You are on page 1of 28

The Maryland State Highway Administration (SHA)  

Road Ready E‐Construction Brochure 
Spring and summer in Maryland offer a wide variety of recreational opportunities easily
reachable by a short road trip. These seasons also offer the best weather for road construction,
which is often most active during “off peak” time to avoid heavy traffic. Keep your road trip
from turning into a slow moving construction tour, the State Highway Administration (SHA)
created “Road Ready” to help you avoid construction zones or allow extra time to reach your
destination.

Road Ready provides a list of the major projects along State highways. Designed in an all-
electronic format this year, each project listing links to more information and/or a map. SHA
includes nearby Scenic Byways information to consider alternate routes when avoiding
construction zones.

In addition to the major projects listed you may also encounter mobile or short-term work zones.
Always drive attentively and slowly through any work zone. Whether it’s a tree trimming
operation or a bridge replacement project, highway crews deserve a high degree of safety so they
can go home at the end of the day unharmed. Think Orange-the color of construction
equipment and slow down.

Over the past 10 years in Maryland there has been an average of 2,600 work zone crashes each
year, injuring more than 1,400 and killing 12 people. Nationally, more than 700 people are killed
each year in work zone crashes – and the majority of them are motorists or their occupants.

Hundreds of state employees, contractors and sub-contractors will be in work zones this season.
While SHA and its transportation partners work hard to keep traffic safely moving in work
zones, each driver needs to actively modify his or her driving style to help prevent crashes.

Citizens can also follow SHA on Twitter @MDSHA for current news releases, alerts or major
incidents in Maryland.

(More)
The Projects

District One (Dorchester, Wicomico, Worcester and


Somerset counties)

DORCHESTER COUNTY

US 50 (Ocean Gateway)
Limits: Old Ocean Gateway to the Nanticoke River
Work: Resurfacing
Start Date: Early-summer 2011
Est. Comp: Late-summer 2011

WICOMICO COUNTY

US 13 Business (Salisbury Boulevard)


Limits: Bridge over US 50 Business (Salisbury Parkway)
Work: Bridge deck replacement
Start Date: Spring 2010
Est. Comp: Fall 2011

US 13 (Ocean Highway)
Limits: US 50 (Salisbury Bypass) to Dagsboro Road
Work: Resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

US 13 Business (Salisbury Boulevard)


Limits: East Church Street to north of London Avenue
Work: Drainage improvements
Start Date: Spring 2011
Est. Comp: Spring 2012

US 13 Business (Salisbury Boulevard)


Limits: Bridgeview Street to Zion Road
Work: Resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

(More)
MD 349 (Nanticoke Road)
Limits: US 50 Business (Ocean Gateway) to Culver Road
Work: Geometric improvements
Start Date: Spring 2011
Est. Comp: Spring 2011

WORCESTER COUNTY

US 113 (Worcester Highway)


Limits: North of Goody Hill Road to Massey Branch (Phase 2B)
Work: Highway widening and reconstruction
Start Date: Summer 2009
Est. Comp: Fall 2011

US 50 (Ocean Gateway)
Limits: MD 346 (Old Ocean City Road) to Bridge over Herring Creek
Work: Resurfacing
Start Date: Fall 2011
Est. Comp: Fall 2011

For Scenic Byway Alternate Routes on the Lower Eastern Shore, Click here:

Blue Crab Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/BlueCrab.pdf

(More)
District Two (Caroline, Cecil, Kent, Queen Anne’s and
Talbot counties)

Caroline County

MD 404 (Shore Highway)


Limits: East of Tuckahoe Creek to east of MD 480 (Ridgely Road)
Work: Widening and safety improvements
Start Date: Fall 2009
Est. Comp: Fall 2011

MD 328 (Matthewstown Road)


Limits: Bridge over Tuckahoe Creek
Work: Bridge replacement
Start Date: Summer 2010
Est. Comp: Fall 2012

MD 331 (Preston Road)


Limits: Dorchester County Line to Sunset Boulevard
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

MD 404 Business (Meeting House Road)


Limits: MD 404 (Shore Highway) to Holly Road
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Summer 2012

MD 287 (Sandtown Road)


Limits: Bridge over Choptank River
Work: Bridge replacement
Start Date: Spring 2011
Est. Comp: Fall 2012
(More)
Cecil County

MD 545 (Blue Ball Road)


Limits: Bridge over Little Elk Creek
Work: Bridge replacement
Start Date: Spring 2011
Est. Comp: Spring 2012

US 40 (Pulaski Highway)
Limits: Bridge over Big Elk Creek
Work: Bridge painting
Start Date: Spring 2011
Est. Comp: Fall 2011

Kent County

US 301 (Blue Star Memorial Highway)


Limits: At the MD 291 (River Road) interchange and from the Queen Anne’s County line
to Chesterville Bridge Road
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

Queen Anne’s County

MD 213 (Centreville Road)


Limits: Liberty Street from Kidwell Lane to Armstrong Avenue
Work: Sidewalk construction
Start Date: Spring 2011
Est. Comp: Summer2011

MD 8 (Romancoke Road)
Limits: Irene Way to Monk Road
Work: Drainage improvements
Start Date: Spring 2011
Est. Comp: Summer2011

(More)
US 301 (Blue Star Memorial Highway)
Limits: At MD 304 (Ruthsburg Road)
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Spring 2012

Talbot County

MD 328 (Matthewstown Road)


Limits: US 50 (Ocean Gateway) to Elliott Road
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

US 50 (Ocean Gateway)
Limits: Idlewild Road to Schwaninger Road
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Summer2011

US 50 (Ocean Gateway) (Westbound only)


Limits: Barber Road to the Choptank River Bridge
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

For Scenic Byway Alternate Routes on the Upper Eastern Shore,


Click here:

(More)
Harriet Tubman Byway
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/HarrietTubmanUnde
rgroundRailroad.pdf

Lower Susquehanna Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/LowerSusquehanna.
pdf

Chesapeake Country Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/ChesapeakeCountry.
pdf

District Three (Montgomery and Prince George’s counties)

Montgomery County

MD 200 (Intercounty Connector)


Limits: MD 97 (Georgia Avenue) to I-95
Work: Construction of a new six-lane toll highway
Start Date: Summer 2007
(First segment of MD 200 between I-270 and MD 97 is open)
Est. Comp: Late 2011/Spring 2012

US 29 (Colesville Road)
Limits: MD 410 (East West Highway) to Wayne Avenue
Work: Traffic signal reconstruction/upgrade
Start Date: Spring 2010
Est. Comp: Summer 2011

MD 650 (New Hampshire Avenue)


Limits: At Adelphi Road/Dilston Road
Work: Intersection Improvement
Start Date: Summer 2011
Est. Comp: Summer 2012

I-495 (Capital Beltway)


Limits: Bridge over Northwest Branch
Work: Bridge deck overlay/resurfacing
Start Date: Spring 2011
Est. Comp: Spring 2013
(More)
I-495 (Capital Beltway)
Limits: Seminary Road to US 29 (Columbia Pike)
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 193 (University Boulevard)


Limits: Arcola Avenue to US 29 (Columbia Pike)
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 97 (Georgia Avenue)
Limits: MD 185 (Connecticut Avenue) to Glenallan Avenue
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 355 (Wisconsin Avenue)


Limits: MD 191 (Bradley Boulevard) to the Washington D.C. line
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Summer 2012

MD 187 (Old Georgetown Road)


Limits: MD 355 (Wisconsin Avenue) to North Brook Lane
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Summer 2011

I-270
Limits: I-495 (Capital Beltway) to MD 187 (Old Georgetown Road)
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 355 (Frederick Road)


Limits: At MD 118 (Germantown Road)
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Fall 2011

(More)
MD 586 (Veirs Mill Road)
Limits: MD 193 (University Boulevard) to Andrew Street
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 320 (Piney Branch Road)


Limits: MD 193 (University Boulevard) to the Washington D.C. line
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 198 (Sandy Spring Road)


Limits: At Dino Drive
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Summer 2012

MD 107 (Whites Ferry Road)


Limits: At Partnership Road
Work: Widening and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

Prince George’s County


MD 201 (Kenilworth Avenue)
Limits: Bridge over I-95/I-495 (Capital Beltway)
Work: Bridge deck replacement
Start Date: Spring 2010
Est. Comp: Spring 2012

MD 725 (Old Marlboro Pike)


Limits: Bridge over Federal Spring Branch
Work: Bridge replacement
Start Date: Summer 2010
Est. Comp: Fall 2011

Forestville Road
Limits: Bridge over I-95/I-495 (Capital Beltway)
Work: Bridge replacement
Start Date: Summer 2010
Est. Comp: Fall 2012
(More)
MD 5 (Branch Avenue)
Limits: MD 373 (Accokeek Road) / MD 381 (Brandywine Road)
Work: Widening, resurfacing and signal work
Start Date: Fall 2009
Est. Comp: Summer 2011

I-95/I-495 (Capital Beltway)


Limits: MD 5 (Branch Avenue) Interchange
Work: Resurfacing and restriping ramps
Start Date: Spring 2011
Est. Comp: Summer 2011

I-95/I-495 (Capital Beltway) (Southbound)


Limits: D’Arcy Road to MD 5 (Branch Avenue)
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Spring 2012

MD 201 (Kenilworth Avenue)


Limits: Tuxedo Road to Frolich Lane
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 410 (East West Highway)


Limits: MD 212 (Riggs Road) to MD 500 (Queens Chapel Road)
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 223 (Woodyard Road)


Limits: Rosaryville Road
Work: Geometric improvements
Start Date: Spring 2011
Est. Comp: Spring 2012

MD 202 (Landover Road)


Limits: Over I-95/I-495 (Capital Beltway)
Work: Bridge deck replacement
Start Date: Spring 2011
Est. Comp: Spring 2012
(More)
MD 373 (Accokeek Road)
Limits: MD 5 (Branch Avenue) to Gardner Avenue
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Fall 2011

MD 212 (Riggs Road)


Limits: MD 193 (University Boulevard) to Sargent Road
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 201 (Kenilworth Avenue)


Limits: MD 450 (Annapolis Road) to Lawrence Street
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

MD 450 (Annapolis Road)


Limits: 54th Street to 65th Avenue
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Spring 2012

For Scenic Byway Alternate Routes in the Washington D.C, region,


Click here:

Booth’s Escape Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/BoothsEscape.pdf

C & O Canal Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/ChesapeakeOhioCan
al.pdf

(More)
District Four (Baltimore and Harford counties)

Baltimore County

I-695 (Baltimore Beltway)


Limits: MD 139 (Charles Street)
Work: Bridge replacement/interchange reconstruction
Start Date: Spring 2009
Est. Comp: Summer 2012

I-695 (Baltimore Beltway)


Limits: Bridge over MD 26 (Liberty Road)
Work: Bridge replacement
Start Date: Spring 2010
Est. Comp: Summer 2012

US 40 (Baltimore National Pike)


Limits: Bridge over Patapsco River (Baltimore County-Howard County line)
Work: Bridge reconstruction
Start Date: Fall 2010
Est. Comp: Summer 2013
Note: Right lane along westbound US 40 closed for three-six months.

I-695 (Baltimore Beltway)


Limits: MD 144 (Frederick Road)
Work: Bridge replacement and interchange reconstruction
Start Date: Spring 2011
Est. Comp: Fall 2013

I-695 (Baltimore Beltway)


Limits: At MD 372 (Wilkins Avenue)
Work: Bridge replacement and interchange reconstruction
Start Date: Summer 2011
Est. Comp: Fall 2013

(More)
MD 542 (Loch Raven Boulevard)
Limits: Baltimore City Line to Taylor Avenue
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Spring 2012

MD 26 (Liberty Road)
Limits: Powells Run Road to Offutt Road
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Spring 2012

MD 45 (York Road)
Limits: At the Towson Roundabout
Work: Geometric improvements
Start Date: Spring 2011
Est. Comp: Fall 2011

Downes Road
Limits: Bridge over I-83 (Baltimore Harrisburg Expressway)
Work: Bridge reconstruction
Start Date: Spring 2011
Est. Comp: Fall 2011

I-795 (Northwest Expressway)


Limits: Red Run Boulevard to Tobins Lane
Work: Drainage improvement
Start Date: Spring 2011
Est. Comp: Fall 2011

Harford County
US 1 (Belair Bypass)
Limits: MD 24 (Rocks Road) to MD 924 (Rock Springs Road)
Work: Guardrail installation
Start Date: Spring 2011
Est. Comp: Summer 2011

US 40 (Pulaski Highway/South Philadelphia Boulevard)


Limits: At MD 715 (Aberdeen Thruway)
Work: Interchange reconstruction
Start Date: Spring 2011
Est. Comp: Fall 2013
(More)
US 1 (Conowingo Road)
Limits: Conowingo Dam
Work: Road slope repair
Start Date: Spring 2011
Est. Comp: Summer 2011

MD 155 (Level Road)


Limits: Bayview Drive to Graceview Drive
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Fall 2011

For Scenic Byway Alternate Routes in Baltimore and Harford counties, click here:

Falls Road Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/FallsRoad.pdf

Horses and Hounds Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/HorsesHounds.pdf

Lower Susquehanna Valley


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/LowerSusquehanna.
pdf

Charles Street
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/CharlesStreet.pdf

(More)
District Five (Anne Arundel, Calvert, Charles and
St. Mary’s counties)
Anne Arundel County

MD 295 (Baltimore Washington Parkway)


Limits: I-695 (Baltimore Beltway) to I-195
Work: Widening and reconstruction
Start Date: Fall 2008
Est. Comp: Fall 2011

Ridge Road
Limits: Bridge over MD 295 (Baltimore Washington Parkway)
Work: Bridge deck replacement
Start Date: Spring 2010
Est. Comp: Fall 2011

MD 168 (Nursery Road) and Hammonds Ferry Road


Limits: Bridges over MD 295 (Baltimore Washington Parkway)
Work: Bridge deck replacement and widening
Start Date: Spring 2011
Est. Comp: Summer 2012

MD 175 (Annapolis Road)


Limits: MD 295 (Baltimore Washington Parkway) MD 713 (Rockenbach/Ridge
Road)
Work: Widening
Start Date: Spring 2011
Est. Comp: Fall 2012

MD 175 (Annapolis Road)


Limits: MD 713 (Rockenbach/Ridge Road) and Disney Road/26th Street)
Work: Intersection reconstruction
Start Date: Spring 2011
Est. Comp: Fall 2012

(More)
MD 2 (Solomon’s Island Road)
Limits: At MD 423 (Fairhaven Road) /Jewell Road
Work: Intersection reconstruction
Start Date: Summer 2011
Est. Comp: Spring 2012

Eastbound MD 100
Limits: MD 713 (Arundel Mills Boulevard) to the Howard County Line
Work: Resurfacing
Start Date: Summer 2011
Est. Comp: Fall 2011

MD 295 (Baltimore Washington Parkway)


Limits: MD 100 to Hanover Road
Work: Resurfacing
Start Date: Summer 2011
Est. Comp: Fall 2011

MD 450 (West Street)


Limits: MD 2 (Solomon’s Island Road) to MD 435 (Taylor Avenue)
Work: Construction of bicycle-pedestrian route
Start Date: Summer 2011
Est. Comp: Summer 2012

Calvert County
MD 231 (Hallowing Point Road)
Limits: Bridge over Patuxent River
Work: Bridge cleaning and painting
Start Date: Spring 2010
Est. Comp: Spring 2011

MD 231 (Hallowing Point Road)


Limits: At JW Williams Road
Work: Geometric improvements
Start Date: Spring 2011
Est. Comp: Fall 2011

(More)
MD 2/MD 4 (Solomon’s Island Road)
Limits: MD 262 (Lower Marlboro Road) to Stoakley Road)
Work: Guardrail installation
Start Date: Summer 2011
Est. Comp: Spring 2012

Charles County
US 301 (Crain Highway)
Limits: At Billingsly Road
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Spring 2012

For Scenic Byway Alternate Routes for Annapolis and Southern Maryland,
Click here:

Star Spangled Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/StarSpangledBanner.
pdf

Religious Freedom Tour


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/ReligiousFreedomTo
ur.pdf

Roots and Tides Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/Roots_Tides.pdf

Booth’s Escape Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/BoothsEscape.pdf

(More)
District Six (Allegany, Garrett and Washington counties)

Allegany County 
I-68 (National Freeway)
Limits: MD 658 (Vocke Road) Bridge to Kelly Boulevard Bridge
Work: Safety and resurfacing
Start Date: Spring 2010
Est. Comp: Summer 2011

US 220 (McMullen Highway)


Limits: Bridge over Potomac River at Keyser-McCoole
Work: Bridge replacement (partnership with West Virginia)
Start Date: Summer 2010
Est. Comp: Spring 2013

I-68 (National Freeway)


Limits: MD 736 (Midlothian Road) to MD 936 (Upper George’s Creek Road)
Work: Drainage Improvement
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 36 (Main Street)
Limits: Bridge over Koontz Run
Work: Bridge replacement
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 51 (Industrial Boulevard)
Limits: Virginia Avenue to Pennsylvania Avenue
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

I-68 (National Freeway)


Limits: MD 55 (Vale Summit Road) to MD 658 (Vocke Road)
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

(More)
MD 49 (Braddock Road)
Limits: At Macy Drive
Work: Geometric improvements
Start Date: Summer 2011
Est. Comp: Spring 2012

Garrett County
MD 546 (Finzel Road)
Limits: I-68 (National Freeway) to the Pennsylvania State Line
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

Washington County
US 40 (Dual Highway)
Limits: Edgewood Drive
Work: Geometric improvements
Start Date: Summer 2009
Est. Comp: Summer 2011

US 340
Limits: Bridge over Potomac River
Work: Bridge painting
Start Date: Spring 2010
Est. Comp: Fall 2011

MD 67 (Rohrersville Road)
Limits: Bridge over US 340 (Jefferson Pike)
Work: Bridge rehabilitation
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 63 (Greencastle Pike)
Limits: Bridge over CSX Transportation
Work: Bridge deck replacement
Start Date: Spring 2011
Est. Comp: Fall 2011

(More)
I-70
Limits: MD 66 (Mapleville Road) to the Frederick County Line
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

US 40 (National Pike)
Limits: MD 56 (Big Pool Road) to Boyd Road
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

US 40 Alternate
Limits: Poffenberger Road
Work: Geometric Improvements
Start Date: Fall 2011
Est. Comp: Spring 2012

I-81
Limits: At I-70
Work: Interchange reconstruction
Start Date: Summer 2011
Est. Comp: Fall 2012

For Scenic Byway Alternate Routes for Western Maryland,


Click here:

Historic National Road


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/HistoricNationalRoa
d.pdf

Mountain Maryland Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/MountainMaryland.p
df

(More)
C&O Canal
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/ChesapeakeOhioCan
al.pdf

Antietam Byway
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/AntietamCampaign.
pdf

District Seven (Carroll, Frederick and Howard counties)

Carroll County
MD 140 (Taneytown Pike)
Limits: Harney Road to MD 832 (Taneytown Road)
Work: Streetscape improvements
Start Date: Summer 2008
Est. Comp: Summer 2011

MD 140 (Westminster Pike)


Limits: At Gorsuch Road
Work: Geometric improvements
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 75 (Main Street)
Limits: At Western Maryland Railroad Crossing
Work: Railroad crossing reconstruction
Start Date: Summer 2011
Est. Comp: Summer 2011

Frederick County

I-70 over South Street


Limits: East of MD 144 (Patrick Street) to west of MD 355 (Urbana Pike)
Work: Interchange reconstruction
Start Date: Spring 2011
Est. Comp: Summer 2013
(More)
US 40 Alternate (National Pike)
Limits: At Beechtree Drive and Willow Tree Drive
Work: Intersection widening and resurfacing
Start Date: Spring 2011
Est. Comp: Fall 2011

I-270
Limits: Bridges over MD 80 (Fingerboard Road) and Bennett Creek
Work: Bridge deck replacement and widening
Start Date: Spring 2011
Est. Comp: Fall 2012

MD 464 (Souder Road)


Limits: Maple Avenue to Second Avenue
Work: Sidewalk installation
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 351 (Ballenger Creek Road)


Limits: At Elmer Derr Road
Work: Roundabout construction
Start Date: Spring 2011
Est. Comp: Fall 2011

MD 77 (Rocky Ridge Road)


Limits: At CSX Tracks
Work: Railroad crossing reconstruction
Start Date: Summer 2011
Est. Comp: Summer 2011

Eastbound I-70
Limits: Ridge Road to west of I-270
Work: Safety and resurfacing
Start Date: Summer 2011
Est. Comp: Summer 2012

(More)
Howard County
Westbound US 40 (Baltimore National Pike)
Limits: Bridge to southbound US 29 (Columbia Pike) over eastbound US 40
Work: Bridge Replacement
Start Date: Spring 2011
Est. Comp: Fall 2012

Northbound US 29 (Columbia Pike)


Limits: Brokenland Parkway to MD 175 (Little Patuxent Parkway)
Work: Safety and resurfacing
Start Date: Spring 2011
Est. Comp: Spring 2012

For Scenic Byway Alternate Routes along the Piedmont,


Click here:

Antietam Byway
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/AntietamCampaign.
pdf

Old Main Streets Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/OldMainStreets.pdf

Historic National Road Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/HistoricNationalRoa
d.pdf

Catoctin Mountain Byway


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/CatoctinMountain.pd
f

(More)
MDTA (Maryland Transportation Authority)
(Toll Facilities)
Anne Arundel County

I-695 (Francis Scott Key Bridge)


Limits: Quarantine Road (Exit 1) and Quarantine Road Bridge over I-695
Work: Interchange improvements
Start Date: Spring 2010
Est. Comp. Summer 2011

US 50/301 (William Preston Lane, Jr. Memorial Chesapeake Bay Bridge)


Limits: Eastbound and Westbound Spans of Chesapeake Bay Bridge
Work: System-preservation work and routine maintenance.
On-going various maintenance activities

Baltimore City
I-895 (Harbor Tunnel Thruway)
Limits: Toll plaza to K-Truss Bridge (Steel Bridge)
Work: Roadway repairs and bridge rehabilitation
Start Date: Fall 2010
Est. Comp: Fall 2011

I-895 (Harbor Tunnel Thruway)


Limits: Tunnel Entrances
Work: Electrical and variable message sign upgrades and drainage repairs
Start Date: Spring 2011
Est. Comp: December 2011

I-95 (Fort McHenry Tunnel)


Limits: Tunnel entrance to Caton Avenue (Exit 50)
Work: Rehabilitation of I-95; resurfacing two overpass bridges repairs to highway
lighting and bridge structures; and road sign upgrades
Start Date: Spring 2010
Est. Comp: Summer 2012

(More)
Southbound I-95 (Fort McHenry Tunnel)
Limits: I-895 split to Eastern Avenue (Exit 59)
Work: Adding one General-Purpose lane to help provide a smooth transition from
Express Toll Lanes
Start Date: Summer 2010
Est. Comp: Summer 2012

Southbound I-95 (Fort McHenry Tunnel)


Limits: One tunnel to be closed Monday through Thursday nights
Work: Repairs to tunnel and approaches and lane-use signals
Start Date: Winter 2011
Est. Comp: December 2011

Baltimore County

I-95 (John F. Kennedy Memorial Highway)


Limits: I-95 (Fort McHenry Tunnel Thruway) split to north of MD 43 (Exit 67, Whitemarsh
Boulevard)
Work: Express Toll Lanes and bridge and interchange improvements
Start Date: Fall 2005
Est. Comp: 2014

Harford County

MD 24/MD 924 Interchange and I-95/MD 24


Limits: I-95 at MD 24 and I-95/MD 24 Interchange
Work: Interchange Improvements
Start Date: Fall 2008
Est. Comp: Fall 2011

Harford County/Cecil County 

US 40 (Pulaski Highway)
Limits: Thomas J. Hatem Memorial Bridge over the Susquehanna River
Work: Bridge deck replacement
Start Date: Spring 2007
Est. Comp: Summer 2011

(More)
For Scenic Byway Alternate Routes to roads maintained by MDTA (Toll Authority), Click here

National Historic Seaport


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/NationalHistoricSea
port.pdf

Charles Street
http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/CharlesStreet.pdf

Star Spangled Banner


http://www.visitmaryland.org/m/SiteCollectionDocuments/Scenic_Byways/StarSpangledBanner.
pdf
Glossary of Terms

Bypass: A roadway built around a town/city designed to carry a majority of through traffic.

Culvert: An opening under a roadway, usually concrete; carries water from one side of the road
to another.

Drainage Improvements: Addition of inlets, culverts, and storm water management ponds.
Drainage involves removing water from the roadway and preserving water quality before
disbursement into the environment.

Geometric/Intersection Improvements: Project designed to improve safety and traffic flow;


may include turn lanes, ramps, line striping, signs, etc.

Interchange: Opposing traffic separated movements through a series of ramps.

Ramp: A directional turn movement that carries traffic from one roadway to another.

Reconstruction: The rebuilding of a road or bridge’s foundation and surface.

Resurfacing/Overlay Project: The placement of new pavement on an older road.

Sound Barrier/Wall: A wall that separates and deflects some highway noise for adjacent
residences.

Streetscape: A community-based highway project featuring sidewalks, drainage improvements,


and lighting that complements the characteristics of the surrounding neighborhood or Town.
These projects provide enhanced safety and travel for all roadway users while preserving the
cultural and environmental qualities of the area.

Widening: The addition of lanes, shoulders or sidewalks as part of highway project.

Ridesharing Lots: Construction or expansion of ridesharing parking.

Bridge Deck Replacement: The replacement of the bridge’s deck (driving portion).

Bridge Replacement: A complete replacement of a bridge.

Safe Zones Speed Enforcement: A program of automated speed enforcement vehicles


deployed in some Maryland highway work zones to protect highway workers and motorists.

(More)
Partners in Safety

###

You might also like