11 2.500 DP4 L/S Completed
12 2.640 U.T Completed
13 3.000 DP5 L/S Completed
14 3.250 1.0 M Drop Not tackled
15 3.250 DP6 L/S Not tackled
16 3.375 Super passage Not tackled
17 3.600 1.50 M Drop Not tackled
18 3.600 OT of 3R Not tackled
19 3.600 DP7 L/S Not tackled
20 3.700 1.0 M Drop Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
21 3.750 Super passage Not tackled
22 4.010 Super passage Not tackled
23 4.375 DP8 L/S Not tackled
24 4.375 DP9 R/S Not tackled
25 4.380 1.50 M Drop cum DLRC Completed
26 4.600 1.50 M Drop Completed
27 4.800 0.50 M Drop Completed
28 4.950 DP10 L/S Completed
29 5.050 OT of 4R Completed
30 5.250 Super passage Completed
31 5.750 OT of 5L Not tackled
32 5.885 1.50 M Drop cum S.P Not tackled
33 6.075 0.50 M Drop Completed
34 6.075 DP11 R/S Completed
35 6.275 1.50 M Drop Completed
36 6.275 OT of 6R Completed
37 6.500 2.0 M Drop Completed
38 6.500 DP12 L/S Completed
39 6.800 2.0 M Drop Completed
40 7.050 2.0 M Drop Completed
41 7.200 1.0 M Drop Completed
42 7.350 1.0 M Drop Completed
43 7.350 DP13 L/S Completed
44 7.475 2.0 M Drop Completed
45 7.700 DP14 R/S Completed
46 7.850 1.0 M Drop Completed
47 8.050 2.0 M Drop Completed
48 8.050 DP15 L/S Completed
49 8.325 DLRC Not tackled
50 8.375 Tail Cluster ( DP16 ) Not tackled

1 2R - 5L of RFMC 1.800 0.150 OT of 1R-2R Not tackled


2 0.400 DP1 L/S Completed
3 0.400 DP2 R/S Completed
4 1.025 DP3 L/S Completed
5 1.025 DP4 R/S Completed
6 1.025 2.0 M Drop Completed
7 1.225 DP5 R/S Completed
8 1.225 1.50 M Drop Completed
9 1.325 0.50 M Drop Completed
10 1.375 1.50 M Drop Completed
11 1.500 0.50 M Drop Completed
12 1.550 0.50 M Drop Completed
13 1.800 Tail Cluster ( DP6 ) Completed

1 1R - 2R - 5L of RFMC 1.918 0.140 SLRC Not tackled


2 0.555 S.P Not tackled
3 0.850 DP1 L/S Not tackled
4 1.325 DP2 L/S Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
5 1.600 DP3 L/S Not tackled
6 1.690 DLRC Not tackled
7 1.918 Tail Cluster ( DP4 ) Not tackled

1 3R - 5L of RFMC 1.650 0.075 DP1 L/S Not tackled


2 0.075 DP2 R/S Not tackled
3 0.500 2.0 M Drop Not tackled
4 0.500 DP3 L/S Not tackled
5 0.550 0.50 M Drop Not tackled
6 0.600 0.50 M Drop Not tackled
7 0.770 1.50 M Drop cum DLRC Not tackled
8 0.950 1.50 M Drop Not tackled
9 1.250 2.0 M Drop Not tackled
10 1.250 DP4 R/S Not tackled
11 1.475 2.0 M Drop Not tackled
12 1.475 DP5 R/S Not tackled
13 1.650 Tail Cluster ( DP6 ) Not tackled

1 4R - 5L of RFMC 1.450 0.200 DP1 R/S Not tackled


2 0.400 0.50 M Drop Not tackled
3 0.475 0.50 M Drop Not tackled
4 0.550 0.50 M Drop Not tackled
5 0.634 SLRC Not tackled
6 0.700 0.50 M Drop Not tackled
7 0.700 DP2 L/S Not tackled
8 0.800 0.50 M Drop Not tackled
9 0.950 1.50 M Drop Not tackled
10 1.100 1.50 M Drop Not tackled
11 1.250 1.50 M Drop Not tackled
12 1.345 DLRC Not tackled
13 1.450 Tail Cluster ( DP3 ) Not tackled

1 4R - 5L of RFMC 0.725 0.050 1.50 M Drop Not tackled


2 0.050 DP1 L/S Not tackled
3 0.050 DP2R/S Not tackled
4 0.150 1.50 M Drop Not tackled
5 0.275 2.0 M Drop Not tackled
6 0.350 1.50 M Drop Not tackled
7 0.500 1.50 M Drop Not tackled
8 0.725 Tail Cluster ( DP3 ) Not tackled

1 6R - 5L of RFMC 2.700 0.025 1.50 M Drop Not tackled


2 0.150 DP1 L/S Not tackled
3 0.150 DP2 R/S Not tackled
4 0.225 1.50 M Drop Not tackled
5 0.375 2.0 M Drop Not tackled
6 0.550 2.0 M Drop Not tackled
7 0.550 DP3 L/S Not tackled
8 0.725 1.50 M Drop Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
9 0.900 1.50 M Drop Not tackled
10 1.050 DP4 L/S Not tackled
11 1.200 2.0 M Drop Not tackled
12 1.200 DP5 R/S Not tackled
13 1.500 1.50 M Drop Not tackled
14 1.750 DP6 R/S Not tackled
15 1.800 0.50 M Drop Not tackled
16 1.951 1.50 M Drop cum SLRC Not tackled
17 1.951 DP7 L/S Not tackled
18 2.300 0.50 M Drop Not tackled
19 2.500 0.50 M Drop Not tackled
20 2.605 DLRC Not tackled
21 2.700 Tail Cluster ( DP8 ) Not tackled

1 6L of RFMC 9.000 0.295 DLRC with Drains L/S & R/S Progresss
2 0.500 OT of 1R Completed
3 0.740 UT Completed
4 0.747 SLRC with Drains L/S & R/S Completed
5 0.900 OT OF 2L Completed
6 1.550 DP1 R/S Completed
7 1.550 0.50 M Drop Completed
8 1.550 DP2 L/S In progress
9 1.700 0.50 M Drop Completed
10 1.900 0.50 M Drop Completed
11 1.900 DP3 R/S Completed
12 1.900 DP4 L/S Completed
13 2.202 SLRC Completed
14 2.275 DP5 R/S Completed
15 2.500 DP6 L/S Completed
16 2.600 0.50 M Drop Completed
17 2.900 0.50 M Drop Completed
18 3.025 DP7 R/S Completed
19 3.025 DP8 L/S Completed
20 3.150 DP9 L/S Completed
21 3.300 DP10 L/S Completed
22 3.600 0.50 M Drop Completed
23 3.600 OT of 3R Completed
24 3.850 1.50 M Drop Completed
25 4.075 1.0 M Drop Not tackled
26 4.250 DP11 R/S Not tackled
27 4.250 DP12 L/S Completed
28 4.437 SLRC Completed
29 4.600 1.50 M Drop Completed
30 4.600 OT of 4R Completed
31 4.750 2.0 M Drop Completed
32 4.900 1.50 M Drop Completed
33 4.998 DLRC with Drains Completed
34 5.075 0.50 M Drop Completed
35 5.075 DP13 R/S Completed
36 5.075 DP14 L/S Completed
37 5.350 0.50 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
38 5.525 DP15 L/S Completed
39 5.900 DP16R/S Completed
40 5.900 DP17 L/S Completed
41 6.050 0.50 M Drop Completed
42 6.200 DP18 L/S Completed
43 6.200 DP19 R/S Completed
44 6.850 2.0 M Drop Completed
45 6.850 DP20 L/S Completed
46 6.850 DP21R/S Completed
47 7.025 2.0 M Drop Completed
48 7.200 DP22 L/S Completed
49 7.430 2.0 M Drop cum SLRC Completed
50 7.430 DP23 R/S Completed
51 7.650 1.50 M Drop Completed
52 6L of RFMC 7.697 2.0 M Drop cum S.P Completed
53 7.855 0.50 M Drop cum S.P Completed
54 8.051 SLRC with Drains Completed
55 8.225 DP24 R/S Completed
56 8.225 DP25 L/S In progress
57 8.440 0.50 M Drop cum S.P In progress
58 8.625 1.50 M Drop Completed
59 8.750 2.0 M Drop In progress
60 8.750 DP26 R/S Completed
61 9.000 Tail Cluster ( DP27 ) Completed

1 1R - 6L of RFMC 4.500 0.050 DP1 L/S Completed


2 0.176 Super passage Completed
3 0.250 DP2 L/S Completed
4 0.544 Super passage Completed
5 1.150 SLRC Completed
6 1.350 DP3 R/S Completed
7 1.450 0.50 M Drop Completed
8 1.350 OT of 1L-1R Completed
9 1.550 0.50 M Drop Completed
10 1.800 DP4 R/S Completed
11 1.800 DP5 L/S Completed
12 1.925 0.50 M Drop Completed
13 2.025 1.50 M Drop Completed
14 2.150 DP6 R/S Completed
15 2.300 1.50 M Drop Completed
16 2.300 DP7 L/S Completed
17 2.419 1.50 M Drop cum SLRC cum S.P Completed
18 2.519 U.T Completed
19 2.600 1.50 M Drop Completed
20 2.975 0.50 M Drop Completed
21 3.150 1.50 M Drop Completed
22 3.150 DP8 L/S Completed
23 3.375 DP9 R/S Completed
24 3.550 2.0 M Drop Completed
25 3.875 1.50 M Drop Completed
26 4.050 2.0 M Drop Completed
27 4.325 1.50 M Drop Completed
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
28 4.500 Tail Cluster (DP10 ) Completed

1 1L - 1R - 6L of RFMC 1.450 0.050 DP1 L/S Completed


2 0.050 DP2 R/S Completed
3 0.125 1.50 M Drop Completed
4 0.300 1.50 M Drop Completed
5 0.500 1.50 M Drop Completed
6 0.650 DP3 L/S Completed
7 0.650 DP4 R/S Completed
8 0.700 0.50 M Drop Completed
9 0.792 1.50 M Drop cum SLRC Completed
10 1.200 2.0 M Drop Completed
11 1.450 Tail Cluster ( DP5 ) Completed

1 2L - 6L of RFMC 2.617 0.500 2.0 M Drop Completed


2 0.650 2.0 M Drop Completed
3 2L - 6L of RFMC 0.739 0.50 M Drop cum DLRC Completed
4 0.850 0.50 M Drop cum S.P Completed
5 1.000 DP1 R/S Completed
6 1.600 DP2 R/S Not tackled
7 2.200 0.50 M Drop Not tackled
8 2.200 DP3 R/S In progress
9 2.350 0.50 M Drop In progress
10 2.500 0.50 M Drop Completed
11 2.617 Tail Cluster ( DP4 ) In progress

1 3R - 6L of RFMC 1.125 0.025 1.50 M Drop Not tackled


2 0.725 1.50 M Drop In progress
3 0.788 SLRC In progress
4 1.000 2.0 M Drop In progress
5 1.050 2.0 M Drop In progress
6 0.025 DP1 L/S In progress
7 0.025 DP2 R/S Not tackled
8 1.125 Tail Cluster ( DP3 ) Not tackled

1 4R - 6L of RFMC 4.324 0.025 2.0 M Drop In progress


2 0.100 DP1 L/S In progress
3 0.100 DP2 R/S In progress
4 0.150 1.50 M Drop Not tackled
5 0.500 2.0 M Drop Not tackled
6 0.500 DP3 L/S In progress
7 0.725 2.0 M Drop Not tackled
8 0.817 DP4 R/S In progress
9 0.817 1.50 M Drop cum DLRB In progress
10 1.125 0.50 M Drop In progress
11 1.125 DP5 L/S In progress
12 1.250 0.50 M Drop Not tackled
13 1.686 2.0 M Drop cum SLRC Not tackled
14 1.850 2.0 M Drop In progress
15 1.937 Super passage In progress
16 2.151 SLRC In progress
17 2.300 1.50 M Drop In progress
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
18 2.300 DP6 L/S In progress
19 2.300 DP7 R/S Not tackled
20 2.650 1.50 M Drop In progress
21 2.685 Super passage Not tackled
22 3.400 DP8 L/S In progress
23 3.400 DP9 R/S In progress
24 3.500 0.50 M Drop Not tackled
25 3.75 0.50 M Drop Not tackled
26 3.848 DLRC Not tackled
27 3.925 0.50 M Drop In progress
28 4.05 0.50 M Drop In progress
29 4.2 0.50 M Drop In progress
30 4.324 Tail Cluster (DP10) Not tackled

1 7L of RFMC 5.500 0.200 DP1 L/S Not tackled


2 0.450 OT of 1R-7L In progress
3 0.675 DP2 R/S Not tackled
4 0.825 0.50 M Drop Not tackled
5 7L of RFMC 1.050 1.50 M Drop Not tackled
6 1.050 DP3 L/S Not tackled
7 1.250 0.50 M Drop Not tackled
8 1.344 2.0 M Drop cum SLRC Completed
9 1.475 DP4 R/S Completed
10 1.550 2.0 M Drop Completed
11 1.850 1.50 M Drop Completed
12 2.075 DP5 L/S Completed
13 2.118 2.0 M Drop cum SLRC Completed
14 2.350 1.50 M Drop Completed
15 2.600 0.50 M Drop Completed
16 2.725 DP6 R/S Completed
17 2.800 0.50 M Drop Completed
18 3.050 0.50 M Drop Completed
19 3.150 0.50 M Drop Completed
20 3.350 0.50 M Drop Not tackled
21 3.450 DP7 L/S Completed
22 3.537 0.50 M Drop cum SLRC Completed
23 3.750 0.50 M Drop Completed
24 3.750 DP8 R/S Completed
25 3.850 0.50 M Drop Completed
26 4.075 1.50 M Drop Completed
27 4.400 1.50 M Drop Completed
28 4.400 DP9 L/S Completed
29 4.400 DP10 R/S Completed
30 4.750 0.50 M Drop Completed
31 4.750 DP11 L/S Completed
32 5.025 0.50 M Drop Completed
33 5.150 0.50 M Drop Completed
34 5.250 0.50 M Drop Completed
35 5.500 Tail Cluster (DP12 & DP13) Completed

1 1R - 7L of RFMC 1.750 0.115 SLRC Not tackled


2 0.200 DP1 L/S Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
3 0.400 Acquiduct Not tackled
4 0.600 DP2 R/S Not tackled
5 0.600 DP3 L/S Not tackled
6 0.600 0.50 M Drop Not tackled
7 0.925 0.50 M Drop Not tackled
8 0.925 DP3A L/S Not tackled
9 0.925 DP4 R/S Not tackled
10 1.000 0.50 M Drop Not tackled
11 1.250 1.50 M Drop Not tackled
12 1.450 1.0 M Drop Not tackled
13 1.750 Tail Cluster (DP5) Not tackled

1 8L of RFMC 3.800 1.200 0.50 M Drop Not tackled


2 1.400 0.50 M Drop Not tackled
3 1.550 1.50 M Drop Not tackled
4 1.800 0.50 M Drop Not tackled
5 1.950 0.50 M Drop Not tackled
6 2.050 0.50 M Drop Not tackled
7 2.250 0.50 M Drop Not tackled
8 2.363 0.50 M Drop cum SLRC Not tackled
9 8L of RFMC 2.500 1.50 M Drop Not tackled
10 2.950 1.50 M Drop Not tackled
11 3.250 2.0 M Drop Completed
12 3.454 2.0 M Drop cum DLRC Completed
13 3.500 0.50 M Drop Completed
14 3.600 0.50 M Drop Completed
15 1.100 OT of 1L-8L Completed
16 1.100 DP1 R/S Completed
17 1.175 DP2 R/S Completed
18 1.400 DP3 R/S Completed
19 1.400 DP4 L/S Completed
20 2.325 DP5 R/S Completed
21 2.325 DP6 L/S Not tackled
22 3.500 DP7 R/S Not tackled
23 3.500 DP8 L/S Not tackled
24 3.800 Tail Cluster (DP9) Not tackled

1 1L - 8L of RFMC 5.300 0.100 DP1 R/S Not tackled


2 0.860 SLRC Completed
3 1.025 DP2 L/S Completed
4 1.100 OT of 1R-1L Completed
5 1.100 1.50 M Drop Completed
6 1.300 0.50 M Drop Completed
7 1.300 DP3 R/S Not tackled
8 1.500 0.50 M Drop Not tackled
9 1.650 0.50 M Drop Not tackled
10 1.650 DP4 L/S Not tackled
11 1.750 0.50 M Drop Not tackled
12 1.850 0.50 M Drop Not tackled
13 1.950 0.50 M Drop Not tackled
14 2.100 1.50 M Drop Not tackled
15 2.700 DP5 R/S Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
16 2.700 DP6 L/S Not tackled
17 2.940 0.50 M Drop Not tackled
18 3.100 1.50 M Drop Not tackled
19 3.437 0.50 M Drop cum DLRC Not tackled
20 3.550 DP7 R/S Not tackled
21 3.625 DP8 R/S Not tackled
22 3.675 U.T Not tackled
23 3.683 SLRC Not tackled
24 3.925 DP9 L/S Not tackled
25 4.000 1.50 M Drop Not tackled
26 4.200 DP10 L/S Not tackled
27 4.400 1.50 M Drop Not tackled
28 4.650 0.50 M Drop Not tackled
29 4.800 0.50 M Drop Not tackled
30 4.950 0.50 M Drop Not tackled
31 4.950 DP11 L/S Not tackled
32 4.950 DP12 R/S Not tackled
33 5.050 0.50 M Drop Not tackled
34 5.200 0.50 M Drop Not tackled
35 5.300 Tail Cluster (DP13) Not tackled

1 1R - 1L - 8L of RFMC 1.100 0.050 1.0 M Drop Not tackled


2 0.050 DP1 R/S Not tackled
3 0.050 DP2 L/S Not tackled
4 0.250 1.0 M Drop Not tackled
5 0.400 0.50 M Drop Not tackled
6 0.600 0.50 M Drop Not tackled
7 0.800 1.0 M Drop Not tackled
8 0.800 DP3 L/S Not tackled
9 1.000 1.0 M Drop Not tackled
10 1.100 Tail Cluster (DP4) Not tackled

1 9L of RFMC 11.600 0.425 SLRC Not tackled


2 0.600 OT of 1L Not tackled
3 1.050 Super passage Not tackled
4 1.125 DP1A L/S Not tackled
5 2.050 DP1 L/S Not tackled
6 2.050 DP2 R/S Not tackled
7 2.150 0.50 M Drop Not tackled
8 2.225 0.50 M Drop Completed
9 2.425 DLRC Not tackled
10 2.550 1.50 M Drop Not tackled
11 2.550 DP3 R/S Not tackled
12 2.550 DP4 L/S Not tackled
13 2.725 1.50 M Drop Not tackled
14 2.850 1.50 M Drop Not tackled
15 3.000 1.50 M Drop Not tackled
16 3.150 1.50 M Drop Not tackled
17 3.275 Super passage Not tackled
18 3.362 0.50 M Drop cum DLRC Not tackled
19 3.525 DLRC with Drains Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
20 3.550 DP5 L/S Not tackled
21 3.550 DP6 R/S Not tackled
22 4.500 DP7 L/S Not tackled
23 4.500 DP8 R/S Not tackled
24 4.700 0.50 M Drop Not tackled
25 4.825 0.50 M Drop Not tackled
26 4.825 DP9 L/S Not tackled
27 4.825 DP10 R/S Not tackled
28 5.025 0.50 M Drop Not tackled
29 5.200 0.50 M Drop Not tackled
30 5.200 DP11 L/S Not tackled
31 5.350 0.50 M Drop Not tackled
32 5.600 0.50 M Drop Not tackled
33 5.600 DP12 L/S Not tackled
34 5.900 DP12A L/S Not tackled
35 5.600 DP13 R/S Not tackled
36 5.987 SLRC Not tackled
37 6.100 DP14 L/S Not tackled
38 6.250 0.50 M Drop Not tackled
39 6.250 DP15 R/S Not tackled
40 6.600 DP15A R/S Not tackled
41 6.400 1.0 M Drop Not tackled
42 6.600 0.50 M Drop Not tackled
43 6.600 DP16 L/S Not tackled
44 9L of RFMC 6.750 0.50 M Drop Not tackled
45 6.850 0.50 M Drop Not tackled
46 6.850 DP17 R/S Not tackled
47 7.300 0.50 M Drop Not tackled
48 7.300 OT of 2L Not tackled
49 7.500 DP18 R/S Not tackled
50 7.559 SLRC cum S.P Not tackled
51 7.700 0.50 M Drop Not tackled
52 8.000 1.0 M Drop Not tackled
53 8.000 DP19 R/S Not tackled
54 8.000 OT of 3L Not tackled
55 8.200 1.0 M Drop Not tackled
56 8.400 1.0 M Drop Not tackled
57 8.625 1.50 M Drop Not tackled
58 8.625 DP20 R/S Not tackled
59 8.800 1.50 M Drop Not tackled
60 9.025 0.50 M Drop Not tackled
61 9.150 0.50 M Drop Not tackled
62 9.150 DP21 R/S Not tackled
63 9.300 0.50 M Drop Not tackled
64 9.300 OT of 4L Not tackled
65 9.400 0.50 M Drop Not tackled
66 9.500 0.50 M Drop Not tackled
67 9.700 0.50 M Drop Not tackled
68 9.700 DP22 R/S Not tackled
69 9.840 DLRC with Drains Not tackled
70 9.900 0.50 M Drop Not tackled
71 10.050 1.0 M Drop Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
72 10.050 DP23 R/S Not tackled
73 10.250 0.50 M Drop Not tackled
74 10.300 Super passage Not tackled
75 10.425 1.50 M Drop Not tackled
76 10.550 0.50 M Drop Not tackled
77 10.550 DP24 L/S Not tackled
78 10.700 0.50 M Drop Not tackled
79 10.821 1.0 M Drop cum SLRC Not tackled
80 10.950 0.50 M Drop Not tackled
81 11.050 1.50 M Drop Not tackled
82 11.050 DP25 R/S Not tackled
83 11.050 DP26 L/S Not tackled
84 11.275 0.50 M Drop Not tackled
85 11.425 0.50 M Drop Not tackled
86 11.600 Tail Cluster TE Not tackled

1 1L - 9L of RFMC 0.568 0.200 DP1 Not tackled


2 0.200 DP2 Not tackled
3 0.350 0.50 M Drop Not tackled
4 0.405 1.50 M Drop Not tackled
5 0.568 Tail Cluster (DP3&DP4) Not tackled

1 2L - 9L of RFMC 1.300 0.025 DP1 L/S Not tackled


2 0.025 DP2 R/S Not tackled
3 0.025 1.50 M Drop Not tackled
4 0.304 0.50 M Drop cum SLRC Not tackled
5 2L - 9L of RFMC 0.525 1.0 M Drop Not tackled
6 0.700 2.0 M Drop Not tackled
7 0.850 1.50 M Drop Not tackled
8 1.161 0.50 M Drop cum DLRC Not tackled
9 1.300 Tail Cluster (DP3) Not tackled
Not tackled
1 3L - 9L of RFMC 2.025 0.025 DP1 R/S Not tackled
2 0.025 DP2 L/S Not tackled
3 0.025 1.50 M Drop Not tackled
4 0.225 1.50 M Drop Not tackled
5 0.450 1.50 M Drop Not tackled
6 0.700 1.50 M Drop Not tackled
7 0.700 DP3 R/S Not tackled
8 0.700 DP4 L/S Not tackled
9 0.827 1.50 M Drop cum DLRC Not tackled
10 1.050 1.50 M Drop Not tackled
11 1.250 1.50 M Drop Not tackled
12 1.475 1.50 M Drop Not tackled
13 1.650 0.50 M Drop Not tackled
14 1.775 0.50 M Drop Not tackled
15 1.850 0.50 M Drop Not tackled
16 1.996 DLRC Not tackled
17 2.025 Tail Cluster (DP5) Not tackled
Not tackled
1 4L - 9L of RFMC 1.100 0.025 DP1 L/S Not tackled
2 0.025 DP2 R/S Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
3 0.025 1.50 M Drop Not tackled
4 0.262 1.50 M Drop cum DLRC Not tackled
5 0.400 DP3 R/S Not tackled
6 0.400 1.50 M Drop Not tackled
7 0.600 1.50 M Drop Not tackled
8 0.800 0.50 M Drop Not tackled
9 1.100 Tail Cluster (DP4) Not tackled
1 10L of RFMC 9.125 0.400 Inlet Not tackled
2 0.700 DP1 R/S Not tackled
3 0.868 S.P cum SLRC Not tackled
4 1.050 DP2 R/S Not tackled
5 1.450 DP3 L/S Not tackled
6 1.700 OT of 1R Not tackled
7 1.800 0.50 M Drop Not tackled
8 1.900 1.50 M Drop Not tackled
9 2.100 0.50 M Drop Not tackled
10 2.100 DP4 L/S Not tackled
11 2.100 DP5 R/S Not tackled
12 2.300 0.50 M Drop Not tackled
13 2.459 2.0 M Drop cum DLRC Not tackled
14 2.825 0.50 M Drop Not tackled
15 3.000 0.50 M Drop Not tackled
16 3.000 OT of 2L Not tackled
17 3.000 OT of 3R Not tackled
18 3.375 1.50 M Drop Not tackled
19 3.600 1.50 M Drop Not tackled
20 3.800 1.50 M Drop Not tackled
21 3.975 1.50 M Drop Not tackled
22 10L of RFMC 3.975 DP6 L/S Not tackled
23 4.175 0.50 M Drop Not tackled
24 4.175 DP7 R/S Not tackled
25 4.339 0.50 M Drop cumDLRC Not tackled
26 4.600 1.50 M Drop Not tackled
27 4.750 DP8 R/S Not tackled
28 5.100 0.50 M Drop Not tackled
29 5.100 DP9 L/S Not tackled
30 5.200 0.50 M Drop Not tackled
31 5.300 1.50 M Drop Not tackled
32 5.500 DP10 R/S Not tackled
33 5.751 SLRC Not tackled
34 5.763 Acquiduct Not tackled
35 5.875 0.60 M Droop Not tackled
36 5.875 OT of 4R Not tackled
37 5.875 DP11 L/S Not tackled
38 6.125 DP12 L/S Not tackled
39 6.225 1.50 M Drop Not tackled
40 6.425 1.50 M Drop Not tackled
41 6.625 0.50 M Drop Not tackled
42 6.625 DP13 R/S Not tackled
43 6.750 0.50 M Drop Not tackled
44 6.750 DP14 L/S Not tackled
45 7.125 0.50 M Drop Not tackled
Status
Sl No. Name of the canal Length of Location Name of the Structure (Complted/Progress /
canal (Kms) Not Tackled)
46 7.325 0.50 M Drop Not tackled
47 7.450 0.50 M Drop Not tackled
48 7.450 DP15 R/S Not tackled
49 7.575 0.50 M Drop Not tackled
50 7.725 1.50 M Drop Not tackled
51 7.725 DP16 L/S Not tackled
52 8.025 1.50 M Drop Not tackled
53 8.025 DP17 L/S Not tackled
54 8.025 DP18 R/S Not tackled
55 8.346 1.50 M Drop cum SLRC Not tackled
56 8.346 DP19 L/S Not tackled
57 8.346 DP20 R/S Not tackled
58 8.675 1.50 M Drop Not tackled
59 8.925 0.50 M Drop Not tackled
60 9.125 Tail Cluster (DP21) Not tackled
1 1L - 10L of RFMC 1.800 0.013 1.50 M Drop Not tackled
2 0.200 1.50 M Drop Not tackled
3 0.200 DP1 L/S Not tackled
4 0.200 DP2 R/S Not tackled
5 0.609 1.50 M Drop cum DLRC Not tackled
6 0.800 0.50 M Drop Not tackled
7 0.900 0.50 M Drop Not tackled
8 1.025 0.50 M Drop Not tackled
9 1.150 1.50 M Drop Not tackled
10 1.150 DP3 R/S Not tackled
11 1.150 DP4 L/S Not tackled
12 1.400 0.50 M Drop Not tackled
13 1.500 0.50 M Drop Not tackled
14 1.600 1.50 M Drop Not tackled
15 1.800 Tail Cluster (DP5) Not tackled
Not tackled
1 2R - 10L of RFMC 1.000 0.050 DP1 R/S Not tackled
2 0.050 DP2 L/S Not tackled
3 0.200 1.50 M Drop Not tackled
4 0.500 1.50 M Drop Not tackled
5 0.650 1.50 M Drop Not tackled
6 0.900 2.0 M Drop Not tackled
7 1.000 Tail Cluster (DP3) Not tackled
Not tackled
1 3R - 10L of RFMC 0.050 1.50 M Drop Not tackled
2 0.050 DP1 R/S Not tackled
3 0.050 DP2 L/S Not tackled
4 0.500 1.50 M Drop Not tackled
5 0.700 2.0 M Drop Not tackled
6 0.950 1.50 M Drop Not tackled
7 1.100 DP3 R/S Not tackled
8 1.250 1.50 M Drop Not tackled
9 1.300 DP4 L/S Not tackled
10 1.700 1.50 M Drop Not tackled
11 1.850 0.50 M Drop Not tackled
12 2.000 Tail Cluster (DP5) Not tackled
Canal wise List of Structures and its status of RFMC of RS Ghanpur
Status
Name of the Length
Sl No. Location Name of the Structure (Complted/Progress/N
canal of canal ot Tackled)

1 Main canal 31.200 0.075 Standing Wave Flume Progress


2 0.350 Super Passage Completed
3 1.273 SLRB Completed
4 1.590 Super Passage Completed
5 1.975 Super Passage Completed
6 2.825 Under Tunnel Completed
7 3.470 Inlet Completed
8 3.500 OT of 1L Ayacut-4895Ac Completed
9 3.975 Super Passage Completed
10 4.440 SLRB Completed
11 4.770 SP Completed
12 5.548 Super Passage Completed
13 6.150 OT of 2L Ayacut -4204Ac Completed
14 7.175 Super Passage Completed
15 7.460 DLRB Completed
16 7.600 Super Passage Completed
17 7.800 OT of 3L Ayacut -1005Ac Completed
18 8.730 SP cum SLRB Completed
19 9.105 Super Passage Completed
20 9.608 SLRB Completed
21 9.725 Super Passage Completed
22 9.850 OT of 4LA Ayacut - 627 Ac Not tackled
23 10.945 SLRB Completed
24 11.185 Super Passage Completed
25 11.985 Super Passage Completed
26 12.875 Super Passage cum SLRB Completed
27 14.525 Super Passage Completed
28 14.750 OT of 5L Ayacut -3263Ac Completed
29 14.930 SLRB Completed
30 16.025 Super Passage Completed
31 17.359 Super Passage Completed
32 17.925 DLRB cum IC Completed
33 18.565 Under Tunnel Completed
34 19.800 OT of 6L Ayacut -3901Ac Completed
35 20.070 Super Passage Completed
36 20.198 DLRB Completed
37 21.350 Under Tunnel Completed
38 21.865 SLRB Completed
39 22.025 Under Tunnel Completed
Status
Name of the Length
Sl No. Location Name of the Structure (Complted/Progress/N
canal of canal ot Tackled)

40 22.475 Inlet Completed


41 22.800 OT of 7L Ayacut -1102Ac Completed
42 23.140 Under Tunnel Completed
43 23.735 Super Passage Completed
44 24.125 Super Passage Completed
45 24.650 Super Passage Completed
46 25.825 Super Passage Completed
47 25.870 DLRB Completed
48 26.200 OT of 8L Ayacut - 1707Ac Completed
49 27.552 Super Passage cum SLRB Completed
50 28.385 Under Tunnel Completed
51 29.250 OT of 9L Ayacut - 3382Ac Completed
52 30.050 DLRB Completed
53 30.100 OT of 10L Ayacut - 2206Ac Completed
54 30.200 Cross Regulator Completed
55 0.250 SP (Additional length) Completed
STATEMENT SHOWING THE BOTTLENECKS ON DISTRIBUTORY CANAL SYSTEM OF R.F.M.C OF RS
GHANPUR

Name of the Canal /


Extent Remarks (Patta /
S.No. SDC File No. Distributroy / Minor / Reach Name of the Farmers
(in Ac - Gts.) Govt / Dispute)
Sub-Minor

1 2 3 4 5 6 7

SDC / LA Not Paid (Due to


Kanduri Sanjeeva Reddy &
1 Bhongir 1L - 1L Minor Km. 2.200 to Km. 2.940 (90% work completed) 3 - 18 title dispute)
others
A1/871/09 Sy. 69,70 & 71

SDC / Wrong payment (SDC


2 Bhongir 3L - 3L - 1L Minor Km. 0.660 to Km. 0.750 0 - 10 Akkireddy Agareddy has to persue) Sy. No.
B1/271/12 504

SDC / Sy. No. 223 & 228


3 Bhongir 1R-1L-2L - 2L Minor Km. 0.500 to Km. 0.800 (90% work completed) 0 - 38 Challa Sathi Reddy & others (Payment to be made
B2/127/13 asper old act)

Sy. No. 445 (Payment


SDC/Jangao
4 Main Canal Km. 23.700 to Km. 23.750 0 - 28 Gaddam Kistaiah to be made asper old
n HQ:Hnk
act)

Sy. No. 170 & 173


(OS No. 1096/2013
SDC /
filed in the cour of
5 Bhongir 1L Main Km. 0.500 to Km. 1.000 4 - 07 Muluguri Yadhagiri & Others
second addl.Jr.Civil
A/283/08
judge has issued
DECREE)
0 Ac
53,40
Tank
2.00Km / 281 Ac 1.00Km / 220 Ac bpet
Nawa
Km.31.200 /
Ayacut : 28,806 Acres 31.775

9.400Kms / 2000Ac Km.30.100

10L

h
1.800Km / 248 Ac

12.00Kms / 3645 Ac Km.29.250

9L
1.0Km / 318 Ac 4L 3L 1L

h
2.00Km / 453 Ac 2L 1.0Km / 342 Ac

1.50Km / 287 Ac

3.800Kms/1861 Ac 1.100 Km.26.200

8L
Km.1.100/210 Ac 1R

h
5.300Km / 1132 Ac 1L 1.80Km / 277 Ac

1R
5.525 km / 1241 5Ac Km.22.800

7L
SCHEMATIC DIAGRAM OF R.F.M.C OF R.S.GHANPUR RESERVOIR

h
4.500 / 961 Ac 1R Km.21.450 to Km. 21.650
4.342Km / 583 Ac 4R 1.125Km / 173 Ac 1L 1.45
3R 1.50 / 261 Ac

9.000Kms / 4147 Ac Km.19.800

6L
Km.4.500

h
STATUS OF EWE WORK & LINNING

2L 2.617Km / 233 Ac

2.700Km / 570 Ac 6R 1.800 / 718 Ac


1.65 / 550 Ac 2R

Progress

15.000

20.000
1.000
1.45 / 265 Ac 3R 1R 1.918/158/ Ac

-
4R

8.375Kms / 3721 Ac ### 5.75 3.6 1.850 Km.14.750


5L

Balance
5L

77.158
1.000

1.000

0.500

519
2
0.725Km / 174 Ac
Chennur Tank

STATUS OF WORK
Completed
24016 Ac Km.12.625
25,165 Ac

30.200

85.382

12.225

5.350

584
53
4L
h

4.175Km / 617Ac Km.9.850

4LA 1L 0.90

162.540
31.200

13.225
h

5.850
Total

1103
55
158Ac
6.00km / 917 Ac Km.7.800

Distributories - CM&CD
3L
h

Main canal - CM&CD


Distributories - Lining
Distributories - EWE

Main canal -Lining


Main canal - EWE
Discription
1.925 / 395 Ac
1R

9.68km / 4451Ac. 5.100 EWE Km.6.150


LINING
2L

0.95 / 188 Ac

1R

0.15 1L 2.300 / 408 Ac

0.675 2L 0.950 / 208Ac

0.90 3L 0.900 / 210 Ac


EARTH WORK

Work not tackled

199 Ac 4R 2.10
LINING

Forest Land
Bottleneck

Km 1.500

2.90 5L 2.800 / 806 Ac

1R
INDEX

1.193 / 241 Ac

Km.4.750
2L
L.A paid Work not Tackled

3.600Kms / 2490 Ac
1L

Work in Progress
Work Completed

11.500Kms / 6152 Ac Km.8.175 EWE Km.3.500


LINING

0.550Kms/156 Ac
Km.1.950

5L 1R 1L 136Ac 0.525Kms
1.125Kms/348 Ac

Km.0.250 2R 2L 1L 215Ac
Km.0.950 / 282 Ac 4L Km.2.520 1.650Kms/261Ac 1L
Km.3.375

Km.2.550 / 376Ac 3L 0.750Kms/ 136 Ac 2.940Kms/ 726Ac Km.2.950 to Km. 3.000

4L 1.100Kms / 235 Ac

Km 1.250
Km.2.800 / 418Ac
* Railway Crossing Km 0.782

3L

7.975 Kms / 2735Ac R


RVOI
RESE
R.S
GHAN
PUR
RESE
RVOI
R
0 Ac
53,40
Tank
2.00Km / 281 Ac 1.00Km / 220 Ac bpet
Nawa
Km.31.200 /
31.775

9.400Kms / 2000Ac Km.30.100

Ayacut : 28,806 Acres

10L

h
1.800Km / 248 Ac

12.00Kms / 3645 Ac Km.29.250

9L
1.0Km / 318 Ac 4L 3L 1L

h
2.00Km / 453 Ac 2L 1.0Km / 342 Ac

1.50Km / 287 Ac

3.800Kms/1861 Ac 1.100 Km.26.200

8L
Km.1.100/210 Ac 1R

h
5.300Km / 1132 Ac 1L 1.80Km / 277 Ac km.23.700
SCHEMATIC DIAGRAM OF R.F.M.C OF R.S.GHANPUR RESERVOIR

1R
5.525 km / 1241 5Ac Km.22.800

7L

h
4.500 / 961 Ac 1R Km.21.450 to Km. 21.650
4.342Km / 583 Ac 4R 1.125Km / 173 Ac 1L 1.45
3R 1.50 / 261 Ac

9.000Kms / 4147 Ac Km.19.800

6L
Km.4.500

h
2L 2.617Km / 233 Ac

2.700Km / 570 Ac 6R 1.800 / 718 Ac

1.65 / 550 Ac 2R
STATUS OF LAND ACQUISITION

1.45 / 265 Ac 3R 1R 1.918/158/ Ac

4R

8.375Kms / 3721 Ac 6.275 5.75 3.6 1.850 Km.14.750

5L
5L

h
0.725Km / 174 Ac
Chennur Tank

24016 Ac Km.12.625
4L
25,165 Ac

2039
1728

###
311
4.175Km / 617Ac Km.9.850

0
4LA 1L 0.90
h

158Ac

STATUS OF LA
6.00km / 917 Ac Km.7.800

Total LA Required (Acrs)


LA Acquired (1373+355)
3L
h

LA Not Submitted
1.925 / 395 Ac
1R

PN Submitted
Balance
9.68km / 4451Ac. 5.100 3.05 Km.6.150
2L

0.95 / 188 Ac

1R

0.15 1L 2.300 / 408 Ac

0.675 2L 0.950 / 208Ac

0.9 3L 0.900 / 210 Ac

199 Ac 4R 2.10

Km 1.500

2.90 5L 2.800 / 806 Ac

1R

1.193 / 241 Ac
INDEX
Km. 8.875

2L
Bottle necks/Disputes

3.600Kms / 2490 Ac
1L

Not Submitted

11.500Kms / 6152 Ac
Not Acquired

Km.8.1 Km.5.350 Km.2.800 Km.1.850 Km.1.965 Km.3.500


LA Acquired

0.550Kms/156 Ac
Km.1.950

5L 1R 1L 136Ac 0.525Kms
1.125Kms/348 Ac

Forest

Km.0.250 2R 2L 1L 215Ac
Km.0.950 / 282 Ac 4L Km.2.520 1.650Kms/261Ac 1L
Km.3.375

Km.2.550 / 376Ac 3L 0.750Kms/ 136 Ac 2.940Kms/ 726Ac Km.2.950 to Km. 3.000

4L 1.100Kms / 235 Ac

Km 1.250
Km.2.800 / 418Ac
* Railway Crossing Km 0.782

3L
OIR
7.975 Kms / 2735Ac RFMC
ERV
RES
R
R.S
GHA
NPU
R
RES
ERV
OIR
Canal wise Ayacut Particulars and status of IP creation
Name of the
canal/ Balance LA Other bottle necks
total length Completed I.P.Conte IP Budget
I.P.Uitlize Balance I.P.Target Main/Distributory (Balance structures)
Sl no Tunnel/Pipipe Length mplated created d (Ac.) I.P.Target for 2017 Requirement
(Km) I.P. (Ac.) for 2018 On Main canal
line/Pump (Km) (Ac.) (Ac.) (in Crores)
house /Distributory
May July June Aug

RFMC of RS
1 Ghanpur
31.775 30.775 - - 2 -
30444
2 Distributories 162.54 85.382 (28806) 9292 0 19514 19514 - 38.03 76-00 235-00 35 306