This report is dedicated to my beloved mother Mrs. Ngozi Benny Ikeh-Chima for her
i
ACKNOWLEGEMENTS
I wish to humbly sound my profound gratitude to God foremost for the guidance and his grace
throughout my life.
I’m grateful to the entire staff of Business Contracting Limited for accepting me to experience
my industrial training programme as well as making it very educative, fun and worthwhile.
My special gratitude goes to my course advisor Dr. Waisu Bello A. for his constant support
department for their seasoned lectures and a special thanks to my H.O.D. Dr. Joseph A.
My regards to my amazing parents, ┼Mr Randie Enyioma Chima and Mrs Ngozi Benny Ikeh-
Chima who financially supported my educational pursuit. I say thank you and forever remain
ii
TABLE OF CONTENTS
Dedication i
Acknowledgement ii
Table of Contents iii
List of Figures v
Abstract vi
iii
3.2.8 Measurement and Preparation of B.O.Q’s 20
3.3 Site Experience 21
3.3.1 Pile construction 21
3.3.2 Construction Of Reinforced Concrete Members 21
3.3.3 Block Laying 25
3.3.4 Septic Tank Construction 27
3.3.5 Surveying Exercises 28
3.3.6 Fire hazard and Firs Aid Training 29
iv
LIST OF FIGURES
Figure 1: Company Logo 4
Figure 2: Organization Chart 11
Figure 3: Sample Of An Architectural Plan 13
Figure 4: Sample Of a Structural Plan Of Pile Foundation 14
Figure 5: Sample Of An Electrical Plan For a Building 15
Figure 6: Interface Of Ms Project 16
Figure 7: Interface Of AutoCAD Software 17
Figure 8: An Interim Valuation Report 18
Figure 9: A Material Schedule Report 19
Figure 10: Labour Productivity Report 20
Figure 11: Excavation works for pile 34
Figure 12: Pile Foundation Construction 34
Figure 13: Ground slab construction 35
Figure 14: Upper floor beam construction 35
Figure 15: Column Construction 36
Figure 16: Block Laying 36
Figure 17: Septic tank construction 37
Figure 18: Setting Out 37
Figure19: Fire Hazard training exercise 38
Figure 20: Dumper, truck, mobile crane 39
Figure 21: Excavator 39
Figure 22: Concrete Mixer 40
Figure 23: Pile driver 40
Figure 24: Crane 41
v
ABSTRACT
The Student Industrial Work Experience Scheme established by the Federal Government of
Nigeria was aimed at exposing students of higher institutions to acquire industrial skill and
practical experience in their approved courses of study and also to prepare the students for the
industrial work situation which they are likely to meet after graduation. This technical report is
based on the experiences gained during my five months of industrial training at Business
Contracting Limited. This report highlights how construction projects are being measured,
estimated and correctly managed. I was opportune to work in four (4) different sites: GNBC
surulere, Skyvilla by Grenadines Homes Ikoyi, Nicon Town Estate Lekki and Iconic Towers
Victoria Island. These sections have exposed me to the safety precautions, rules and
regulations, management and construction processes. Most importantly, it describes the
activities and my experience gained during the period of the training. Also, it states the
problems encountered and gave suggestions for improvement of the scheme.
vi