You are on page 1of 2

Proposed Work Flow for the Design of the Proposed Construction of Tula-Tula Relocation Site Water

Supply, Improvement of Camalig Relocation Site Water System and the Construction of Water System
for the Baligang Relocation Site.

Key Result Area Objective Activity Expected Output Duration/Time Resources


line Needed
Water Demand To ensure that - Updating of Updated 3 days Mobilization
Established water data on population, Cost
consumption is population for growth rate
computed based all relocation ,projected
on the present sites population and
and projected - Computation demand for the
population for of population duration of the
the for the growth rate Project design
duration of the life.
project design
life
Water Supply To ensure that a -Coordination Identified water 14 days Follow up and
Established/Identified sufficient supply with Camalig source and updating of the
of potable water Water District method of letter request
is identified / on the state of extraction. to MGB,
established in texisting water Assistance in
preparation for sources near the the
the detailed vicinity of the coordination
engineering project sites with Camalig
design - Coordination water district
with Municipal
Engineers Office
for the conduct
of Geo-
Resistivity Tests
on all project
sites for the
identification of
areas for water
source
development
Site topography To ensure that Geo-Mapping/ Topographic 7 If survey works
identified the elevations Survey works (if Map/ Profile of is deemed
and contours of needed) Proposed Pipe necessary, The
the proposed Network cost of the
site are survey works
identified in
preparation for
the preparation
of he detailed
engineering
design
Detailed Engineering To ensure that Hydraulic Complete 14
Design Completed with the data Analysis, Engineering Plan,
gathered a Structural Analysis Results,
sound Analysis (if Program of
engineering needed), Design Works with Bill of
design will be Preparation,Qua Quantities
prepared that ntity Survey
will meet the
required
engineering
standards and
the
requirements of
the project and
the target
beneficiaries

Prepared By:

ARMAND MIKHAIL G. TEMPLADO


Consultant