Professional Documents
Culture Documents
Table of Contents
1) General description of process....................................................................................................2
2) Situation.....................................................................................................................................2
3) Needed transactions...................................................................................................................2
4) System Demo..............................................................................................................................2
5) FAQs...........................................................................................................................................7
2) Situation
Describing the different reports.
3) Needed transactions
ZPP_CO14 Analyses of order confirmation for regular reports
4) System Demo
Analyses for monthly management report (translations will follow)
Select either a certain posting date, a certain confirmation or a work center. In addition the type
of analysis has to be chosen.
Daily report
Monthly report
Monthly report special shifts
Cycle Efficiency
Display Confirmation
Execute with
The order confirmation for all machines starting with M* are now shown.
You can use the standard layout functions and excel download for a better overview.
- Machine
- Product description
- Mould
- Planned cycle time (“Soll-Zyklus”)
- Real cycle time (“Ist-Zyklus”)
- Total quantity (“Menge Gesamt”) – good parts, no scrap
- Number of injections (“Menge Schuss”)
- Planned/ Real Efficiency (“Soll-Ist Leistung”) – real production hours divided by planned
production hours multiplied by 100 [real production hours= confirmed good quantity/
number of production hours]
- Planned/ Real Hours (“Soll-Ist Stunden”) – Real hours divided by planned hours multiplied
with 100
- Number of production hours (“Prod-Stunden”) – number of calculated or manual corrected
hours in the confirmation
- Total hours (“Gesamt”) - number of production hours + downtimes
- Confirmation number
- Date of confirmation
ZPP_CO14 Monthly Report
The report now shows all downtimes in the selected time per each downtime reason.
- Machine
- Number of production hours (“Prod-Stunden”) – number of calculated or manual corrected
hours in the confirmation
- Downtime reasons (F1-F10)
- Total hours, production hours + downtime (“Gesamt”)
- Planned/ Real Hours (“Soll-Ist Stunden”) – number of production hours divided by total hours
(prod. + downtime) multiplied with 100
ZPP_CO14 Cycle Efficiency
- Material number
- Confirmed good quantity
- Planned production/ hours (“Soll-Produktion/Std”) – number of production hours multiplied
with planned production hours
- Planned/ real hours/ efficiency (“S/I/Std(Lei”) – confirmed good quantity divided by planned
production/ hours multiplied with 100
- Material description
ZPP_CO14 Display order confirmation
You can double click on a confirmation and see the details how they were entered:
Display Confirmation (With scrap declaration & scrap cost) :
Choose the plant (division) and the date then click on Confirmation HT ( Afficher confirmation
HT)
Click on
You need to change the form by clicking on
Then Select the form for Scrap view (HTM SCRAP) and click ok :
Now you can see the confirmed scrap and the cost :
5) FAQs