Professional Documents
Culture Documents
10
CONCRETE METER CONCRETE METER
BOX WITH COVER BOX WITH COVER 0.60 0.20
1.00
AND LOCK AND LOCK
0.28
NGL NGL
0.15
REINFORCED REINFORCED
1.00
CONCRETE CONCRETE
0.70 TAP STAND 1.10 0.20 REINFORCED TAP STAND
CONCRETE
0.10
0.10 TAP STAND
10 MM DIA. DEF. BARS BRASS FAUCET 10 MM DIA. DEF. BARS BRASS FAUCET
BRASS FAUCET
SPACED AT 0.20 MM OCBW SPACED AT 0.20 MM OCBW
CONCRETE METER CONCRETE METER
BOX WITH COVER 0.80 BOX WITH COVER
AND LOCK AND LOCK
0.45
0.60 0.60
0.75
10 MM DIA. DEF. BARS 10 MM DIA. DEF. BARS
0.20 SPACED AT 0.10 MM OCBW 0.20 SPACED AT 0.10 MM OCBW
REINFORCED CONCRETE
FAUCET PAD
2-FAUCET TAP STAND FRONT ELEVATION 2-FAUCET TAP STAND LEFT SIDE ELEVATION 1-FAUCET TAP STAND FRONT ELEVATION 1-FAUCET TAP STAND LEFT SIDE ELEVATION
SCALE 1:16 SCALE 1:16 SCALE 1:16 SCALE 1:16
TAP STAND TYPE 2 -TAP STAND TO BE CONSTRUCTED OVER OPEN LINED CANAL
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
PHILIPPINE RURAL
DEVELOPMENT PROJECT
DEVELOPMENT OF TIWI POTABLE WATER SYSTEM 32
MUNICIPALITY OF TIWI PUBLIC FAUCET TYPE 2 DETAILS
LOCATION: Tiwi, Albay ENGR. MABEL P. KALLOS ENGR. ERIC MONICO B. BUSTILLO ENGR. EDMUND C. DANTES JAIME C. VILLANUEVA 167
PROVINCE OF ALBAY ENGINEERING ASSISTANT MUNICIPAL ENGINEER MPMIU/MPDO MUNICIPAL MAYOR
DATE: DATE: DATE: DATE: