Network Security Management Regulation For Subcontractor
Network Security Management Regulation For Subcontractor
Subcontractor PIC
Get on site before 30mins On Start time, Notice to enter Huawei: PIC Subcontractor PIC
Implementation, strictly follow 1st confirmation with Take photo after
early than CR time site and ACK with HW. Clock out with
up MOP step and scope. Integrator about operation Leave Site
Notice PE, Integrator Enter site double confirmation
No operate out of MOP service verification Clean the site
Clock in Take photo before operation envidence.
Call HW immediately when 2nd confirmation with
meet any unexpected issue PE
Network Roll Out
8 (Delapan) Kebijakan Huawei Indonesia untuk
8 (eight) Policies of Huawei Indonesia for
Tenaga Kerja Lapangan Subkontraktor di Site Core
Field Operation Subcontractor in Core Site
Subkontraktor wajib mengikuti Huawei MOP petunjuk kerja untuk setiap pekerjaan
1
Subcontractor must follow Huawei MOP Work Guidance for each activities such as 1
(MOS, Installation, Commissioning and ATP, etc.) (MOS, Instalasi, Commissioning, ATP dan lain lain)
Subkontraktor wajib mengikuti Huawei SOW (Scope Of Work), jika ada pekerjaan tidak
Subcontractor must follow Huawei SOW (Scope Of Work), if any activities out of SOW 2 sesuai dengan SOW maka pekerjaan ditunda dan eskalasi melalui telfon kepada Huawei
2 PM, CTM dan TD dalam 5 menit.
must suspend and escalate call to Huawei PM/CTM/TD within 5 Minutes.
Subkontraktor wajib memahami detail Scope Of Work (SOW) List kewajiban kerja yang
3 berkaitan dengan PO Kontrak dan tabel kewajiban, jika ada informasi yang tidak jelas
Subcontractor must understand the detail Scope Of Work (SOW) Related with PO
Subkontraktor harus kontak dengan team Huawei
3 Contract and Responsibility Matrix, if have any unclear information Subcontractor
must contact with Huawei
Sebelum Subkontraktor berinteraksi dengan material yang sudah terinstall di ruangan
Subcontractor before interact of existing network material such as (patch cord, mcb, antara lain (kabel patch cord, mcb, perangkat, cable tray, dll) harus mendapat
equipment, cable tray, etc) must get approval with huawei PM, CTM and TD. Can not 4 persetujuan dari Huawei PM, CTM dan TD. Tidak boleh langsung interaksi dengan
4 material sensitive hanya karena permintaan pelanggan (customer).
interact with sensitive parts just because of customer request
Subcontractor must call to Huawei Huawei PM/CTM/TD if encounter any problem 7 Subkontraktor yang masuk ke site wajib memiliki pass ID.
8
within 5 Minutes.
Subkontraktor wajib menghubungi Huawei PM, CTM and TD dalam kurun waktu 5 menit
8
apabila mengalami masalah.
Core Site: Site with Core Network or BSC/RNC or Routers, Hub Site , Core Switch Site & Data Centre (DC) and the site which is treated as Core Site by Customer
RSC network security operation flow: Manual management
Automatic IT management
Personnel ID + SPES + NetCareClient + NetCare account management + WFM change control & account verification
IT coverage: PC antivirus and security protection, PC redline tool management, personnel qualification management, network account application management, and
network operation management