HIGHWAY CIRCLE, D.G.

KHAN
LIST OF SCHEMES ADP 2016-17
Sr. Length Approved Allocation Time Consultancy
ADP No. Name of Schemes Cost
No (Kms) Cost 2016-17 Limit

DISTRICT D.G.KHAN
Construction of metalled road from
06
1. 3686 Vehova to Binda from Km No.0.00 8.00 84.000 18.750 Months
to 8.00 Length = 8.00 Km.
DISTRICT RAJANPUR
Construction of metalled road from
Thul Janan to Mud Rindan U/C 12
2. 3691 14.00 150.000 20.000 Months
Thul Ali Muhammad, Tibbi Lundan
Length = 14 Km.
Rehabilitation / W/I of metalled
road from Sheroo Adda to Nala 06
3. 3693 6.50 79.500 22.500 Months
Soon Road Length = 6.50 Km
(Phase-I to Phase-IV).
Widening/Improvement of road
06
4. 3694 from Dajal to Harrand from Km 5.55 70.500 22.500 Months
No.0.00 to 5.55 Length = 5.55 Km
DISTRICT MUZAFFARGARH
Construction of Road from Chak
No. 530/TP to Goormani Chowk, 06
5. 3713 7.00 58.079 15.000 Months
Chak No. 528, Length 11 Km
(Phase-I Length = 7.00 Km)
Metalled Road from Sohni Chowk
06
6. 3717 to Rampur Hospital (24 Feet) 7.00 3.70 71.520 18.750 Months
KM (Phase-I Length = 3.70 Km)
DISTRICT LAYYAH
Construction of Metalled road from
Chak No.157/TDA to Chak No.
12
7. 3722 425/ TDA via Chak No. 169/TDA 11.55 100.901 25.000 Months
Length = 19.70 Km (Phase-I
Length =11.55 Km)
Const. of metalled road from Chak
No.160-A/TDA to MM Road via
12
8. 3723 Chak No.150, 151, 145, 140, 142 & 26.00 240.886 25.000 Months
154-A, Layyah Length = 39.00 KM
(Phase-I Length = 26 Km).
W/I of Road from Heera Adda to
12
9. 3724 Ghalloo Mor via Ladhana & Pir 37.80 499.377 25.000 Months
Jaggi Sharif, Length = 37.80 Km.
Total 120 1355 193