No Indonesian Unit

1 Berapa lama memasang (installasi) Boiler unit 1? 1


2 Berapa lama merakit Cyclone Separator? 1
3 Berapa lama memasang Economizer? 1
4 Berapa lama memasang Primary Air Fan? 1
5 Berapa lama memasang Secondary Air Fan? 1
6 Berapa lama memasang Reverse Air Fan? 1
7 Berapa lama memasang Forced Draught Fan? 1
8 Berapa lama memasang Turbine? 1
9 Berapa lama memasang Generator? 1
10 Berapa lama memasang Main Transformer? 1
11 Berapa lama memasang Auxiliary Transformer? 1
12 Berapa lama memasang Non Segragated Phase Bus Duct? 1
13 Berapa lama memasang Integrated Phase Bus Duct? 1
14 Berapa lama merakit Demineralized Water Tank? 1
15 Berapa lama merakit Service Water Tank? 1
16 Berapa lama merakit Chimney? 1
17 Berapa lama memasang Steel structure main building?
18 Berapa lama memasang Tank? 1
19 Berapa lama memasang Coal Bunker? 1
20 berapa lama memasang Coal conveyor? 1
21 Berapa lama memasang Ship unloader? 1
22 Berapa lama memasang Reclaimer? 1
23 Berapa lama memasang Coal Feeder? 1
24 Berapa lama memasang Pump? 1
25 Berapa lama memasang Motor? 1
26 Berapa lama memasang Piping?
27 Berapa lama memasang Motor Control Center? 1
28 Berapa lama memasang Power Distribution Control? 1
29 Berapa lama memasang Conduit Pipe?
30 Berapa lama memasang Cable Power?
31 Berapa lama memasang Post Insulator? 1
32 Berapa lama memasang Surge Arrester? 1
33 Berapa lama memasang Capacitive Voltage Transformer? 1
34 Berapa lama memasang Current Transformer? 1
35 Berapa lama memasang Voltage Transformer? 1
36 Berapa lama memasang Circuit Breaker? 1
37 Berapa lama memasang Disconnector Switch? 1
38 Berapa lama memasang Lighting Pole? 1
39 Berapa lama memasang HP Drum? 1
40 Berapa lama memasang LP Drum? 1
41 Berapa lama memasang Insulation?
42 Berapa lama memasang Medium Voltage Switchgear? 1
43 Berapa lama memasang Low Voltage Switchgear? 1
44 Berapa lama memasang Electrical Cabinet? 1
45 Berapa lama memasang Electrical Panel? 1
46 Berapa lama memasang Marshalling Kios? 1
47 Berapa lama memasang Chiller? 1
48 Berapa lama memasang De-aerator? 1
49 Berapa lama memasang Water Intake Channel Pipe 1
50 Berapa lama memasang Grounding
51 Berapa lama memasang Lighting
Durasi (Hari) Duration Labor Nonlabor
Level Activity ID Quantity Unit of Measure Production per day
1.1 Piling Work Lm
1.2 Foundation Work 165,000 M3 917
1.3 Steel Structure Installation 25,000 Ton 139
1.4 Mechanical Work
Pump
Tank
Support
1.8
1.9 Piping Work 5,000,000 Di 23,810
1.1 Electrical Work
1.11 Instrument and Control Work
1.12 Architecture Work
Unit of Measure
Lm
M3
Ton

Di