Sr. C.A. NO. DATE C.A. VALUE NAME OF WORK AGENCY PROGRESS WORK INCHARGE(WITH NAME)
AMOUNT % SR.DEN ADEN
1 201906040100010 Dt.04.06.2019 Ratlam Division:-Supplying and renewal of fittings of steel channel Dhrub Tara Construction, ADEN (East) Ratlam
12528297.48 sleepers on various steel girder bridges. Moffer Ganj Gareri Tola, Katihar 11016539.00 115.00
(Bihar)
2 201812040100025 Dt.10.09.2018 Godhra-Nagda Sec:- Through rail renewal with 60 Kg new rails M/s OM Prakash Menghani ADEN (East) Ratlam
(45.311 Km) and 60 Kg (SH) rails (2.72 Km), Complete track renewal G1-Abhiruchi Tower, halalpura,
- 13.875 Kms with 60 Kg (SH) rails and 60 Kg new PRC sleepers, Lalghati, Bhopal
41251283.37 Conversion of SWR into LWR in loop line -13.778 Kms and Through 23384112.00 55.00
fittings renewal (70.555 Km).
3 RTM-2018-19-187 Dt.15.01.2019 Godhra-Nagda Section:-Supply of welding portion (60kg.) (2471 M/s Harshad Thermic Industries ADEN (South) Dahod
22758206.52 Nos.) and welding of rail joints by SKV Process(2471 Nos.). Pvt Ltd Unit II, Plot No.12-17, 9268683.00 40.00
Sector-A, Urla Industrial Area,
4 RTM/2019-20/124(R) Dt.15.07.2020 Godhra-Nagda Section:-Through rail renewal with 60 K.G. new rails Urla,
HarlalRaipur
Meena, Nagda
(Chhattisgarh) ADEN (East) Ratlam
(33.28 Kms.) and 60Kg (SH) rails (3.52 Km.), Complete Track
45803685.79 Renewal 6.099 kms. with 60Kg (SH) rails and 60 kg new PRC sleepers 17656919.41 40.00
and Through Fitting Renewal (298.625 Km.)
5 RTM/2019-20/148 Dt.29.02.2020 Godhara-Nagda Section:-Widening of cutting with provision of drain M/s Mahesh Richhariya, Bhopal ADEN (East) Ratlam
22517037.36 in SSE/P.Way/NAD section under ADEN(East) Ratlam.
6 RTM/2019-20/157 Dt.23.03.2020 Godhra-Nagda Section:- Providing side drain in connection with M/s Vicky Construction Co., ADEN (South) Dahod
20243122.32 various track renewal works in ADEN (South) Dahod Jurisdiction. Jhabua 11336390.00 60.00
7 RTM/2019-20/158 Dt.11.05.2020 Godhra-Nagda Section:- Providing side drain in connection with M/s Vivek Industries, Bhopal ADEN (South) Dahod
30061928.63 various track renewal works in ADEN (East) Ratlam Jurisdiction. 17601257.00 50.00
8 RTM/2020-21/49 Dt.21.07.2020 Dahod :- Replacement of pipeline from source to staff quarters and M/s SIDDIQUI BROTHERS-NAGPUR ADEN (Works) Dahod
improvement of water supply system in toilets & bathrooms of staff METRO PLAZA F4 GOREWADA
25478062.46 quarters. RING ROAD
NAGPUR
9 RTM/2020-21/62 Dt.31.08.2020 Godhra-Nagda Section:-Jecot:-Extension of BR No. 98 in connection M/s Narendra Doulatsinh Datala, ADEN (South) Dahod
10579479.84 to increasing CSR of line no.1 at. Dahod 30.00
10 RTM/2020-21/64 Dt.16.09.2020 21590393.00 Godhra-Nagda Section:-TBTR 774 Nos. with H-Beam. VIVEK CONSTRUCTION-RATLAM ADEN (East) Ratlam
13 RTM/2020-21/109 Dt.06.01.2021 GDA-NAD section - Track machine siding work with Pway work at M/s VICKY CONSTRUCTION ADEN (East) Ratlam
Bamania and providing approach roads, Pathway,rest room and COJHABUA
miscellaneous civil work in connection with providing and
10532672.35 improvement of track machine siding at Bamania & Santroad
Stations with Electrical work.
14 RTM/2020-21/112R Dt.25.02.2021 GDA-NAD section:- Deep screening of loop lines and Turnout M/s DEV CONSTRUCTION ADEN (East) Ratlam
11141821.74 (Manually) at NAD. COMPANY-BANDIKUI
15 RTM/2020-21/102 Dt.12.01.2021 Meghnagar-Nagda Section:-Deep screening of loop lines and M/s LAXYO ENERGY ADEN (East) Ratlam
turnout (Manually) at RTM yard and Through ballast renewal by LIMITEDRATLAM
23787145.14 shallow screening TBR (SBC) 25.0 Km under ADEN (East) Ratlam 6398125.00 30.00
jurisdiction.
16 201902040100029 Dt.09.02.2019 Godhra-Nagda Section:-Replacement of small span girder on Bridge Praween Gulati Infrastructure Pvt ADEN (East) Ratlam
Dt.09.02.2019 No.83(UP Siding), 84 (UP Siding), 104(Common Loop), 247 (Common Ltd., Judges Bungalow Road,
Loop), DHD-Loco-2, DHD-Loco-3, 312 (UP Loop), 291B (RTM UP Bodakdev, Ahmedabad
23302202.67 Yard), 119DN, 83DN, R-23 DN, 55 UP, 253DN, 290D(RTM Yard), 23127555.00 100.00
290G(RTM Yard) & 290I(RTM Yard) with RCC/PSC slab.
17 201908040100014 Dt.08.08.2019 Ratlam Division:-Providing tool cum rest room for trackmen. Royal Paint House, 1 Civic Center, ADEN (East) Ratlam
10881270.53 New Road, Ratlam 6091920.00 65.00
18 RTM/2020-21/142 Dt.31.03.2021 Godhra-Nagda Section:-Providing S & T rooms and SM office for M/s CHITRA CONSTRUCTION ADEN (East) Ratlam &
central operation at BILDI and USRA Stations in connection to CO.-RAJKOT ADEN (South) Dahod
20591562.32 replacement of over aged indoor and outdoor signaling equipments.
19 201806040100010 Dt.20.06.2018 Ratlam Division (Godhra-Nagda Section):-Provision of Boundary wall Royal Paint House, 1 Civic Center, ADEN (East) Ratlam &
to prevent encroachment in Railway land. (Dahod-2000 meter, New Road, Ratlam ADEN (South) Dahod
24045107.40 Nagda-1500 meter, Ratlam ”A” cabin-1000 metre). Total=4500 13615111.00 57.00
meters.
20 201905040100008 Dt.30.05.2019 Dahod (Work Shop):-Development of training facilities BTC (Near Ramesh Bhai Hema Bhai Berawat ADEN (Works) Dahod
22057879.43 Wagon Shop) Trg Centre. 5-Santosh Nagar, Mandavav Road, 7454528.00 34.00
Dahod (Gujrat)
21 WR/RTM/Civil/2020/ Dt.15.06.2020 GDA-RTM Section:-Providing covering shed atLHS to avoid water Laxyo Enerhy LTD., RAatlam ADEN (East) Ratlam
0007 20012024.00 logging with elimination of level crossings No. 6X(Km-473/16-18), 8945945.00 43.29
11(Km-479/14-16) and12 (Km-480/12-14) (Total=03Nos.)
22 201901040100027 Dt.06.01.2019 Godhra-Nagda Section:-Reconditioning of CMS crossing in situ by Railtech Infraventure PVT ADEN (East) Ratlam &
14531346.85 RW-20 Translematic Robotic Welding technology. LTD.,New Delhi 9779651.00 67.30 ADEN (South) Dahod
23 Dahod :-Repair to north light glass in different location in LCW, AUM STRCUTBUILD PVT LTD., SF- ADEN (Works) Dahod
Providing boundary wall and repair to cycle stand in general store at 6-10, Subhash Park Shopping
17370014.75 work shop/LCW and repair to roof leakage of main Hospital at. Centre, Sangam Char Rasta, 4300309.00 24.33
Vadodara
24 201911040100035 Dt.13.11.2019 Godhra-Nagda Section:-Repairs of Trolley refuges and various Vivek Construction, Ratlam ADEN (East) Ratlam &
15645837.86 Boards (SEJ, Curve, Keyman Boards etc.) under jurisdiction of 13872038.00 88.54 ADEN (South) Dahod
DEN(West) Ratlam.
25 202002040100047 Dt.28.02.2020 Nagda-Ratlam Section:-Repair to PF covering shed at Nagda, M/s Arihant Engineers, 592, Katju ADEN (East) Ratlam
15656063.01 Khachrod, Berawanya, Runkheda & Bangrod station. Nagar, Ratlam 6099220.00 40.41
26 RTM/2020-21/78 Dt.19.10.2020 Dahod (Workshop):-Repair to AC/GI sheet, valley gutter, ventillator M/s N. S. PATEL, Surat ADEN (Works) Dahod
in various shop at Bay No. C8-D8 to C14-D14, D6-E6 to D18-E18 and
18771355.84 O2-P2 to O16-P16 & repair to working platform require for
operating and maintenance of EOT cranes in various shop.
27 RTM-2020-21-151 Dt.20.05.2021 GDA-NAD Section -Supply ofpotable drinking water at Various M/s DEWAS ASSEMBLES DEWAS- ADEN (East) Ratlam &
stations, LC gates between stations (For 2 years), and cleaning of DEWAS ADEN (Works) Dahod
10990657.89 Over head and under ground water storage tanks(For 2 years) at
various stations between GDA(Excl)NAD(Incl.) and excluding RTM
station.
28 RTM-2020-21-152 Dt.15.05.2021 Godhra-Nagda Section:-Fabrication of 60 kg in situ Glued Joints (692 M/s TEROTECH ENGINEERS ADEN (East) Ratlam &
10310544.93 Nos.). PRIVATE LIMITED-MORADABAD ADEN (South) Dahod
29 RTM/2020-21/110R dt.29.03.2021 Ratlam division:-Recharging of dry open well at various location (22 M/s JAGDAMBA CONSTRUCTION, ADEN (East) Ratlam &
10240978.07 nos) UJJAIN ADEN (South) Dahod
LIST OF ONGOING WORKS COST MORE TAHN Rs.5 CRORE EXCEPT ZONE RTM DIVISION.
1 RTM/2018-19/40(R-3) Dt.30.05.2020 GDA-MGN Sec:- Piplod Yard-Supply of 50 mm size machine crushed Rameshbhai Hemabhai Berawat, ADEN (South) Dahod
79038050.49 stone ballast & loading the same into Railway Hoppers (Total Ballast Dahod 30129097.00 50.00
Qty=88,178 CUM) (As per new specification)
2 RTM/2019-20/117 Dt.28.01.2020 Godhra-Nagda Section:-Deep screening of plain track ballast Haridas, Bhopal
(164.456KMs), manually deep screening of points and crossing 30
Nos. (1:12) & 34 Nos. (1:8.5) in various yards and deep screening of
102876336.66 points and crossing with BCM machine 100 Nos. (1:12) and other 7831878.00 10.00
miscellaneous track works related to deep screening.
3 RTM/2020-21/135 Dt.16.04.2021 Godhra-Nagda Section:- Widening of cutting with provision of drain M/s Shree-Robert JV, Morbi
77501519.31 in connection with raising the speed to 160 kmph on existing NDLS-
MMCT route.
4 RTM/2020-21/107 Dt.27.01.2021 GDA-NAD section:- Providing side drain in connection with raising M/s RICHMOND INFRA TECH
58141947.68 speed to 160 Kmph on existing NDLS-MMCT route. AHMEDABAD
5 RTM/2020-21/111 Dt.03.02.2021 GDA-NAD Section:-Morvani yard-Supply of 50 mm size machine M/s PSC INFRATECH-INDORE ADEN (East) Ratlam
Crushed stone ballast & loading the same into Railway Hoppers at
104657023.26 Morvani yard(Total
Ballast Qty=1,81,149 CUM.)
6 201712040100017 Dt.08.12.2017 Providing S & T rooms, SM office, at Runkheda, Khachrod, M/s Raamesh Construction, ADEN (East) Ratlam &
Berawanya, Amargarh, Bamania, Raoti, Morwani, Thandla Road, Ratlam ADEN (South) Dahod
Bajrangarh, & Panchpiplia stations & IBS S&T rooms at Runkheda-
Khachrod, Berawanya-Nagda, Bhairogarh-Raoti, Bildi-Morwani,
51624309.12 Morwani-Ratlam ”A”, sant Road-Piplod, jekot-USRA and 53482317.00 104.00
panchpipliya-Amargarh in connection with replacement of over
aged indoor and outdoor signals equipment at 10 stations and 8 IBS.
7 201905040100009 Dt.30.05.2019 Godhra-Nagda Section:-Dahod:-Providing Roof leakage treatment of Ramesh Bhai Hema Bhai Berawat ADEN (East) Ratlam
staff quarters, improvement to sewer line, Plaster of quarters, Court 5-Santosh Nagar, Mandavav Road,
65205336.51 Yard doors, colony roads, Individual Latrines at Dahod Railway Dahod (Gujrat) 49947678.00 75.00
Colony.
8 201911040100032 Dt.11.11.2019 Godhra-Nagda Section:- Providing 55 units Type II quarters in lieu of Ramesh Bhai Hema Bhai Berawat ADEN (East) Ratlam &
old abandoned/ dilapidated gang staff quarters at BILDI (06 unit), 5-Santosh Nagar, Mandavav Road, ADEN (South) Dahod
85672118.66 BOG(09 units), MRN (06 units), PCN (15 units), SAT (19 units) Dahod (Gujrat) 34752140.00 40.00
stations including electrical work of these 55 units type-II quarters.
9 201904040100004 Dt.12.04.2019 394262718.16 Godhra-Nagda Section and Surat-Vadodara-Godhra Section :- M/s BHAGWATI CONSTRCUTION, ADEN (East) Ratlam &
RTM= Construction of Boundary wall Near Stations and its approaches as 304, ASHIRWAD PARAS COMPLEX, ADEN (South) Dahod
125559220 measure to safe guard track and establishments avoiding OPPO PRAHLAD NAGAR GARDEN,
encroachments in ADEN(E)RTM, ADEN(S) DHD, ADEN(N) BRC, AHMEDABAD (GUJRAT)-380015 120441118.00 96.00
ADEN(N) BH and ADEN(S) BH Jurisdiction.(Total= 50.760 kms.)
10 RTM-2021-22-01 Dt.29.05.2021 82174855.80 NAD-RTM section- Realignment of curve No.126 UP/DN, 127UP/DN, M/s KISHAN INFRASTRUCTURE
129DN & 130 UP/DN. Scope of work includes earthwork in PRIVATE LIMITED-RAJKOT
formation , laying of new track , slewing of existing track on curves ,
extension of Bridge culvert in connection with raising the speed to
160 kmph on existing NDLS-MMCT route.
LHS Work
1 201804310100003 dt. 09.04.2018 Godhara-Ratlam section-Providing Subway to eliminate manned LC Deosi Govind JI Parmar, Kutch ADEN (RSW) Ujjain
No. 39x Km 526/40-42 Between USRA-JKT Station, Godhara-Ratlam
section-Providing Subway to eliminate manned LC No.62 Km
63905169.00 581/08-10 Between MGN-THDR Station. Godhara-Ratlam section- 88521057.00 140.00
Providing Subway to eliminate manned LC No.64 Km 584/22-24
Between THDR-BJG Station.
2 201804310100002 dt.06.04.2018 Godhara - Ratlam section :- Providing Subway to eliminate manned Deosi Govind JI Parmar, Kutch ADEN (RSW) Ujjain
LC No. 12 Km 480/12-14 near CCL Yard at,Godhara - Ratlam
section :- Providing Subway to eliminate manned LC No. 13 Km
63679674.00 482/10-12 b/w CCL-SAT station at.Godhara - Ratlam section :- 74238599.00 120.00
Providing Subway to eliminate manned LC No. 29 Km 503/10-12
b/w PPD-LMK at.
3 201805310100004 Dt.07.05.2018 Nagda-Ujjain section-Providing Subway to eliminate manned LC Brham Prakash Modi, Jaipur ADEN (RSW) Ujjain
No.12 Km 25/26-28 Between UNL-PSO Station.Ratlam-Nagda
section-Providing Subway to eliminate manned LC No.86 Km
64417467.00 662/04-06 Between RTM 'E'- BOD Station.Ratlam-Nagda section- 34062939.00 57.12
Providing Subway to eliminate manned LC No.89 Km 667/07-08
Between BOD-RNH Station.
4 201909301100002 Dt.30.09.2019 RTM Divison Prov. Sub way elemenated manned level crossing LC OM Prakash Goyal & Co., ADEN (RSW) Ujjain
105489216.00 No. 79, 80 & 87 in GDA-RTM Section Neemuch 13788928.00 13.07
5 201911310100004 Dt.04.11.2019 Ratlam Division : Providing LHS by launching of Pre cast RCC Box OM Prakash Goyal & Co., ADEN (RSW) Ujjain
68808867.00 segment using R.H. girder & Cutting method at LC No. 85, 88, 93 & Neemuch 39553762.00 57.48
97 of GDA-NAD Section (Total No. of LC=04 Nos.) .
6 RTM/2020-21/141 Dt.23.04.2021 Ratlam Division :-Providing Subway(RUB) to eliminate manned Level M/s PRAWEEN GULATI ADEN (RSW) Ujjain
crossings nos. 90(Km:668/24-26), 91 (Km:670/24-26), INFRASTRUCTURE PVT. LTD.-
94(Km:674/20-22), 95 (Km:676/14-16), 99(Km:685/04-06) & 101 AHMEDABAD
230506456.19 (Km:690/12-14)(Total=06 Nos.) in RTM-NAD section by inserting
relieving girder and laying the box(es) by pushing the box below the
relieving girder.
7 RTM/2020-21/146 Dt.28.04.2021 Godhra-Nagda Section:- Providing LHS to eliminate manned LCs Brham Prakash Modi, Jaipur ADEN (RSW) Ujjain
59303068.00 No.17 & 100 in GDA-NAD section on GQ Route . 0.00 0.00
LIST OF ONGOING WORKS COST MORE TAHN Rs.1 CRORE EXCEPT ZONE RTM D
1 201602040100026 Dt.15.02.2016 GDA-NAD Section:-TRR with 60kg new rails(45.181 km) &
13617145.56 removal of rubber pads(297.49 km.).
23 RTM/2020-21/112R Dt.25.02.2021 GDA-NAD section:- Deep screening of loop lines and Turnout
11141821.74 (Manually) at NAD.
24 RTM/2020-21/102 Dt.12.01.2021 Meghnagar-Nagda Section:-Deep screening of loop lines and
turnout (Manually) at RTM yard and Through ballast renewal by
23787145.14 shallow screening TBR (SBC) 25.0 Km under ADEN (East) Ratlam
jurisdiction.
28 201908040100014 Dt.08.08.2019 Ratlam Division:-Providing tool cum rest room for trackmen.
10881270.53
22057879.43
35 WR/RTM/Civil/2020/ Dt.15.06.2020 20012024 GDA-RTM Section:-Providing covering shed atLHS to avoid water
0007 logging with elimination of level crossings No. 6X(Km-473/16-
18), 11(Km-479/14-16) and12 (Km-480/12-14) (Total=03Nos.)
VIVEK CONSTRUCTION-RATLAM
53482317.00 104.00
M/s OM PRAKASH
MENGHANIBHOPAL
Sr. C.A. NO. DATE C.A. VALUE NAME OF WORK AGENCY PROGRESS WORK INCHARGE(WITH NAME)
AMOUNT % SR.DEN ADEN
1 201906040100011 Dt.14.06.2019 Godhra-Nagda Section:-Morwani Yard:-Supply of 50mm size M/s Saiyyed Akhtar Ali, 16/10,
machine crushed stone ballast and loading the same into Rehmat Nagar, Ratlam
62250064.33 Railway hoppers at Morwani Yard. (Total Ballast Qty.=1,03,750 60677000.00 97.00
cum).
2 RTM/2018-19/ Dt.30.05.2020 GDA-MGN Sec:- Piplod Yard-Supply of 50 mm size machine Rameshbhai Hemabhai Berawat,
40(R-3) 79038050.49 crushed stone ballast & loading the same into Railway Hoppers Dahod 30129097.00 50.00
(Total Ballast Qty=88,178 CUM) (As per new specification)
3 RTM/2019-20/117 Dt.28.01.2020 Godhra-Nagda Section:-Deep screening of plain track ballast Haridas, Bhopal
(164.456KMs), manually deep screening of points and crossing
30 Nos. (1:12) & 34 Nos. (1:8.5) in various yards and deep
102876336.66 screening of points and crossing with BCM machine 100 Nos. 7831878.00 10.00
(1:12) and other miscellaneous track works related to deep
screening.
4 RTM/2020-21/135 Dt.16.04.2021 Godhra-Nagda Section:- Widening of cutting with provision of M/s Shree-Robert JV, Morbi
77501519.31 drain in connection with raising the speed to 160 kmph on
existing NDLS-MMCT route.
5 RTM/2020-21/107 Dt.27.01.2021 GDA-NAD section:- Providing side drain in connection with M/s RICHMOND INFRA TECH
58141947.68 raising speed to 160 Kmph on existing NDLS-MMCT route. AHMEDABAD
6 RTM/2020-21/111 Dt.03.02.2021 GDA-NAD Section:-Morvani yard-Supply of 50 mm size machine M/s PSC INFRATECH-INDORE
Crushed stone ballast & loading the same into Railway Hoppers
104657023.26 at Morvani yard(Total Ballast Qty=1,81,149 CUM.)
7 201712040100017 Dt.08.12.2017 Providing S & T rooms, SM office, at Runkheda, Khachrod, M/s Raamesh Construction,
Berawanya, Amargarh, Bamania, Raoti, Morwani, Thandla Road, Ratlam
Bajrangarh, & Panchpiplia stations & IBS S&T rooms at
Runkheda-Khachrod, Berawanya-Nagda, Bhairogarh-Raoti, Bildi-
51624309.12 Morwani, Morwani-Ratlam ”A”, sant Road-Piplod, jekot-USRA 53482317.00 104.00
and panchpipliya-Amargarh in connection with replacement of
over aged indoor and outdoor signals equipment at 10 stations
and 8 IBS.
8 201905040100009 Dt.30.05.2019 Godhra-Nagda Section:-Dahod:-Providing Roof leakage Ramesh Bhai Hema Bhai Berawat
treatment of staff quarters, improvement to sewer line, Plaster 5-Santosh Nagar, Mandavav Road,
65205336.51 of quarters, Court Yard doors, colony roads, Individual Latrines Dahod (Gujrat) 49947678.00 75.00
at Dahod Railway Colony.
9 201911040100032 Dt.11.11.2019 Godhra-Nagda Section:- Providing 55 units Type II quarters in Ramesh Bhai Hema Bhai Berawat
lieu of old abandoned/ dilapidated gang staff quarters at BILDI 5-Santosh Nagar, Mandavav Road,
(06 unit), BOG(09 units), MRN (06 units), PCN (15 units), SAT (19 Dahod (Gujrat)
85672118.66 units) stations including electrical work of these 55 units type-II 34752140.00 40.00
quarters.
10 201904040100004 Dt.12.04.2019 394262718.16 Godhra-Nagda Section and Surat-Vadodara-Godhra Section :- M/s BHAGWATI CONSTRCUTION,
RTM= Construction of Boundary wall Near Stations and its approaches 304, ASHIRWAD PARAS COMPLEX,
125559220 as measure to safe guard track and establishments avoiding OPPO PRAHLAD NAGAR GARDEN,
encroachments in ADEN(E)RTM, ADEN(S) DHD, ADEN(N) BRC, AHMEDABAD (GUJRAT)-380015 120441118.00 96.00
ADEN(N) BH and ADEN(S) BH Jurisdiction.(Total= 50.760 kms.)
LHS Work
1 201804310100003 dt. 09.04.2018 Godhara-Ratlam section-Providing Subway to eliminate manned Deosi Govind JI Parmar, Kutch
LC No. 39x Km 526/40-42 Between USRA-JKT Station, Godhara-
Ratlam section-Providing Subway to eliminate manned LC No.62
63905169.00 Km 581/08-10 Between MGN-THDR Station. Godhara-Ratlam 88521057.00 140.00
section-Providing Subway to eliminate manned LC No.64 Km
584/22-24 Between THDR-BJG Station.
2 201804310100002 dt.06.04.2018 Godhara - Ratlam section :- Providing Subway to eliminate Deosi Govind JI Parmar, Kutch
manned LC No. 12 Km 480/12-14 near CCL Yard at,Godhara -
Ratlam section :- Providing Subway to eliminate manned LC No.
63679674.00 13 Km 482/10-12 b/w CCL-SAT station at.Godhara - Ratlam 74238599.00 120.00
section :- Providing Subway to eliminate manned LC No. 29 Km
503/10-12 b/w PPD-LMK at.
3 201805310100004 Dt.07.05.2018 Nagda-Ujjain section-Providing Subway to eliminate manned LC Brham Prakash Modi, Jaipur
No.12 Km 25/26-28 Between UNL-PSO Station.Ratlam-Nagda
section-Providing Subway to eliminate manned LC No.86 Km
64417467.00 662/04-06 Between RTM 'E'- BOD Station.Ratlam-Nagda 34062939.00 57.12
section-Providing Subway to eliminate manned LC No.89 Km
667/07-08 Between BOD-RNH Station.
4 201909301100002 Dt.30.09.2019 RTM Divison Prov. Sub way elemenated manned level crossing OM Prakash Goyal & Co.,
105489216.00 LC No. 79, 80 & 87 in GDA-RTM Section Neemuch 13788928.00 13.07
5 201911310100004 Dt.04.11.2019 Ratlam Division : Providing LHS by launching of Pre cast RCC Box OM Prakash Goyal & Co.,
68808867.00 segment using R.H. girder & Cutting method at LC No. 85, 88, 93 Neemuch 39553762.00 57.48
& 97 of GDA-NAD Section (Total No. of LC=04 Nos.) .
6 RTM/2020-21/146 Dt.28.04.2021 Godhra-Nagda Section:- Providing LHS to eliminate manned LCs Brham Prakash Modi, Jaipur
59303068.00 No.17 & 100 in GDA-NAD section on GQ Route . 0.00 0.00