Professional Documents
Culture Documents
Maintenance Remorqueur-Anciens
Maintenance Remorqueur-Anciens
d’ EHOALA
MADAGASCAR
Remorqueur EHOALA TOLY ME BD ME TD GE1 GE2 CPRS 1 CPRS 2
Sunday, January 23, 2022 HR 20322 20463 13005 13100 976 976
Maintenance plan
Ref Item Jobs descriptions period U Done Due to running hr RQS LATE OK
1.0 PORT MAIN ENGINE
1.1 Lub Oil Sampling/Analysis 250 h 19346 19596 976 CAT/MANDENA
1.2 Air starter filter Clean 250 h 19346 19596 976
1.3 Hoses Inspect 250 h 19346 19596 976
1.4 Coolant system Test/Add conditioner 250 h 19346 19596 976
1.5 Zinc Rod Check/Replace 1000 h 19346 20346 976
1.6 Fuel filter primary Replace AR 19215 AS REQUIRED
1.7 Air filter Blow/Replace AR AS REQUIRED
1.8 Starting air lubricator Check/Adjust level AR AS REQUIRED
1.9 Sea water strainer Clean 90 J 30-mars-00 RETARD
1.10 Oil filters Replace 1000 h 19346 20346 976 24 h restantes
1.11 Lub Oil Change 1000 h 19346 20346 976
1.12 Fuel filter main Replace 1000 h 19215 20215 1107
1.13 Engine protective devices Check/Inspect 1000 h 19346 20346 976
1.14 Crankcase Breather Clean 1000 h 19346 20346 976
1.15 FW cooler Clean 1000 h 19346 20346 976
1.16 Engine Valve lash Adjust 1000 h 19346 20346 976 by team CAT
1.17 Turbo chargers Inspect/Check 1000 h 19346 20346 976
1.18 Vibration Damper Inspect/Check 2000 h 19346 21346 976 by team CAT
1.19 Engine Mounts Inspect/Check 2000 h 19346 21346 976
1.20 Cooling system&Conditioner Clean& Change 4000 h 19346 23346 976
1.21 Water pumps(Jacket&Aux) Inspect/Rebuilt/Exchange 6000 h 19346 25346 976
1.22 Air Starting Motor Inspect/Rebuilt/Exchange 6000 h 19346 25346 976
1.23 Turbo chargers Inspect/Rebuilt/Exchange 6000 h 18000 24000 2322 by team CAT
1.24 Fuel Injectors Test 7500 h 15000 22500 5322 by team CAT
1.25 Thermostat Replace 7500 h 15000 22500 5322 by team CAT
1.26 Top End Overhaul Inspect cylinder head 10000 h 10000 20000 10322 by team CAT
1.27 Engine Major Overhaul 20000 h 20000 20322 by team CAT
1.28 Aftercooler Core Clean/Test DD DRY DOCK
1.29 Oil cooler Clean/Test DD DRY DOCK
14.0 PUMPS
14.1 Air Cond Cooling pump Overhaul AR/DD AS REQUIRED DRY DOCK
14.2 Potable FW pump n°1 Overhaul AR/DD AS REQUIRED DRY DOCK
14.3 Potable FW pump n°2 Overhaul AR/DD AS REQUIRED DRY DOCK
14.4 Ballast pump Overhaul AR/DD AS REQUIRED DRY DOCK
14.5 Gen Serv/Fire pump Overhaul AR/DD AS REQUIRED DRY DOCK
14.6 Std-by Hydraulic pump Overhaul AR/DD AS REQUIRED DRY DOCK
14.7 SW cooling pump for prop Overhaul AR/DD AS REQUIRED DRY DOCK
14.8 Fwd WTD Hydraulic pump Overhaul AR/DD AS REQUIRED DRY DOCK
14.9 Aft WTD Hydraulic pump Overhaul AR/DD AS REQUIRED DRY DOCK
15.0 ELECTRICITY
15.1 Main Switch Board Clean,check connection DD DRY DOCK
15.2 Emergency SB Clean,check connection DD DRY DOCK
15.3 Distribution SB Clean,check connection DD DRY DOCK
15.4 24Volts Batteries Check Voltage&level 30 J 18-mars-21 17-avr.-21 RETARD
19.0 CAPSTAN
19.1 Bearing, all points Lubricate 60 J 1-oct.-18 30-nov.-18 RETARD
20.0 SAFETY
20.1 Quick closing valves Test function 30 J 30-avr.-21 30-mai-21 RETARD
20.2 Bilge Water High Level Alarm Test function 30 J 30-avr.-21 30-mai-21 RETARD
20.3 Fire Detection/Alarm Test function 30 J 9-mars-17 8-avr.-17 RETARD with brigade
20.4 Main Fire pump/Hose/Nozzle Test function 30 J 30-avr.-21 30-mai-21 RETARD
20.5 CO2 Fixed Installation Test function/blow pipe 90 J 30-avr.-21 29-juil.-21 RETARD
20.6 Emergency steering Test function 30 J 24-mars-21 23-avr.-21 RETARD Visite Annuelle par APMF
20.7 Fwd/Aft WTD emerg shut Test function 30 J 30-avr.-21 30-mai-21 RETARD
20.8 TOW SAFETY TEST with bollard test 60 j 1-févr.-21 2-avr.-21 RETARD
PORT
d’ EHOALA
MADAGASCAR
REMORQUEUR EHOALA TOLY